Trip Generation
.Trip generation estimates for the Amigos Restaurant were
obtained from Trip Generation, 4th Edition, ITE. The trip
generation for the Amigos restaurant is shown in Table 2. Table
2 shows trip generation on a daily and peak hour basis. Due to the
proximity of the proposed restaurant to CSU, some patrons of Amigos
will likely walk or bike to the restaurant. It was assumed that
35 percent of the generated vehicle trips would be walk or bike
trips. These walk/bike trips are also reflected in Table 2.
' Background Traffic
Background traffic is defined as the traffic that is and/or
1 will be on the area streets but is not related to the proposed
development. The roads considered for the operations analysis are
West Elizabeth Street and Shields Street.
Background traffic for impacted streets was projected for each
of the two future years analyzed (1995 and 2010). Background
traffic was projected to increase at 2 percent per year for the
' short range future. This rate of increase is normal for streets
in this area of the City of Fort Collins. It accounts for general
traffic growth. While the traffic is expected to grow at a similar
rate to the year 2010, this growth will occur to the daily traffic.
The peak hours will grow at a lesser rate of increase due to
physical constraints of the street system.
' Trip Distribution
Trip distribution was determined based upon an evaluation of
trip productions and the most likely routes available to travel
from those productions. The directional distribution of the
' - approaching and departing traffic generated at the Amigos
Restaurant is a function of:
- Geographic location within the City of Fort Collins;
- Location of employment/business centers and residential uses
which are likely to produce trips;
- Access to the site.
Figure 6 illustrates the trip distribution percentages used in the
' subsequent traffic assignments.
Traffic Assignment and Intersection Operation
Using the vehicular trip generation estimates presented in
Table 2, the site generated traffic was assigned to the area street
network." The street network consisted of Shields Street and West
Elizabeth Street as they are today. The analyzed intersections
1 3
I
1
1
1
1
1
II
[]
1
1
N
C.S.U.
1 TRIP DISTRIBUTION Figure 6
were Shields/West Elizabeth, with the existing signalization, and
the accesses to this site.
Figure 7 shows the short range (1995) peak hour traffic
assignment. This assignment also includes a 2 percent per year
increase in background traffic as described earlier in this report.
Table 3 shows the peak hour operation at the key intersections.
Calculation forms are provided in Appendix D. The signalized
Shields/West Elizabeth intersection will be at level of service D
during the peak hours. The right-in/right-out accesses to Amigos
will operate acceptably.
While not directly related to the Amigos Restaurant
development, the driveway access to the Campus West Shops from
Shields Street bears some comment. As indicated earlier in this
report, the full movement access to Shields Street, south of West
Elizabeth Street, presents some operational concerns. These
concerns are related to left -turn ingress and egress. The proposed
Amigos accesses will improve the operation at the present Texaco
site. However, as long as the Campus West Shops access to the
north functions as a full movement intersection, the concerns will
continue. There are advantages to a shared access between Amigos
and Campus West Shops. This was pursued as part of this proposal,
but agreement could not be reached with Campus West Shops. Since
agreement could not be reached to consolidate accesses, it is
recommended that, at a minimum, the Campus West Shops access be
restricted to right-in/right-out. It is further recommended that
the City of Fort Collins consider closing the Campus West Shops
access to Shields Street as part of the Choices 95 program. Since
a connection is proposed between the Amigos and Campus West Shops,
Campus West Shops would continue to have access to Shields Street.
This recommendation may also provide additional parking for Campus
West Shops.
The alley between the proposed Amigos and Campus West Shops
is proposed to remain open. While the various site plans show this
--a-l-ley as 20 feet wide it is functionally no more than 12 feet wide,
due to dumpsters, poles, and walls. This alley can be accessed
from Shields Street on the east and West Elizabeth Street on the
west. once a vehicle is in the alley, it becomes a one-way alley
for the period that the vehicle is there. If the Campus West Shops
access to Shields Street remains, even as a right-in/right-out, the
alley can function as it does today. If the Campus West Shops
access to Shields Street is eliminated, then trucks will not be
able to enter the alley in the westbound direction from the
proposed Amigos northern access. However, trucks will be able to
exit the alley in the eastbound direction via this proposed Amigos
access.
Figure 8 shows the long range (2010) peak hour traffic
assignment, which includes background traffic on the area streets.
Table 4 shows the peak hour operation at the key intersections.
4
C.S.U.
NOON / PM
SHORT RANGE PEAK HOUR TRAFFIC Figure 7
Table 3
Short Range Peak Hour Operation
Level of Service
Intersection Noon PM
Shields/West Elizabeth (signal) D D
Shields/Combined Right-in/right-out
Access (stop sign)
EB RT A A
Table 4
Long Range Peak Hour Operation
Level of Service
Intersection Noon PM
Shields/West Elizabeth (signal) E* E*
C** C**
Shields/Combined Right-in/right-out
Access (stop sign)
EB RT
*--With existing geometrics
** With southbound right -turn lane
7
tat
0
Q
N
C.S.U.
NOON / PM
LONG RANGE PEAK HOUR TRAFFIC Figure 8
Calculation forms are provided in Appendix E. The Shields/West
Elizabeth signalized intersection will be at level of service E
with the existing geometry. If a separate southbound right -turn
lane is added, the operation will improve to level of service C.
As mentioned earlier, there is a high right -turn demand and this
lane would allow these vehicles to have a separate signal phase
during the eastbound West Elizabeth phase and allow a higher
proportion of right -turns -on -red. The accesses to the proposed
Amigos will continue to operate acceptably. The earlier comments
regarding the Campus West Shops access to Shields Street and the
alley apply in the long range future.
The geometry of the proposed Amigos accesses were verified for
a 30 foot single unit vehicle. This is typical for a garbage truck
or step delivery van. The accesses will work for the Amigos site.
However, a SU 30 vehicle, turning from southbound Shields to the
Campus West Shops or the alley via the Amigos right -in, will not
be able to make the turn. However, the SU 30 vehicle can exit from
either the Campus West Shops or the alley via the Amigos northern
access.
III. Conclusions
The following summarizes the significant findings as a result
of this study:
- The Amigos Restaurant is expected to generate approximately
1420 daily trip ends. A portion of these will likely be bike and
walk trips.
- Traffic operation at the area intersections is acceptable
except for the eastbound left -turns from stop sign controlled
intersections along Shields Street. Left -turn ingress at the
Texaco service station access and the Campus West Shops access
causes the turning vehicle to occupy the left -turn lane for the
_signalized intersection to the north.
- In the short range future (1995), the key intersections
' operate acceptably. The right-in/right-out accesses of the Amigos
will operate acceptably. In conjunction with the Choices 95
improvements, the City of Fort Collins should consider restricting
the Campus West Shops access to Shields Street as right-in/right-
out or eliminating it completely.
' - In the long range future (2010), the Shields/West Elizabeth
intersection will operate acceptably with the addition of a
southbound right -turn lane. The right-in/right-out accesses of the
Amigos will operate acceptably.
L
I
5
I
i
1
1
i
i
II
II
II
APPENDIX A
i MA-1 i HEIN J. DELICH, P.E.
3413 BANYAN AVENUE
LOVELAND, CO 80538
TABULAR SUMMARY OF VEHICLE. COUNTS
Observer Date ¢ 4Z Day — City �� /z T (2d (, L I A-) S R = Rignt turn
_rf Gam— Tgnt
INTERSEC ION OF t-f f tr G S AND �' L! -;-A P, T f e S� C> L = Lett' um
TIME
BEGINS
S rflL c S
Srf t U L 1� S
TOTAL
Narth
South
e S (�
W C: Lr �ABeTff II
TOTAL
W'
TOTAL
ALL
from NORTH
II from SOUTH
from EAST
from WESTEast
R
I S
I L I Tate! 11 R I S I L I Total
R
I S I L I Total II
R I S I L I Total I
IZ.0-0 Ilgo
1Z30
o 132-011 5 12.01 1&o 1 2g311 &a3
11 3 1 1 9 I Z 1 115-(p1
1 1(P3 1 1 Z011
l 4- t II
7¢4-
t2/srllgsil9-1
I I IZ<6311 4 1 iq 1'�41z87 1 5-70II
r 1 3 1 3 1 % 11
55 1 4 Itfl'� IIz 7 II
134 11
704-
lZ3011-7911931S
IZ-7-7IIQ Ir5-9l(p'?1231 IlsogllS
l 3 I(p 1 14 IIW1
¢ 1&511¢911
r(p311(,71
to 4 5-11'9'4. 1 194-1
I z 6311 -7 11Tto 15-51L4-9' 11 53.1
11 1 Ito I Z4 I10131
3 1.7 I 1 &7 II
► 9 1 11
72 Z
it I
I I II I I I II
II I I I II
I i I II
II
rz-r 1133W1$14
II 111(o3112-017s31 7 11o4911Z2 Iz
111-7 Izl IZAI & 6o11734
1ZIZG71�6'311
& 7, 9
IZW 1
II I
I I II I i t q
II i I I II
I i t
II
II
II I
I I II I I I II II I
I I II
I I I
II
II
INN -1
II I
I it I I I II
II I
I
I II
I I I
II
II
II I
I
I II I I I II
II I
I
I II
I I I
II
II
11 1
11
111 11 II
II I
I
I II
I I I
II
II
43o1173 IzZO
I I
I z 9 11 ? I169 16TI z3s 11 S29
112 1 3 ltsl
zo II
GI AQ 1a471 9 4-
11 114-
I16,43
45115(p I-L49I
2
154(011 � Izo9 I&t 1Z79 II62Z4-
I1Z 1 (9 1 9
1 1 -7 II5-010
13s1lo5
11 1 ZZ
1174&
Sao Ilia 1Z81
1 r
1353 11 1 ItB.31a* 1z40 II Co7,3
II 1 1 s 15'
I 1 1 II
401 _. 1391 Loa
11 1 14-
11737
sty 1194-Iz3l10
1331 11(9 11s3I7Z1231 11sCaZ 11 1 1 3 13
1 7 II
!1 1 1451 t1-7
11 12-4-11(oFSb
II I
I
i II � I I I II II I I
I II
I- I l
II
II
3a-53oI13(D4IQg�I
4-
113s4112-31714'IZA71
93¢IIZ33S'11& 1
)"7
1321
5---54271
s-1)S714-1 '1114-74II2-9
1 z
MATTHEW J. DELICH, P.E.
3413 BANYAN AVENUE
LOVELAND, CO 80538
r
r,
TABULAR SUMMARY OF VEHICLE COUNTS
Obaervar Date 7 /$ 91 pay tKI :LA'/ qty F09-r UO"I/1S R a Right turn
Sr1/EL DS (/n1I 1/G--7� S v Stmpm
INTERSECTION OF AND L = Lett turn
TIME BEGINS
AL
TNohn
South
TOTAL
We%
TALL
from NORTH
from SOUTH
tmm EAST
from WEST
R
I S
L
Total
R
S
I L
Total
R
S
L
Total
R
S
L
I Total
imp
1
ISO
ISI
III
I
IIZ.
Z(�3
z
I
3
3
I Z(o Cn
71s
1
1 2
IB31
1147S
1 1s4
337
Z
I
3
3
1340
750
IZ
ZZO
222I
173
1[a1
1T9
I4D 1
3
D
33
3
I404-
74
Z
27a
Z11Z
297
14
311
15G3
4
4
c
f`?
6-71
gaP
I
Z03
z04
ZZ7
Z3(all4¢D
I
I
(0
4
1U
10
14�"0
`d 1'�
I
215-
zICn
19(0l
l
1 197
I4/3
I
S
0
S
S"
1412,
`d30
210
ZII
I
IS-?
3
)9Z.
14o3
I
o
1
2-
9-
r
141
I
1
730-03
ss8$
$
Bq3
30
923
18 7
11
$
?-(a
zCo
I I B43
u
I
1
1145
3
245
24
z
Z3G
S24
3ZB
-
33Z
(
4$
SS
7
Q
11
I(
1593
IZ15to
z1a841
zZq4l
S
z31
szz
S
S
o
to
IszzIZOO
I Z 30
I
zs
10
Z
IZ
-
I10
I(D5Z3�4
I),
zs
52
7IZ4S
/5
r
1770
Ior)
9
374
333
IZ
ZZS
SS
13
4
57Z4
zovlW
3Co3
(,01301990
z4n9
37
1-1471
2s2o
MATTHEW J. DELICH, P.E.
3413 BANYAN AVENUE
LOVELAND, CO 80538
TABULAR SUMMARY OF VEHICLE COUNTS
Observer Data? I$ pay k5 city f-O" -r a<-f—m) s R . Right lum
S = Straight
OF SF111-L �� AND (JA.r r t/ERS I T t/ L - Leh tum
TIME
BEGINS
.�rl/vLD�
`So Ir_=LDS
TOTAL
North
South
U,Cq 1/E"/-' i
TOTAL
East
Wm
70TAL
ALL
from NORTH
tmm SOUTH
tmm EAST
from WEST
R
S
L
Total
R
S
L
Total
R
S
L
Total
R
5
L
11 To
413-
3
12q,-1
17 W
z43
9
1 zsZ
440
3
2
s-
s
445-
30
s
3c'7
31Z
729
S
1 z34
54(0
41
10
1 4
4
1sso
445-
19
34
3531
Z40-
17,1*-57
&10
1
S
3
8
$
rol$
''-fro 1111
3(c1'6
379
Z5
Ito
z74
1 &53
110
I
1 1t
II
Co64-
s1s-I
s
34Z
34-7
z7o
9
z79
Z61
I
to
I
II
I
7
536
3
3Z-7
a30
23
(v
1237
1567
3
(0
9
115 7Co
I
I
445-,W,
Z$
13'R
14o9
I
hoo4-431io47
245
la16
11
3
31
IZ496
I
I
I
I
I
I
I
I
I
I
I
I
I
PR
6a
Retail uses
south of the
of the site.
Shields.
I
I. Introduction
Amigos Restaurant is proposing a sit down/drive-through
restaurant on approximately 0.6 acres, located west of Shields
Street and 300 feet south of Elizabeth Street in Fort Collins,
Colorado. The site location is shown in Figure 1. This study
conforms to the City of Fort Collins guidelines for traffic impact
studies. The area streets are shown in Figure 2.
Shields Street is classified as an arterial on the Fort
Collins Master Street Plan. The segment between Prospect Road and
Laurel Street has a four lane plus center turn lane cross section.
' The posted speed in both directions is 30 mph. There is signal
control at the Shields/Elizabeth intersection and stop sign control
on University Avenue at its intersection with Shields Street.
Elizabeth Street is classified as an arterial west of Shields
Street on the Fort Collins Master Street Plan. It is 60 feet wide
approaching Shields Street. There are three eastbound lanes and
one westbound lane. Elizabeth Street is a heavily used bike route.
East of Shields Street, across from Elizabeth Street, is an access
to the Moby Gym parking lot. West of Shields Street, Elizabeth is
posted at 30 mph.
University Avenue is not classified and is considered to be
a local street. It has a two lane urban cross section west of
Shields Street. It has stop sign control at its intersection with
Shields Street.
Land uses in the immediate area are commercial and school.
are north of the site. A professional office exists
site across University Avenue. There is a church west
Colorado State University is east of the site across
II. Existing Conditions -
The most recent daily traffic counts near this site were
obtained in 1991. These counts are directional volumes on area
streets and are shown in Figure 3. Peak hour intersection counts
were obtained in 1989, 1991, and 1992. These counts are provided
in Appendix A. The traffic counts cover a three year period and
were obtained both during the summer and when CSU is in regular
session. The various counts were analyzed to determine a
relationship between the various years and between the summer and
"school" counts. The peak hour traffic shown in Figure 4 is
adjusted and balanced to reflect typical weekday traffic when
school is in session.
With the existing control at the various intersections, the
peak hour operation of those intersections is shown in Table 1.
F1
CITY OF
FORT COLLINS
CITY OF FORT COLLINS
Site [ode : 00000046
PARE: 1
Site Code : 00000046
PAGE: !
N-S Street: SHIELDS ST.
FILE: 46-9-99
N-S Street: SHIELDS ST.
FILE: 46-9-89
E-N Street: ELIZABETH ST.
E-1 Street: ELIZABETH ST.
SUNNY : SNHl/RA14
Movements
Sv: Pr4auy
DATE: ?112189
SUNNY SNOW/RAIN
Movements iy: Primary
DATE: ?112189
PEA
PERIOD ANALYSIS FOR THE
PERIOD: 04:30
FM - 05:3O
PM
PEAK
PERIOD ANALYST- FOR THE PERIOD: 12:00 IN - 01:00
?4
DIRECTION
START
PEAK ''.R
...........
VOLUMES ...........
...... FERCENTS .......
rmr n
DIRECTION
-
START
P
PEAK HA
•' !'J• '
........... ..D ,Ea ...........
.... ..
PERCENTS ....... -
-mn
r__M
PEAK HOUR
fACiCR
FED ;;=it
...,,
TEro Left
atal
:__ Rita inru t
'E'' L=_ :
FROM
PEAK HOUR.
FACTOR
PED Right Thru Leit
Total
PED
Ri ant Thru Left
-----------
_------ ____
--- —_—
---- _-----------
___ ':
___--_______-__-_______-_-__
4arth
4:30 ?M
0.?5
? »23
;044 7
1479
! 29 J
North
12:00 PM
O.B9
6 ;5l 749 I1
11:4
1
3l i7 2
East
4:30 ?.M
0.93
65 93
174
2O 3 ;8 53
East
12:00 ?M
04 64
23 1S S4
l"
!B
IS 44 43
molt;
t:3J FM
0.59
_.
i0! ?r?
4T:
-
! ._ .2
Soath
li:OQ PM
1!:00
Q.
5 i_ ].? c!4
?$i
!
i i7 ?'
le=.t
..:i FM
0.3$
_ __.
.. ?40
-
58
gee:
P•
0.70
!3 29R .. i2:
S3
.. :?
En tin
Zn:e!set:Z.a
entire !ntersecti;n
Barth
t:TO %M
').9S
? a?;
!049
1479
! ?? 71 ')
9art6
12:00 PA
9.39
6 15! 749 24
1124
!
;l 67 ?
east
0.93
.._ 15
6i 93
'74
20 9 3S '
East
0.84
23 !i __ 04
i8
13 44 43
Souti
0.39
?5
70l 29?
9T:
75 C2
South
d.43
- 45 528 214
i97
1
6 i7 21
Jest
0.5B
_ _..
IS ^,yrj
504
5J 3 48
lest
0.70
18 299 37 327
663
3
45 5 49
SHIEL DS
ST.
,... N
SHIELDS ST.
..
!J
___________
W—+—E
............
S
.............
S
,
,1049
:.....56
9�6
....
I
1 .......
...,
1'
CPED
D 9
—
142Z
1
7 .............I
35 CPED B
CPED
D 6 1 351
1749 I 24 f..........
23 CPED D
_
..................
:
,
..................
••••••......••••..
___
,
1479 ____
__ 15
1124
--
lb
..........
696
-;
..........
620
1
__________________
-•-•••......•.....
..................
.. ELIZABETH ST.
174 66
... ELIZABETH ST.
125 55
240
--
-- 93
327
--
--
54
37
663
ELIZABETH ST. ...
13
504
ELIZABETH ST. ...
106 . ......
.....•....
.........
.......
CPED
D 1E3 .............:
214
529
45
5 [FED 3
CPED
1 3 1 .......
.,
207 701
25 1 6 CPED D
.. 1102
....
... 1393
...,
.
...,
SHIELDS ST.
-...,
SHIELDS ST.
SAMPLE
Site Code : 00000046 PAGE: 1
M-S Street: SHIELDS 37. FILE: 46
E-1 Street: ELIZABETH ST.
SUNNY Movements by: Primary DATE: 3111189
PEAK PERIOD ANALYSIS FOR THE PERIOD: 12:d0 PM - 01:00 PM
i
DIRECTION START PEAK HR ........... VOLUMES ........... ...... PERCENTS .......
FROM PEAK HOUR FACTOR PD/0K Allot Thru Left Total ?DIEK Right Thru Left
--- —_—---------- _____—------- —_—---- __------- _— ------------------- — ----- ___
North L":00 PM 0.96 10 317 662 6 985 1 67 i
East 12:00 PM 0.72 17 4 21 24 49 'S 8 43 49
South 12:00 PM 0.92 9 !2 607 290 909 t 1 67 32
Aest 12:00 PM 1.15 31 298 !6 305 St9 48 1 49
Entire !utersec::on
North 12:00 PM 0.94 10 317 562 5 985 57 !
East 0.72 17 4 21 24 49 'E �B 43 49
South 0.92 9 I2 107 °0 909 ! 67 ..
Mest 0.75 31 293 16 7J5 519 5 48 3 49
SHIELDS ST. N
----------- W_-_E
............ i S
916
CPD/BK3 10 ; 317 ; 662 ; 6 17 CPD/BK3
.................. .
.................. ___ 985 ____ __ 4
.......... 628
.................. ; ______—___________
... ELIZABETH ST. 49 21
-------------
305 -- -- 24
__________________—_______—_—_---___
16 619 ELIZABETH ST. ...
-------------
__________________ : ..................
I 34 ..........
.
298 __ ___ 909 ____ ...........
..................
__________________--________________
CPD/BK3 31 1............1 290 ; 607 12 ; 9 CPD/BK3
.. 984
... SHIELDS ST.
SAMPLE
Site Cade : 00000046 PAGE: I
N-S Street: SHIELDS ST. FILE: 46
E-M Street: ELIZABETH ST.
SUNNY Movements hv: Priury DATE: 3117189
PEAK PERIOD ANALYSIS FOR THE PERI00: 04:C0 PM - 05:30 PM
DIRECTION START PEAK HR ........... VOLUMES ........... ...... PERCENTS .......
..P.ON PEAK HOUR FACTOR ?DISK Ript Thru Left Total FRISK Riiht Thru Left
------------ —._---- __------ _________+—____---- —___------ —._
North 4:30 PM 0.?3 !0 je4 934 2 1289 1 27 72 0
East 4:30 PM 0.59 22 14 29 35 78 CS !S i7 45
South 4:30 PM ORO B 11 73I 218 960 76 _
Aest 4:30 PM )AO 17 'fig !0 133 401 4
.71 1. ir _ iatrec:i cn
AOfth 4:30 FM 0. P3 !0 934 _ 1239 ! 0 72
East n a _ .c7 _9 _. 73 29 !8 31 45
South i.S0 3 !! 731 21, 06.3 1 76 23
lest 0.90 !7 202 !0 !83 401 4 52 2 46
SHIELDS ST. N
5
9 2 S
CPD/BK3 SO 753 934 _ __ CPD/BKI
___________________ w__________________
..................
.................. --- 1289 ____ __ 14
.......... 600
.................. __________________
... ELIZABETH ST. 78 29
-------------
183 __ __ 35
__________________ --_______________-
10 401 ELIZABETH ST. ...
_____________ ...
__________________ ..................
I 223 ..........
208 __ --- 960 ---- ..................
..................
__________________ -_
CPD/SK.3 17 218 ; 731 ; 11 B CPD/BK.3
1177
SHIELDS ST.
0
LEVEL -OF -SERVICE CRITERIA
SIGNALIZED INTERSECTIONS
Level -of -service for signalized intersections is defined in terms of delay.
Delay is a measure of driver discomfort, frustration, fuel consumption, and lost
travel time. Specifically, level -of -service criteria are stated In terms of the
average stopped delay per vehicle for a 15-minUte analysis period.
Level -of -service A describes operations with very low delay, i.e., lees then 5.0
seconds per vehicle.
Level -of -service 6 describes operations with delay in the range of 5.1 to 15.0
seconds per vehicle.
Level -of -service C describes operations with delay in the range of 15.1 to 25.0
seconds per vehicle.
Level -of -service D describes operations with delay in the range of 25.1 to 40.0
seconds per vehicle.
Level -of -service E describes operations with delay in the range of 4U.1 to 60.0
seconds per vehicle. This is considered to be the limit of acceptable delay.
Level -of -service F describes operations with delay in excess of 60.0 seconds per
vehicle. This is considered to be unacceptable to most drivers.
RESERVE CAPACITY
UNSIGNALIZED INTERSECTIONS
LEVEL OF
SERVICE
EXPECTED DELAY TO
MINOR STREET TRAFFIC
40U A Little or no delay
30U-399 6 Short traffic delays
200-299 C Average traffic delays
IOU-199 D Long [.ruffle delays
0- 99 E Very luny traffic delays
* F
*When demand volume exceeds the capacity of the lane, extreme delays will be
encountered with queuing which may cause severe congestion sffeut.ing other
traffic movements in the intersection. This condition usually warrants
improvement to the intersection.
APPENDIX C
r =. = r M m m m M M r M M M_ M M M M
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
###############F#############################
INTERSECTION..west elizabeth/shields
AREA TYPE ..... OTHER
ANALYST....... mid
DATE.......... noon
TIME......... noon p 19�
COMMENT ...... .s ort Iona
--------------------------------------------------------------------------
VOLUMES GEOMETRY
EB W8 NB SB EB W8 NB 58
LT 307 60 276 25 L 12.0 L il.0 L 12.0 L 12.0
TH 35 55 753 895 LT 12.0 TR 12.0 T 12.0 T 12.0
RT 312 34 40 380 R 12.0 12.0 TR 12.0 TR 12.0
RR 0 15 33 33 12.0 12.0 12.0 12.0
GRADE
(%)
EB 0.00
WB 0.00
NB 0.00
SB 0.00
------------
EB LT
TH
RT
PO
WB LT
TH
RT
PD
GREEN
YELLOW
PH-1
K
X
X
X
12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.0
------------------------------------------------------------
ADJUSTMENT FACTORS
HV AD-1 PKG BUSES PHF PEDS RED. BUT. ARR. TYPE
(%) Y/N Nm Nb Y/N min T
0.00 N 0 2 0.95 100 Y 25.8 3
0.00 N 0 2 0.95 100 Y 25.8 3
1.00 N 0 2 0.95 100 Y 22.8 3
1.00 N 0 2 0.95 100 Y 22.8 3
---------------------------------------------------- -----
SIGNAL SETTINGS CYCLE LENGTH = 110.0
PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
NB LT X X
TH X X
RT X X
PO X X
X SS LT X
X TH X
X RT X
X PD X
17.0 12.0 0.0 0.0 GREEN 14.0 48.0 0.0 0.0
5.0 5.0 0.0 0.0 YELLOW 4.0 5.0 0.0 0.0
------------------------------- ------------------------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. DELAY APP. LOS
ES L 0.656 0.173 35.9 O 32.2 D
LT 0.555 0.173 33.4 D
R 0.723 0.309 29.5 D
WB L 0.290 0.127 33.3 0 33.5 D
TR 0.360 0.127 33.8 D
NB L 0.808 0.618 23.1 C 11.9 8
TR 0.381 0.618 6.0 g
SB L 0.108 0.455 13.1 6 26.0 0
TR 0.896 0.455 26.2 0 1
------------------------------------------------------ 7-------------------
INTERSECTION: Delav = 22.9 (sec/veh) V/C = 0.881 LOS = C
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY kEPORT
INTERSECTION -west elizabeth/shields
AREA TYPE ..... OTHER
ANALYST....... mid
DATE ........ ..7/23/92
TIME.......... noon pm 97
COMMENT....... shorpong
--------------------------------------------------------------------------
VOLUMES GEOMETRY
ES WB NB S8 EB W6 NB 56
LT 240 90 247 8 L 12.0 L 12.0 L 12.0 L 12.0
TH 15 65 714 1085 LT 12.0 TR 12.0 T 12.0 T 12.0
RT 250 15 45 420 R 12.0 12.0 TR 12.0 TR 12.0
RR 0 15 33 33 12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.0
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
(%) (%) Y/N Nm Nb Y/N min T
EB 0.00 0.00 N 0 2 0.95 100 Y 25.8 3
WB 0.00 0.00 N 0 2 0.95 100 Y 25.8 3
NB 0.00 1.00 N 0 2 0.95 100 Y 22.8 3
SB 0.00 1.00 N 0 2 0.95 100 Y 22.9 3
--------------------------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 110.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
EB LT X NB LT X X
TH X TH X X
RT X RT X X
PO X PD X X
WB LT X 58 LT X
TH X TH X
RT X RT X
PO X PD X
GREEN 16.0 12.0 0.0 0.0 GREEN 10.0 53.0 0.0 0.0
YELLOW 5.0 5.0 0.0 0.0 YELLOW 4.0 5.0 0.0 0.0
-------------------------------------- ------ -----------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. DELAY APP. LOS
EB L 0.542 0.164 33.7 0 32.0 D
LT 0.414 0.164 31.9 0
R 0.681 0.264 31.0 D
WB L 0.435 0.127 34.6 D 34.1 D
TR 0.301 0.127 33.3 D
NS L 0.398 0.627 37.3 0. 14.9 8
TR 0.360 0.627 7.5 B
S8 L 0.028 0.500 10.6 B 30.4 D
TR 0.962 0.500 30.5 D
--------------------------------------------------------------------------
INTERSECTION: Delay = 26.0 (sec/veh) V/C = 0.904 LOS = 0
r M M M M r M M M M M w M M M r Mao m
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
YX<.V[1X3X:kXXXXXXXH.XX.Y.XXW.X:RXXX.Y.XXWf.....XXX>YXl[Y Y MYIXX'X YN1X1(:RXkXYXXX:K>'Y
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING, SPEED, MAJOR STREET.. 30
PEAK
HOUR FACTOR .....................
1
AREA
POPULATION ......................
100000 -
NAME
OF THE EAST/WEST STREET.........
university
NAME
OF THE NORTH/SOUTH STREET.......
shields
NAME
OF THE ANALYST ..................
mJd
DATE
OF THE ANALYSIS (mm/dd/yy)......
7/28/92
TIME PERIOD ANALYZED ................ a
pm 1992
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
--------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
TRAFFIC VOLUMES
--------------------------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT 20 -- 40 0
THRU 0 -- 1049 1227
RIGHT 45 -- 0 40
NUMBER OF LANES
EB WB NB SE,
------- ------- ------- -------
LANES 1 -- 2
CAPACITY AND LEVEL -OF -SERVICE page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c= c v LOS
p M SH R SH
------------------------------------------------ ---
MINOR STREET
ES LEFT 22 83 72
RIGHT 50 533 533
MAJOR STREET
NB LEFT 44 233 233
91I7J01&A IUM W MIS RJUQP
> 72 > 50 > E
> 180 > 108 >D
> 533 .> 484 > A
233
NAME OF THE EAST/WEST STREET...... university
NAME OF THE NORTH/SOUTH STREET.... shields
DATE AND TIME OF THE ANALYSIS..... 7/28/92 noo pm 1992
OTHER INFORMATION....
189 D
M w M= M w M w r w M M= M M r w r M
1965 HCM: UNSIGNALIZED INTERSECTIONS Page-1
♦xxsxxszxzszz<xxx.rxs:rszxxxxxsssssxzzzz.r sxxsxsss z:rsxrx zzxx z:rsaxz r.sxs x:r
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 30
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... university
NAME OF THE NORTH/SOUTH STREET....... shields
NAME OF THE ANALYST .................. mid
DATE OF THE ANALYSIS (mm/dd/yy).._... 7/28/92
TIME PERIOD ANALYZED ................. noon pm 1992
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
TRAFFIC VOLUMES
EB WB NB SB
---- ---- ---- ----
LEFT 15 -- 50 0
THRU 0 -- 1001 1390
RIGHT 40 -- 0 35
NUMBER OF LANES
---------------------------------------------------------------------
ES W6 NB S6
------ ------- ------- -------
LANES 1 -- 2 2
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c= c v LOS
p M SH R SH
------- ----------------------------------------- ---
MINOR STREET
EB LEFT 17 83 64 > 64 > 48 > E
> 173 > 113 >D
RIGHT 44 482 482 > 482 > 438 > A
MAJOR STREET
N8 LEFT 55 184 184 184 129 D
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... university
NAME OF THE NORTH/SOUTH STREET.... shields
DATE AND TIME OF THE ANALYSIS..... 7/28/92 : noon pm 1992
OTHER INFORMATION....
M= M= M w M w M M M M= w M M M r M
u
1985 HCM: UNSIGNALIZED INTERSECTIONS Paae-1
XY.KYY Y.4 XYYYY.FYY.F YtY)YYY<YF.0 YYY X'Y.FX.F.K YYYYX.F.0 X:R YYYYYYYYYYM.F .K YYYXYYYY.tXX
IDENTIFYING INFORMATION
AVERAGE
RUNNING SPEED.
MAJOR STREET..
30
PEAK
HOUR
FACTOR .....................
1
AREA
POPULATION ......................
100000
NAME
OF
THE EAST/WEST
STREET.........
combined access
NAME
OF
THE NORTH/SOUTH
STREET.......
shields
NAME
OF
THE ANALYST ..................
mid
DATE
OF
THE ANALYSIS
(mm/dd/yy)......
7/28/92
TIME PERIOD ANALYZED ................. noon pm 1992
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
---------------------------------- -------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------- --------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT 10 -- 10 0
THRU 0 -- 1059 1252
RIGHT 15 -- 0 15
NUMBER OF LANES
------------------------------------------------------------------_
EB WB NB SE
------- ------- ------- -------
LANES. i -- 2 � �I
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c= c v LOS
P M SH R SH
------------------------------------ ------------ ---
MINOR STREET
EB LEFT 11 83 81 > 81 > 70 > E
> 164 > 137 >D
RIGHT 17 533 533 > 533 > 517 > A
MAJOR STREET
INB LEFT 11 233 233 233 222 C
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... combined access
NAME OF THE NORTH/SOUTH STREET.... shields
DATE AND TIME OF THE ANALYSIS..... 7/28/92 noon pm 1992
OTHER INFORMATION....
I
M M M= M M= w M= M M= w M" M r M
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
:K,KYiM(i XYR'KZIYYY LKKKKkKM:I .K K.K KK K.K .K K:K KKY<Kt K:K .Y .KKK.KK<Y%.K t:K :KYK t?.KMYY". Z.K R:I:TY
IDENTIFYING INFORMATION
AVERAGE
RUNNING SPEED,
MAJOR STREET..
30
PEAK
HOUR FACTOR .....................
1
AREA
POPULATION ......................
100000
NAME
OF
THE EAST/WEST
STREET.........
combined access
NAME
OF
THE NORTH/SOUTH
STREET.......
shields
NAME
OF
THE ANALYST ..................
mjd
DATE
OF
THE ANALYSIS
(mm/dd/yy)......
7/28/92
TIME PERIOD ANALYZED ................. noon �� L/ 1992
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
-------------------------------------------------------------- ----
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
TRAFFIC VOLUMES
------------------------------------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT 5 -- 15 0
THRU 0 -- 1001 1415
RIGHT 10 -- 0 10
NUMBER OF LANES
--------------------------------------------------------------
EB WB NB SB
------- ------ ------ ------
LANES. 1 -- 2
I
CAPACITY AND LEVEL -OF -SERVICE Paqe-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c= c v LOS
p M SH R SH
------- ----------------- ------------ ------------ ---
MINOR STREET
EB LEFT 6 83 79 > 79 > 73 > E
> 178 > 161 >D
RIGHT 11 462 482 > 482 > 471 > A
MAJOR STREET
NB LEFT 17 184 184 184 168 D
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... combined access
NAME OF THE NORTH/SOUTH STREET.... shields
DATE AND TIME OF THE ANALYSIS..... 7/28/92 ; noon pm 1992
OTHER INFORMATION....
Gravel
5267
2
4
i'll'Su6sti
r
lkk
.:j
........... ...
z
4
ti 3
hristrnJ� Field
jtr4
•r
I IN
ui f
Ref in(ry
it
L
North Yar
North Yar
u ai;;:'
A
0
416
L - --- --
7171
I z
7
4
:itJL
"AMIGOS
G if
Co'U0
.
Ff
JL
... P0 S(wz
I .-ul
. . . . . V,
mi
e -
;p sal
A
REST URAN
W
tj
A- Q
1510
PM 4954
II
17
W.
it
1z 'iE
mat I 4'� M.
7
j
18
(I Ali jq
_3P ......
tol
A01FE1
AJE
. —
'if fr
?0-65
1544
LU
r
--A
Hughes t77,�' #,�— I
1 �' Stadium
20
-
:w
22
:S
'Ll..
!Vh'Veei'
[it
Mlil=
19
avel Ddve-ik
orill
A
Q,
IL# I
7
yon
U) Q-.,
$A
rakes
Ir
1 zY.
9 11
A.
9 28
Zb 1
L L 1��
_'
30
\\ f
a' Grav
r S.
5 79
V,
I
I
Ito-
offle
1549
. 4 .
Dry
1.41
-Ac, of
Lak 33(('
Spring Canyon _1�ravel
0
- - ) 34
35
36 499/,
5-a —
m..hikes
Dam
f
hie Clellands
.
"
ill
Marmon},
4L
'j!
Cem
0
k5oho .1
- ----------------
4�
6
77�
A,
"Lm
1 . SITE LOCATION Figure 1
11
I
Fl
I
I
n
I
I
II
I APPENDIX D
11
1
1�
1
1
I
1
1
M M M M M M M M M M M r M M w M r M M
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..west elizabeth/shields
AREA TYPE ..... OTHER
ANALYST....... mjd
DATE .......... 7/23/92
TIME......... inon pm 192
COMMENT...... short: long
_____________ ____-___------_-_--------------------------------------
VOLUMES GEOMETRY
EB WB NB SB : EB WB N8 SB
LT 339 71 306 27 : L 12.0 L 12.0 L 12.0 L 12.0
TH 46 58 798 962 : LT 12.0 TR 12.0 T 12.0 T 12.0
RT 339 36 42 402 : R 12.0 12.0 TR 12.0 TR 12.0
RR 0 15 33 33 : 12.0 12.0 12.0 12.0
GRADE
EB 0.00
WS 0.00
NB 0.00
SB 0.00
--------------
PH-1
EB LT X
TH X
RT X
PO X
WB LT
TH
RT
PD
GREEN 17.0
YELLOW 5.0
--------------
12.0 12.0 12.0
12.0 12.0 12.0
-------------------------------------------------
ADJUSTMENT FACTORS
HV ADJ PKG BUSES PHF REDS RED. BUT.
(%) YIN NM Nb YIN min T
12.0
12.0
ARR. TYPE
0.00 N 0 2 0.95 100 Y 25.8 3
0.00 N 0 2 0.95 100 Y 25.8 3
1.00 N 0 2 0.95 100 Y 22.8 3
1.00 N 0 2 0.95 100 Y 22.8 3
------------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 110.0
PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
NB LT X X
TH X X
RT X X
PD X X
X SB LT X
X TH X
X RT X
X PD X
12.0 0.0 0.0 GREEN 14.0 48.0 0.0 0.0
5.0 0.0 0.0 YELLOW 4.0 5.0 0.0 0.0
-----------------------------------------------------------
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTFRSECTION..west elizabeth/shields
AREA TYPE ..... OTHER
ANALYST....... mjd
DATE.......... 7/28/92
TIME.......... r+ m 192
COMMENT ...... .shorr long
------------- __---______------------__--------_--___-_________-__-----
VOLUMES GEOMETRY
EB WB NB SB EB WB N8 SS
LT 261 100 269 9 L 12.0 L 12.0 L 12.0 L 12.0
TH 21 69 756 1158 LT 12.0 TR 12.0 T 12.0 T 12.0
RT 11 16 47 440 R 12.0 12.0 TR 12.0 TR 12.0
RR 0 15 33 33 12.0 12.0 12.0 12.0
------------
GRADE
EB 0.00
WB 0.00
NB 0.00
SB 0.00
------------
EB LT
TH
RT
PD
WB LT
TH
RT
PO
GREEN
YELLOW
PH-1
X
X
X
X
15.0
5.0
LEVEL OF SERVICE
LANE GRP.
V/C
G/C
DELAY
LOS
APR.
DELAY
APR. LOS
LANE GRP.
EB
L
0.725
0.173
38.5
D
34.8
D
EB
L
LT
0.638
0. 173
35.3
0
LT
R
0.785
0.309
32.4
D
R
WB
L
0.343
0.127
33.7
D
33.9
0
WB
L
TR
0.385
0.127
34.1
D
TR
N8
L
0.922
0.618
38.4
0
16.2
C
NB
L
TR
0.405
0. 618
8.2
8
1
TR
58
L
0.128
0.455
13.2
8
32.4
0
58
L
-----------------------------------------------
TR
0.960
0.455
32.8
D
TR
INTERSECTION:
Delay
= �7.6
(sec/veh)
---------------------------
V/C
= 0.957
LOS
= 0
--------------
INTERSECTION:
12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.0
------------------------------------------------------------
ADJUSTMENT FACTORS
HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
(%) YIN Nm Nb YIN min T
0.00 N 0 2 0.95 100 Y 25.8 3
0.00 N 0 2 0.95 100 Y 25.8 3
1.00 N 0 2 0.95 100 Y 22.8 3
1.00 N 0 2 0.95 100 Y 22.8 3
----------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 110.0
PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
NB LT X X
TH X X
RT X X
PD X X
X 58 LT X
X TH X
X RT X
X PD X
11.0 0.0 0.0 GREEN 11.0 54.0 0.0 0.0
5.0 0.0 0.0 YELLOW 4.0 5.0 0.0 0.0
----------------------------------------------------------
LEVEL OF SERVICE
V/C G/C DELAY LOS APR. DELAY APR. LOS
0.624 0.155 36.2 D 34.0 D
0.494 0.155 33.6 D
0.735 0.264 33.0 D
0.521 0.118 36.6 0 35.6 D
0.349 0.118 34.3 D
0.938 0.645 43.8 E 16.2 C
0.371 0.645 7.0 6
0.034 0.509 10.3 B 37.9 D
1.004 0.509 38.1 0
----------------------------------------------------------
Delay = 30.4 (sec/veh) V/C = 0.974 LOS = D
1985 HCM: UNSIGNALIZED INTERSECTIONS Paae-1
X kXXX2X Y'.<1f.KXXXX Y.'K.KX:Kk.V(Xkt><:K:r:KX:K.K:KW. X.kXX:KMXXXMYYXX<MX:k .R X:A :A KXX K RX:K X M'.#Y
IDENTIFYING INFORMATION
AVERAGE RUNNING SPEED, MAJOR STREET..
30
PEAK HOUR FACTOR .....................
1
AREA. POPULATION ......................
100000
NAME OF THE EAST/WEST STREET.........
combined
access
NAME OF THE NORTH/SOUTH STREET.......
shields
NAME OF THE ANALYST ..................
mid
DATE OF THE ANALYSIS (mm/dd/yy)......
7/28/92
TIME PERIOD
0
1994
ANALYZED ................
pm
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT 0 -- 0 0
THRU 0 -- 0 1337
RIGHT 20 -- 0 35
NUMBER OF LANES
---------------------------------------------------------------------'
EB WB NS Sc I
------ ------- ------- ------
LANES 2 -- 2 2
CAPACITY AND LEVEL-OF-SERVICE------------------Pear-3
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) cp(pcph) cM(pcph) cSH(pcph) cR= cSH- v LOS
MINOR STREET
EB LEFT 0 113 113 113 .113 D
RIGHT 22 499 499 499 477 A
MAJOR STREET
NB LEFT 0 199 199 199 199 D
IDENTIFYING INFORMATION
-----------------------------------------------------------------'
NAME OF THE EAST/WEST STREET...... combined access
NAME OF THE NORTH/SOUTH STREET.... shields
DATE AND TIME OF THE ANALYSIS..... 7/28/92 noon pm }9-=
OTHER INFORMATION..._ cal/ ,"�
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-I
.K:K.ZXXXXXtZZZXZXZZZXXXZ.ZXZKXXXXXZZMXZX.FXX%.ZXZZZ.FZ CXXXXXZXXXXXXYZYXX X.KZ
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED. MAJOR. STREET.. 30
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... combined access
NAME OF THE NORTH/SOUTH STREET....... shields
NAME OF THE ANALYST .................. mjd
DATE OF THE ANALYSIS (mm/dd/yy)...... 7/28/92
TIME PERIOD ANALYZED ................. noon pm L49 q
OTHER INFORMATION.... 2
INTERSECTION TYPE AND CONTROL V
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
ES W8 NB SB
---- ---- ---- ----
LEFT 0 -- 0 0
THRU 0 -- 0 1508
RIGHT 15 -- 0 20
NUMBER OF LANES
---------------------------------------------------------------------
EB WB NB SB
------- ------ ------- -------
LANES 2 -- 2 2
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
MINOR STREET
EB LEFT 0 87 87 87 87 E
RIGHT 17 448 448 448 432 A
MAJOR STREET
N8 LEFT 0 161 161 161 161 0
IDENTIFYING INFORMATION
---------------------------------------------------------------------
NAME OF THE EAST/WEST STREET...... combined access
NAME OF THE NORTH/SOUTH STREET..._ shields
DATE AND TIME OF THE ANALYSIS..... 7/28/92 ; noon Lp.'
OTHER INFORMATION.... v d
FLI
APPENDIX E
M= M M M M M M M M M M M M M M r M M
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
#M############=#xx############....... ###################_#################
INTERSECTION..west elizabeth/shields
AREA TYPE..... OTHER
ANALYST....... mjd
DATE.......... 7/23/92
TIME......... noon Pm 192
COMMENT....... snort long
--------------------------------------------------------------------------
VOLUMES GEOMETRY
EB W8 NS SB EB WB NB S8
LT 390 75 345 30 L 12.0 L 12.0 L 12.0 L 12.0
TH 50 60 940 1100 LT 12.0 TR 12.0 T 12.0 T 12.0
RT 390 40 45 460 R 12.0 12.0 TR 12.0 TR 12.0
RR 0 15 33 33 12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.0
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS RED. BUT. ARR. TYPE
(%) (%) YIN Nm Nb YIN min T
EB 0.00 0.00 N 0 2 0.95 100 Y 25.8 3
WB 0.00 0.00 N 0 2 0.95 100 Y 25.8 3
NB 0.00 1.00 N 0 2 0.95 100 Y 22.8 3
SB 0.00 1.00 N 0 2 0.95 100 Y 22.8 3
------------------- --------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 120.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
EB LT X NB LT X X
TH X TH X X
RT X RT X X
PO X PO X X
W8 LT X SB LT X
TH X TH X
RT X RT X
PO X PO X
GREEN 19.0 10.0 0.0 0.0 GREEN 18.0 54.0 0.0 0.0
YELLOW 5.0 5.0 0.0 0.0 YELLOW 4.0 5.0 0.0 0.0
------------------------------------------------- ----------------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APR. DELAY APR. LOS
EB L 0.323 0.175 47.7 E 40.7 E
LT 0.714 0.175 40.7 E
R 0.836 0.333 36.4 D
WB L 0.462 0.100 40.2 E 40.9 E
TR 0.531 0.100 41.5 E
NB L 0.972 0.650 47.3 E 18.1 C
TR 0.455 0.650 8.0 B
38 L 0.194 0.467 14.3 B 64.9 F
TR 1.073 0.467 65.8 F
------- ------------------------------------- ---------------------------
1NTERSECTION: Oelay = 43.0 (sec/veh) V/C = 1.092 LOS = E
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION..west elizabeth/shields
AREA TYPE..... OTHER
ANALYST....... mjd
DATE.......... 7/28/92
TIME.......... noon
m 192
t lorigCOMMENT.......shor
--------------------------------------------------------------------------
VOLUMES GEOMETRY
EB W8 NB SB EB WB NB SB
LT 300 100 310 10 L 12.0 L 12.0 L 12.0 L 12.0
TH 25 70 880 1300 LT 12.0 TR 12.0 T 12.0 T 72.0
RT 310 20 50 510 k 12.0 12.0 TR 12.0 TR 12.0
RR 0 15 33 33 12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.0
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
(%) (%) YIN Nm Nb YIN min T
EB 0.00 0.00 N 0 2 0.95 100 Y 25.8 3
WB 0.00 0.00 N 0 2 0.95 100 Y 25.8 3
NB 0.00 1.00 N 0 2 0.95 100 Y 22.8 3
S8 0.00 1.00 N 0 2 0.95 100 Y 22.8 3
--------------- --------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH = 110.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
EB LT X NB LT X X
TH X TH X X
RT X RT X X
PD X PD X X
WB LT X SB LT X
TH X TH X
RT X RT X
PO X PD X
GREEN 14.0 10.0 0.0 0.0 GREEN 12.0 55.0 0.0 0.0
YELLOW 5.0 5.0 0.0 0.0 YELLOW 4.0 5.0 0.0 0.0
------------------------------------ -- ----------------------------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APR. DELAY APR. LOS
EB L 0.762 0.145 43.1 E 39.9 D
LT 0_607 0.145 36.4 0
R 0.841 0.264 39.7 D
WB L 0.564 0.109 33.2 0 37.1 0
TR 0.409 0. 109 35.5 0
NB L 1.054 0.664 77.4 F 24.2 C
TR 0.420 0.664 6.6 B
SB L 0.047 0.518 9.9 8 83.7 F
TR 1.122 0.518 84.1 F
--------------------------------------------------------------------------
INTERSECTION: Delay = 55.7 (sec/veh) V/C = 1.109 LOS = E
1935 HCM: SIGNALIZED
INTERSECTIONS
1985 HCM: SIGNALIZED
INTERSECTIONS
SUMMARY REPORT
SUMMARY REPORT
<=x=======x=x===x=xx==x=x====xxxx=xx=======xxxx===xx=====x=xx=xx=xx=xx===x
=txzz=zx=Yx=zzxxx==xt=xxzxi=xz=zzx<xZxzYxlxz=x'Kx=xx=:Kx=zxxxxx=<zYY(=xxxX=xz
INTERSECTION -west
elizabeth/shields
INTERSECTION..west
elizabeth/shields
AREA TYPE -----
OTHER
AREA TYPE .....
OTHER
ANAL .......
ANALYST.......
mjd
DATE ...... .......
/27/2 8/92
DATE..........
TIME.........
7/28/92
192
TIME..........
noon m 192
noon p
COMMENT.......short
unq
COMMENT .......
short long
------ ------------------------------------------------------------------
VOLUMES
GEOMETRY
VOLUME°.
GEOMETRY
EB
WB NB
SB EB WB
NB
SB
EB WB
NB
SB
EB WB
NB
SB
LT 390
75 345
30 L 12.0 L 12.0
L 12.0 L
12.0
LT 300 100
310
10 L
12.0 L 12.0
L 12.0 L
12.0
TH 50
60 940
1100 LT 12.0 TR 12.0
T 12.0 T
12.0
TH 25 70
880
1300 LT
12.0 TR 12.0
T 12.0 T
12.0
RT 390
40 45
460 R 12.0 12.0
TR 12.0 T
12.0
RT 310 20
50
510 R
12.0 12.0
TR 12.0 T
12.0
RR 0
15 33
0 12.0 12.0
12.0 R
12.0
RR 0 15
33
0
12.0 12.0
12.0 R
12.0
12.0 12.0
12.0
12.0
12.0 12.0
12.0
12.0
12.0 12.0
12.0
12.0
__________________________________________________________________________
12.0 12.0
12.0
12.0
_ _________________________________________________________________________
ADJUSTMENT FACTORS
ADJUSTMENT
FACTORS
GRADE
HV
ADJ PKG BUSES PHF PEDS
PED. BUT. ARR.
TYPE
GRADE
HV ADJ PKG BUSES
PHF PEDS
PED. BUT. ARR.
TYPE
(%)
(%)
Y/N Nm Nb
Y/N min T
(%)
(%) Y/N Nm
Nb
Y/N min T
EB 0.00
0.00
N 0 2 0.95 100
Y 25.8
3
EB 0.00
0.00
N 0
2 0.95 100
Y 25.8
3
WB 0.00
0.00
N 0 2 0.95 100
Y 25.8
3
W8 0.00
0.00
N 0
2 0.95 100
Y 25.8
3
NB 0.00
1.00
N 0 2 0.95 100
Y 22.8
3
NB 0.00
1.00
N 0
2 0.95 100
Y 22.8
3
SB 0.00
1.00
N 0 2 0.95 100
Y 22.8
3
SB 0.00
--------------
1.00
----------------------------------------------`----------
N 0
2 0.95 100
Y 22.8
3
----- ------------------------------------------------------------------
SIGNAL SETTINGS
CYCLE LENGTH =
110.0
SIGNAL
SETTINGS
CYCLE LENGTH =
110.0.
PH-1
PH-2
PH-3 PH-4 PH-1
PH-2 PH-3
PH-4
PH-1
PH-2
PH-3
PH-4 PH-1
PH-2 PH-3
PH-4
EB LT
X
NB LT
X X
EB LT X
NB LT
X X
TH
X
TH
X X
TH X
TH
X X
RT
X
RT
X X
RT X
RT
X X
PD
X
PO
X X
PD X
PD
X X
WB LT
X
SB LT
X
WB LT
X
SB LT
K
TH
X
TH
X
TH
X
TH
K
RT
X
RT
X
RT
X
RT
X
PD
X
PD
X
PD
X
PD
X
GREEN 19.0
13.0
0.0 0.0 GREEN 18.0
45.0 0.0
0.0
GREEN 19.0
13.0
0.0
0.0 GREEN 18.0
45.0 0.0
0.0
YELLOW 5.0
5.0
0.0 0.0 YELLOW
0.0 5.0 0.0
0.0
YELLOW 5.0
------------------------------------------------------------------------
5.0
0.0
0.0 YELLOW
0.0 5.0 0.0
0.0
- -------------------------------------------------------------------------
LEVEL OF SERVICE
LEVEL
OF SERVICE
LANE GRP. V/C
G/C DELAY LOS
APP. DELAY APP.
LOS
LANE GRP.
V/C
G/C
DELAY LOS
APP. DELAY APP.
LOS
EB L
0.755
0.191 38.5 D
36.3
D
EB L
0.580
0.191
32.7 0
29.5
D
LT
0.655
0.191 34.5 0
LT
0.463
0.191
30.8 D
R
0.854
0.327 36.0 D
R
0.679
0.327
27.0 D
WB L
0.339
0. 136 33.0 0
33.3
D
W8 L
0.451
0. 136
34.2 D
33.7
D
TR
0.389
0.136 33.5 D
TR
0.328
0.136
32.9 D
N8 L
0.933
0.591 41.8 E
18.2
C
N8 L
0.937
0.591
42.6 E
18.0
C
TR
0.500
0.591 10.1 B
'
TR
0.472
0.591
9.3 B
1;8 L
0.215
0.427 15.2 C
10,0
C
SB L
0.063
0.427
14.1 8
25.6
0
T
0.794
0.427 22.9 C
I
'
T
0.939
0.427
31.3 D
R
0.540
0.618 9.7 8
R
0.598
0.618
10.5 8
__________________________________________________________________________
iN TERSEf,TION:
Delay
= 22.9 (sec/veh) V/C =
0.898 LOS = C
---__-__-_-________-___-___-__----------_-------_____-___-___-___-_---____
INTERSECTION:
Delay
= 24.1
(sec/veh) V/C =
0.913 LOS = C
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
tYYZFRiztt3tCYt<M*1.Y fk:KY1'Y:K:K ....... .tZ:Y.K....:Y KFR.KY......YZ.tYXt
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 30
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... combined access
NAME OF THE NORTH/SOUTH STREET....... shields
NAME OF THE ANALYST .................. mid
DATE OF THE ANALYSIS (mm/dd/yy)...... 7/28/92
TIME PERIOD ANALYZED ................ noon m 199t•
OTHER INFORMATION....
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB N8 SB
---- ---- ---- ----
LEFT 0 -- 0 0
THRU 0 -- 0 1530
RIGHT 20 -- 0 35
NUMBER OF LANES
---------------------------------------------------------------------
EB WB NB SB
----------------------------
LANES 2 -- 2 -
I
CAPACITY AND LEVEL -OF -SERVICE
----------------------------------- --
Page-3
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT V(pcph) c (pcph) C (pcph) c (pcph) c = r - v LOS
p M SH R SH
------------------------------------------------ ---
MINOR STREET
EB LEFT 0 83 83 83 83 E
RIGHT 22 436 436 436 414 A
MAJOR STREET
NB LEFT 0 153 153 153 153 0
IDENTIFYING INFORMATION
NAME
OF THE EAST/WEST STREET......
combined access
NAME
OF THE NORTH/SOUTH STREET....
shields
DATE
AND TIME OF THE ANALYSIS.....
7/28/92 noo pm
V99 '
OTHER
INFORMATION....
LO�''�}I
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
2Xi.................. Y XXY A...................trtKYR t.K Yi
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 30
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ...................... 100000
NAME OF THE EAST/WEST STREET......... combined access
NAME OF THE NORTH/SOUTH STREET....... shields
NAME OF THE ANALYST .................. mid
DATE OF THE ANALYSIS (mm/dd/yy)...... 7/28/92
TIME PERIOD ANALYZED ................. noon&1.9922-
OTHER INFORMATION.... L
INTERSECTION TYPE AND CONTROL V
--------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
TRAFFIC VOLUMES
-------------------------------------------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT 0 -- 0 0
THRU 0 -- 0 1690
RIGHT 15 -- 0 20
NUMBER OF LANES
---------------------------------------------------------------------
EB WB NB SB
----------------------------
LANES 2 -- 2 2
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------------------------------------------- ----- ---
MINOR STREET
EB LEFT 0 75 75 75 75 E
RIGHT 17 399 399 399 382 B
MAJOR STREET
NB LEFT 0 145 145 145 145 D
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET...... combined access
NAME OF THE NORTH/SOUTH STREET.... shields
DATE AND TIME OF THE ANALYSIS..... 7/28/92 ; noon ® 1_9
OTHER INFORMATION.... LV7
Q
N
I PRIMARY STREETS Figure 2
1
1
I � s
N 4
! 2aoo S
' �i Oi70i1' 3300 ►
! 3400
2500 ► J /400 ► G 4400 ►
/ 2300 = d 6c'00 W ! 3000 - v
a
LL 600 ► _ 3600 ► W
® ! 700 ' 3800 0
1 �
5500 W. MULBERRY 6900 ►
d 6200 ! 7600 e
seoo ► ,AtiMm 7200 ► M
! 6700 ! 8600 ..
ELIZA ETH 6400 PpI ' a 9600 ! 4800
M
- -- --- � � SITE o 2100 ► � �
910 ► £500 No.
1 44590 6300 ► ME ! 45W
e600 ► PROSPECT 9800 ►
! Q00 ! ee00 a 14400
1
1
1991 DAILY TRAFFIC Figure 3
WEST ELIZABETH
TEXACO
UNIVERSITY
00
N O
0
O
0 m U)
McON
307/240
35/15
312/250
34/1.5
55/65
60/90
�'tv
�Co
O M d
�0
N
10/5 —�
15/10 —y
0�
,- o
O
o
rn
0
0
o
rn
M
r
N
co
G
� N
J
oN
W
d r
I
N
20/15
45/40
1992 ADJUSTED / BALANCED
PEAK HOUR TRAFFIC
Q
N
C.S.U.
NOON / PM
Figure 4
Table 1
1992 Peak Hour Operation
Level of Service
Intersection Noon PM
Shields/West Elizabeth (signal) C D
Shields/University (stop sign)
EB LT E E
EB RT A A
NB LT D D
Shields/Combined Access (stop sign)
EB LT E E
EB RT A A
NB LT C D
Land Use
Table 2
Trip Generation
Daily
Trips
Amigos Restaurant 1420
Walk/Bike - 35% 500
Remaining Vehicle Trips 920
R
Noon
Peak
Trips
Trips
in
out
72
72
25
25
47
47
P.M.
Peak
Trips
Trips
in
out
38
37
13
13
25--
_24
This operation is deemed acceptable, except for eastbound exits at
the Shields/University intersection and left -turn exits from the
driveway accesses on Shields
Street.
Acceptable operation
is
defined as level of service D
or better.
Descriptions of level
of
service from the 1985 Highway
Capacity
Manual for signalized
and
unsignalized intersections are provided in Appendix B. Calculation
forms for the operation shown in Table 1 are provided in Appendix
C. The signalized Shields/West Elizabeth intersection operates
acceptably with the existing geometrics. A southbound right -turn
lane on the north leg of Shields Street will greatly reduce the
vehicle delay when considering the high number of right turns and
the high southbound through traffic. This right turn lane should
be considered
as part of future
capital
improvements at this
I
intersection or
incorporated into
future redevelopment plans for
the properties
in the northwest
quadrant
of the intersection.
1
Left -turn exits from stop sign controlled
along Shields Street are at level of service
streets and driveways
E. This operation is
due to the high
volumes on Shields
Street.
Observations of the existing access situation on the west side
of Shields indicates that, during a number of hours a day, a
congested condition exists. Northbound left turns on Shields
' Street approaching West Elizabeth often extend to the Texaco
service station. The left -turn lane is striped to the Texaco
service station. A number of times, northbound left -turning
vehicles desiring to enter either Campus West Shops or the Texaco
service station were in the left -turn lane approaching West
Elizabeth. This created a confusing situation for vehicles
desiring to turn left at West Elizabeth. These vehicles were often
'stuck" behind the vehicles desiring to enter one of the driveways.
Left turns from the Texaco and Campus West driveways were delayed.
As indicated in Table 1, these left -turns are at level of service
IE during both peak hours. This is considered to be long delays.
III. Proposed Development — —
Amigos is proposing to develop a sit down/drive-through
restaurant on a parcel of land south of West Elizabeth Street and
1 west of Shields Street. A schematic site plan is shown in Figure
5. The parcel currently has a Texaco service station on it. It
is proposed that the north access will be right-in/right-out and
the south access will be right -out only. Two-way access exists
to the Campus West Shops parking lot to the north. The existing
access driveway to the Campus West Shops from Shields Street is
shown to remain. This access is not part of the Amigos proposal,
nor does Amigos have control over this access. Land to the south
of the proposed Amigos (between Amigos and University Avenue) is
under private ownership and not part of this proposal.
' 2
11
II
I
I
�J
1
1
I
WEST ELIZABETH STREET
Campus West Shops
ALLEY
W
M
F-
co
N
I IT
I � N
PROPOSED __ _ 0
I\ AMIGOS N
University Center : L
Church Parking ; L"
John 23rd University Center
I
I
UNIVERSITY AVENUE