Loading...
HomeMy WebLinkAboutTACO BELL RESTAURANT - 51-90 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESARCHITECTS/PLANNERS, P.C. ONE TACO BELL RESTAURANT PROSPECT ROAD AND COLLEGE AVENUE FORT COLLINS, CO LEGAL DESCRIPTION Lots 7, 8, 9, and 10, Block 6, L.C. Moore's Second Addition to the City of Fort Collins, Larimer County, Colorado. Otherwise known as 1530 and 1538 South College Avenue. STATEMENT OF PLANNING OBJECTIVES Taco Bell has recently acquired an available property immediately north of their existing property at South College Avenue and Prospect Road. The acquisition of this property will allow Taco Bell to achieve the following objectives: 1. Construct a new restaurant with an increased seating capacity and the convenience of a drive-thru service capability, and 2. The ability to accommodate the City of Fort Collins Transportation Department concerning the dedication of additional right-of-way along both College and Prospect to allow for planned improvements to the intersection. Initial consideration was given to an extensive remodel and addition to the existing residence at 1530 South College Avenue. However, site vehicular circulation and open space requirements within the kitchen/food preparation area rendered this design solution unfeasible. Currently, Taco Bell is working with the City of Fort Collins Housing Authority in an effort to relocate the existing residential structure to another property. The new Taco Bell restaurant wil corporation's standard design in better neighborhood compatibility. the other residential structures South College Avenue (i.e. - face mission tile clay roofing) will be building materials on the new Taco 1 deviate from the order to achieve a Materials common to along this area of brick., stucco, and utilized as exterior Bell restaurant. 150 EAST 29TH STREET PALMER GARDENS. SUITE 200 LOVELAND. COLORADO 80538 303/669-9060 FACSIMILE 303/669-9066 The new restaurants location on the site will allow the existing Taco Bell to remain open during the time period that the new facility is under construction. ppUpon completion of construction, the existing restaurant will be demolished and the sitework will be completed. This scenario will allow for a two week closed period as opposed to the restaurant being out of operation for as much as several months. Special consideration has been preliminary site planning process of the mature deciduous trees properties as possible. Only oni College Avenue will be lost in the other trees further to the east, two existing properties, will also taken through the to preserve as many on the existing mature tree along redevelopment. Two located between the be removed.