HomeMy WebLinkAboutTACO BELL RESTAURANT - 51-90 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEW- ` .
City of Fort Collins
Develo lent Services
Planning Department
July 23, 1990
Mr. Al Hauser
Architecture One
150 E. 29th Street
Loveland, CO 80538
Dear Mr. Hauser:
For your information, attached is a copy of the Staff's comments concerning
the Taco Bell . Expansion, which was presented before the Conceptual Review
Team on July 23, 1990.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
Ted Shepard
Project Planner
TS/gjt
Attachment
xc: Tom Peterson, Director of Planning
Kerrie Ashbeck, Civil Engineer I
Project Planner
File
281 N. College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (3031 221-5750
CONCEPTUAL
MEETING DATE: July 23, 1990
REVIEW STAFF COMMENTS
ITEM: Taco Bell Expansion, N.E.C. College and Prospect
APPLICANT: Mr. Al Hauser, Architecture One, 150 E. 29th St. Loveland, CO. 80538
LAND USE DATA:
Request to remove the existing office at
Taco Bell at 1538 S. College to construct
floor area on 30,623 square feet of lot
drive-thru lanes and alley improvements.
COMMENTS:
1530 S. College and demolish the existing
a new Taco Bell with 2,650 square feet of
area. New restaurant would include two
The full turn movements at the improved alley/Prospect Road intersection will
not be allowed. This curb cut will have to be restricted to a right -in right -out
only. There is insufficient distance from the intersection of College and
Prospect to allow full turn movements at the alley. The area east of the alley
is proposed to be the taper for a new right -turn bay for westbound Prospect
Road.
2. A traffic impact analysis should
generation •and the location of
streets. The traffic consultant
Transportation Director, and Mr.
existing data and future p
redevelopment of this parcel w
should address traffic volumes a
be prepared to address the impact of the trip
the proposed curb cuts on the surrounding
is encouraged to contact Mr. Rick Ensdorff,
Greg Lanning, Project Manager, regarding the
ans for intersection improvements. The
I impact the surrounding area. The analysis
d proposed geometries.
3. A new curb cut on College Avenue will require an access permit from the State
Highway Department. Application is made to the City who will facilitate the
permit process.
4. According to Greg Lanning, Project Manager for College/Prospect intersection
improvements, the City is interested in providing a double left turn lane for
southbound College to eastbound Prospect as well as the aforementioned right
turn lane for westbound Prospect. This project has been designed on a
preliminary basis. Mr. Lanning is willing to work with Taco Bell on
coordinating so that the subject property is negatively impacted. Please contact
Mr. Lanning at 221-6605 for details on this capital improvement project.
5. The Planning Department is concerned about the proposal to remove the
existing structure at 1530 South College (KSQI Radio). It is the Planning
Department's position that such removal would change the distinctive character
of the two blocks of College Avenue between Prospect and Pitkin. This area
represents a dramatic change from the commercial strip south of Prospect along
the South College Avenue corridor. For this reason, the west side of College
Avenue, from Prospect to Lake, has been allowed to develop as small offices
under very strict P.U.D. guidelines. The two block area is defined by tall
trees, large spruce trees, parking in the rear, a City Park, and residential
character. This area is unique and offers a gateway to the C.S.U. campus and
the downtown.
6. The structure to be removed
has historical significance. The City's Historic
Specialist
has
indicated that
this building may be eligible for the National
Register
of
Historic Places.
The house has beautiful architecture and is an
asset to
the
surrounding area.
Has any consideration been done to adapt the
structure
to
fit Taco Bell's
needs? This would preserve the structure and
maintain
the
character of the
area.
7. The project would be reviewed under the Business Service Uses point chart of
the Land Development Guidance System. The proposal to add development to
the north would be reviewed as a new project and does not meet the 50%
minimum required score. The Planning and Zoning Board has authority to
grant variances based on hardship or a plan that demonstrates a quality equal
to or better than a plan that would normally meet the 50% minimum score.
8. The existing electrical source is from the alley via overhead power lines.
Redevelopment would trigger this overhead line to be placed underground, if
feasible. A transformer would have to be located and an easement provided
from the transformer to the structure. It is recommended that easement
dedication be by subdivision plat rather than separate deed.
9. There is a 12 inch water main in College Avenue, and
a 6 inch
sewer main in
the alley. Both of
these mains are available for
tapping.
It would be
necessary to abandon
any existing service line at the
main. If
new or larger
taps are required, then credit may be given to any
taps that
are abandoned.
For instance, the 3/4
inch water tap for KSQI could
be abandoned and credit
taken for a one inch
tap.
10. A grease trap would have to be provided on the sanitary sewer and located
outside the building.
11. The site drains to the intersection. Any redevelopment appears to add
impervious surface which requires on -site stormwater detention. This detention
may be accomplished in the parking lot. A Drainage Report and Drainage and
Grading Plan are also required.
12. The stormwater culvert should be protected from pollution and debris usually
found around the dumpster. Erosion control must be implemented during the
construction phase. The site is located in the Spring Creek Drainage Basin,
and fees are approximately $15,005 per acre of impervious surface.
13. The Poudre Fire Authority requires the parking lot to have 20 feet inside and
40 foot outside turning radii.
14. The parking lot should show internal parking stall length to be 19 feet and
stalls that overhang at least a six foot sidewalk or landscaping may be reduced
to 17 feet.
15. If a hold-up alarm system is installed, please consult with the Fort Collins
Police Department, Crime Prevention Unit.
16. The site plan should indicate separate bicycle, motorcycle, and handicap parking
stalls.
17. Menu boards are counted as free-standing signs if they are visible from the
street or property line. Or, the signs may be allowed if they each total less
than four square feet.
18. Any P.U.D. that proposes a pole sign would be recommended to the Board to be
replaced with a monument sign.
19. Under normal circumstances, 6% of the parking lot is required to be landscaped.
Also, the landscaping along College Avenue, especially north of the curb cut
looks weak and would need improvement.