HomeMy WebLinkAboutA REPLAT OF LOTS 11 AND 12 OF EVERGREEN PARK THIRD FILING - 53 90 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWDevelc ent Services
Planning Department
City of Fort Collins
July 24, 1990
CDS Engineering Corp.
Dave Woutersz
100 W. 29th Street
Loveland, CO 80538
Dear Mr. Woutersz:
For your information, attached is a copy of the Staff's comments concerning
the Housing Authority lots on Matuka Ct., which was presented before the
Conceptual Review Team on July 23, 1990.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely, �/%%.��.��.
4 w �.. � 4 Ar.[aif0r 1.2.
Kirsten Whetstone
Project Planner
KW/gjt - - -- —
Attachment
xc: Tom Peterson, Director of Planning
Kerrie Ashbeck, Civil Engineer I
Project Planner
File
281 N. College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: July 23, 1990
PROJECT: Housing Authority two lots on Matuka.Ct.
APPLICANT: CDS Engineering Corp., Dave Woutersz, 100 W. 29th St, Loveland,
CO., 80538.
LAND USE DATA:
There are two lots with existing fourplexes. The proposal is to divide these
two lots into three in order to add a duplex between the existing two
fourplexes.
COMMENTS:
1. The property is zoned RLM, low density multifamily, duplexes are an
allowable use. There are enough engineering and utility issues to consider
this request as a Subdivision as opposed to a Minor
Subdivision/Administrative Review. The project must meet the minimum
requirements of the RLM, Low Density Multifamily, zoning district or must
be submitted as a Planned Unit Development (PUD).
2. Minimum lot area shall be the equivalent of three times the total floor area
of the buildings, but not less than 6,000 sq. ft. for a duplex and not less
than 9,000 sq. ft. for a fourplex. Minimum lot width shall be 60' for a
duplex and 75' for a fourplex. Minimum depth of the front yard shall be
20' and minimum depth of the rear yard shall be I5'.
3. For duplexes the
minimum
side yard shall be
15' on the street side
of any
corner lot and 5'
on all interior side yards.
For fourplexes the minimum
side yard width
shall be
the equivalent of
1' per 3' of building
height
_prov_ ided that a _side yard
on the street side
of any corner lot shall
not be
less than 15 feet
and on
all interior sides
the setbacks shall not
be less
than 5 feet.
4. There was a suggestion made to place the proposed building up against the
power line easement to gain the minimum front yard depth.
5. Parking standards require at least 2 spaces per unit for duplexes on lots
with less than 40 feet of street frontage. Each fourplex unit with 2
bedrooms requires at least 1.75 parking spaces, each fourplex unit with
three bedrooms requires at least 2 parking spaces. Eighteen to twenty
parking spaces would be required for combined parking for the three
buildings.
6. All open off-street parking lots containing 6 or more parking spaces or
1800 square feet, must meet parking lot setback requirements, screening
and landscaping requirements, and bicycle and handicapped parking
requirements. Please sce the attached Parking lot requirements.
7. You will need to replace the drainage inlet or in some way get the
drainage to work with the new parking areas. With the replat of lots
please vacate old and dedicate new easements with specific vacation
language. Mike Herzig in the planning office can assist you with this
language.
8. With no gas provided to the site, all heating will be through City Light
and Power. Power is available to the project via a transformer located
between lots 11 and 18 at the rear corner. Existing easements should be
utilized. The Fort Collins Housing Authority is responsible for any
modifications and new services provided to the site as a result of the
proposed development. Please contact Doug Martine at 221-6700 for more
information on fees and charges.
9. There are existing water and sewer mains in Matuka Court, the developer
will be required to install any new taps that are needed for this project.
10. A drainage report will need to be submitted to explain how storm water
will be handled on the site and how it will be carried to the existing
drainage easement on the southern boundary of the site. This report
should also address erosion control for the outfall structure as well as
during construction. The City Storm Water Utility has purchased a strip
of land which runs south of this property, for a drainage Swale. The
timing of the City's construction of this swale and the development of this
duplex project should be coordinated or temporary drainage measures may
be needed. Please contact the Storm Water Utility (221-6589) for more
information.
11. It would be preferable, design wise, to place the building as far to the
south of the site as possible (to the power easement, if possible). This
would allow for parking to be located in the front and connect to the two
existing parking lots. By creating a loop drive/parking. area, using the 2
existing curb cuts, there would be the opportunity to landscape the area
between the curb. cuts with trees, shrubs, grass, and planting beds. Small
landscaped islands between the parking lots for the fourplexes and the
duplex, on both sides, would break up the visual impact of 3 large parking
_.__areas in front of these buildings.
12. The Planning Department is recommending that a neighborhood meeting be
held to get neighborhood input on this project.