DRAINAGE INVESTIGATION
FOR
PROPOSED TACO BELL RESTUARANr
FORT COLLINS, COLORADO
Prepared for
b%RCHUUECUUHE OKE
150 East 29th Street
Suite 200
Loveland, Colorado 805338
October 28,1991
Project No. GRD-040-90
(Revised November 27,1991)
PREPARED BY:
LOOOM $ Engineering Associates
150 East 29th Street, Suite 225
Loveland, Colorado 80538
Telephone: (303) 663-2221
Civil and Environmental Engineering Consultants
Client: ARCHITECTURE ONE Project No. GRD-040-90
By: DRM Date: Oct. 28, 1991
REVISED: Nov. 25, 1991
EXISTING CONDITIONS TIME -OF -CONCENTRATION
Tc = 1.8 [ 1.1 - (0.755 x 1.0) ] 480 + 342.9 = 3.75 min.(Overland Offsite to North)
Ts = 350 + [ 2.5 x 60 ] = 2.33 min.(Street Offsite to North)
Ts = [230 + (3.5 x 60) + 150 + (2.5 x 60)] = 2.10 min.(Street Adjacent to Site)
TTotal = Ts +Tc + Tr Therefore, T = 2.33 + 2.1 + 5.00 + 3.75 = 13.28 min.
USE 10 minutes as Time of Concentration for Point of Concentration located at the
Southeast Corner of the Site
I2 @ 10 min. = 2.50 in./hr. Iioo ® 10 min. = 7.25 in./hr.
RUNOFF
Runoff, Q = C x I x A x Cf
Cf at 2 year Storm = 1.0 Cf at 100 Year Storm = 1.25
RUNOFF FROM SITE AT EXISTING CONDITIONS:
Q2 = 0.755 x 2.50 x 0.703 x 1.00 = 1.33 c.fs.
Qioo = 0.755 x 7.25 x 0.703 x 1.25 = 4.81 c.ts.
RUNOFF FROM SITE AT PROPOSED CONDITIONS
Q2 = 0.767 x 2.50 x 0.703 x 1.00 = 1.35 c.fs.
Qioo = 0.767 x 7.25 x 0.703 x 1.25 = 4.89 c.fs.
The estimated difference in total runoff volume based upon the 2 and 100 Year Storms
Determine
Volume if Detention
were to be provided.
Time
Q2Proposed
Vol. ® Q2
QDis. @ 2 Yr.
10 (min.)
1.35 (c.f.s.)
822 (cu.ft.)
1.33 (c.f.s.)
15 1.13
1,019 1.33
20
1.00
1,200
1.33
Time
QiooProposed
Vol. ® Qioo
Qnis. ® 100 Yr.
10 (min.)
4.89 (c.f.s.)
2,934(cu.ft.)
4.81 (c.f.s.)
15
4.04
3,636
4.81
20
3.50
4,200
4.81
Vol, nis.
Vol. Diff.
798 (cu.ft.)
24.(cu.ft.)
1,197
078)
1,596 096)
Vol. as. Vol. Diff.
2,886(cu.ft.) 48 (cu.ft.)
4,329 (-693)
5,772 (-1,572)
Page 2 of 6
Client: ARCHITECTURE ONE
By: DRM
Project No. GRD-040-90
REVISED: Nov. 25, 1991
EXISTING CONDITIONS WITH OFFFSITE AREAS CONSIDERED•
1. Area to North of Site concentrating at College Ave. gutter on North Property Line
Area = 0.61 ± acres Tc = 5 minutes
C = 0.60 I2 = 3.30 in./hr. Iioo = 7.25 in./hr.
Q2= 0.60 x 3.30 x 0.61 x 1.00 = 1.21 c.f.s.
Qioo = 0.60 x 7.25 x 0.61 x 1.25 = 3.31 c.f.s.
2. Area to North of Site concentrating at Alley to East on North Property Line
Area = 0.37 ± acres Tc = 5 minutes
C = 0.60 I2 = 3.30 in./hr. Iioo = 7.25 in./hr.
Q2=0.60x3.30x0.37x1.00=0.73c.f.s.
Qioo = 0.60 x 7.25 x 0.37 x 1.25 = 2,41 c.f.s.
3. Area on the West side of the Site concentrating at inlet on the N.W corner of Prospect
Rd.
Area = 0.61 + 0.27 + 0.16 = 1.04± acres Tc = 10 minutes
C = 0.70 I2 = 2.50 in./hr. Iioo = 7.25 in./hr.
Q2= 0.70 x 2.50 x 1.04 x 1.00 = 1.82 c.f.s.
Qioo = 0.70 x 7.25 x 1.04 x 1.25 = 6.60 c.f.s.
4. Area Onsite concentrating at Prospect Rd. gutter on East Property Line
Area = 0.542± acres Tc = 10 minutes
C = 0.755 I2 = 2.50 in./hr. Iioo = 7.25 in./hr.
Q2 = 0.755 x 2.50 x 0.542 x 1.00 = 1.02 c.f.s.
Qioo = 0.755 x 7.25 x 0.542 x 1.25 = 3.71 c.f.s.
5. Area from alley to East of Site concentrating at Prospect Rd. gutter on East Property
Line
Area = 0.37 + 0.36 = 0.73± acres Tc = 10 minutes
C = 0:60- -- - - - I2 = 2.50 in./hr.---I1oo = 7.25 in./hr. _-
Q2= 0.60 x 2.50 x 0.73 x 1.00 = 1.10 c.f.s.
Qioo= 0.60 x 7.25 x 0.73 x 1.25 = 3.97 c.f. s.
6. Area from Prospect Rd. concentrating in gutter on East Property Line
Area = 0.07± acres Tc = 10 minutes
C = 0.85 I2 = 2.50 in./hr. Iioo = 7.25 in./hr.
Q2= 0.85 x 2.50 x 0.07 x 1.00 = 0.15 c.f.s.
Qioo= 0.85 x 7.25 x 0.07 x 1.25 = 0.54 c.f.s.
7. Total area concentrating at Prospect Rd. gutter on East Property Line
Area = 0.542 + 0.074 + 0.37 + 0.36 = 1.35± acres Tc = 10 minutes
C = 0.70 I2 = 2.50 in./hr. Iioo = 7.25 in./hr.
Q2 = 0.70 x 2.50 x 1.35 x 1.00 = 2.36 c.f.s.
Qioo = 0.70 x 7.25 x 1.35 x 1.25 = 8.56 c.f.s.
Page 3 of3
Client: ARCHITECTURE ONE
By: DRM
Project No. GRD-040-90
REVISED: Nov. 25,1991
PROPOSED CONDITIONS WITH OFFFSITE AREAS CONSIDERED:
1. Area to North of Site concentrating at College Ave. gutter on North Property Line
Area = 0.61 ± acres Tc = 5 minutes
C = 0.60 I2 = 3.30 in./hr. Iioo = 7.25 in./hr.
Q2= 0.60 x 3.30 x 0.61 x 1.00 = 1.21 c.f.s.
Qioo= 0.60 x 7.25 x 0.61 x 1.25 = 3.31 c.f.s.
2. Area to North of Site concentrating at Alley to East on North Property Line
Area = 0.37 ± acres Tc = 5 minutes
C = 0.60 I2 = 3.30 in./hr. Iioo = 7.25 in./hr.
Q2= 0.60 x 3.30 x 0.37 x 1.00 = 0.73 c.f.s.
Qioo = 0.60 x 7.25 x 0.37 x 1.25 = 2,41 c.f.s.
3. Area on the West side of the Site concentrating at inlet on the N.W corner of Prospect
Rd.
Area = 0.61 + 0.272 + 0.146 = 1.03± acres Tc = 10 minutes
C = 0.70 I2 = 2.50 in./hr. Iioo = 7.25 in./hr.
Q2 = 0.70 x 2.50 x 1.03 x 1.00 = 1.80 c.f.s.
Qioo = 0.70 x 7.25 x 1.03 x 1.25 = 6.53 c.f.s.
4. Area Onsite concentrating at Prospect Rd. gutter on East Property Line
Area = 0.332± acres Tc = 10 minutes
C = 0.767 I2 = 2.50 in./hr. Iioo = 7.25 in./hr.
Q2 = 0.767 x 2.50 x 0.332 x 1.00 = 0.64 c.f.s.
Qioo = 0.767 x 7.25 x 0.332'x 1.25 = 2.31 c.f.s.
5. Area Onsite concentrating at inlet in parking lot onsite
Area = 0.225± acres Tc = 10 minutes
C = 0.767 I2 = 2.50 in./hr. Iioo = 7.25 in./hr.
Q2 = 0.767 x 2.50 x 0.225 x 1.00 = 0.43 c.f.s.
Qioo = 0.767 x 7.25 x 0.225 x 1.25 = 1.56 c.f.s.
6. Area from alley to East of Site concentrating at Prospect Rd. gutter on East Property
Line
Area = 0.37 + 0.36 = 0.73± acres Tc = 10 minutes
C = 0.60 I2 = 2.50 in./hr. Iioo = 7.25 in./hr.
Q2 = 0.60 x 2.50 x 0.73 x 1.00 = 1.10 c.f.s.
Qioo = 0.60 x 7.25 x 0.73 x 1.25 = 3.97 c.f.s.
7. Area from Prospect Rd. concentrating in gutter on East Property Line
Area = 0.12± acres Tc = 10 minutes
C = 0.85 I2 = 2.50 in./hr. Iioo = 7.25 in./hr.
Q2 = 0.85 x 2.50 x 0.12 x 1.00 = 0.26 c.f.s.
Qioo=0.85x7.25x0.12x1.25=0.93c.f.s.
Page 4 off
Client: ARCHITECTURE ONE
By: DRM
Project No. GRD-040-90
REVISED: Nov. 25,1991.
PROPOSED CONDITIONS WITH OFFFSITE AREAS CONSIDERED: (cont.)
7. Total area concentrating at Prospect Rd. gutter on East Property Line
Area = 0.332 + 0.12 + 0.37 + 0.36 = 1.18± acres Tc = 10 minutes
C = 0.70 I2 = 2.50 in./hr. Iioo = 7.25 in./hr.
Q2 = 0.70 x 2.50 x 1.18 x 1.00 = 2.07 c.f.s.
Qioo = 0.70 x 7.25 x 1.18 x 1.25 = 8.49 c.f.s.
THEREFORE, THE QUANTITY OF RUNOFF FLOWING IN THE GUTTER TO THE
EAST OF THE SITE WILL BE REDUCED FROM THAT AT PRESENT.
SIZE INLET IN PARKING LOT
From Fig. 5-2 with 6" deep opening and 6" depth of flow in gutter
Q/ft. = 1.1± cfs/ft.
with 4' long opening Q = 1.1 x 4 = 4.4 cfs
Reduction Factor for sump condition = 80%
Q allowable = 0.80 x 4.4 = 3.5 cfs >> 0.43 & 1.56
SIZE PIPE
Q = 1.486/n A R*2/3 S*1/2
Consider 15" dia. Pipe @ 1.0 %
Q = 1.486/0.013 x 1.23 x 0.46 x 0.1= 6.47 cfs>>0.43 & 1.56
Therefore, 4 ft inlet OK
Therefore, 15" dia. OK
Page-5 of,fi
DETENTION VOLUME DETERMINATION FOR "RATIONAL METHOD"
Time
Q100 Prop.
Vol. @ 0100
Q dis. @ 2 Yr.
Vol. dis.
Vol. Diff.
(min.)
(c.f.s.)
(cu.ft.)
(c.f.s.)
(cU.ft.)
(cU.ft.)
10
4.89
2932
1.33
798
2134
15
4.04
3640
1.33
1197
2443
20
3.50
4206
1.33
1596
2610
25
3.10
4651
1.33
1995
2656
30
2.80
5035
1.33
2394
2641
40
2.36
5662
1.33
3192
2470
50
2.02
6066
1.33
3990
2076
60
1.75
6309
1.33
4788
1521
At Q2 Existing Q = CIACf = 0.755 x 2.50 x 0.703 x 1.0 = 1.33
At Q100 Proposed Q = CIACf = 0.767 x I x 0.703 x 1.25
CACf = 0.767 x 0.703 x 1.25 0.67
Therefore, the Detention Volume desired is 2,656 cu. ft. at a release rate of 1.33 c.f.s.
This is based upon detaining the difference between the present site conditions with runoff
generated by a 2 Year Storm event and the proposed site conditions with runoff generated by
a 100 Year Storm event.
NOTE that it is not possible to detain the desired volume of runoff on the site due to existing
conditions and grading parameters.
ARCHITECTURE ONE
TACO BELL
Proj. No. HYD-040-90
Page 6 of 6 11/25/91 DRM
Engineering
November 27, 1991
Project No. GRD-040-90
Mr. Al Hauser, Architect
ARCHITECTURE ONE
150 East 29th Street
Suite 200
Loveland, Colorado 80538
Dear Mr. Hauser,
The enclosed report represents the results of a 'revised' preliminary drainage
investigation for the proposed TACO BELL to be located on Lots 7 thru 10, Block 6 of the R.
C. Moore's Second Addition to the City of Fort Collins, Larimer County, Colorado.
This investigation was based upon the proposed site development plan and plat; proposed
site grading plan; on -site observations; and available topographic information. The
investigation was performed in accordance with the criteria established in the City of
Fort Collins "Storm Drainage Design Criteria and Construction Specification Standards"
manual and incorporates the comments and concerns expressed through the review by
the City's staff.
Thank you for the opportunity to be of service to you. If you should have any questions,
please feel free to contact this office.
Respectfully Submitted,
Dennis R. Messner, P.E.
MESSNER Engineering Associates
DRM/mkm
Enclosures
Civil and Environmental Engineering Consultants
150 E. 29th Street, Suite 225 Loveland, Colorado 80538 Telephone: (303) 663-2221
TABLE OF CONTENTS
Letter of Transmittal
Table of Contents
Scope
Site Description
Existing Conditions
Proposed Development
Erosion Control Measures
Conclusions and Recommendations
i
ii
1
1
1
2
2
3
Vicinity Map
Existing Conditions Exhibit
Grading & Drainage Exhibit
Calculations
ii
SCOPE
The following report represents the results of a drainage investigation for a proposed
TACO BELL restaurant to be located on a parcel of land situated in the Southwest
Quarter of Section 13, Township 7 North, Range 69 West of the 6th P.M., Larimer County,
Colorado. The site legal description is: Lots 7 thru 10, Block 6 of the R. C. Moore's Second
Addition to the City of Fort Collins.The investigation was performed for
ARCHITECTURE ONE. The purpose of this investigation is to determine the effects of
the proposed development on the area's existing drainage conditions and to determine
the improvements, if any, and the appropriate sizing for proposed improvements so that
it may be incorporated with the construction of the project. The conclusions and
recommendations presented in this report are based upon the proposed site development
plan and plat; proposed site development construction plans; on -site observations; and
the available topographic information. The analysis was performed in accordance with
the City of Fort Collins "Storm Drainage Design Criteria and Construction Standards"
manual.
SITE DESCRIPITION
The site is rectangular in shape and contains approximately 0.703 acres. The site's
East-West dimension is approximately 143 feet and its North -South dimension is
approximately 213 feet. The site abuts the easterly right-of-way of College Avenue and the
northerly right-of-way of Prospect Road. The site is located In the SPRING CREEK
DRAINAGE BASIN.
EXISTING CONDITIONS
The site presently consists of two separate uses. A brick structure is located on the
northern half of the site. This structure was originally constructed as a single-family
residence but has been utilizied as an office building for the past several years. A TACO
BELL restaurant is located on the southerly half of the site at the Northeast corner of the
intersection of College Avenue and Prospect Road. The site slopes gently from North to
South: toward- Prospect Road at a slope of approximately 3%. The site -does not receive
run-off from the properties to the North. The runoff generated on the adjacent property is
directed westerly into the gutter of College Avenue or easterly into the alley. Runoff that
enters both the gutter in College Avenue and the alley flows southerly to Prospect Road.
A storm inlet that is located at the easterly end of the curb radius at the northeast corner
of the intersection of College and Prospect intercepts flow from the north. Excess flow
continues easterly along Prospect to Remington and then southerly along Remington to
Spring Creek.
PROPOSED DEVELOPMENT
The proposed re -development of the site is to consist of the demolition of the existing
TACO BELL structure that is presently situated on the southerly portion of the site. The
existing residential/office structure that is located on the north side of the site is to be
renovated to be used as the "new" restaurant structure. The parking, landscaping and
driveways associated with the "new" restaurant will be places following the existing
structures demolition. The sequence of construction and demolition is anticipated to be
1
PROPOSED DEVELOPMENT(cont.)
such that the existing restaurant will remain in operation while the existing structure is
being renovated. Other improvements that will take place in the future and will
ultimately effect the grading and drainage for the site is the proposed reconstruction of
Prospect Road. This construction is being proposed in order to provide channelizing and
turning lanes to improve traffic flow in the area. In order to do this the street will be
widened. The curb and gutter is to be shifted to the North a distance of 15.5 ft. along
Prospect Road in order to provide additional turning lanes. This roadway widening will
also require that the existing storm drainage inlet located at the northeast corner of the
intersection be reconstructed. The proposed grading and drainage plan for the site has
taken this proposed future construction into account. The perimeter grades have been
established by continuing the crown slope grades of the existing roadway to the proposed
gutter locations.
A portion of the site, approximately 0.2 acres, is to be routed to a new drainage inlet to be
located in the parking lot on the site. This area previously discharged directly into the
curb and gutter located along the north side of Prospect Road.
EROSION CONTROL MEASURES
Erosion control considerations have been made based upon the short term,i.e., during
construction activities and the long term, through the life of the facility. The long term
measures incorporated to eliminate erosion are the proposed methods and materials to
be used to provide a surface covering for the driveways, parking areas, walkways and the
landscaped open areas. The structure and hard surfaced areas will provide a covering to
deter erosion. The landscaping to be established will be a combination of plantings and
ground covers to deter erosion.(Please refer to the proposed "Landscaping Plan"
prepared by the project's Architect)
The short term erosion control method to be incorporated into the construction
requirements for the project is the placing of "Curb Inlet Filter Gravel" at the proposed
storm drain inlet to be constructed onsite. It is not considered as necessary to provide any
wind erosion measures due to the protected nature of the site. The anticipated schedule
of construction activities is anticipated to be: remodel and addition to the existing
structure; perform access and site related construction around remodelled structure;
demolition -of existing Taco Bell structure and existing drives and -parking; construct
new parking and drives; and instal landscaping and signage. With this schedule the site
will be "open" and subject to water caused erosion for an extremely short period of time.
This is due to the desire to have the existing restaurant remain in operation while the
existing structure is being renovated. The demolition of existing facilities and subsequent
grading and paving operations will be scheduled in a manner that will place the "new"
restaurant in operation as quickly as possible. Therefore, depending upon the sequence
of activities and the weather conditions it may be possible for no temporary measures to
be required.
2
CONCLUSIONS AND RECOMMENDATIONS
1. The proposed development will retain the existing drainage patterns.
2. The site is located in the SPRING CREEK DRAINAGE BASIN. The site is not
located within the floodway or flood plain.
3. All development is to be performed in accordance with City of Fort Collins
Standards and Specifications.
4. Onsite detention of stormwater is desired by the City of Fort Collins. The difference
between the existing and proposed conditions is estimated to be 2,656 cu. ft. when
based upon the difference between the runoff from a 2 Year Storm at the existing
condition and the runoff from a 100 Year Storm at the proposed conditions. It is not
practical to detain this volume on the site due to existing topographic conditions and
physical grading constraints that are placed on the site. The grading and drainage
plan has been designed to assure that the proposed development will not adversely
impact the existing drainage system. The design is such that the runoff from the site
is to be routed to reduce the area that drains directly into the street curb and gutter.
This will reduce the runoff that flows to the east along the north side of Prospect
Road.
A request for a variance to the City's policies is to be submitted in conjunction. with
this report.
5. The City of Fort Collins Standards for temporary erosion control measures are to be
incorporated with the construction activities. Specifically, 'filter gravel' is
recommended to be placed at the proposed curb inlet to be constructed in the parking
lot onsite.
3
VICINITY' MAP!
i
--- _....._ .... - - -- - -
I ,no.
Do
OO - on m
...a N _
o II SCALE: 1"-20' INo D
i II 1 :1�:.::: -n p
W N U)
W T -n
n U)
U) m D
' R/RTIE 1.0 I Ian y
OFF LINE 9S 9s R TIE 00 LINE
W r. O _ ��S _
�1 — ._ _ •.' :_ �y - 99>9s3 M�FENCE ON LIVE
`41
GRAVEL D(ZIVE o
'.• PHONE PEP.co
M�
���' a • X 1
Odd P /
\V A\Q .
I
I STORY BRICK m ,, 5 Zo.�'
W/ BASEMEFJT 49 C7�2AVEL �` 3
cA BRICK
! I 9 GAPZAGE° 5.8
1530 S. COLLEGE - Ate° Su2FAc�- � FF.
= N
�110.42
B-1,41
in72
100.1,
l,
r
r J 92' - �6 . • AI\L Q
o`ti O '•—ice �� �O 0 40 7 \0 . C71Z II' - PV .w
O BRIGK aL3�
3 / 030' �1 24" DO PSTE
O :
jj R/R TIE PNOUE PEP.
I u i RETAIN1106 WALL L 9!Av
01,
AN
j::'• ' PSI �.; ,. 7i v +( o
I agclLP � GAS ��� �...1
Q/ °`'
i I .
:... I 4"7.4'
ASPNAL-T
fl I S70�1 Q
I
"•. f.'I � I STCRY MA�GNRY _ i. � �.1
Wo BA5EMEO-( : 11
�
TACO BELL �ESTAU(zA1JT :::� ^�\�-- LL y
O.D
I.: :: jSTONE \: • F.F. = 91.11 °�� a0� ~\ �e N
I O °' oL m
�... 41.4' .1 ° aA is o o II
D90!2 9, Q
Q 90 Fo o
$IGN
QQ� 3
0.0
qFq �::. c�
RAFFIC- 5IGNAL Q2 0 1
\ cONTZOLE� ; ' t 'oo to C S4 qc a9 .•'t
TRAFFIC 51GNAL, i CFS9vTr : x:
O�1C. CURB GUTTER: SIDEWALK:.:.
77
aNMAO"OLF— S FLOW LINE
%r Lio (6r. �l i T) 9� CURB CUT
AREA = 1.04 AC. I /� a,� AREA = 0.07 AC.
Q2 = 1.8 CFS �p Q2 = 0.15 CFS / a�
L— - Q 100 = 6.6 CFS r— }� -
Q 100 = 0.5 CFS
-PROSPECT ROAD—
AREA = 1.35 AC.
EXISTING CONDITIONS EXHIBIT Q100 2• s 6 CFS
Client: ARCHITECTURE ONE Project No. GRD-040-90
By: DRM Date: Oct. 28, 1991
REVISED: Nov. 25, 1991
Calculations for Drainage Investigation for Lots 7 thru 10 , Block 6 of R. C. Moore's 2nd
Addition located in the SW1/4 of Section 13, Township 7 North, Range 69 West of the 6th
P.M., City of Fort Collins, Larimer County, Colorado
Total Site Area = 0.703 ± acres of existing platted property
The proposed development of the site is to consist of demolition of the existing structures
on the site and the construction of a new TACO BELL restuarant. The site will be
required to dedicate property along College Ave. and Prospect Road due to proposed
street widening projects proposed to occur in the near future. The net area of the site
after right-of-way dedication is anticipated to be:
Net Site Area = 0.634 ± acres
EXISTING CONDITIONS - RUNOFF COEFFICIENT
Rational "C" Factor = 0.20 for Lawns and Landscaped Areas
= 0.95 for Roofs, Decks, Patios, etc.
= 0.95 for Asphalt and Concrete Streets, Drives, and Parking
= 0.50 for Gravel Streets, Drives, and Parking
"C"avg (Existing) Lawns and Landscaped Areas = 3,728 sq.ft.±
Roofs, Decks, Patios, etc. = 7,649 sq.ft.±
Streets, Drives, and Parking = 12,196 sq.ft.±
Gravel Drives, and Parking = 7.050 sq.ft.±
Total Site = 30,623 sq.ft.±
"C" avg = ((3,728 x 0.20) + (7,649 x 0.95) + (12,196 x 0.95) + (7,050 x 0.50)) + 30,623 = 0.755
"C" avg = 0. 755
PROPOSED DEVELOPMENT - RUNOFF COEFFICIENT
"C"avg : Lawns and Landscaped Areas = 7,490 sq.ft.±
Roofs, Decks, Patios, etc. = 2,825 sq.ft.±
Streets, Drives, and Parking = 20.308 sq.ft.±
-- ---Total-Site- - = 30,623-sq.ft.±
"C" avg = {(7,490 x 0.20) + (2,825 x 0.95) + (20,308 x 0.95)} + 30,623 = 0.767
"C"avg = 0.767
TIME -OF -CONCENTRATION
Time of Concentration (Roof to Ground) = 5 minutes
Time of Concentration (Ground to Street): Tc(min.) = 1.8 [ 1.1 - (Cf x C) ] 4L(ft.) + 3qS(%)
Time of Concentration (Street Flow): T(min.) = L(ft.) + [Vel. (ft./sec.) x 60 min./sec.]
TTotal = TRoof + Tc + Ts
Page 1 of 6