City of Fort Collins
Planning Department
August 17, 1990
Craig Hau
The Group, Inc.
401 West Mulberry Street
Fort Collins, CO 80521
Dear Craig:
For your information, attached is a copy of the Staff's comments concerning
the 203 West Mulberry Street, which was presented before the Conceptual
Review Team on August 13, 1990.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely0
v t
*Stephner
SO/gjt
Attachment
xc: Tom Peterson, Director of Planning
Kerrie Ashbeck, Civil Engineer I
Project Planner
File
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: August 13, 1990
ITEM: 203 West Mulberry Street
APPLICANT: Craig Hau, The Group Inc., 401 West Mulberry Street, Fort
Collins, CO. 80521
LAND USE DATA: This is a request for automobile rentals & sales on an
existing, developed lot at the southwest corner of West Mulberry and Mason
Streets.
COMMENTS:
1. The property being considered . to be purchased is currently 6 parcels. The
potential owners intend to submit only Parcels 1, 2, and 6 under this
request. Parcels 3, 4, and 5 will remain the same as their present use, and
would .not be part of a PUD review.
2. Home Federal Savings currently owns this property
3. The property is zoned . BG, General Business, which does not allow auto
sales as a "use -by -right". The statute of limitations, being 12 months to
allow the proposed use as a grandfathered consideration, has expired. This
site has been vacant for approximately 3 years: A PUD review; with the
final decision to be determined by the Planning & Zoning Board, will be
required to continue in the process.
4. If this request were a "use -by -right" then the landscape requirements for the
site would be as follows:
a) Width of landscaped area along West Mulberry (an arterial street) would
be 15' from the back of sidewalk.
b)- Width of landscaped area along Mason (a non -arterial street) would be
10' from the back of sidewalk.
c) Width of landscaped area along any interior lot line would be 5'.
d) Any vehicular use area with more than 15 parking spaces or 4,500
square feet shall provide landscaped islands and trees that conform to
City specifications and which are dispersed throughout the vehicular use
area in such a way as to provide visual relief with vertical landscaped
elements and physical relief with seasonal shading. Not less than 6
percent of the interior of any such vehicular use area shall be
landscaped with such islands.
These requirements are the minimum standards for any site. The impetus
for going through the PUD process is the expectation that the site will be
revitalized to equal or greater conditions.
5. There was once a 20' alley dedication along the south side of the existing
building (basically, Parcels 5 & 6). What is the status of that dedication?
There arc existing utilities in that area; therefore, a utility easement will
be required.
6.. The building currently does not have power. If the existing load to the
building is adequate for the proposed use, electric may just be reconnected.
7. The existing overhead power lines to the site are intended to be
undergrounded, possibly in conjunction with this request. Only if there are
changes to the building that would necessitate a secondary power supply
would the owner incur any additional electric fees/charges.
8. There are water mains in both West Mulberry and Mason Streets. The
existing water supply to this site is adequate unless improvements are made
that necessitate a larger water tap, such as an automatic sprinkler system
in the building. At that time the easiest, most cost effective water tap to
this property would be from Mason.
9. Sanitary sewer is present to the site and appears to be adequate for the
existing structure.
10. If any auto maintenance is proposed that would involve substantial cleaning
and lubricating, then possibly a sand and oil interceptor would be
necessary.
11. The building will not have to be fire sprinkled unless substantial structural
changes are made, and this will be determined by the City Building
Department at the time of plan checks.
12. A one hour fire -rated construction will be required in the existing building.
Should any welding or chemical usage be intended in the building then a
more restrictive set of criteria would be used.
13. This site is in the Old Town Drainage Basin and is not subject to any
drainage fees. A drainage report will not be necessary unless there are
significant changes to the site that would affect the on -site drainage
patterns or it is determined that there are existing adverse impacts to
adjacent properties caused by this site. A letter addressed to the
Stormwater Utility stating the intent of the owner will be required.
14. The existing curb cut/access to the site from West Mulberry Street would
work better if it were shifted as far to the west as possible. Also, will
both curb cuts off Mason Street be maintained? A traffic impact study for
the perimeter of this site will be required.
15. Any changes in driveway access points will require curb cut permits from
the City. Necessary repairs to the streets and sidewalks will require a
permit and will be at the property owner's expense.
16. The landscaping for this site should reflect substantial improvement over
what was in place for the last use.
17. The site lighting should be looked at and be responsive to the concern
about light spillage off -site into adjacent properties.
18. This site is part of a Westside Neighborhood Rezoning Plan that is
currently being reviewed by the City. The proposed rezoning .is to be BL,
Limited Business, which also would require a PUD.
19. This site will be evaluated against the Auto -Related. and Roadside
Commercial point chart in the LDGS. The project should earn at least 50%
of the maximum points possible on the point chart. This request, in its
present form, achieves 14 of a possible 48 points, which represents only
29% of the maximum points possible. The applicant will need to request a
variance to this point chart and provide documentation supporting such a
request.
20. Sherry Albertson -Clark, Chief Planner, will assume the role of project
planner for this request at the time of formal submittal to the City.
21. A complete
submittal package
for the
Preliminary and Final PUD review
must be in
the City Planning
Office
by Friday, August 17th to remain on
the agenda
for the September
24, 1990
Planning and Zoning Board hearing.