HomeMy WebLinkAboutCSU RAW WATER UTILITY EXTENSION SOUTH CAMPUS - SPA200001 - SUBMITTAL DOCUMENTS - ROUND 1 - APPLICATIONCSU South Campus - Raw water supply
Routing Diagram
NORTH
P
P
C
W. ELIZABETH STREET
COLLEGE
LAKE
Horsetooth
Reservoir Supply
Future phase
storage pond
W. Prospect Road
W. Drake Road
Foothills
Campus
Main
Campus
South
Campus
Centre Avenue
Overland Trail
Taft Hill Road
Shields Street
College Avenue
HORSETOOTH
RESERVOIR
P
C
P
LEGEND
Primary Pumpstation
Chillplant
Secondary Pumpstation
Primary Supply trunk
line - 14” steel 1960’s
Secondary Mainline
Proposed Supply line
routing current scope
May 2020
CSU South Campus Raw water supply
Alignment Diagram
NORTH
(See Enlarged Plan)
Spring
Centre Avenue
NRRC
PHEMISTER RD.
Chill Plant
Point of
connection
USDA
CSU Board of Governors
State Land Board
CSURF
OWNERSHIP LEGEND
Creek
Proposed raw
water supply
line alignment
June 2020
CSU South Campus Raw water supply
Enlarged Plan - SPAR Review Boundary
NORTH
Spring
Centre Avenue
NRRC
SHERWOOD LATERAL
Point of
connection
USDA
CSU Board of Governors
State Land Board
CSURF
Site Photo Locations
SPAR Review Boundary
LEGEND
Creek
Proposed raw
water supply
line alignment
#
1
2
3
4
6
5
June 2020
2
3
CSU South Campus Raw water supply
Site Photos
1 2
3
4
5 6
June 2020