Loading...
HomeMy WebLinkAboutMARS LANDING - PDP190013 - SUBMITTAL DOCUMENTS - ROUND 2 - VARIANCE REQUEST (2)Gam'".010-oway September 9, 2020 Spencer Smith Engineering Development Review City of Fort Collins 281 N College Avenue Fort Collins, CO 80524 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 • GallowayUS.com RE: Mars Landing -Variance Request to LCUASS Chapter 8.2 Dear Spencer, Please find this letter as our formal request for an administrative variance to the requirements set forth in Chapter 8.2 of the Larimer County Urban Area Street Standards (LCUASS) as they relate to lane alignment through intersections. The project, Mars Landing, is located at the southwest corner of the intersections of Mars Drive and Skyway Drive in the City of Fort Collins. The project proposes to restripe the eastbound approach of Skyway Drive at South College Avenue (US Hwy 287) to allow for a right -turn only lane onto College Avenue. Section 8.2.2 of LCUASS allows a maximum 2-foot shift across an intersection. The existing striping configuration at the eastbound approach of Skyway Drive includes a 6-foot wide bike lane to the south and a 11-foot through lane. The 11-foot through lane also accommodates both right and left turns. As part of the proposed Mars Landing project, it has been requested of the owner to install a right -turn lane to alleviate congestion on Skyway Drive. The proposed restriping plan, as directed by City Staff, includes a 10.5-foot right -turn lane, a 5' bike lane, and a 10.5-foot lane that allows through and left -turn movements. The proposed configuration results in a shift of the eastbounc centerline of approximately 4.5-feet north. The proposed centerline, therefore, would not align with the existing centerline of the westbound approach from Skyway Drive on the opposite side of the intersection. This offset of 4.5' would exceed the allowable 2-foot shift across the intersection. It is understood that the re -striping of the eastbound Skyway Drive would alleviate congestion at the intersection and is desirable by residents of the neighborhoods to the west and north of the Mars Landing project site. Thank you for your consideration of this variance request. Should you have any questions, please do not hesitate to contact me 970.800.3300. Sincerely, GALLOWAY Donald B. Cecil, P.E. Civil Project Engineer 970.800.3300 DonaldCecil@GallowayUS.com cc: