HomeMy WebLinkAboutSAMS CLUB FUEL STATION - MJA200002 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSSITE S1 S2 S3 S4 S5 S6 S7 HC POL LDR E GC HC UE LDR LDMN MDMN MDMN LDR LDR POL POL LDMN LDR POL LDMN GC SC LDMN LDMN E HARMONY ROAD OAKRIDGE DR S BOARDWALK DR S LEMAY AVE S COLLEGE AVE FOSSIL CREEK PKWY S COLLEGE AVE S MASON ST MASON TRAIL S BOARDWALK DR SAM'S CLUB E HARMONY ROAD S LEMAY AVE S COLLEGE AVE Engineering Associates, Inc. ARIZONA § ARKANSAS § CALIFORNIA § FLORIDA § MINNESOTA § NORTH CAROLINA § PENNSYLVANIA § TEXAS CONSTRUCTION PLANS FOR 7543 N. Ingram Ave., Suite 107 Fresno, CA 93711 (559) 447-3119 FAX: (559) 447-3129 31493-CS 31493 SAM'S CLUB FUEL STATION #6633-212 4700 BOARDWALK DRIVE C1 FORT COLLINS , COLORADO LAND USE TABLE PROJECT NAME: SAM'S CLUB FUEL STATION #6633 DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 4:10 PM C2 7/23/20 GENERAL NOTES 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633-212 31493 31493-GN JOB # 31493 DRAWING: 31493-GN.dwg LAST SAVED BY: JOEPERKINS GENERAL NOTES: A. TOPOGRAPHIC BOUNDARY SURVEY, INCLUDING PROPERTY LINES, LEGAL DESCRIPTION, EXISTING UTILITIES, SITE TOPOGRAPHY WITH SPOT ELEVATIONS, OUTSTANDING PHYSICAL FEATURES AND EXISTING STRUCTURE LOCATIONS WAS PROVIDED BY THE FOLLOWING COMPANY, AS A CONTRACTOR TO THE SELLER/OWNER: TOPOGRAPHY/BOUNDARY: PLS CORPORATION 532 WEST 66TH STREET LOVELAND, COLORADO 80538 PHONE 970 669-2100 M. BRYAN SHORT, PLS BOUNDARY SURVEY WAS NOT REQUESTED OR PERFORMED. BOUNDARY WAS TAKEN FROM OLD DESIGN DRAWINGS. CEI ENGINEERING SHALL NOT BE HELD RESPONSIBLE FOR ERRORS OR OMISSIONS DUE TO THE LOCATION OF BOUNDARY LINES. CEI ENGINEERING AND ITS ASSOCIATES WILL NOT BE HELD RESPONSIBLE FOR THE ACCURACY OF THE SURVEY OR FOR DESIGN ERRORS OR OMISSIONS RESULTING FROM SURVEY INACCURACIES. B. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF EXISTING STRUCTURES, RELATED UTILITIES, PAVING, UNDERGROUND STORAGE TANKS AND ANY OTHER EXISTING IMPROVEMENTS AS NOTED. SEE SITE WORK SPECIFICATIONS. C. CONTRACTOR IS TO REMOVE AND DISPOSE OF ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM PREVIOUS AND CURRENT DEMOLITION OPERATIONS. DISPOSAL WILL BE IN ACCORDANCE WITH ALL LOCAL, STATE AND/OR FEDERAL REGULATIONS GOVERNING SUCH OPERATIONS. D. THE GENERAL CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR AND SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. E. WARRANTY/DISCLAIMER: THE DESIGNS REPRESENTED IN THESE PLANS ARE IN ACCORDANCE WITH ESTABLISHED PRACTICES OF CIVIL ENGINEERING FOR THE DESIGN FUNCTIONS AND USES INTENDED BY THE OWNER AT THIS TIME. HOWEVER, NEITHER THE ENGINEER NOR ITS PERSONNEL CAN OR DO WARRANT THESE DESIGNS OR PLANS AS CONSTRUCTED EXCEPT IN THE SPECIFIC CASES WHERE THE ENGINEER INSPECTS AND CONTROLS THE PHYSICAL CONSTRUCTION ON A CONTEMPORARY BASIS AT THE SITE. F. SAFETY NOTICE TO CONTRACTOR: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. ANY CONSTRUCTION OBSERVATION BY THE ENGINEER OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES, IN, ON OR NEAR THE CONSTRUCTION SITE. G. ALL CONSTRUCTION IN STATE HIGHWAY DEPARTMENT RIGHT-OF-WAY SHALL BE COORDINATED w w stop sign stop sign stop sign stop sign stop sign stop sign stop sign stop sign metal chase covered cart return covered cart return storm grate rim = 4996.62' 18" RCP inv. (S) = 4994.40' speed bump outback curbside pickup sign concrete sidewalk concrete asphalt asphalt asphalt concrete sidewalk concrete sidewalk concrete sidewalk concrete sidewalk yield to pedestrian sign 20' AUE 10' AUE w ue mb large snow pile at time of survey concrete sidewalk stop sign stop sign stop sign pillars planters concrete sidewalk 15" 3" 14 10" 14" 6" 12" 12" 14" 15" 15" 18" 9" 4" 14" 18" 12" 20' AUE 10' AUE mb WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer WB-50 - Intermediate Semi-Trailer VAN KIOSK 200± SF FFE 5000.05 DO NOT ENTER DO NOT ENTER S JT JT JT OSV VENT TEMPORARY ONSITE BENCHMARK IRON PIPE IN ASPHALT HOLE ELEV 5000.297' N 1433734.81993' E 3121499.21743' 1 4 21 17 44 14 12 11 14 L=17.28, R=11.00 Δ=90°00'00" N88°12'35"W 107.00' L = 1 5 5 . 4 3 , R = ue ue ue ue mb VAN KIOSK DO NOT ENTER DO NOT ENTER S VENT PROPOSED SAM'S CLUB FUEL STATION SINGLE STORY KIOSK: 200± SQ FT CANOPY: 3,467± SQ FT ZONE: HARMONY CORRIDOR DISTRICT USE: COMMERCIAL/RETAIL EAST HARMONY ROAD (MAJOR ARTERIAL 6 LANES) SOUTH BOARDWALK DRIVE (COLLECTOR 2 LANES) OAKRIDGE DRIVE (COLLECTOR 2 LANES) S. LEMAY AVENUE (ARTERIAL 4 LANES) SAM'S CLUB 130,383± SQ FT 4700 E. BOARDWALK DRIVE, FORT COLLINS, CO ZONE:HC (HARMONY CORRIDOR DISTRICT) USE: COMMERCIAL/RETAIL E-ONE Heavy Walkin Rescue E-ONE Heavy Walkin Rescue E-ONE Heavy Walkin Rescue E-ONE Heavy Walkin Rescue E-ONE Heavy Walkin Rescue E-ONE Heavy Walkin Rescue E-ONE Heavy Walkin Rescue E-ONE Heavy Walkin Rescue E-ONE Heavy Walkin Rescue E-ONE Heavy Walkin Rescue E-ONE Heavy Walkin Rescue E-ONE Heavy Walkin Rescue E-ONE Heavy Walkin Rescue E-ONE Heavy Walkin Rescue E-ONE Heavy Walkin Rescue EXISTING FIRE HYDRANT TO REMAIN EXISTING FIRE HYDRANT TO REMAIN EXISTING FIRE HYDRANT TO REMAIN EXISTING FIRE HYDRANT TO REMAIN 30' EXISTING FIRE HYDRANT TO REMAIN EXISTING FIRE HYDRANT TO REMAIN EXISTING FIRE HYDRANT TO REMAIN EXISTING FIRE HYDRANT TO REMAIN PROPOSED FIRE HYDRANT END PROPOSED FIRE LANE STRIPING & SIGNAGE BEGIN PROPOSED FIRE LANE STRIPING & SIGNAGE 300' 20' 20' 10' VAN KIOSK 200± SF FFE 5000.05 covered cart return covered cart return DO NOT ENTER DO NOT ENTER S OSV VENT TEMPORARY ONSITE BENCHMARK IRON PIPE IN ASPHALT HOLE ELEV 5000.297' N 1433734.81993' E 3121499.21743' ue mb R25' 3.5' 8.02' 35' 41' 15.61' 24.25' 12.37' 25.1'± 10.3'± 3'± 17.7'± 18.1'± 13'± 9.29' 3.08' 29.92' 3.08' 29.92' 3.08' 9.29' 19.1'± 20.3'± 18'± 17.7'± 18.3'± 47.9'± 18' 6.2' 47.64' 20.3'± 17.7'± 5.9'± 12' 18' 5' 6' 6' 7' 8.25' R5' R5' R5' R5' R5' R5' R5' R5' A A F A A A A B 43' 12' C TYP D TYP D TYP 5000.00 fl 4999.64 fl fl 4999.56 fl 4999.78 4999.20 fl fl 4998.50 fl 4997.70 fl 4997.69 fl 4997.54 fl 4997.67 fl 4997.97 fl 4997.93 4998.06 fl fl 4998.10 4998.20 fl 4998.24 fl fl 4998.94 fl 4999.89 4999.95 fl 5000.37 fl w MB w 5001.57 tc 5001.10 fl 5000.75 fl 5000.39 fl 5000.42 fl 5000.88 fl fl 4997.49 4997.46 fl 4997.59 fl 4998.01 fl 4998.12 tc 4997.97 fl ec 4997.92 ec 4997.66 fl 4997.63 4997.32 ec fl 4997.36 4997.80 4999.20 fl fl 4998.50 4997.70 fl fl 4998.10 4998.20 fl 4998.24 fl 4998.94 fl 4997.38 fl 4997.74 ec 4998.39 ng 4997.73 fl 4999.31 ng fl 4998.45 4998.21 fl ng 4998.43 4998.77 ng fl 4998.79 fl 4999.90 metal chase storm grate rim = 4996.62' 18" RCP inv. (S) = 4994.40' ng 4998.19 4999.70 ng ng 4998.96 ng 4998.49 4998.25 ng 4998.15 ng 4998.14 ng 4999 4998 4997 15" 15" 18" 14" 10" 10" 14" 12" 10" 12" KIOSK 200± SF FFE 5000.05 KIOSK 200± SF FFE 5000.05 covered cart return covered cart return S VENT ue ue ue mb 5001 5000 5000 4999 4999 4999 4999 4998 4998 4997 4998 4999 ONSITE DRAINAGE AREA 0.80 ACRES OFFSITE DRAINAGE AREA 0.42 ACRES OFFSITE DRAINAGE AREA 0.09 ACRES ALERT TO CONTRACTOR: ALL SAM'S CLUB GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. SCALE IN FEET 0 30' 45' 60' DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 12:16 PM C7.1 7/29/20 DRAINAGE MAP EXHIBIT 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633-212 31493 31493-DR JOB # 31493 DRAWING: 31493-DR.dwg LAST SAVED BY: JOEPERKINS Know what'sbelow. Call before you dig. NOTE: SEE ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF KIOSK covered cart return covered cart return S VENT ue ue ue mb ALERT TO CONTRACTOR: ALL SAM'S CLUB GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. SCALE IN FEET 0 30' 45' 60' DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 12:16 PM C7.2 7/29/20 EXISTING IMPERVIOUS MAP 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633-212 31493 31493-DR JOB # 31493 DRAWING: 31493-DR.dwg LAST SAVED BY: JOEPERKINS Know what'sbelow. Call before you dig. NOTE: SEE ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF PORCHES, RAMPS, VESTIBULE, SLOPED PAVING, TRUCK DOCKS, BUILDING UTILITY ENTRANCE LOCATIONS AND PRECISE BUILDING DIMENSIONS. SITE BENCHMARK: CITY OF FORT COLLINS BENCHMARK: 4-08 ON SOUTH SIDE OF HARMONY RD. AT THE NORTHWEST CORNER OF 625 EAST HARMONY RD. (FRONT RANGE BAPTIST CHURCH), ON THE NORTH WALL OF A CONCRETE IRRIGATION DROP STRUCTURE. NAVD88=5017.14' 5/19/2020INITIAL DESIGN SITE FEATURES DRAINAGE BOUNDARY PERVIOUS AREA IMPERVIOUSNESS PERVIOUS AREA (SF) 5151 9% IMPERVIOUS AREAS (SF) 51973 91% KIOSK 200± SF FFE 5000.05 covered cart return covered cart return S VENT ue ue ue mb ALERT TO CONTRACTOR: ALL SAM'S CLUB GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. SCALE IN FEET 0 30' 45' 60' DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 12:16 PM C7.3 7/29/20 PROPOSED IMPERVIOUS MAP 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633-212 31493 31493-DR JOB # 31493 DRAWING: 31493-DR.dwg LAST SAVED BY: JOEPERKINS Know what'sbelow. Call before you dig. NOTE: SEE ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF PORCHES, RAMPS, VESTIBULE, SLOPED PAVING, TRUCK DOCKS, BUILDING UTILITY ENTRANCE LOCATIONS AND PRECISE BUILDING DIMENSIONS. SITE BENCHMARK: CITY OF FORT COLLINS BENCHMARK: 4-08 ON SOUTH SIDE OF HARMONY RD. AT THE NORTHWEST CORNER OF 625 EAST HARMONY RD. (FRONT RANGE BAPTIST CHURCH), ON THE NORTH WALL OF A CONCRETE IRRIGATION DROP STRUCTURE. NAVD88=5017.14' 5/19/2020INITIAL DESIGN SITE FEATURES DRAINAGE BOUNDARY PERVIOUS AREA IMPERVIOUSNESS PERVIOUS AREA (SF) 5539 10% IMPERVIOUS AREAS (SF) 51585 90% UGE UGE JT building Q N SAM'S CLUB STORE FRONT 2'' UGT 2'' FOC 2'' UGE KIOSK 200± SF FFE 5000.05 covered cart return covered cart return S 2''W UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE JT JT JT JT JT JT JT JT OSV VENT TEMPORARY ONSITE BENCHMARK IRON PIPE IN ASPHALT HOLE ELEV 5000.297' N 1433734.81993' E 3121499.21743' 6''SS 6''SS 6''SS 6''SS 6''SS 6''SS 6''SS 6''SS 6''SS 6''SS 6''SS w w stop sign stop sign stop sign stop sign stop sign stop sign stop sign stop sign metal chase storm grate rim = 4996.62' 18" RCP inv. (S) = 4994.40' speed bump outback curbside pickup sign concrete sidewalk concrete asphalt asphalt concrete sidewalk concrete sidewalk concrete DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 4:41 PM C9 7/29/20 DETAIL SHEET 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633-212 31493 31493-DT JOB # 31493 DRAWING: 31493-DT.dwg LAST SAVED BY: JOEPERKINS 5/19/2020INITIAL DESIGN 1'-0" 4"(TYP.) 3"(TYP.) 1'-0" 8'-0" 3'-9" 1'-9" 2'-0" "ENTER" PAVEMENT MARKING W/ ARROW N.T.S. NOTE: ALL TRAFFIC FLOW ARROWS TO BE SOLID YELLOW REFLECTIVE TRAFFIC PAINT PER DIMENSIONS ABOVE. N.T.S. CONCRETE JOINT DETAILS & FILLER CONSTRUCTION JOINT T/4 POURED JOINT SEALING COMPOUND T/2 T 1. DOWELS SHALL BE SUPPORTED BY AN APPROVED DEVICE. 1-1/4" MIN. CLEARANCE SEALING COMPOUND POURED JOINT 2" MIN. BUTT JOINT TRANSVERSE EXPANSION JOINT T/2 T T/4 DOWEL SLEEVE (CLOSED END) TO FIT DOWEL AND BE SECURED TOP 1/8" NO SEALING COMPOUND CONTRACTION JOINT 1. DOWEL BARS SHALL BE DRILLED INTO PAVEMENT HORIZONTALLY BY USE OF A MECHANICAL RIG. DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 4:41 PM C10 7/29/20 DETAIL SHEET 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633-212 31493 31493-DT JOB # 31493 DRAWING: 31493-DT.dwg LAST SAVED BY: JOEPERKINS 5/19/2020INITIAL DESIGN SAM'S LIGHT BASE N.T.S. DO NOT PAINT THE CONCRETE LIGHT POLE BASE- (SAM'S CLUB ONLY) 04/19/16 SAM'S LIGHT BASE 2" 6" CONCRETE MANHOLE PRE-CAST GRADE LINE CURVE AS POSSIBLE) (PROVIDE AS LARGE A BOTTOM OF GROOVE TO MATCH PIPE INVERTS GROOVE IN CONCRETE BASE CAST IRON MANHOLE RING & COVER, SEE SPECIFICATIONS. GRADE RINGS AS REQUIRED PRECAST CONCRETE CONE SECTION GASKET BETWEEN ALL SECTIONS IN NON-SHRINKING GROUT PAINT EXTERIOR OF MANHOLE WITHIN 5" OF JOINT WITH MASTIC WATERPROOFING. RUBBER GASKET PER MANUFACTURER'S SPECS DTMANPRE 12/21/04 N.T.S. 5" MIN. VARIABLE B SEC. A-A 8" (MIN.) 5'-0" B NOTE: TOP OF MANHOLE TO BE LEVEL WITH FINISH GRADE UNLESS OTHERWISE NOTED OR DIRECTED BY THE ENGINEER. (TYP.) 22" MIN. SEC. B-B DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 4:41 PM C11 7/29/20 DETAIL SHEET 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633-212 31493 31493-DT JOB # 31493 DRAWING: 31493-DT.dwg LAST SAVED BY: JOEPERKINS 5/19/2020INITIAL DESIGN DTISOJNT 12-04-08 ISOLATION JOINT DETAILS BACKER ROD AND SEALANT SECTION AT FIXED STRUCTURE ISOLATION JOINT TYPICAL ROUND FIXED STRUCTURE PLAN DETAIL TYPICAL RECTANGULAR FIXED STRUCTURE PLAN DETAIL N.T.S. TOOLED WITH 1/8" RADIUS 1/2" PREMOLDED JOINT FILLER JOINT SEALANT PER SPECS TOP OF PAVEMENT T/2 BUT NOT LESS THAN 1/4" BACKER ROD SEALANT T 1/2" SOFT PREFORMED JOINT FILLER FULL DEPTH OF PAVEMENT. 1'-6" (TYP) 1/2" SOFT PREFORMED JOINT FILLER FULL DEPTH OF PAVEMENT WITH BACKER ROD AND SEALANT. FIXED STRUCTURE 2-#4 TOP & BOT 11 2" CLR FROM TOP 21 2" CLR FROM BOT 2-#4 TOP & BOT 1" CLR FROM TOP 2" CLR FROM BOT 1" CLR (TYP) FIXED STRUCTURE DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 4:41 PM C12 7/29/20 DETAIL SHEET 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633-212 31493 31493-DT JOB # 31493 DRAWING: 31493-DT.dwg LAST SAVED BY: JOEPERKINS 5/19/2020INITIAL DESIGN GENERAL NOTES: 1. ALL EXPOSED CORNERS TO HAVE 3/4" CHAMFER 2. ALL #4 & #5 REINFORCING BARS TO HAVE 1-1/2" COVER, LARGER SIZES TO HAVE 2" COVER. 3. REF SHEET C7 - DRAINAGE PLAN FOR PIPE SIZES, LOCATIONS, AND INVERTS. 4. PIPES SHALL CONNECT TO THE ENDS OR SIDES OF THE INLET. CONNECTION SHALL NOT BE MADE AT CORNERS OF BOX. 5. ALL REINFORCING BARS TO BE GRADE 60. FUEL SPILL CONTAINMENT STRUCTURE SUMP 4992.20 INV (OUT) 4995.08 TG 4999.71 VENT PIPE, REF SHEET C7 - DRAINAGE PLAN FOR CONTINUATION 150 GALLON FUEL CONTAINMENT AREA (MAX 620.88 GALLONS) 4.75' - NO JOINTS WITHIN THIS ZONE EIGHT (EIGHT) INCH OIL STOP VALVE, CONTECH OR APPROVED EQUAL. INV (IN) 4992.70 REF SHEET C7 - DRAINAGE PLAN FOR NO. AND ORIENTATION (HEAVY DUTY) NEENAH R-1960 (LIGHT DUTY) RING & "A" PLAN NEENAH R-1737 CORNER BARS - SAME SIZE AND SPACING AS HORIZONTAL BARS COVER "A" CORNER BAR 90° 10" KIOSK 200± SF FFE 5000.05 DO NOT ENTER DO NOT ENTER S 2''W UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE JT JT JT JT JT JT JT JT 3/4''W 3/4''W 3/4''W UGE 3/4''W 6''SS 6''SS 6''SS 6''SS 6''SS OSV 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77A 77B 77B 77B 77B 77C 77C 77C 77C 77C 77C 77C KIOSK 200± SF FFE 5000.05 DO NOT ENTER DO NOT ENTER S 2''W UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE JT JT JT JT JT JT JT JT 3/4''W 3/4''W 3/4''W UGE 3/4''W 6''SS 6''SS 6''SS 6''SS 6''SS OSV ALL SAM'S CLUB GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. 0 20' 30' 40' SCALE IN FEET Not to Scale SITE WATER BUDGET CHART HYDROZONE AREA (SF) WATER NEEDS (GALLON/SF) ANNUAL WATER USE (GALLONS) HIGH 0 18 0 MODERATE 0 10 0 LOW 1462 3 4386 VERY LOW 0 0 0 TOTAL 1462 AVG: 365.5 4386 LOW HYDROZONE HYDROZONE LEGEND DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 3:57 PM L2 7/15/20 LANDSCAPE HYDROZONES 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633 31493 31493-LP JOB # 31493 DRAWING: 31493-LP.dwg LAST SAVED BY: MPARKS KIOSK 200± SF FFE 5000.05 S 2''W UGE UGE UGE UGE UGE UGE UGE UGE JT JT JT JT JT JT 3/4''W 3/4''W 3/4''W UGE 3/4''W 6''SS 6''SS OSV IRRIGATION EQUIPMENT TO BE LOCATED INSIDE BUILDING. SEE BUILDING PLANS FOR LOCATION. M BF MS 1 8.16 1" 2 1.59 1" IRRIGATION SLEEVE IRRIGATION SLEEVE IRRIGATION SLEEVE IRRIGATION SLEEVE IRRIGATION SLEEVE 1.5" IRRIGATION MAINLINE C RF ALL SAM'S CLUB GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. 0 20' 30' 40' SCALE IN FEET Not to Scale SITE DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 3:57 PM L3 7/15/20 IRRIGATION PLAN 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633 31493 31493-LP JOB # 31493 DRAWING: 31493-LP.dwg LAST SAVED BY: MPARKS 5/19/2020INITIAL DESIGN Know what'sbelow. Call before you dig. Know what'sbelow. Call before you dig. R DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN REV0 SW0 2:37 PM 7/23/20 SWPPP NOTES 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 7/23/20 SAM'S CLUB FUEL STATION #6633-212 31493 31493-SWPPP-CS JOB # 31493 DRAWING: 31493-SWPPP-CS.dwg LAST SAVED BY: JYANG USGS Quadrangle Map Not to Scale Vicinity Map Not to Scale SITE LOCATION 4700 BOARDWALK DRIVE FORT COLLINS, CO SWPPP PLANS FOR CONSTRUCTION OF SAM'S CLUB FUEL STATION #6633-212 4700 BOARDWALK DRIVE FORT COLLINS, COLORADO GENERAL NOTES A. PROJECT OFFICE WALL SWPPP POSTINGS: THE FOLLOWING ITEMS MUST BE POSTED TOGETHER IN A SINGLE, ORGANIZED LOCATION ON A WALL INSIDE THE PROJECT OFFICE: 1) SWPPP SITE MAPS (ALL PHASES); 2) SWPPP DETAIL SHEETS; 3) MAP SHOWING LOCATION OF OFFSITE IMPORT OR EXPORT FACILITY; 4) REVISIONS TO DETAILS, SITE MAPS, OR SWPPP-RELATED RFIS; 5) SITE SWPPP BINDER; 6) SWCT PLACARD; 7) CURRENT OWNER TRAINING CERTIFICATES FOR SUPERINTENDENT(S) AND COMPLIANCE OFFICER(S); AND 8) CERTIFICATIONS AND/OR TRAINING CERTIFICATES REQUIRED TO PERFORM INSPECTIONS BY THE APPLICABLE CONSTRUCTION GENERAL PERMIT OR AUTHORITY HAVING JURISDICTION. B. PERMITTED PROJECT AREA: FOR PURPOSES OF THIS SWPPP AND ASSOCIATED STORMWATER PERMIT, 'PERMITTED PROJECT AREA' IS DEFINED AS ANY AND ALL AREAS WITHIN THE PROJECT LIMITS OF DISTURBANCE, AS SHOWN ON THE SWPPP SITE MAPS AND IDENTIFIED IN THE NOTICE OF INTENT TO THE AGENCY. ALL GROUND-DISTURBING AND CONSTRUCTION-RELATED ACTIVITIES (MATERIAL STORAGE, DUMPSTERS, PARKING AREAS, PROJECT OFFICE TRAILER, ETC.) MUST BE INCLUDED WITHIN THE PERMITTED PROJECT AREA LIMITS OF DISTURBANCE. OFFSITE AREA(S) TO BE DISTURBED AS PART OF THIS PROJECT (NOT ON OWNER PROPERTY): OFFSITE AREAS THAT EXTEND BEYOND THE SAM'S CLUB BOUNDARY AREA, BUT MUST BE INCLUDED WITHIN THE PERMITTED AREA INCLUDE THE FOLLOWING: - NO OFFSITE WORK ASSOCIATED WITH THIS PROJECT. ALL AREAS OUTSIDE THE PERMITTED PROJECT AREA (I.E., LIMITS OF DISTURBANCE) ACQUIRED FOR USE BY THE GC OR A SUBCONTRACTOR OF THE GC (BORROW SOURCES, DISPOSAL AREAS, ETC.) MUST BE MANAGED IN covered cart return covered cart return VENT ww covered cart return covered cart return asphalt concrete sidewalk w mb CF CF CF CF CF CF CF CF CF CF CF CF CF PROPOSED CANOPY FOOTPRINT PROPOSED BUILDING FOOTPRINT KIOSK 200± SF FFE 5000.05 covered cart return covered cart return S UGE UGE UGE UGE UGE UGE JT JT JT JT JT OSV VENT TEMPORARY ONSITE BENCHMARK IRON PIPE IN ASPHALT HOLE ELEV 5000.297' N 1433734.81993' E 3121499.21743' 6''SS 6''SS 6''SS www m b CF CF CF CF CF CF CF CF CF CF CF CF CF DATE Engineering Associates, Inc. REVISIONS SWPPP IMPLEMENTATION DPOR PM DES DRW INITIAL DESIGN REV0 SW1 3:16 PM 8/4/20 SEQUENCE AND LIMITS OF WORK 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 ww covered cart return covered cart return asphalt concrete sidewalk w mb 5006 5005 5004 5003 5003 5002 5001 5000 4999 4998 4997 4995 4996 4997 4998 4999 5000 5001 5002 5000 5001 5002 5003 5005 5004 5003 5002 5001 5000 4999 4998 4997 4997 4998 3.9% 2.0% 4.6% 3.1% 2.0% 1.4% 1.1% 1.2% 0.5% 0.8% 0.5% 0.3% 2.1% 2.3% 1.3% 4.5% 0.7% 1.1% 0.8% 0.6% 2.1% 0.4% KIOSK 200± SF FFE 5000.05 covered cart return covered cart return S UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE JT JT JT JT JT JT JT JT JT JT OSV VENT TEMPORARY ONSITE BENCHMARK IRON PIPE IN ASPHALT HOLE ELEV 5000.297' N 1433734.81993' E 3121499.21743' 6''SS 6''SS 6''SS 6''SS 6''SS 6''SS 6''SS ww w mb 5006 5005 5004 5003 5003 5002 5001 5000 4999 4998 4997 4995 4996 4997 4998 4999 5000 5001 5002 5000 5001 5002 5003 5005 5004 5003 5002 5001 5000 4999 4998 4997 TEMPORARY CONTROL MEASURES SITE CONSTRUCTION STORM FACILITIES STRIP & STOCKPILE TOPSOIL FOUNDATION / BUILDING CONSTRUCTION TEMPORARY CONSTRUCTION EXITS SEDIMENT CONTROL BASIN(S)/TRAP(S) FINISH GRADING LANDSCAPING/SEED/FINAL STABILIZATION PERMANENT CONTROL STRUCTURES ROUGH GRADING DEC NOTE: GENERAL CONTRACTOR TO COMPLETE TABLE WITH THEIR ESTIMATED PROJECT SCHEDULE SOIL EROSION/SEDIMENTATION CONTROL OPERATION TIME SCHEDULE CONSTRUCTION SEQUENCE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV JAN FEB MAR APR MAY JUN 1) CONTRACTOR MUST COMPLETE TABLE WITH ESTIMATED DATES OF PROJECT ACTIVITIES PRIOR TO BMP CERTIFICATION. 2) TIME SCHEDULE MUST COINCIDE WITH THE SWPPP IMPLEMENTATION SEQUENCE. JUL AUG SEP OCT NOV DEC LAST REVISED: APRIL 30, 2011 WAL-MART STANDARD DETAIL 1 2 3 4 5 SAM'S CLUB PROPERTY AREA PERMITTED AREA WITHIN SAM'S CLUB PROPERTY PERMITTED AREA OUTSIDE OF SAM'S CLUB PROPERTY TOTAL PERMITTED PROJECT AREA (MUST MATCH NOI) IMPERVIOUS AREA BEFORE PROJECT 0.91 0.99 0.00 0.99 11.95 LAST REVISED: JUNE 2013 WAL-MART STANDARD DETAIL ACREAGE SUMMARY (IN ACRES) OFF-SITE DRAINAGE AREA OFF-SITE RUN ON AREA A 0.39 AVERAGE SLOPE MAXIMUM SLOPE AREA COVER TYPE (ACRES) 1% 4% LAST REVISED: JUNE 2012 WAL-MART STANDARD DETAIL OFF-SITE RUN-ON SUMMARY 1.57 TEMPORARY DOUBLE GATE 6' N.T.S. (2" TYP.) PAVING ENDURO SHADE CLOTH BY HENDEE ENTERPRISES, INC. (OR EQUAL) TEL:1-800-231-7275 TCF1PS ONE PEG STABILIZER OR TCF2PS TWO PEG STABILIZER (OR APPROVED EQUAL) CONTRACTOR TO PROVIDE BASE WEIGHT AS REQUIRED TO ENSURE FENCE WILL NOT MOVE OR OVERTURN DUE TO WIND LOADS. TCF612 6'hx12'w PORTABLE TEMPORARY CONSTRUCTION FENCE PANEL (OR APPROVED EQUAL) 8' CONTRACTOR TO PROVIDE TEMPORARY CONSTRUCTION FENCE PANELS AND STABILIZERS ALONG WITH ANY OTHER MATERIALS TO ADEQUATELY CONSTRUCT AND STABILIZE FENCE. REFERENCE ACADEMY FENCE COMPANY WEB SITE @ www.academyfence.com OR CALL 1-800-427-0854. 8' LATCH WITH LOCK (TYP. ALL GATES) CF TEMPORARY FENCE N.T.S. (2" TYP.) PAVING ENDURO SHADE CLOTH BY HENDEE ENTERPRISES, INC. (OR EQUAL) TEL:1-800-231-7275 12' 6' TCF1PS ONE PEG STABILIZER OR TCF2PS TWO PEG STABILIZER (OR APPROVED EQUAL) CONTRACTOR TO PROVIDE BASE WEIGHT AS REQUIRED TO ENSURE FENCE WILL NOT MOVE OR OVERTURN DUE TO WIND LOADS. TCF612 6'hx12'w PORTABLE TEMPORARY CONSTRUCTION FENCE PANEL (OR APPROVED EQUAL) CONTRACTOR TO PROVIDE TEMPORARY CONSTRUCTION FENCE PANELS AND STABILIZERS ALONG WITH ANY OTHER MATERIALS TO ADEQUATELY CONSTRUCT AND STABILIZE FENCE. REFERENCE ACADEMY FENCE COMPANY WEB SITE @ www.academyfence.com OR CALL 1-800-427-0854. DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN REV0 SW6 12:40 PM 8/4/20 SWPPP DETAIL SHEET 2 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 7/23/20 SAM'S CLUB FUEL STATION #6633-212 31493 31493-SWPPP-DT JOB # 31493 DRAWING: 31493-SWPPP-DT.dwg LAST SAVED BY: JYANG NOTES: 1. VERIFY WITH CEC WHICH DISCHARGES FROM DEWATERING ACTIVITIES ARE ALLOWED OR ARE NOT ALLOWED NON-STORMWATER DISCHARGES UNDER THE GENERAL PERMIT AND OTHER REGULATIONS. OBTAIN ALL DEWATERING PERMITS AND AUTHORIZATIONS REQUIRED BY STATE AND LOCAL REGULATIONS. SEE THE REQUIRED DEWATERING PERMITS AND AUTHORIZATIONS TABLE BELOW. GC MUST COMPLETE COLUMNS 3 AND 4. 2. GC MUST WAIT TO HAVE WRITTEN COPY OF ALL REQUIRED DEWATERING PERMITS AND AUTHORIZATIONS BEFORE PERFORMING DEWATERING ACTIVITIES. 3. DISCHARGES FROM DEWATERING OPERATIONS MUST BE DIRECTED THROUGH AN APPROPRIATE POLLUTION PREVENTION/TREATMENT SYSTEM OF CONTROL MEASURES, SUCH AS A SEDIMENT/FILTER BAG, SEDIMENT TRAP OR SEDIMENT BASIN, AND OTHERS, AS NEEDED, PRIOR TO BEING DISCHARGED FROM THE SITE OR INTO A WATER BODY OF THE STATE. UNDER NO CIRCUMSTANCES ARE DISCHARGES FROM DEWATERING OPERATIONS TO BE DISCHARGED DIRECTLY INTO SANITARY SEWER SYSTEMS, STREAMS, RIVERS, LAKES OR OTHER AREAS BEYOND THE PERMITTED PROJECT AREA. LIKEWISE, DISCHARGES INTO STORM SEWER SYSTEMS THAT DO NOT DRAIN TO A SUITABLE ON-SITE TREATMENT FACILITY, SUCH AS A BASIN, ARE ALSO PROHIBITED. DISCHARGES FROM DEWATERING OPERATIONS MUST ALSO BE CONDUCTED IN A MANNER SUFFICIENT TO PREVENT EROSION FROM THE DISCHARGE RUNOFF. 4. IN SEDIMENT TRAP OR BASIN OR POND DEWATERING OPERATIONS, WATER MUST ONLY BE REMOVED FROM THE SURFACE OF THE CONTAINED WATER. A SKIMMER OR SIMILAR FLOATING DEVICE MUST BE USED, TO ONLY REMOVE THE WATER AT THE SURFACE. 5. DO NOT DISCHARGE ON A SLOPE GREATER THAN THREE PERCENT NOR WITHIN 20 FEET OF A SURFACE WATER BODY. 6. DEWATERING SHALL NOT OCCUR DURING OR IMMEDIATELY AFTER PRECIPITATION EVENTS, BUT EXCEPTIONS SHALL BE EVALUATED ON CASE BY CASE BASIS. CONTACT THE CEC AND RECEIVE WRITTEN APPROVAL. DW WALMART STANDARD DETAIL DEWATERING GOVERNING AGENCY PERMIT NAME/TYPE PERMIT NO. (GC TO COMPLETE) DATE PERMIT WAS ISSUED BY AGENCY (GC TO COMPLETE) REQUIRED DEWATERING PERMITS AND AUTHORIZATIONS 1 2 3 4 LAST REVISED: JUNE 2012 NOTES: 1. ALL ON-SITE TOPSOIL MUST BE PRESERVED FOR REUSE ON THE SITE DURING REVEGETATION, UNLESS IT IS INFEASIBLE OR UNREASONABLE TO DO SO. (NOTE: TOPSOIL STOCKPILING ON-SITE MAY BE INFEASIBLE IF SPACE IS NOT AVAILABLE ON-SITE FOR TOPSOIL STOCKPILING OR IF LITTLE TO NO VEGETATION IS TO REMAIN UNDER POST-CONSTRUCTION CONDITIONS. STOCKPILING OF TOPSOIL AT AN OFF-SITE LOCATION OR TRANSFER OF TOPSOIL TO OTHER LOCATIONS MAY ALSO BE ACCEPTABLE BUT MUST BE AUTHORIZED BY THE CEC). DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN REV0 SW7 12:40 PM 8/4/20 SWPPP DETAIL SHEET 3 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 7/23/20 SAM'S CLUB FUEL STATION #6633-212 31493 31493-SWPPP-DT JOB # 31493 DRAWING: 31493-SWPPP-DT.dwg LAST SAVED BY: JYANG NOTES: 1. THE GC SHALL DESIGNATE AREAS ON THE SITE MAPS FOR EQUIPMENT CLEANING, MAINTENANCE, AND REPAIR. THE GC AND SUBCONTRACTORS SHALL UTILIZE SUCH DESIGNATED AREAS. CLEANING, MAINTENANCE, AND REPAIR AREAS SHALL BE PROTECTED BY A TEMPORARY PERIMETER BERM, SHALL NOT OCCUR WITHIN 150 FEET OF ANY WATERWAY, WATER BODY OR WETLAND, AND SHALL OCCUR IN AREAS LOCATED AS FAR AS PRACTICAL FROM STORM SEWER INLETS. DRIP PANS SHALL BE USED FOR VEHICLE MAINTENANCE ACTIVITIES AND RESULTANT WASTES SHALL BE DISPOSED OF IN ACCORDANCE WITH THE HAZARDOUS MATERIAL MANAGEMENT AND SPILL REPORTING PLAN NOTES INCLUDED ON THIS PLAN SHEET. 2. USE OF DETERGENTS FOR LARGE SCALE WASHING IS PROHIBITED (FOR EXAMPLE, WASHING VEHICLES, BUILDINGS, PAVEMENT SURFACES, ETC.). ALL WASH WATER SHALL BE DETAINED AND PROPERLY TREATED OR DISPOSED. LAST REVISED: JUNE 2013 WALMART STANDARD DETAIL EQUIPMENT AND VEHICLE EMA CLEANING AND MAINTENANCE AREAS LAST REVISED: JUNE 2012 WALMART STANDARD DETAIL NOTES: 1. CONSIDERATION MUST BE GIVEN TO ANTICIPATED CLIMATE AND SEASONAL CONDITIONS WHEN PLANTING SEED. 2. SEED SHALL BE FREE OF WEEDY SPECIES AND APPROPRIATE FOR SITE SOILS AND REGIONAL CLIMATE. SEED AND MULCH PER THE CONSTRUCTION DRAWINGS AND THE 02900 PLANTING SPECIFICATION IMMEDIATELY AFTER TOPSOIL IS APPLIED AND FINAL GRADE IS REACHED. 3. THE SITE HAS ACHIEVED FINAL STABILIZATION ONCE ALL AREAS ARE COVERED WITH BUILDING FOUNDATION OR PAVEMENT, OTHER LANDSCAPING COVER (STONE, MULCH, ETC.), OR HAVE A STAND OF GRASS WITH A MINIMUM OF 80 PERCENT DENSITY OVER THE ENTIRE VEGETATED AREA, OR GREATER IN ACCORDANCE WITH THE GENERAL PERMIT REQUIREMENTS. 4. 5. VEGETATED AREAS MUST BE WATERED, FERTILIZED, AND RESEEDED AS NEEDED TO ACHIEVE THIS REQUIREMENT. 6. THE VEGETATIVE DENSITY MUST BE MAINTAINED THROUGH PROJECT COMPLETION TO BE CONSIDERED STABILIZED. AREAS PROTECTED BY EROSION CONTROL BLANKETS ARE NOT PERMANENTLY STABILIZED UNTIL THE APPLICABLE GENERAL PERMIT REQUIREMENT FOR FINAL VEGETATIVE DENSITY IS ACHIEVED. 7. RIP-RAP, MULCH, GRAVEL, DECOMPOSED GRANITE OR OTHER EQUIVALENT PERMANENT STABILIZATION MEASURES MAY BE EMPLOYED IN LIEU OF VEGETATION BASED ON SITE-SPECIFIC CONDITIONS, DESIGN AND GOVERNING AUTHORITY APPROVAL. 8. ALL VEGETATED AREAS SHALL BE INSPECTED REGULARLY TO CONFIRM THAT A HEALTHY STAND OF GRASS IS MAINTAINED. SVR N.T.S. FORT COLLINS, CO EXISTING HPS LUMINARIES ONLY UNVERIFIED MOUNTING HEIGHTS TARGET: 5.00 fc AVG 3.00 fc MIN FUEL STATION Phillip Bejarano - SLDP June'11 EXISTING AND RELOCATED POLE LOCATIONS SAM'S CLUB Engineering Associates, Inc. L uminaire Schedule Symbol Qty Label Arrangement LLF Description Arr. Watts Arr. Lum. Lumens BUG Rating 24 A SINGLE 0.864 CRUS-SC-LED-LW-CW MTD @ 15' 87.9 10871 B3-U0-G1 3 (E) D BACK-BACK 0.700 (E) (2) 400S ON (E) POLE 936 59864 B5-U0-G3 2 (E) S SINGLE 0.700 (E) 400S ON (E) POLE 468 29932 B5-U0-G3 Calculation Summary Illuminance Foot-candles Label Avg Max Min Max/Min Fuel Station 5.38 8.97 1.53 5.86 Limited 3.42 5.02 1.25 4.02 Main parking 3.99 6.21 1.48 4.20 A A A A A A A A A A A A A A A A A A A A A A A A (E) D (E) D (E) S (E) S (E) D 2.58 3.71 5.03 5.79 6.63 7.14 7.25 6.94 6.30 5.66 4.25 3.02 3.64 5.83 7.54 8.52 8.78 8.97 8.89 7.59 5.52 3.44 6.50 4.55 6.36 7.82 8.45 8.37 7.16 5.59 5.61 2.54 3.99 5.00 5.23 5.33 5.61 6.04 6.48 6.27 5.22 4.10 1.53 2.21 2.79 3.06 2.83 3.08 4.00 4.31 4.42 4.05 3.74 1.33 1.96 2.57 3.01 2.83 3.06 3.87 4.29 4.35 3.83 3.39 1.35 2.07 2.93 3.21 3.60 3.55 3.89 4.35 4.54 4.49 3.92 3.13 1.36 2.33 3.10 3.99 4.14 4.09 4.30 4.68 5.01 4.35 3.67 2.72 1.35 2.17 3.24 4.02 4.45 4.89 5.02 4.84 4.64 4.12 3.11 2.24 1.26 2.03 3.14 3.81 4.70 3.99 4.09 4.92 4.19 3.61 2.53 1.76 1.25 2.01 3.10 3.81 4.65 4.30 4.35 4.77 4.02 3.35 2.29 1.52 4.43 3.97 3.05 2.34 1.75 1.48 1.50 1.83 2.24 2.41 2.52 2.29 4.65 4.46 3.64 3.08 2.54 2.22 2.22 2.62 2.89 3.22 3.02 2.88 4.89 4.80 4.56 4.11 3.38 3.02 3.04 3.39 3.87 3.95 3.59 3.48 4.55 4.85 5.02 4.67 4.55 4.21 4.22 4.62 4.59 4.61 4.16 3.65 3.87 4.55 4.79 5.16 4.92 4.78 4.83 5.13 5.40 5.02 4.34 3.74 3.00 3.71 4.48 5.02 5.39 5.81 5.95 5.78 5.58 5.21 4.29 3.37 FORT COLLINS, CO EXISTING HPS LUMINARIES ONLY UNVERIFIED MOUNTING HEIGHTS TARGET: 5.00 fc AVG 3.00 fc MIN FUEL STATION Phillip Bejarano - SLDP June'11 EXISTING AND RELOCATED POLE LOCATIONS Engineering Associates, Inc. SITE PLAN SAM'S CLUB Luminaire Schedule Symbol Qty Label Arrangement LLF Description Arr. Watts Arr. Lum. Lumens BUG Rating 24 A SINGLE 0.864 CRUS-SC-LED-LW-CW MTD @ 15' 87.9 10871 B3-U0-G1 3 (E) D BACK-BACK 0.700 (E) (2) 400S ON (E) POLE 936 59864 B5-U0-G3 2 (E) S SINGLE 0.700 (E) 400S ON (E) POLE 468 29932 B5-U0-G3 (E) D (E) D DIFFERENT THAN SITE LIGHTING ASSOCIATED WITH THE STORE PARKING LOT. VERIFY AVAILABLE VOLTAGE PRIOR TO SHIPPING. NOTE: VOLTAGE FOR THE FUEL STATION SITE LIGHTING PACKAGE MAY BE RELOCATE TWO (E) D TO NEW LOCATIONS INDICATED. E Date Date Date Description Description Description By By By REVISIONS 532 West 66th Street, Loveland, Colorado 80538 PLS Corporation CLIENT Party Chief Print Date Field Date PLS PM ST Phone: 970.669.2100 - Info@plscorporation.com TITLE PROJECT NO. SHEET NO. NO. OF SHEETS P:\Project\2019\19096\dwg\19096.dwg December 04, 2019 - 2:23pm NOTICE: According to Colorado law you must commence any legal action based upon any defect in this survey within three years after you first discover such defect. In no event, may any action based upon any defect in this survey be commenced more than ten years from the date of the certification shown hereon. December 04, 2019 ADS November 5, 2019 MBS MBS MDG/ADS CEI Engineering Associates, Inc HARMONY MARKET P.U.D., FIRST FILING, Lot 1 Topographic Survey Plat Section 1, Township 6 North, Range 68 West, 6th P .M., Larimer County, Colorado 19096.001 1 2 LEGAL DESCRIPTION - based on title work: A portion of Lot 1, Harmony Market P.U.D., First Filing, in the City of Fort Collins, County of Larimer, State of Colorado. TITLE COMMITMENT NOTES: PLS Corporation relied upon Commitment Number: 19000033022, Commitment Date: May 28, 2019 at 5:30 p.m., provided by Stewart Title Guaranty Company. SCHEDULE B-1: PLS Corporation did not address or research these Items. SCHEDULE B- SECTION 2 EXCEPTIONS: Items 1-9: PLS Corporation did not address or research these Items. 10. Terms, provisions, options, rights of first refusal, covenants, conditions, restrictions, easements, charges, assessments and liens provided in the Covenants, Conditions and Restrictions recorded April 20, 1977 Book 1763 at Page 510, but omitting any covenant, condition or restriction, if any, based on race, color, religion, sex, handicap, familial status, or national origin unless and only to the extent that the covenant, condition or restriction (a) is exempt under Title 42 of the United States Code, or (b) relates to handicap, but does not discriminate against handicapped persons. APPLIES, UNPLOTTABLE, ENCOMPASSES ENTIRE PROPERTY 11. All matters as shown on the plat of Harmony Market P.U.D., First Filing, recorded May 31, 1989 at Reception No. 89023900. APPLIES, SHOWN HEREON 12. Notice of Planning and Zoning Board of the City of Fort Collins recorded May 31, 1989 at Reception No. 89023901. w MB w stop sign stop sign stop sign stop sign stop sign stop sign stop sign stop sign metal chase covered cart return covered cart return storm grate rim = 4996.62' 18" RCP inv. (S) = 4994.40' speed bump outback curbside pickup sign concrete sidewalk concrete asphalt asphalt asphalt concrete sidewalk concrete sidewalk concrete sidewalk concrete sidewalk yield to pedestrian sign approximate boundary of Lot 1 20' AUE ADE ADE ADE 10' AUE w MB MB TV storm grate rim = 4996.35' 18" RCP inv. in (N) = 4993.95' 18" RCP inv. out (W) = 4993.84' covered cart return large snow pile at time of survey stop sign concrete sidewalk stop sign stop sign stop sign stop sign stop sign stop sign stop sign trash enclosure pillars planters concrete sidewalk concrete sidewalk 5006 5005 5004 5003 5003 5002 5001 5000 4999 4998 4997 4995 4996 4997 4998 4999 5000 5001 5002 5000 5001 5002 5003 5004 5005 5004 5003 5002 5001 5000 4999 4998 4997 4997 building building 15" 3" 14 10" 14" 6" 14" 12" 12" 12" 12" 10" 10" 10" 10" 15" 14" 15" 15" 18" 9" 4" 14" 18" 12" 15" 14" 10" 12" 10" 10" 12" 12" 14" 10" 12" 14" 15" 14" 12" 12" 12" 12" 12" 12" 10" 12" 10" 10" 12" 15" 12" 15" 15" 15" 18" 14" 12" 14" 10" 10" 14" 12" 10" 12" 10" 14" 14" 10" 10" 12" Date Date Date Description Description Description By By By REVISIONS 532 West 66th Street, Loveland, Colorado 80538 PLS Corporation CLIENT Party Chief Print Date Field Date PLS PM ST Phone: 970.669.2100 - Info@plscorporation.com TITLE PROJECT NO. SHEET NO. NO. OF SHEETS P:\Project\2019\19096\dwg\19096.dwg December 04, 2019 - 2:23pm NOTICE: According to Colorado law you must commence any legal action based upon any defect in this survey within three years after you first discover such defect. In no event, may any action based upon any defect in this survey be commenced more than ten years from the date of the certification shown hereon. December 04, 2019 ADS November 5, 2019 MBS MBS MDG CEI Engineering Associates, Inc HARMONY MARKET P.U.D., FIRST FILING, Lot 1 Topographic Survey Plat Section 1, Township 6 North, Range 68 West, 6th P .M., Larimer County, Colorado 19096.001 2 2 Scale 1 inch = 20 feet 20 0 10 20 40 w ADE NOTES: 1. This is not an ALTA/NSPS Land Title Survey. 2. No improvements, other than those shown, were located this date. 3. No offsite improvements, other than those shown, were located this date. 4. Elevations are based on NAVD 88 derived from a GPS OPUS solution. 5. Distances shown are in U.S. Survey Feet. sign water valve water meter light pole underground electric line underground water line access and drainage easement access and utility easement LEGEND: AUE telecommunications pedestal TV cable TV pedestal Topographic Survey Plat sanitary sewer manhole sanitary sewer clean-out underground storm line deciduous tree (sizes shown hereon) Dec. 4, 2019 ADS added trees APPLIES, UNPLOTTABLE, ENCOMPASSES ENTIRE PROPERTY 13. Site and Landscape Covenants recorded May 31, 1989 at Reception No. 89023902. APPLIES, UNPLOTTABLE, ENCOMPASSES ENTIRE PROPERTY 14. Terms, provisions, options, rights of first refusal, covenants, conditions, restrictions, easements, charges, assessments and liens provided in the Declaration of Establishment of Protective Covenants, Conditions and Restrictions and Grants of Easements recorded June 1, 1989 at Reception No. 89024111, First Amendment recorded December 11, 1990 at Reception No. 90056719 and Second Amendment recorded January 22, 1991 at Reception No. 91002702, but omitting any covenant, condition or restriction, if any, based on race, color, religion, sex, handicap, familial status, or national origin unless and only to the extent that the covenant, condition or restriction (a) is exempt under Title 42 of the United States Code, or (b) relates to handicap, but does not discriminate against handicapped persons. APPLIES, UNPLOTTABLE, ENCOMPASSES ENTIRE PROPERTY 15. Terms, provisions, options, rights of first refusal, covenants, conditions, restrictions, easements, charges, assessments and liens provided in the Amended and Restated Declaration of Establishment of Protective Covenants, Conditions and Restrictions and Grants of Easements recorded December 7, 1992 at Reception No. 92078372, but omitting any covenant, condition or restriction, if any, based on race, color, religion, sex, handicap, familial status, or national origin unless and only to the extent that the covenant, condition or restriction (a) is exempt under Title 42 of the United States Code, or (b) relates to handicap, but does not discriminate against handicapped persons. APPLIES, UNPLOTTABLE, ENCOMPASSES ENTIRE PROPERTY 16. Terms and conditions of a revocable license granted by Oak Farm, Inc. to Pace Membership Warehouse, Inc. recorded June 1, 1989 at Reception No. 89024112. APPLIES, UNPLOTTABLE, ENCOMPASSES ENTIRE PROPERTY 17. Harmony Road Landscape Buffer Agreement recorded June 1, 1989 at Reception No. 89024113. Affidavit recorded September 4, 1990 at Reception No. 90039979. APPLIES, UNPLOTTABLE, ENCOMPASSES ENTIRE PROPERTY 18. Terms and provisions of the lease from Benenson Capital Company, a New York general partnership, lessor, to Pace Membership Warehouse, Inc., a Colorado corporation, lessee, a memorandum of which is recorded February 1, 1990 at Reception No. 90004725. APPLIES, UNPLOTTABLE, ENCOMPASSES ENTIRE PROPERTY 19. Deed of Trust and Security Agreement dated October 17, 2000, executed by Benenson Boardwalk Ft Collins Co, LLC, a Delaware limited liability company, to the Public Trustee, to secure an indebtedness of $3,875,000.00 in favor of Royal Indemnity Company, a Delaware corporation, recorded October 23, 2000 at Reception No. 2000072608. APPLIES, UNPLOTTABLE, ENCOMPASSES ENTIRE PROPERTY 20. Absolute Assignment of Rents and Leases recorded October 23, 2000 at Reception No. 2000072609. APPLIES, UNPLOTTABLE, ENCOMPASSES ENTIRE PROPERTY 21. Financing Statement from Benenson Boardwalk Ft Collins Co, LLC, debtor, to Royal Indemnity Company, secured party, recorded November 13, 2000 at Reception No. 2000077666. APPLIES, UNPLOTTABLE, ENCOMPASSES ENTIRE PROPERTY TABLE A ITEMS: 1. Monuments placed or found: as shown hereon. Not Applicable 2. Address: 4700 Boardwalk Drive Fort Collins, CO 80525 (per assessors) 3. Flood zone classification: Zone X (area of minimal flood hazard) Flood Insurance Rate Map 08069C1000F, dated Dec. 19, 2006 4. Gross land area: Not Applicable 5. Vertical relief: as shown hereon source of information: NGS OPUS solution contour interval: 1' minor, 5' major datum: NAVD 88 7(a). Exterior dimensions of all buildings at ground level: there are no buildings in the surveyed area. 7(b). Square footage of exterior footprint of all buildings at ground level: there are no buildings in the surveyed area. 7(c). Measured Height of all buildings above grade at a specified location: there are no buildings in the surveyed area. 8. Substantial features observed in the process of conducting the fieldwork: as shown hereon. 9. Number and type of clearly identifiable parking spaces on surface parking areas, lots and in parking structures: 139 regular spaces on the surveyed area (not counting the 4 spaces covered by cart returns). 10. As designated by the client, a determination of the relationship and location of certain division or party walls with respect to adjoining properties: there are no buildings in the surveyed area. 11. Location of utilities existing on or serving the surveyed property as determined by markings requested by the surveyor: as shown hereon. 13. Names of adjoining owners according to current tax records: as shown hereon. 15. Rectified orthophotography, photometric mapping, remote sensing, airborn/mobile laser scanning and other similar products: declined by client. 16. Evidence of recent earth moving work, building construction, or building additions observed in the process of conducting the fieldwork: None. 17. Proposed changes in street right-of-way lines or evidence of recent street or sidewalk construction or repair: None. 18. If there has been a field delineation of wetlands conducted by a qualified specialist: no wetlands determinations were made this date. 19. Include any plottable offsite easements or servitudes disclosed in documents: as shown hereon. 20. Professional Liability Insurance policy obtained by the surveyor in the minimum amount of $ to be in effect throughout the contract term: satisfied. 21. The surveyor shall graphically depict and give the recording information for any easements identified in the title commitment or Ownership and Encumbrance Report of which the Surveyor has knowledge, even if it does not appear in the title commitment or Ownership Encumbrance Report: as shown hereon. NOTES: 1. This is not an ALTA/NSPS Land Title Survey. 2. No improvements, other than those shown, were located this date. 3. No offsite improvements, other than those shown, were located this date. 4. Elevations are based on NAVD 88 derived from a GPS OPUS solution. 5. Distances shown are in U.S. Survey Feet. SURVEYOR'S STATEMENT I, M. Bryan Short, a duly registered Professional Land Surveyor in the State of Colorado, do hereby state that this Topographic Survey Plat truly and correctly represents the results of a topographic survey made by me under my direction. Topographic Survey Plat Dec. 4, 2019 ADS added trees 2.42 3.28 4.40 5.00 5.81 4.48 4.62 6.21 5.70 5.14 4.10 3.21 DIFFERENT THAN SITE LIGHTING ASSOCIATED WITH THE STORE PARKING LOT. VERIFY AVAILABLE VOLTAGE PRIOR TO SHIPPING. NOTE: VOLTAGE FOR THE FUEL STATION SITE LIGHTING PACKAGE MAY BE RELOCATE TWO (E) D TO NEW LOCATIONS INDICATED. RECOMMEND ALLOWING MIN VALUES BELOW REQUIRED LEVELS AS-IS. CAN BE CORRECTED UNDER FUTURE LED UPGRADE OF SITE LIGHTING. E Fuel Station Limited Main parking Fuel Station PHOTOMETRIC PLAN LAST REVISED: JUNE 2012 WALMART STANDARD DETAIL SEEDING/VEGETATION REQUIREMENTS NOTES: 1. PERMANENT STABILIZATION SHALL BE ACCOMPLISHED IN ALL DISTURBED AREAS BY COVERING THE SOIL WITH PAVEMENT, BUILDING STRUCTURES, VEGETATION, OR OTHER FORMS OF SOIL STABILIZATION. 2. THE GC IS REQUIRED TO INITIATE PERMANENT SOIL STABILIZATION MEASURES IMMEDIATELY UPON REACHING FINAL GRADE. FOR THOSE AREAS NOT AT FINAL GRADE THAT WILL NOT BE DISTURBED FOR GREATER THAN 14 DAYS, THE CONTRACTOR SHOULD INITIATE TEMPORARY STABILIZATION PER THE TEMPORARY SEEDING OR STABILIZATION DETAIL. 3. THE GC HAS 7 DAYS FROM INITIATION OF STABILIZATION TO COMPLETE SOIL PREPARATION, SEEDING, MULCHING, AND ANY OTHER REQUIRED ACTIVITIES RELATED TO THE PLANTING AND ESTABLISHMENT OF VEGETATION. THE GC ALSO HAS 7 DAYS FROM INITIATION OF STABILIZATION TO COMPLETELY INSTALL NON-VEGETATED MEASURES, IF UTILIZED. 4. SOILS MUST BE PREPARED BEFORE INSTALLATION OF SOD OR SEED. SEE 02900 SPECIFICATION FOR INSTRUCTION ON PROPER SOIL PREPARATION. 5. AT THE COMPLETION OF GROUND-DISTURBING ACTIVITIES, THE ENTIRE SITE MUST HAVE PERMANENT VEGETATIVE COVER MEETING VEGETATIVE DENSITY REQUIREMENTS IN THE GENERAL PERMIT, OR MULCH PER LANDSCAPE PLAN, IN ALL AREAS NOT COVERED BY HARDSCAPE (STONE, PAVEMENT, BUILDINGS, ETC.). 6. SEEDED AREAS SHALL BE PROTECTED WITH STRAW MULCH, HYDRAULIC MULCH OR A ROLLED EROSION CONTROL PRODUCT. STRAW MULCH MUST BE TACKIFIED OR CRIMPED BY DISC OR OTHER MACHINERY, AND ROLLED EROSION CONTROL PRODUCTS MUST BE INSTALLED PER MANUFACTURER RECOMMENDATIONS. ONLY ROLLED EROSION CONTROL PRODUCTS ARE PERMITTED TO BE USED IN FLOW CONVEYANCES. 7. ALL AREAS TO BE SEEDED MUST MEET TOPSOIL DEPTH, PH AND ORGANIC CONTENT REQUIREMENTS. SEE 02900 SPECIFICATION FOR INSTRUCTION ON PROPER SEEDING REQUIREMENTS. 8. FINAL SITE STABILIZATION IS ACHIEVED WHEN PERENNIAL VEGETATIVE COVER PROVIDES PERMANENT STABILIZATION WITH A UNIFORM DENSITY GREATER THAN 80 PERCENT OVER THE ENTIRE AREA TO BE STABILIZED BY VEGETATIVE COVER. THIS AREA IS EXCLUSIVE OF AREAS THAT ARE COVERED WITH ROCK (CRUSHED GRANITE, GRAVEL, ETC.) OR LANDSCAPE MULCH, PAVED OR HAVE A BUILDING OR OTHER PERMANENT STRUCTURE ON THEM. PS N.T.S. PERMANENT SEEDING, SOD, OR MULCHING TS N.T.S. LAST REVISED: JUNE 2012 WALMART STANDARD DETAIL TEMPORARY SEEDING OR STABILIZATION NOTES: 1. THE GC IS REQUIRED TO, AT A MINIMUM, INITIATE SOIL STABILIZATION MEASURES IMMEDIATELY WHENEVER ANY CLEARING, GRADING, EXCAVATING OR OTHER EARTH DISTURBING ACTIVITIES HAVE PERMANENTLY CEASED ON ANY PORTION OF THE SITE, OR TEMPORARILY CEASED ON ANY PORTION OF THE SITE AND WILL NOT LIKELY RESUME FOR A PERIOD EXCEEDING 14 CALENDAR DAYS. 2. THE GC HAS 7 DAYS FROM INITIATION OF STABILIZATION TO COMPLETE SOIL PREPARATION, SEEDING, MULCHING, AND ANY OTHER REQUIRED ACTIVITIES RELATED TO THE PLANTING AND ESTABLISHMENT OF VEGETATION. THE GC ALSO HAS 7 DAYS FROM INITIATION OF STABILIZATION TO COMPLETELY INSTALL NON-VEGETATED MEASURES, IF UTILIZED. 3. ALL DISTURBED AREAS MUST BE STABILIZED TEMPORARILY WITH THE USE OF FAST-GERMINATING ANNUAL GRASS/GRAIN VARIETIES APPROPRIATE FOR SITE SOIL AND CLIMATE CONDITIONS. MULCH IS REQUIRED FOR ALL SEEDING APPLICATIONS, AND ALL MULCH APPLICATIONS MUST INCLUDE A SUITABLE FORM OF MULCH ANCHORING TO MINIMIZE MOVEMENT OF MULCH BY WIND OR WATER. 4. ALTERNATIVE STABILIZATION MEASURES TO SEEDING, SUCH AS ANCHORED MULCH APPLICATION (WITHOUT SEEDING), MAY BE UTILIZED DURING PERIODS WHEN VEGETATIVE GROWTH IS UNLIKELY (E.G. WINTER MONTHS). 5. IT IS NOT ACCEPTABLE TO ALLOW BARE SOIL TO REMAIN EXPOSED AT ANY TIME DURING THE YEAR, REGARDLESS OF WEATHER/TEMPERATURE/SITE CONDITIONS. 6. ALTERNATIVE STABILIZATION MEASURES INCLUDE, BUT ARE NOT LIMITED TO: ANCHORED STRAW/HAY MULCH, WOOD CELLULOSE FIBER MULCH, SPRAY-ON SOIL GLUES/BINDERS, AND ROLLED EROSION CONTROL PRODUCTS. 7. ALL ROLLED EROSION CONTROL PRODUCTS SHALL HAVE CURRENT QDOR(TM) STATUS ISSUED BY THE EROSION CONTROL TECHNOLOGY COUNCIL (ECTC) PLUS ANY STATE OR AGENCY-SPECIFIC REQUIREMENTS. EVIDENCE OF QDOR(TM) APPROVAL SHALL ACCOMPANY THE PRODUCT SHIPPED TO THE JOBSITE FOR READY IDENTIFICATION BY THE CONTRACTOR OR AGENCY INSPECTOR. 8. ROLLED EROSION CONTROL PRODUCTS (NETS, BLANKETS, TURF REINFORCED MATES) AND VEGETATED AREAS NOT MEETING REQUIRED VEGETATIVE DENSITIES FOR FINAL STABILIZATION MUST BE INSPECTED DAILY. RILING, RUTTING AND OTHER SIGNS OF EROSION INDICATE THE SPECIFIED EROSION CONTROL DEVICE IS NOT FUNCTIONING OR INSTALLED PROPERLY AND/OR ADDITIONAL EROSION CONTROL DEVICES ARE WARRANTED. 9. ROLLED EROSION CONTROL PRODUCTS MUST BE INSTALLED AND ANCHORED IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS. NORTH AMERICAN GREEN S150 IS RECOMMENDED ON ALL SLOPES GREATER THAN 3:1 AND WITHIN TEMPORARY EROSION BMPs SUCH AS DIVERSION DIKES, DIVERSION CHANNELS, SEDIMENT TRAPS, SEDIMENT BASINS, ETC. 10. GC TO IMPLEMENT TEMPORARY STABILIZATION AS FOLLOWS: 1) BROADCAST SEED OVER DISTURBED AREA, 2) INSTALL NORTH AMERICAN GREEN S150 PER MANUFACTURER INSTRUCTIONS, AND 3) WATER AREA IN ACCORDANCE WITH THE 02900 SPECIFICATION IN ORDER TO GERMINATE AND ESTABLISH VEGETATION. 11. TEMPORARY SEED MIX SHALL BE SELECTED BASED ON BELOW CHART: MARCH 15 - AUGUST 31 100% HULLED COMMON BERMUDA 5LBS DATE RANGE STABILIZATION TECHNIQUE SEED WEIGHT / 1,000 SF SEPTEMBER 1 - MARCH 14 100% ANNUAL RYE GRASS 5LBS IMPORTANT: GC MUST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. 2. ALL SOIL STOCKPILES MUST BE STABILIZED TO PREVENT EROSION AND FUGITIVE DUST. THE SURFACE OF THE STOCKPILE MUST BE PROPERLY PROTECTED TO ELIMINATE THE RISK OF EROSION. SEE TEMPORARY SEEDING OR STABILIZATION DETAIL. SUITABLE ALTERNATIVE MEANS OF STABILIZATION CAN BE USED, SUCH AS PROPERLY ANCHORED PLASTIC TARPS. 3. PERIMETER SEDIMENT CONTROLS ALSO MUST BE INSTALLED AT STOCKPILE LOCATIONS TO PREVENT CONTACT WITH STORMWATER, INCLUDING RUN-ON. 4. STOCKPILES MUST BE LOCATED OUTSIDE OF ANY VEGETATED BUFFER AREAS AND SHOULD BE LOCATED AS FAR AS PRACTICABLE FROM STORMWATER CONVEYANCES AND IMPOUNDMENTS AND WATER BODIES. 5. STOCKPILE LOCATIONS SHALL BE NOTED ON THE SITE MAPS. WALMART SP STANDARD DETAIL LAST REVISED: STOCKPILES JUNE 2012 NOTES: 1. LARGE AREAS OF SOIL THAT ARE DENUDED OF VEGETATION AND HAVE NO PROTECTION FROM PARTICLES BEING PICKED UP AND CARRIED BY WIND SHOULD BE PROTECTED WITH A TEMPORARY COVER OR KEPT UNDER CONTROL WITH WATER OR OTHER SOIL ADHERING PRODUCTS TO PREVENT SOIL PARTICLES FROM BECOMING AIRBORNE, AND FROM EXITING THE SITE PERIMETER. 2. WATER TRUCKS OR OTHER DUST CONTROL AGENTS SHALL BE USED AS NEEDED DURING CONSTRUCTION TO MINIMIZE DUST GENERATED ON THE SITE. TACKIFIERS MAY BE USED TO HOLD SOIL IN PLACE AND PREVENT DUST. MANUFACTURER RECOMMENDATIONS FOR APPLICATION LOCATIONS AND RATES MUST BE USED FOR DUST CONTROL APPLICATIONS. ONLY SWPPP-SPECIFIED TACKIFIERS MAY BE USED ON THE PROJECT SITE; ANY CHEMICAL APPLICATION NOT INCLUDED IN THE SWPPP MUST BE APPROVED, IN WRITING, BY THE CEC. 3. DUST CONTROL MUST BE PROVIDED BY THE GC TO A DEGREE THAT IS IN COMPLIANCE WITH APPLICABLE FEDERAL, LOCAL AND STATE DUST CONTROL REGULATIONS. 4. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED. 5. IN ADDITION TO BMPS, GC SHALL PERFORM PER PRACTICES AND PROCEDURES WHICH MINIMIZE AND PREVENT AIRBORNE DUST OR OTHER PARTICLES FROM OCCURRING. WALMART DC STANDARD DETAIL LAST REVISED: DUST CONTROL JUNE 2012 NOTES: 1. USING WATER FROM BASINS, TRAPS, TANKS, OR OTHER WATER CONTAINMENT AREAS FOR IRRIGATION MINIMIZES DISCHARGES FROM THE SITE, AND IT MAY SATISFY OTHER NEEDS OF THE CONSTRUCTION PROJECT, SUCH AS DUST CONTROL, VEGETATIVE ESTABLISHMENT, ETC. 2. CARE SHOULD BE TAKEN THAT WATER UTILIZED FROM CONTAINMENT AREAS ON-SITE FOR CONSTRUCTION PURPOSES DOES NOT DISCHARGE OFF-SITE. IF DISCHARGE IS ANTICIPATED OR OBSERVED, DEWATERING PROCEDURES STATED IN THE DEWATERING DETAIL MUST BE FOLLOWED. 3. GC SHALL IMPLEMENT IRRIGATION OR DISPERSION AS PRACTICABLE TO REDUCE WATER VOLUME IN IMPOUNDMENTS AND TO FOSTER VEGETATION GROWTH. WALMART STANDARD DETAIL LAST REVISED: JUNE 2012 IP INLET PROTECTION NOTES: 1. STORM DRAIN INLET PROTECTION MEASURES SHALL PREVENT SOIL AND DEBRIS FROM ENTERING STORM DRAIN INLETS. 2. TEMPORARY CONTROLS SHALL BE CONSTRUCTED BEFORE THE SURROUNDING AREA IS DISTURBED. 3. TO PREVENT CLOGGING, STORM DRAIN CONTROL STRUCTURES MUST BE MAINTAINED FREQUENTLY. 4. CHECK ALL TEMPORARY CONTROL MEASURES DAILY, AND AFTER EACH STORM EVENT. 5. CONTROL MEASURES MUST BE BUILT PER DETAIL AND PLANS, AND MUST BE IN GOOD WORKING CONDITION AT ALL TIMES. LAST REVISED: JUNE 2013 WALMART STANDARD DETAIL NOTES: 1. THE GC SHALL IDENTIFY FUELING AREAS WITH LEGIBLE SIGNAGE ON THE SITE. TEMPORARY ON-SITE FUEL TANKS FOR CONSTRUCTION VEHICLES SHALL MEET ALL LOCAL, STATE AND FEDERAL REGULATIONS. ALL TANKS, SINGLE AND DOUBLE WALLED, SHALL BE PROVIDED WITH SECONDARY CONTAINMENT (THAT IS CONTAINMENT EXTERNAL TO AND SEPARATE FROM PRIMARY CONTAINMENT). TANKS SHALL HAVE APPROVED SPILL CONTAINMENT WITH THE CAPACITY REQUIRED BY THE APPLICABLE REGULATIONS. SECONDARY CONTAINMENT SHALL BE CONSTRUCTED OF MATERIALS OF SUFFICIENT THICKNESS, DENSITY, AND COMPOSITION SO AS NOT TO BE STRUCTURALLY WEAKENED AS A RESULT OF CONTACT WITH THE FUEL STORED AND CAPABLE OF CONTAINING DISCHARGED FUEL FOR A PERIOD OF TIME EQUAL TO OR LONGER THAN THE MAXIMUM ANTICIPATED TIME SUFFICIENT TO ALLOW RECOVERY OF DISCHARGED FUEL. IT SHALL BE CAPABLE OF CONTAINING 110% OF THE VOLUME OF THE PRIMARY TANK IF A SINGLE TANK IS USED, OR IN THE CASE OF MULTIPLE TANKS, 150% OF THE LARGEST TANK OR 110% OF THE AGGREGATE, WHICHEVER IS LARGER. 2. THE TANKS SHALL BE IN SOUND CONDITION, FREE OF RUST OR OTHER DAMAGE WHICH MIGHT COMPROMISE CONTAINMENT. FUEL STORAGE AREAS SHALL MEET ALL EPA, OSHA AND OTHER REGULATORY REQUIREMENTS FOR SIGNAGE, FIRE EXTINGUISHERS, ETC. HOSES, VALVES, FITTINGS, CAPS, FILLER NOZZLES, AND ASSOCIATED HARDWARE SHALL BE MAINTAINED IN PROPER WORKING CONDITION AT ALL TIMES. TANKS SHALL BE LOCATED TO MINIMIZE EXPOSURE TO WEATHER AND SURFACE WATER DRAINAGE FEATURES. THE LOCATION OF FUEL TANKS SHALL BE SHOWN ON THE SITE MAPS. 3. A SPILL PREVENTION, CONTROL AND COUNTERMEASURE (SPCC) PLAN MUST BE DEVELOPED IF ABOVEGROUND OIL STORAGE CAPACITY AT THE CONSTRUCTION SITE EXCEEDS 1,320 GALLONS OR AS SPECIFIED BY STATE. 4. CONTAINERS WITH A STORAGE CAPACITY OF 55-GALLONS OR LESS ARE NOT INCLUDED WHEN CALCULATING SITE STORAGE CAPACITY. THE GC SHALL WORK WITH THE CEC TO DEVELOP AND IMPLEMENT A SPCC PLAN IN ACCORDANCE WITH THE OIL POLLUTION PREVENTION REGULATION AT TITLE 40 OF THE CODE OF FEDERAL REGULATIONS, PART 112, (40 CFR 112). LAST REVISED: JUNE 2013 WALMART STANDARD DETAIL TP TEMPORARY PARKING LAST REVISED: JUNE 2013 WALMART STANDARD DETAIL LAST REVISED: JUNE 2013 WALMART STANDARD DETAIL NOTES: 1. THE GC SHALL IDENTIFY MASONS' AREA WITH LEGIBLE SIGNAGE ON THE SITE. TO THE EXTENT PRACTICAL, ALL MASONRY TOOLS, MATERIAL, INCLUDING SAND AND SACKED CEMENT AND/OR MORTAR MATERIALS, MIX, AND EQUIPMENT SHALL BE LOCATED WITHIN THE AREA IDENTIFIED. MATERIALS VULNERABLE TO WEATHER ELEMENTS SHALL BE STORED IN CONTAINERS AT THE END OF EACH WORK DAY; SUCH MATERIALS SHALL REMAIN STORED IN CONTAINERS WHEN NOT IN USE. 2. RUNOFF CONTROL, SUCH AS DIVERSION BERMS, SILT FENCE, SILT DIKE, OR OTHER MEANS OF CONTAINMENT SHALL BE PROVIDED TO PREVENT THE MIGRATION OF STORMWATER POLLUTANTS FROM THE MASONS' AREA. COVERED RECEPTACLES FOR DEBRIS AND TRASH DISPOSAL SHALL ALSO BE PROVIDED. 3. THE MASONS' AREA SHALL MEET OSHA AND OTHER REGULATORY REQUIREMENTS FOR PERSONAL PROTECTIVE EQUIPMENT (PPE), FIRE EXTINGUISHERS, ETC. GC SHALL PROVIDE SCREENING OR OTHER TECHNOLOGIES FOR MASONS' AREA TO PREVENT AIRBORNE TRANSPORT OF CEMENT DUST AND OTHER PARTICULATES DUE TO HIGH SPEED WIND OR OTHER CONDITIONS. THE LOCATION OF THE MASONS' AREA SHALL BE SHOWN ON THE SITE MAPS. LAST REVISED: JUNE 2013 WALMART STANDARD DETAIL NOTES: 1. MATERIAL STORAGE AREAS SHOULD BE LOCATED, WHEN POSSIBLE, TO MINIMIZE EXPOSURE TO WEATHER. INSPECTIONS SHALL EVALUATE DISTURBED AREAS AND AREAS USED FOR STORING MATERIALS THAT ARE EXPOSED TO RAINFALL FOR EVIDENCE OF, OR THE POTENTIAL FOR, POLLUTANTS ENTERING THE DRAINAGE SYSTEM OR DISCHARGING FROM THE SITE. IF NECESSARY, THE MATERIALS MUST BE COVERED OR ORIGINAL COVERS MUST BE REPAIRED OR SUPPLEMENTED. ALSO, PROTECTIVE BERMS MUST BE CONSTRUCTED, IF NEEDED, TO CONTAIN RUNOFF FROM MATERIAL STORAGE AREAS. GC SHALL ADHERE TO ALL STATE AND LOCAL REGULATIONS PERTAINING TO MATERIAL STORAGE AREAS. 2. CHEMICALS, PAINTS, SOLVENTS, FERTILIZERS, AND OTHER TOXIC MATERIALS MUST BE STORED IN WATERPROOF CONTAINERS. EXCEPT DURING APPLICATION, THE CONTAINERS AND THE CONTENTS MUST BE KEPT IN TRUCKS OR INSIDE OF STORAGE FACILITIES. RUNOFF CONTAINING SUCH MATERIAL MUST BE COLLECTED, REMOVED FROM THE SITE, TREATED, AND DISPOSED OF AT AN APPROVED SOLID WASTE AND CHEMICAL DISPOSAL FACILITY. LAST REVISED: JUNE 2013 WALMART STANDARD DETAIL NOTES: 1. PROVIDE WASH STATION IN A LOCATION PROTECTED FROM WEATHER ELEMENTS. 2. COLLECT ALL USED WASH WATER AND DISPOSE OF IT PROPERLY. 3. PROVIDE ADEQUATE SUPPLY OF WATER AND ANY OTHER SUPPLIES TO ENSURE PROPER OPERATION OF WASH STATION WHEN NEEDED. LAST REVISED: JUNE 2013 WALMART STANDARD DETAIL NOTES: 1. ALL PERSONNEL INVOLVED WITH CONSTRUCTION ACTIVITIES MUST COMPLY WITH STATE AND LOCAL SANITARY OR SEPTIC SYSTEM REGULATIONS. PORTABLE TOILETS MUST BE LOCATED AT LEAST 30 FEET FROM INLETS, CHANNELS, SWALES, OR PERMITTED LIMITS OF DISTURBANCE, AND MUST BE LOCATED AT LEAST 50 FEET FROM WATERS OF THE STATE, OR WATERS OF THE U.S.. PORTABLE TOILETS MUST BE SECURELY ANCHORED AND/OR TIED DOWN. SECONDARY CONTAINMENT SHALL BE PROVIDED AND FULL CAPACITY SHALL BE RESTORED IMMEDIATELY UPON DISCOVERY OF ITS DIMINISHMENT. THE LOCATION OF SANITARY FACILITIES SHALL BE SHOWN ON THE SITE MAPS. LAST REVISED: JUNE 2013 WALMART STANDARD DETAIL FUEL AND PETROLEUM FPSU STORAGE AND USE MA MASONS' AREA CW CEMENT AND CONCRETE WASHOUT MATERIAL LAYDOWN AND STORAGE AREA PSW PAINT AND STUCCO WASHOUT SAF SANITARY FACILITIES NOTES: 1. SUBSTANCES THAT HAVE THE POTENTIAL FOR POLLUTING SURFACE AND/OR GROUNDWATER MUST BE CONTROLLED BY ANY MEANS NECESSARY TO ENSURE THAT THOSE DO NOT DISCHARGE FROM THE SITE. IN THIS REGARD, POTENTIALLY POLLUTING SUBSTANCES SHALL BE STORED AND HANDLED IN A MANNER CONSISTENT WITH THE RISK OF IMPACT THOSE REPRESENT, AND ACCORDING WITH THE REGULATIONS. 2. NO SOLID MATERIALS, INCLUDING BUILDING MATERIALS, ARE ALLOWED TO BE DISCHARGED FROM THE SITE WITH STORMWATER. ALL SOLID WASTE, INCLUDING DISPOSABLE MATERIALS INCIDENTAL TO THE CONSTRUCTION ACTIVITIES, MUST BE COLLECTED AND PLACED IN CONTAINERS. RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS SHALL BE DEPOSITED INTO SEALED CONTAINERS. MATERIALS SHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE ACTION OF WIND OR STORMWATER DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE. THE CONTAINERS SHALL BE HAULED AWAY FROM THE SITE AND EMPTIED WHEN THOSE BECOME 95% FULL, OR AS NECESSARY, BY A CERTIFIED TRASH DISPOSAL SERVICE. LIDS OR COVERS FOR THE CONTAINERS SHALL BE PROVIDED FOR USE DURING RAIN EVENTS TO PREVENT WASTE CONTACT WITH STORMWATER. WASTES THAT CANNOT BE STORED IN A CONTAINER MUST BE STORED UNDER COVER OR INDOORS. THE LOCATION OF SOLID WASTE RECEPTACLES SHALL BE SHOWN ON THE SITE MAPS. LAST REVISED: JUNE 2013 WALMART STANDARD DETAIL SWD SOLID WASTE DISPOSAL NOTES: 1. THIS SECTION INCLUDES THE CONTROLS OF POLLUTANTS OTHER THAN SEDIMENT AND ADDITIONAL REQUIREMENTS OF THE GENERAL PERMIT. 2. NO ADDITIONAL POLLUTANT CONTROLS ARE ANTICIPATED FOR THIS PROJECT. LAST REVISED: JUNE 2013 WALMART STANDARD DETAIL OPC OTHER POLLUTANT CONTROLS NOTES: 1. CONTRACTOR SHALL PROVIDE DESIGNATED LOCATION FOR SORTING AND SEPARATING HAZARDOUS WASTES. 2. HAZARDOUS WASTE STORAGE MUST BE PROTECTED FROM WEATHER ELEMENTS AND HAVE RESTRICTED ACCESS. 3. HAZARDOUS WASTE STORAGE MUST COMPLY WITH LOCAL, STATE, AND FEDERAL REGULATIONS. 4. HAZARDOUS WASTE STORAGE MUST COMPLY WITH CONTRACT DOCUMENTS. HWD HAZARDOUS WASTE DISPOSAL NOTES: 1. CONCRETE WASTE MANAGEMENT PERTAINS TO WASTE FROM CONCRETE READY-MIX TRUCKS, MASONRY OPERATIONS, AND SIMILAR WASTE. 2. NO LOCAL AND/OR STATE REQUIREMENTS PROHIBIT THE USE OF CONCRETE WASHOUT-OUT PITS. 3. DISCHARGE OF EXCESS OR WASTE CONCRETE AND/OR WASH WATER FROM CONCRETE TRUCKS IS ALLOWED AT THE CONSTRUCTION SITE. ONLY COMMERCIALLY AVAILABLE ABOVE GROUND PORTABLE CONCRETE WASHOUT CONTAINERS ARE ALLOWED AND MUST BE PROTECTED FROM VEHICLE TRAFFIC AND CLEARLY IDENTIFIED BY LEGIBLE SIGNAGE, AND MUST BE LOCATED OUTSIDE OF VEGETATED BUFFERS AND AS FAR AS PRACTICABLE FROM STORMWATER CONVEYANCES AND IMPOUNDMENTS AND WATER BODIES. PORTABLE CONCRETE WASHOUT CONTAINERS SHALL CONTAIN AND/OR ACTIVELY MANAGE BOTH, SOLID AND FLUID, COMPONENTS OF THE MIX. CONCRETE WASHOUT CONTAINERS MUST BE CLEANED OR EXCHANGED WHEN THE REMAINING VOLUME IS REDUCED BY 85% TO PREVENT ANY POTENTIAL OVERFLOW IN A STORM EVENT. 4. ALTERNATIVELY, WASTE CONCRETE CAN BE PLACED INTO FORMS TO MAKE RIP RAP AND/OR OTHER USEFUL CONCRETE PRODUCTS. PORTABLE CONCRETE WASHOUT CONTAINERS SHALL BE DISPOSED IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS. THE GC IS RESPONSIBLE FOR ASSURING THAT THESE PROCEDURES, APPLICABLE LAWS, AND ENVIRONMENTAL REGULATIONS ARE FOLLOWED. THE LOCATION OF CONCRETE WASHOUT CONTAINERS SHALL BE SHOWN ON THE SITE MAPS. LAST REVISED: JUNE 2013 WALMART STANDARD DETAIL MLS ID IRRIGATION OR DISPERSION N/A N/A N/A N/A NOTES: 1. THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN GOOD CONDITION (SUITABLE FOR PARKING AND STORAGE). THIS MAY REQUIRE PERIODIC TOP DRESSING OR SWEEPING (IF LOCATED ON PAVEMENT) OF THE TEMPORARY PARKING AREA AS CONDITIONS DEMAND IN ORDER TO PREVENT TRACK OUT OF SEDIMENT. IMPORTANT: GC MUST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. CF COPY OF WAL-MART NOI COPY OF WAL-MART PERMIT AUTHORIZATION COPY OF WAL-MART CONSTRUCTION SITE NOTICE SWPPP INFORMATION DETAILED DESCRIPTION OF THE LOCATION OF THE SWPPP DOCUMENTATION (BINDER AND SITE MAPS) ON THE SITE. 4' (MINIMUM) 4' (MINIMUM) 3' (MINIMUM) SIGN TO BE CONSTRUCTED OF A RIGID MATERIAL, SUCH AS PLYWOOD OR OUTDOOR SIGN BOARD. SIGN MUST BE CONSTRUCTED IN A MANNER TO PROTECT DOCUMENTS FROM DAMAGE DUE TO WEATHER (WIND, SUN, MOISTURE, ETC.). "SWPPP INFORMATION" MUST BE DISPLAYED PROMINENTLY ACROSS THE TOP OF THE SIGN, AS SHOWN IN THE DETAIL. SIS LAST REVISED: JUNE 2012 WAL-MART STANDARD DETAIL SWPPP INFORMATION SIGN N.T.S. 3' (MINIMUM) NOTES: 1. THE SWPPP INFORMATION SIGN MUST BE LOCATED IN A PROMINENT, PUBLICLY ACCESSIBLE LOCATION NEAR THE MAIN ENTRANCE OF THE SITE, SUCH THAT THE DOCUMENTATION CAN BE READ WITHOUT ACCESSING THE JOBSITE, BUT NOT OBSTRUCTING VIEWS AS TO CAUSE A TRAFFIC SAFETY HAZARD. 2. ALL POSTED DOCUMENTS MUST BE MAINTAINED IN A CLEARLY READABLE CONDITION AT ALL TIMES THROUGHOUT CONSTRUCTION AND UNTIL THE NOTICE-OF-TERMINATION (NOT) IS FILED FOR THE PERMIT. 3. ALL PAGES OF NOTICES OF INTENT AND PERMIT AUTHORIZATIONS MUST BE POSTED. THE CONTRACTOR MAY UTILIZE ACCESSIBLE WATERPROOF FOLDERS TO STORE THESE DOCUMENTS IF IT WILL BE DIFFICULT TO POST ALL PAGES INDIVIDUALLY. 4. CONTRACTOR SHALL POST OTHER STORMWATER AND/OR EROSION AND SEDIMENT CONTROL RELATED PERMITS ON THE SIGN AS REQUIRED BY THE GOVERNING AGENCIES. 5. SUBSEQUENT PERMIT MODIFICATION REQUESTS OR RENEWAL APPLICATIONS AND THEIR ASSOCIATED AUTHORIZATIONS OR RESPONSES SHALL BE POSTED ON THE SWPPP SIGN. 6. SIGN SHALL BE LOCATED OUTSIDE OF PUBLIC RIGHT-OF-WAY AND EASEMENTS UNLESS APPROVED BY THE GOVERNING AGENCY. 7. CONTRACTOR IS RESPONSIBLE FOR ENSURING STABILITY OF THE SWPPP INFORMATION SIGN. IP5 INLET PROTECTION FILTER SACK WALMART STANDARD DETAIL LAST REVISED: APRIL 30, 2011 GEOTEXTILE BAG OVERFLOW HOLES LOOPS SIZED FOR 1" REBAR. USE REBAR FOR A HANDLE TO EMPTY FILTER SACK AT A SEDIMENT COLLECTION LOCATION. LOOPS SIZED FOR RECTANGULAR BAR 2"X1/4". LIFT FILTER BAG FROM INLET USING RECTANGULAR BAR FOR HANDLES. 2"X2"X3/4" RUBBER BLOCK (TYP) (FILTER SACK INSTALLED) GRAB TENSILE STRENGTH GRAB TENSILE ELONGATION PUNCTURE MULLEN BURST TRAPEZOID TEAR UV RESISTANCE APPARENT OPENING SIZE FLOW RATE PERMITTIVITY PROPERTIES TEST METHOD UNITS ASTM D-4632 ASTM D-4632 ASTM D-4833 ASTM D-3786 ASTM D-4533 ASTM D-4355 ASTM D-4751 ASTM D-4491 ASTM D-4491 300 LBS 20 % 120 LBS 800 PSI 120 LBS 80 % 40 US SIEVE 40 GAL/MIN/SQ FT 0.55 SEC -1 GRAB TENSILE STRENGTH GRAB TENSILE ELONGATION PUNCTURE MULLEN BURST TRAPEZOID TEAR UV RESISTANCE APPARENT OPENING SIZE FLOW RATE PERMITTIVITY PROPERTIES TEST METHOD UNITS ASTM D-4632 ASTM D-4632 ASTM D-4833 ASTM D-3786 ASTM D-4533 ASTM D-4355 ASTM D-4751 ASTM D-4491 ASTM D-4491 LOW TO MODERATE FLOW GEOTEXTILE FABRIC SPECIFICATION TABLE MODERATE TO HIGH FLOW GEOTEXTILE FABRIC SPECIFICATION TABLE 265 LBS 20 % 135 LBS 420 PSI 45 LBS 90 % 20 US SIEVE 200 GAL/MIN/SQ FT 1.5 SEC -1 FRAME TO HOLD FILTER BAG IN PLACE 1/4" BRIGHTLY COLORED NYLON ROPE EXPANSION RESTRAINT ISOMETRIC VIEW SECTION VIEW FOR USE ONLY IN PAVED AREAS WHERE SEDIMENT LOADS ARE EXPECTED TO BE VERY LOW. FILTER SACK MUST HAVE OVERFLOW HOLES TO PREVENT PONDING. SECURE RECTANGULAR BAR TO OR UNDER SURROUNDING SURFACE. 1/4" BRIGHTLY COLORED NYLON ROPE EXPANSION RESTRAINT FINISH GRADE N.T.S. NOTES: 1. GEOTEXTILE SHALL BE A WOVEN POLYPROPYLENE FABRIC THAT MEETS OR EXCEEDS REQUIREMENTS IN THE SPECIFICATIONS TABLE. 2. PLACE AN OIL ABSORBENT PAD OR PILLOW OVER INLET GRATE WHEN OIL SPILLS ARE A CONCERN. 3. THE WIDTH, "W", OF THE FILTER SACK SHALL MATCH THE INSIDE WIDTH OF THE GRATED INLET BOX. 4. THE DEPTH, "D", OF THE FILTER SACK SHALL BE BETWEEN 18 INCHES AND 36 INCHES. 5. THE LENGTH, "L", OF THE FILTER SACK SHALL MATCH THE INSIDE LENGTH OF THE GRATED INLET BOX. D H MAINTENANCE NOTES: 1. INLET PROTECTION DEVICES MUST BE INSPECTED FOR SEDIMENT ACCUMULATION WITHIN THE CATCH BASIN. REMOVE TRAPPED SEDIMENT WHEN BRIGHTLY COLORED EXPANSION RESTRAINT CAN NO LONGER BE SEEN. 2. REMOVAL OF SEDIMENT ACCUMULATED IN OR ADJACENT TO A STORM DRAIN INLET MUST BEGIN IMMEDIATELY UPON DISCOVERY, WITH COMPLETION OF THE ACTIVITY OCCURRING NO LATER THAN THE END OF THE FOLLOWING BUSINESS DAY. 3. INLET PROTECTION DEVICES SHALL BE INSPECTED FOR UNINTENDED BYPASS OR IMPROPER FLOW-RATES THAT MAY CAUSE DOWNSTREAM FLOODING. 4. CONTACT THE CEC FOR ALTERNATE INLET PROTECTION IF THE DESIGNED PROTECTION MAY IMPACT DOWNSTREAM BMPS, ADJACENT SLOPES, ETC., DUE TO PONDING ISSUES. ENSURE THAT NO UNDERMINING OF INLET PROTECTION DEVICES HAS OCCURRED. 5. INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR REPLACED IF THEY SHOW SIGNS OF UNDERMINING OR DETERIORATION. INLET GRATE BIG RED MAINTENANCE AND INSTALLATION NOTES 1. BIG REDS SHALL BE INSPECTED ALONG ITS ENTIRETY AND MUST BE CLEANED WHEN SEDIMENT HAS ACCUMULATED TO ONE-THIRD THE HEIGHT OF THE BIG RED. MAINTENANCE CLEANOUT MUST BE CONDUCTED REGULARLY TO PREVENT ACCUMULATED SEDIMENTS FROM REACHING ON-THIRD THE HEIGHT OF THE BIG RED. 2. SPECIAL ATTENTION SHOULD BE PAID TO ENSURE THAT NO UNDERMINING OF BIG RED HAS OCCURRED AND THAT NO BYPASS IS OCCURRING AT JOINING SECTIONS. 3. IF EXCESS SEDIMENT IS ACCUMULATING IN ANY SECTION OF BIG RED, THE CONTRACTOR SHOULD IMPLEMENT ADDITIONAL UPSTREAM STABILIZATION MEASURES OR ADDITIONAL BMPS (PENDING CEC APPROVAL) TO PREVENT EXCESSIVE BUILDUP ON BIG RED. 4. BIG REDS SHALL BE REPAIRED TO THEIR ORIGINAL CONDITIONS IF DAMAGED. 5. A 12" OVERLAP (MIN.) SHALL BE PROVIDED WHERE BIG REDS ADJOIN EACH NEW BIG RED. BR 1 FOOT OVERLAP (MIN) BIG RED ENSURE THERE ARE NO GAPS BETWEEN BIG RED SECTIONS BIG RED OVERLAP/JOINT DETAIL FLOW CONSTRUCTION EXIT CE N.T.S. INTERSECTING ROAD HARD SURFACE 20' MINIMUM A A 100' MIN. SECTION A-A PLAN VIEW EDGE OF EXISTING PAVEMENT 25' MINIMUM EXISTING PAVEMENT, 6" CONCRETE PAVEMENT, OR 4" ASPHALT PAVEMENT 20' 20' ℄ ℄ EXISTING PAVEMENT, 6" CONCRETE PAVEMENT, OR 4" ASPHALT PAVEMENT 10" MIN. DEPTH 2"-3" CLEAN STONE LAST REVISED: JUNE 2012 WAL-MART MODIFIED DETAIL MARIFI 500X GEOTEXTILE FABRIC FOR SEPARATION 95% STANDARD PROCTOR COMPACTED SUBGRADE (ASTM D698) MARIFI 140N GEOTEXTILE FABRIC FOR DRAINAGE AND FILTRATION 6" CRUSHED STONE BASE 2% MIN. 2% MIN. VARIES VARIES 10" MIN. DEPTH 2"-3" CLEAN STONE MARIFI 140N GEOTEXTILE FABRIC FOR DRAINAGE AND FILTRATION 6" CRUSHED STONE BASE MARIFI 500X GEOTEXTILE FABRIC FOR SEPARATION 95% STANDARD PROCTOR COMPACTED SUBGRADE (ASTM D698) NOTE TO GC: THE GOAL OF A CONSTRUCTION EXIT AND ASSOCIATED WHEEL WASH AREAS IS TO ELIMINATE TRACK OUT. SIMPLY MANAGING TRACK OUT THROUGH DESIGNATED OR CONTINUAL STREET SWEEPING IS NOT AN ACCEPTABLE PRACTICE. WHILE STREET SWEEPING IS AN ACCEPTABLE PRACTICE FOR REMOVING DUST AND MINIMAL AMOUNTS OF FINE SEDIMENT, OBSERVABLE TRACK OUT FROM THE PROJECT SHOULD TRIGGER THE USE OF ADDITIONAL MEASURES (WHEEL WASH), CONSIDERATION OF ALTERNATE EXITS, OR DISCONTINUING VEHICLE TRAFFIC UNTIL CONDITIONS ON-SITE HAVE IMPROVED. TRACK OUT IS A SEDIMENT RELEASE. ALL SEDIMENT RELEASES MUST BE REPORTED TO THE SWCT VIA THE ONLINE CRITICAL INCIDENT REPORT. NOTES: 1. ALL SITE ACCESS MUST BE CONFINED TO THE CONSTRUCTION EXIT(S). BARRICADE TO PREVENT USE OF ANY LOCATIONS OTHER THAN THE CONSTRUCTION EXIT(S) WHERE VEHICLES OR EQUIPMENT MAY ACCESS THE SITE. 2. CONTRACTOR TO LOCATE TEMPORARY CONSTRUCTION FENCING, JERSEY BARRIERS, OR BOTH ALONG THE SIDES OF THE CONSTRUCTION EXIT TO PREVENT CONSTRUCTION TRAFFIC FROM SHORT CIRCUITING/BYPASSING THE EXIT. 3. PROVIDE SEDIMENT TRAP ON DOWN GRADIENT SIDE (OR BOTH SIDES) AS REQUIRED. SEDIMENT TRAP SHALL BE LOCATED OUTSIDE OF THE RIGHT-OF-WAY AND AT A MINIMUM SETBACK DISTANCE AS REQUIRED PER LOCAL JURISDICTION. 4. IF THE ACTION OF VEHICLES TRAVELING OVER THE GRAVEL CONSTRUCTION EXIT(S) IS NOT SUFFICIENT TO PREVENT TRACKING OF DIRT, DUST OR MUD, THEN TIRES MUST BE WASHED BEFORE THE VEHICLES ENTER A PUBLIC ROAD. ALL WASH WATER MUST BE ROUTED TO A SEDIMENT TRAP OR OTHER TREATMENT AREA AND SHALL NOT BE DIRECTLY DISCHARGED OFF-SITE. 5. LOCATIONS WHERE VEHICLES ENTER AND EXIT THE SITE MUST BE INSPECTED FOR EVIDENCE OF SEDIMENT TRACKING BEYOND THE PERMITTED PROJECT AREA. ALL MATERIALS SPILLED, DROPPED, WASHED OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. 6. ANY SEDIMENT DEPOSITED ON THE ROADWAY SHALL BE SWEPT AS NECESSARY (AND WITHIN THE SAME DAY AS DISCOVERY) AND DISPOSED OF IN AN APPROPRIATE MANNER. SEDIMENT SHALL NOT BE WASHED INTO STORM SEWER SYSTEMS. SOURCE BOX PROVIDE CULVERT AS REQUIRED TO CARRY DITCH FLOW. SEE SITE MAPS FOR PIPE LOCATION, TYPE, SIZE, AND SLOPE. DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN REV0 SW5 10:54 AM 8/5/20 SWPPP DETAIL SHEET 1 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 8/5/20 SAM'S CLUB FUEL STATION #6633-212 31493 31493-SWPPP-DT JOB # 31493 DRAWING: 31493-SWPPP-DT.dwg LAST SAVED BY: JYANG IMPORTANT: GC MUST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. FLOW (CFS) PRE-CONSTRUCTION RUNOFF COEFFICIENT: POST-CONSTRUCTION RUNOFF COEFFICIENT: RUNOFF COEFFICIENT SUMMARY "c" = 0.85 LAST REVISED: JUNE 2012 WAL-MART STANDARD DETAIL "c" = 0.84 LAST REVISED: JUNE 2012 WAL-MART STANDARD DETAIL ADDRESS: SITE LOCATION SUMMARY CENTER OF SITE: LATITUDE: LONGITUDE: ADJACENT SURROUNDING PROPERTIES: 4700 BROADWALK DRIVE, FORT COLLINS, CO 80525 40° 31' 15.7'' N OR 40.521015° N NORTH: FULLY DEVELOPED COMMERCIAL. USE: MULTIPLE COMMERCIALS SOUTH: FULLY DEVELOPED COMMERCIAL. USE: SAM'S CLUB EAST: FULLY DEVELOPED COMMERCIAL. USE: COMMERCIALS (KOHL'S) WEST: BOARDWALK DRIVE, SINGLE-LANE. USE: ROAD 105° 03' 49.4'' W OR -105.063731° W LAST REVISED: JUNE 2013 WAL-MART STANDARD DETAIL LOWEST ELEVATION OF PROJECT SITE: SITE TOPOGRAPHY SUMMARY HIGHEST ELEVATION OF PROJECT SITE: PERCENT SLOPE VARIATION: TOPOGRAPHY CHANGES: VEGETATION: 5001.00' 0.20% TO 5.50% LANDSCAPING AREAS CONTAINING VARIOUS TREES, SHRUBS, AND MULCH. GRASS WITH VARIOUS TREES 4997.00' SITE WILL MATCH EXISTING GRADES, LIMITED CUT/FILL LAST REVISED: JUNE 2012 WAL-MART STANDARD DETAIL SOIL TYPE AND TEXTURE: SITE SOILS SUMMARY AVERAGE DEPTH OF TOPSOIL: AVERAGE DEPTH TO GROUNDWATER: FREE GROUNDWATER WAS ENCOUNTERED AT A DEPTH OF 10 FEET BSG IN TEST BORINGS B-1 DURING THE TIME OF INVESTIGATION NONE - EXISTING SITE IS PAVED NOTE: · THE ABOVE SOILS INFORMATION IS FOR INFORMATION ONLY AND SHOULD NOT BE USED FOR BIDDING PURPOSES, CONSTRUCTION COSTS OR ESTIMATING. · INFORMATION WAS OBTAINED FROM "GEOTECHNICAL ENGINEERING INVESTIGATION" PREPARED BY SALEM ENGINEERING GROUP, INC. DATED OCTOBER 25, 2019. SITE RAINFALL SUMMARY LAST REVISED: JUNE 2012 WAL-MART STANDARD DETAIL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 0.40 0.40 1.59 2.06 2.43 2.17 1.7 1.60 1.33 1.15 0.76 0.50 AVGERAGE RAINFALL IN INCHES THE TOTAL AVERAGE ANNUAL RAINFALL FOR THE PROJECT AREA IS: 16.10 INCHES THE DESIGN RAIN EVENT FOR THE PROJECT IS: 5 YEAR, 24 HOUR RAIN EVENT: 2.48" PER NOAA ATLAS 14 PRECIPITATION FREQUENCY ESTIMATES FOR 4700 BOARDWALK DRIVE, FORT COLLINS, CO. LAST REVISED: JUNE 2013 WAL-MART STANDARD DETAIL BUFFER NAME VEGETATED STRIPS OR BUFFERS BUFFER AREA (ACRES) - INCLUDE ORIENTATION DESCRIPTION AND RELATIONSHIP TO WATERS OF THE US NOTES: 1. PRESERVE VEGETATED AREAS THROUGHOUT THE CONSTRUCTION PROJECT. ESTABLISH VEGETATION IN DISTURBED AREAS PER STABILIZATION DETAILS. 2. DELINEATE AND PROTECT VEGETATED STRIPS OR BUFFERS PRIOR TO EARTH DISTURBING ACTIVITIES. 3. INSPECT VEGETATED STRIPS OR BUFFERS AS REQUIRED. 7 PERVIOUS AREA AT COMPLETION 0.10 6 IMPERVIOUS AREA AT COMPLETION 0.90 AVERAGE SLOPE: 1%-5% IN PAVED AREAS; 1%-12% IN LANDSCAPED AREAS OFF-SITE RUN ON AREA B 3.09 0.84 OFF-SITE RUN ON AREA C 1.45 0.31 NOTES: 1. OFF-SITE RUN-ON FLOW (CFS) FOR EACH AREA ABOVE IS CALCULATED BASED ON THE DESIGN STORM PROVIDED IN THE RAINFALL SUMMARY TABLE USING THE RATIONAL METHOD AND 5-YEAR STORM EVENT. 2. OFF-SITE RUN-ON AREA A CONSISTS OF A PORTION OF THE ADAJACENT LOT TO THE NORTH BEING ROUTED OVERLAND TO AN INLET IN THE ON-SITE AREA. 3. OFF-SITE RUN-ON AREA B CONSISTS OF A PORTION OF THE SAM'S CLUB PARKING LOT AND ADJACENT LOT TO THE NORTH BEING ROUTED OVERLAND TO AN INLET IN THE ON-SITE AREA. 4. OFF-SITE RUN-ON AREA C CONSISTS OF A PORTION OF THE SAM'S CLUB PARKING LOT BEING ROUTED OVERLAND TO AN INLET IN THE ON-SITE AREA. 5. OFF-SITE RUN-ON AREA D CONSISTS OF A PORTION OF THE SAM'S CLUB PARKING LOT BEING ROUTED OVERLAND TO AN INLET IN THE ON-SITE AREA. N/A N/A THE BORING LOCATIONS WERE CHECKED FOR THE PRESENCE OF GROUNDWATER DURING AND AFTER THE DRILLING OPERATIONS. FREE GROUNDWATER WAS ENCOUNTERED AT A DEPTH OF 10 FEET BSG IN TEST BORINGS B-1 DURING THE TIME OF THE FIELD EXPLORATION. BASED ON REVIEW OF AVAILABLE GROUNDWATER DATA FROM STATE OF COLORADO DIVISION OF WATER RESOURCES, WELL NAME SB00606901 LOCATED WITHIN THE PROPERTY REPORTED A GROUNDWATER DEPTH OF 13 FEET BSG IN MAY, 1977. IT SHOULD BE RECOGNIZED THAT WATER TABLE ELEVATIONS MAY FLUCTUATE WITH TIME, BEING DEPENDENT UPON SEASONAL PRECIPITATION, IRRIGATION, LAND USE, LOCALIZED PUMPING, AND CLIMATIC CONDITIONS AS WELL AS OTHER FACTORS. THEREFORE, WATER LEVEL OBSERVATIONS AT THE TIME OF THE FIELD INVESTIGATION MAY VARY FROM THOSE ENCOUNTERED DURING THE CONSTRUCTION PHASE OF THE PROJECT. THE EVALUATION OF SUCH FACTORS IS BEYOND THE SCOPE OF THIS REPORT. PAVEMENT/ LANDSCAPING PAVEMENT/ LANDSCAPING PAVEMENT/ LANDSCAPING 1% 4% 1% 4% OFF-SITE RUN ON AREA D 0.54 0.13 PAVEMENT/ 1% 4% LANDSCAPING DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN REV0 SW4 11:17 AM 8/5/20 SWPPP INFORMATION SUMMARIES 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 8/5/20 SAM'S CLUB FUEL STATION #6633-212 31493 31493-SWPPP-DT JOB # 31493 DRAWING: 31493-SWPPP-DT.dwg LAST SAVED BY: JYANG IMPORTANT: GC MUST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. 4997 4998 CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF PROPOSED CANOPY FOOTPRINT 1.4% 1.4% 2.6% 5.5% 0.8% 3.6% 3.1% 0.6% 3.5% 1.3% 1.7% 4.6% 2.7% 0.6% 1.3% 2.3% 1.6% 1.5% 0.7% 0.6% 1.0% 1.1% 1.3% 1.0% 1.1% 0.6% 3.2% 1.8% 0.9% 2.1% 1.0% 1.0% 3.3% 4.4% 1.8% 1.0% 1.0% 0.4% 0.4% 2.9% 2.4% 2.3% 0.3% 0.8% 4.5% 1.6% 1.3% 0.6% 1.3% 2.0% 1.3% 0.4% 1.0% 3.0% 2.9% 1.0% 2.6% 2.9% 1.1% 2.5% BIG RED SECTION 8 BIG RED SECTION 9 2.1% 1.9% OFF-SITE DRAINAGE AREA B 0.84 ACRES OFF-SITE DRAINAGE AREA A 0.39 ACRES OFF-SITE DRAINAGE AREA D 0.13 ACRES BIG RED SECTION 2 BIG RED SECTION 1 OFF-SITE DRAINAGE AREA C 0.31 ACRES CF CF CF CF BIG RED SECTION 3 BIG RED SECTION 4 BIG RED SECTION 5 BIG RED SECTION 6 BIG RED SECTION 7 BIG RED SECTION 10 BIG RED SECTION 11 BIG RED SECTION 12 BIG RED SECTION 13 IP5 IP IP5 IP CE OFFSET 4FT FOR CLARITY INLET PROTECTION AND STORMWATER OUTFLOW LOCATION 1 PS PS PS PS PS CF CF BR BR PROPOSED BUILDING FOOTPRINT SIS OFFSET 2FT FOR CLARITY BR BR MLS LOCKABLE DOUBLE GATE CF BR BR BR BR BR BR CONTRACTOR NOTE: DO NOT BLOCK DRIVE BR BR BR CF 2.4% 1.3% DATE Engineering Associates, Inc. REVISIONS PHASE 2 DPOR PM DES DRW INITIAL DESIGN REV0 SW3 9:21 AM 8/10/20 PHASE 2 EROSION AND SEDIMENT 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 8/7/20 SAM'S CLUB FUEL STATION #6633-212 31493 31493-SWPPP-PH2 JOB # 31493 DRAWING: 31493-SWPPP-PH2.dwg LAST SAVED BY: JYANG 1 A 2 3 4 5 6 7 8 9 10 B C D E F G Know what's below. Calblefore you dig. THE GC MUST UPDATE THE SWPPP, INCLUDING THE JOBSITE BINDER AND SITE MAPS, TO REFLECT THE PROGRESS OF CONSTRUCTION ACTIVITIES AND GENERAL CHANGES TO THE PROJECT SITE. UPDATES SHALL BE MADE DAILY TO TRACK PROGRESS WHEN ANY OF THE FOLLOWING ACTIVITIES OCCUR: BMP INSTALLATION, MODIFICATION OR REMOVAL, CONSTRUCTION ACTIVITIES (E.G., PAVING, STORM SEWER INSTALLATION, FOOTING INSTALLATION, ETC.), CLEARING, GRUBBING OR GRADING, OR TEMPORARY OR PERMANENT STABILIZATION. IMPORTANT: THE GENERAL CONTRACTOR MUST SUBMIT A REQUEST FOR INFORMATION (RFI) TO THE CEC AND OBTAIN WRITTEN CEC APPROVAL BEFORE DOING ANY OF THE FOLLOWING: 1. MODIFYING EROSION OR SEDIMENT CONTROL BMPS (SUBSTITUTIONS ARE TYPICALLY ONLY APPROVED IF SPECIFIED MATERIALS ARE NOT AVAILABLE OR THERE IS A VALID REASON THE SPECIFIED BMP WILL NOT WORK) 2. ADDING/DELETING EROSION OR SEDIMENT CONTROL BMPS; 3. MODIFYING THE SWPPP IMPLEMENTATION SEQUENCE; OR 4. PERFORMING ANY ACTIONS OR IN ANY MANNER THAT IS CONTRARY TO THE SWPPP. THE CONTRACTOR MAY MODIFY OR ADD ADDITIONAL BMPS, WITHOUT CEC APPROVAL, IN AN EMERGENCY SITUATION TO PREVENT SEDIMENT DISCHARGE OR PROTECT WATER QUALITY; HOWEVER, GC MUST NOTIFY THE CEC AS SOON AS PRACTICAL AS TO THEIR ACTIONS TO DISCUSS THE NEED FOR ADDITIONAL OR SUPPLEMENTAL MEASURES AND TO OBTAIN THE REQUIRED APPROVALS. THE CONTRACTOR IS ULTIMATELY RESPONSIBLE TO ENSURE COMPLIANCE WITH THE PERMIT AND PROTECTION OF DOWNSTREAM WATER QUALITY. AMENDING THE SWPPP DOES NOT MEAN THAT IT HAS TO BE REPRINTED. IT IS ACCEPTABLE TO ADD ADDENDA, SKETCHES, NEW SECTIONS, DETAILS, AND/OR REVISED DRAWINGS THAT HAVE THE CEC NAME IN PRINT, ARE STAMPED, SIGNED, DATED, AND ARE ACCOMPANIED BY WRITTEN COPY OF THE ASSOCIATED RFI AND ITS RESPONSE FROM CEC. ENGINEERED ITEMS MUST BE SIGNED AND STAMPED BY THE CEC OF RECORD FOR THE PROJECT. SWPPP UPDATES AND AMENDMENTS IMPORTANT: GC MUST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. CF SIS CONSTRUCTION FENCE BR BIG RED (OR ENGINEER APPROVED EQUAL) SWPPP INFORMATION SIGN IP5 INLET PROTECTION FILTER SACK 1. PRIOR TO CONSTRUCTION, GC MUST CLEARLY DELINEATE AND MARK OFF AREAS IDENTIFIED, IN THE SWPPP OR IN THE FIELD, TO BE PROTECTED (SUCH AS HISTORIC PROPERTIES, NATURAL BUFFERS, TREES, HABITATS OF ENDANGERED/THREATENED SPECIES, ETC.). 2. WHERE IN CLOSE PROXIMITY, LIMIT OF DISTURBANCE (LOD) LINE TO FOLLOW PROPERTY LINE. LOD LINE SHOWN OUTSIDE PROPERTY LINE AND CONSERVATION EASEMENT FOR GRAPHIC CLARITY ONLY. 3. CONTRACTOR TO ENSURE ALL CONSTRUCTION TRAFFIC UTILIZES THE CONSTRUCTION EXIT(S) PRIOR TO LEAVING CONSTRUCTION SITE. 4. TEMPORARY PARKING AND STORAGE TO REMAIN THROUGHOUT ENTIRE PROJECT. 5. CONTRACTOR TO CLEAN OUT ALL EXISTING INLETS, MANHOLES, PIPES, AND CATCH BASINS PRIOR TO REMOVING ANY EROSION CONTROL BMPS. 6. FOR EXISTING LEGEND, PLEASE REFER TO SITE DEVELOPMENT PLANS. 7. NO LOADING/UNLOADING OF MATERIALS AND/OR EQUIPMENT AND PARKING IS PERMITTED ON AREAS THAT IMPEDE ACCESS TO ADJACENT PROPERTIES AND BUSINESSES. 8. CONTRACTOR MUST ADHERE TO ANY HOURS OF WORK, NOISE LEVEL, AND OTHER CONSTRUCTION RELATED RESTRICTIONS IN ACCORDANCE WITH THE CITY OF FORT COLLINS REGULATIONS. 9. CONTRACTOR SHALL OBTAIN PRIOR APPROVAL FROM CEC, WALMART CONSTRUCTION MANAGER, COLORADO DEPARTMENT OF TRANSPORTATION (CDOT), AND THE CITY OF FORT COLLINS PRIOR TO ANY WORK WITHIN PUBLIC RIGHT-OF-WAY. CONTRACTOR SHALL PROVIDE ADEQUATE TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH THE STANDARDS OF THE CITY OF FORT COLLINS PRIOR TO WORK. 10. CONTRACTOR SHALL OBTAIN PRIOR APPROVAL FROM CEC, WALMART CONSTRUCTION MANAGER, AND STORE MANAGER PRIOR TO ANY WORK THAT MAY DISRUPT THE SURROUNDING BUSINESS' OPERATIONS. 11. CONTRACTOR SHALL PHASE GRADING/DISTURBANCE ACTIVITIES AS MUCH AS POSSIBLE TO MINIMIZE RISK OF SEDIMENT RELEASES. 12. WHEN SILT FENCE INLET PROTECTION IS SHOWN CONJUNCTION WITH ANOTHER INLET PROTECTION DEVICE, THE SILT FENCE INLET PROTECTION DEVICE IS TO BE USED IN THE INTERIM PERIOD BETWEEN THE CONSTRUCTION ON THE INLET STRUCTURE BASE AND WALLS AND THE INLET TOP, ONCE THE INLET TOP IS CONSTRUCTED, CONTRACTOR SHALL USE THE OTHER SPECIFIED ON THE PLANS. PROPOSED LIMITS OF DISTURBANCE SECTION # BMP CALLOUTS SIZE (IF APPLICABLE) PROPOSED BUILDING FOOTPRINT PROPERTY BOUNDARY DRAINAGE BASIN BOUNDARY SCALE IN FEET 0 30' 45' 60' SITE BENCHMARK CITY OF FORT COLLINS BENCHMARK: 4-08 ON SOUTH SIDE OF HARMONY RD. AT THE NORTHWEST CORNER OF 625 EAST HARMONY RD. (FRONT RANGE BAPTIST CHURCH), ON THE NORTH WALL OF A CONCRETE IRRIGATION DROP STRUCTURE NAVD88=5017.14' DUST CONTROL (ENTIRE SITE - NOT SHOWN ON PLAN) DEWATERING (ENTIRE SITE - NOT SHOWN ON PLAN) ON-SITE DEWATERING FROM ALL EXCAVATIONS MUST FOLLOW THESE REQUIREMENTS. FUEL AND PETROLEUM STORAGE AND USE (NOT SHOWN ON PLAN - G.C. TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION) HAZARDOUS WASTE DISPOSAL (NOT SHOWN ON PLAN - G.C. TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION) MATERIAL LAYDOWN AND STORAGE AREA OTHER POLLUTANT CONTROLS (ENTIRE SITE - NOT SHOWN ON PLAN) SANITARY FACILITIES (NOT SHOWN ON PLAN - G.C. TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION) STOCKPILES (NOT SHOWN ON PLAN - G.C. TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION) SOLID WASTE DISPOSAL (NOT SHOWN ON PLAN - G.C. TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION) SEEDING/VEGETATION REQUIREMENTS (ENTIRE SITE - NOT SHOWN ON PLAN) MASONS AREA (NOT SHOWN ON PLAN - G.C. TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION IRRIGATION OR DISPERSION (ENTIRE SITE - NOT SHOWN ON PLAN) PAINT AND STUCCO WASHOUT (NOT SHOWN ON PLAN - G.C. TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION) CEMENT AND CONCRETE WASHOUT (NOT SHOWN ON PLAN GC TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION) TEMPORARY PARKING (NOT SHOWN ON PLAN) - G.C. TO DETERMINE LOCATION AND COORDINATE WITH STORE MANAGER OR OPERATOR. INLET PROTECTION CW SWD MLS MA SP DC SAF TP SVR PSW OPC IP ID HWD FPSU DW PERMANENT SEEDING, SOD, MULCHING, OR ROCK - TYP. PS (REF LANDSCAPING PLAN) TEMPORARY CONCRETE WASHOUT (NOT SHOWN ON PLAN - G.C. TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION.) (DISCHARGE OF EXCESS OR WASTE CONCRETE AND/OR WASH WATER FROM CONCRETE TRUCKS WILL BE ALLOWED ON THE CONSTRUCTION SITE, BUT ONLY IN APPROVED ABOVEGROUND PORTABLE CONCRETE WASHOUT CONTAINERS.) TCW TS TEMPORARY SEEDING AND STABILIZATION (ENTIRE SITE - NOT SHOWN ON PLAN) CE CONSTRUCTION ENTRANCE 1.9% 1.5% 4.0% 0.3% 1.4% 1.7% 1.9% 0.5% 0.3% 2.9% 2.1% 3.6% 3.3% 2.8% 1.0% 0.8% 0.3% 1.2% 0.6% 0.8% 2.7% 1.2% 1.2% 2.2% 3.5% 4.9% 2.0% 3.2% 0.5% 0.9% 0.4% 0.6% 1.3% 0.3% 0.6% 0.3% 3 CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF CF PROPOSED CANOPY FOOTPRINT BIG RED SECTION 2 BIG RED SECTION 1 BIG RED SECTION 3 ON-SITE DRAINAGE AREA A 0.99 ACRES OFF-SITE DRAINAGE AREA B 0.84 ACRES OFF-SITE DRAINAGE AREA A 0.39 ACRES OFF-SITE DRAINAGE AREA C 0.31 ACRES OFF-SITE DRAINAGE AREA D 0.13 ACRES BIG RED SECTION 5 BIG RED SECTION 4 IP5 IP IP5 IP CE MLS OFFSET 4FT FOR CLARITY INLET PROTECTION AND STORMWATER OUTFLOW LOCATION 1 LOCKABLE DOUBLE GATE CF CF CF BR PROPOSED BUILDING FOOTPRINT BR BR SIS OFFSET 2FT FOR CLARITY BR CONTRACTOR NOTE: DO NOT BLOCK DRIVE BR CF LOCKABLE DOUBLE GATE DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN REV0 SW2 12:17 PM 8/7/20 PHASE 1 EROSION AND SEDIMENT 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 8/7/20 SAM'S CLUB FUEL STATION #6633-212 31493 31493-SWPPP-PH1 JOB # 31493 DRAWING: 31493-SWPPP-PH1.dwg LAST SAVED BY: JYANG Know what's below. Calblefore you dig. SOIL TYPE ALTVAN-SATANTA LOAM, 0 TO 3 PERCENT SLOPES THE GC MUST UPDATE THE SWPPP, INCLUDING THE JOBSITE BINDER AND SITE MAPS, TO REFLECT THE PROGRESS OF CONSTRUCTION ACTIVITIES AND GENERAL CHANGES TO THE PROJECT SITE. UPDATES SHALL BE MADE DAILY TO TRACK PROGRESS WHEN ANY OF THE FOLLOWING ACTIVITIES OCCUR: BMP INSTALLATION, MODIFICATION OR REMOVAL, CONSTRUCTION ACTIVITIES (E.G., PAVING, STORM SEWER INSTALLATION, FOOTING INSTALLATION, ETC.), CLEARING, GRUBBING OR GRADING, OR TEMPORARY OR PERMANENT STABILIZATION. IMPORTANT: THE GENERAL CONTRACTOR MUST SUBMIT A REQUEST FOR INFORMATION (RFI) TO THE CEC AND OBTAIN WRITTEN CEC APPROVAL BEFORE DOING ANY OF THE FOLLOWING: 1. MODIFYING EROSION OR SEDIMENT CONTROL BMPS (SUBSTITUTIONS ARE TYPICALLY ONLY APPROVED IF SPECIFIED MATERIALS ARE NOT AVAILABLE OR THERE IS A VALID REASON THE SPECIFIED BMP WILL NOT WORK) 2. ADDING/DELETING EROSION OR SEDIMENT CONTROL BMPS; 3. MODIFYING THE SWPPP IMPLEMENTATION SEQUENCE; OR 4. PERFORMING ANY ACTIONS OR IN ANY MANNER THAT IS CONTRARY TO THE SWPPP. THE CONTRACTOR MAY MODIFY OR ADD ADDITIONAL BMPS, WITHOUT CEC APPROVAL, IN AN EMERGENCY SITUATION TO PREVENT SEDIMENT DISCHARGE OR PROTECT WATER QUALITY; HOWEVER, GC MUST NOTIFY THE CEC AS SOON AS PRACTICAL AS TO THEIR ACTIONS TO DISCUSS THE NEED FOR ADDITIONAL OR SUPPLEMENTAL MEASURES AND TO OBTAIN THE REQUIRED APPROVALS. THE CONTRACTOR IS ULTIMATELY RESPONSIBLE TO ENSURE COMPLIANCE WITH THE PERMIT AND PROTECTION OF DOWNSTREAM WATER QUALITY. AMENDING THE SWPPP DOES NOT MEAN THAT IT HAS TO BE REPRINTED. IT IS ACCEPTABLE TO ADD ADDENDA, SKETCHES, NEW SECTIONS, DETAILS, AND/OR REVISED DRAWINGS THAT HAVE THE CEC NAME IN PRINT, ARE STAMPED, SIGNED, DATED, AND ARE ACCOMPANIED BY WRITTEN COPY OF THE ASSOCIATED RFI AND ITS RESPONSE FROM CEC. ENGINEERED ITEMS MUST BE SIGNED AND STAMPED BY THE CEC OF RECORD FOR THE PROJECT. SWPPP UPDATES AND AMENDMENTS PROPOSED LIMITS OF DISTURBANCE SECTION # BMP CALLOUTS SIZE (IF APPLICABLE) PROPOSED BUILDING FOOTPRINT 3 PROPERTY BOUNDARY 1. PRIOR TO CONSTRUCTION, GC MUST CLEARLY DELINEATE AND MARK OFF AREAS IDENTIFIED, IN THE SWPPP OR IN THE FIELD, TO BE PROTECTED (SUCH AS HISTORIC PROPERTIES, NATURAL BUFFERS, TREES, HABITATS OF ENDANGERED/THREATENED SPECIES, ETC.). 2. WHERE IN CLOSE PROXIMITY, LIMIT OF DISTURBANCE (LOD) LINE TO FOLLOW PROPERTY LINE. LOD LINE SHOWN OUTSIDE PROPERTY LINE AND CONSERVATION EASEMENT FOR GRAPHIC CLARITY ONLY. 3. CONTRACTOR TO ENSURE ALL CONSTRUCTION TRAFFIC UTILIZES THE CONSTRUCTION EXIT(S) PRIOR TO LEAVING CONSTRUCTION SITE. 4. TEMPORARY PARKING AND STORAGE TO REMAIN THROUGHOUT ENTIRE PROJECT. 5. CONTRACTOR TO CLEAN OUT ALL EXISTING INLETS, MANHOLES, PIPES, AND CATCH BASINS PRIOR TO REMOVING ANY EROSION CONTROL BMPS. 6. FOR EXISTING LEGEND, PLEASE REFER TO SITE DEVELOPMENT PLANS. 7. NO LOADING/UNLOADING OF MATERIALS AND/OR EQUIPMENT AND PARKING IS PERMITTED ON AREAS THAT IMPEDE ACCESS TO ADJACENT PROPERTIES AND BUSINESSES. 8. CONTRACTOR MUST ADHERE TO ANY HOURS OF WORK, NOISE LEVEL, AND OTHER CONSTRUCTION RELATED RESTRICTIONS IN ACCORDANCE WITH THE CITY OF FORT COLLINS REGULATIONS. 9. CONTRACTOR SHALL OBTAIN PRIOR APPROVAL FROM CEC, WALMART CONSTRUCTION MANAGER, COLORADO DEPARTMENT OF TRANSPORTATION (CDOT), AND THE CITY OF FORT COLLINS PRIOR TO ANY WORK WITHIN PUBLIC RIGHT-OF-WAY. CONTRACTOR SHALL PROVIDE ADEQUATE TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH THE STANDARDS OF THE CITY OF FORT COLLINS PRIOR TO WORK. 10. CONTRACTOR SHALL OBTAIN PRIOR APPROVAL FROM CEC, WALMART CONSTRUCTION MANAGER, AND STORE MANAGER PRIOR TO ANY WORK THAT MAY DISRUPT THE SURROUNDING BUSINESS' OPERATIONS. 11. CONTRACTOR SHALL PHASE GRADING/DISTURBANCE ACTIVITIES AS MUCH AS POSSIBLE TO MINIMIZE RISK OF SEDIMENT RELEASES. DRAINAGE BASIN BOUNDARY CONTROL PLAN IMPORTANT: GC MUST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. SITE BENCHMARK CITY OF FORT COLLINS BENCHMARK: 4-08 ON SOUTH SIDE OF HARMONY RD. AT THE NORTHWEST CORNER OF 625 EAST HARMONY RD. (FRONT RANGE BAPTIST CHURCH), ON THE NORTH WALL OF A CONCRETE IRRIGATION DROP STRUCTURE NAVD88=5017.14' CF SIS CONSTRUCTION FENCE BR BIG RED (OR ENGINEER APPROVED EQUAL) SWPPP INFORMATION SIGN IP5 INLET PROTECTION FILTER SACK SCALE IN FEET 0 30' 45' 60' CE CONSTRUCTION ENTRANCE DUST CONTROL (ENTIRE SITE - NOT SHOWN ON PLAN) DEWATERING (ENTIRE SITE - NOT SHOWN ON PLAN) ON-SITE DEWATERING FROM ALL EXCAVATIONS MUST FOLLOW THESE REQUIREMENTS. EQUIPMENT AND VEHICLE CLEANING AND MAINTENANCE AREA (NOT SHOWN ON PLAN - G.C. TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION) FUEL AND PETROLEUM STORAGE AND USE (NOT SHOWN ON PLAN - G.C. TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION) MATERIAL LAYDOWN AND STORAGE AREA OTHER POLLUTANT CONTROLS (ENTIRE SITE - NOT SHOWN ON PLAN) SANITARY FACILITIES (NOT SHOWN ON PLAN - G.C. TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION) STOCKPILES (NOT SHOWN ON PLAN - G.C. TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION) SOLID WASTE DISPOSAL (NOT SHOWN ON PLAN - G.C. TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION) SEEDING/VEGETATION REQUIREMENTS (ENTIRE SITE - NOT SHOWN ON PLAN) MASONS AREA (NOT SHOWN ON PLAN - G.C. TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION IRRIGATION OR DISPERSION (ENTIRE SITE - NOT SHOWN ON PLAN) PAINT AND STUCCO WASHOUT (NOT SHOWN ON PLAN - G.C. TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION) CEMENT AND CONCRETE WASHOUT (NOT SHOWN ON PLAN GC TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION) INLET PROTECTION CW EMA SWD MLS MA SP DC SAF SVR PSW OPC IP ID FPSU DW TEMPORARY CONCRETE WASHOUT (NOT SHOWN ON PLAN - G.C. TO DETERMINE LOCATION SPECIFIC TO EACH PHASE OF CONSTRUCTION.) (DISCHARGE OF EXCESS OR WASTE CONCRETE AND/OR WASH WATER FROM CONCRETE TRUCKS WILL BE ALLOWED ON THE CONSTRUCTION SITE, BUT ONLY IN APPROVED ABOVEGROUND PORTABLE CONCRETE WASHOUT CONTAINERS.) TCW TS TEMPORARY SEEDING AND STABILIZATION (ENTIRE SITE - NOT SHOWN ON PLAN) TEMPORARY PARKING (NOT SHOWN ON PLAN) - G.C. TO DETERMINE TP LOCATION AND COORDINATE WITH STORE MANAGER OR OPERATOR. (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 8/4/20 SAM'S CLUB FUEL STATION #6633-212 31493 31493-SWPPP-LOW JOB # 31493 DRAWING: 31493-SWPPP-LOW.dwg LAST SAVED BY: JYANG 1 A 2 3 4 5 6 7 8 9 10 B C D E F G MINIMIZATION OF DISTURBED AREAS: 1. CONTRACTOR SHALL MANAGE CONSTRUCTION ACTIVITIES TO REDUCE EROSION AND RETAIN SEDIMENT AND OTHER POLLUTANTS IN THE SOIL AT THE CONSTRUCTION SITE. 2. CONTRACTOR SHALL MINIMIZE THE TIME BARE SOIL IS EXPOSED. 3. CONTRACTOR SHALL MINIMIZE SITE DISTURBANCE BY MINIMIZING THE EXTENT OF GRADING AND CLEARING TO EFFECTIVELY REDUCE SEDIMENT YIELD. NOTE TO GC: OWNER HAS AUTHORITY AT ANY TIME TO LIMIT SURFACE AREA OF ERODIBLE EARTH MATERIAL EXPOSED BY CLEARING AND GRUBBING, EXCAVATION, BORROW AND EMBANKMENT OPERATIONS AND TO DIRECT THE GC TO PROVIDE IMMEDIATE PERMANENT OR TEMPORARY POLLUTION CONTROL MEASURES. IMPORTANT: GC MUST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. SWPPP IMPLEMENTATION SEQUENCE PHASE 1 1. INSTALL THE SWPPP INFORMATION SIGN AND POST REQUIRED DOCUMENTS NEAR THE PLANNED CONSTRUCTION EXIT, AND WITHIN EASY ACCESS TO THE GENERAL PUBLIC WITHOUT ENTERING THE SITE. 2. STAKE/FLAG THE LIMITS OF DISTURBANCE (LOD) (WHERE STAKING IS NOT POSSIBLE/PRACTICAL, THE LOD MUST BE CONSPICUOUSLY, AND PROMINENTLY, MARKED TO DENOTE THE BOUNDARY). LOD MUST REMAIN CONSPICUOUSLY MARKED THROUGHOUT THE ENTIRE CONSTRUCTION PROJECT. 3. INSTALL BIG RED SECTIONS 1-5 4. INSTALL CONSTRUCTION EXIT AS SHOWN ON SITE MAPS. 5. INSTALL CONSTRUCTION FENCING AS SHOWN ON SITE MAPS. 6. PREPARE TEMPORARY PARKING AND STORAGE AREA AND SET THE PROJECT OFFICE TRAILER. 7. HALT ALL ACTIVITIES CONTACT THE CIVIL ENGINEERING CONSULTANT (CEC) TO PERFORM INSPECTION AND CERTIFICATION OF BEST MANAGEMENT PRACTICES (BMPS). BMP CERTIFICATION MUST OCCUR BEFORE STORMWATER PRE-CONSTRUCTION MEETING. (THIS SHOULD BE SCHEDULED IN ADVANCE, IN ANTICIPATION OF THE EXPECTED DATE WHEN THE ABOVE SEQUENCE ITEMS WILL BE COMPLETED.) ALL EXCEPTIONS NOTED ON THE BMP CERTIFICATION FORM MUST BE ADDED AS DEFICIENCIES WITHIN THE BMP CERTIFICATION FORM AND RESOLVED WITHIN 24-HOURS. BMPS MUST NOT BE CERTIFIED IF ONE OR MORE OF THE EXCEPTIONS WILL NOT BE RESOLVED WITHIN 24-HOURS OF THE BMP CERTIFICATION BY THE CEC. IF THE CEC IS UNABLE TO CERTIFY THAT SITE CONDITIONS ARE PER PLANS AND SPECIFICATIONS, THE CERTIFICATION OF BMPS MUST BE RESCHEDULED. THE STORMWATER PRE-CONSTRUCTION MEETING MAY ONLY OCCUR AFTER BMPS CAN BE CERTIFIED. GENERAL CONTRACTOR (GC) SHALL SCHEDULE AND CONDUCT THE STORMWATER PRE-CONSTRUCTION MEETING WITH THE CEC, OWNER'S CONSTRUCTION MANAGER (CM), AGENCY(IES) AND SUBCONTRACTORS BEFORE PROCEEDING WITH CONSTRUCTION. DAILY STORMWATER INSPECTION REPORTS IN THE ONLINE SWPPP REPORTING SYSTEM PROVIDED BY THE OWNER MUST START ON THE NEXT BUSINESS DAY AFTER THE SITE BMPS & PRECONSTRUCTION MEETING CERTIFICATION IS SIGNED/CERTIFIED BY THE CEC. NOTE: UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: TRAILER, PARKING, LAY DOWN, PORTA-POTTY, WHEEL WASH, CONCRETE WASHOUT, MASON'S AREA, FUEL AND MATERIAL STORAGE AREAS/CONTAINERS, SOLID WASTE CONTAINERS, ETC., IMMEDIATELY DENOTE THEM ON THE SITE MAPS AND NOTE ANY CHANGES IN LOCATION AS THEY OCCUR THROUGHOUT THE CONSTRUCTION PROCESS. IN ADDITION, NOTE ALL AREAS WHERE FILL IS IMPORTED FROM OR SOIL IS EXPORTED TO ON THE SITE MAPS. NOTE: DOWN SLOPE PROTECTIVE MEASURES MUST ALWAYS BE IN PLACE BEFORE SOIL IS DISTURBED. ACTIVITIES ARE PRESENT IN THE ORDER OR SEQUENCE IN WHICH THEY ARE REQUIRED TO BE COMPLETED. PHASE 2 1. BEGIN DEMOLITIONING EXISTING SITE FEATURES AS SHOWN ON THE SITE MAPS. (PHASE DEMOLITION TO THE MAXIMUM EXTENT PRACTICAL TO MINIMIZE THE AMOUNT OF AREA DISTURBED AT ANY POINT IN TIME). 2. BEGIN GRADING THE SITE. 3. START CONSTRUCTION OF BUILDING PAD AND STRUCTURES. 4. TEMPORARILY STABILIZE, THROUGHOUT CONSTRUCTION IMMEDIATELY FOLLOWING THE COMPLETION OF THE MOST RECENT LAND DISTURBING/GRADING ACTIVITY, ANY DISTURBED AREAS, INCLUDING MATERIAL STOCKPILES THAT ARE SCHEDULED OR LIKELY TO REMAIN INACTIVE FOR 14 DAYS OR MORE. 5. PRIOR TO UTILITY WORK, INSTALL BIG RED SECTIONS 6 THRU 13 AT ALL NEWLY CONSTRUCTED ENTRANCES, INCLUDING ADJUSTING BIG REDS AS NEEDED AS GRADING ACTIVITIES PROGRESS TO CONSTRUCT ENTRANCE. 6. INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, CURBS AND GUTTERS 7. IMMEDIATELY PERMANENTLY STABILIZE AREAS TO BE VEGETATED AS THEY ARE BROUGHT TO FINAL GRADE. 8. INSTALL INLET PROTECTION AT ALL STORM SEWER STRUCTURES AS EACH INLET STRUCTURE IS INSTALLED. 9. REMOVE CONSTRUCTION EXIT PRIOR TO PAVING OPERATIONS. 10. REMOVE AND REPLACE BIG REDS AT THE END OF EACH WORKDAY AS PAVING OPERATION. 11. PREPARE SITE FOR PAVING. 12. PAVE SITE. 13. INSTALL APPROPRIATE INLET PROTECTION DEVICES FOR PAVED AREAS AS WORK PROGRESSES, PER BMP DETAILS. 14. COMPLETE GRADING AND INSTALLATION OF PERMANENT STABILIZATION OVER ALL DISTURBED AREAS. 15. OBTAIN CONCURRENCE FROM THE OWNER CONSTRUCTION MANAGER (CM) THAT THE SITE HAS BEEN FULLY STABILIZED AND ALL CONSTRUCTION HAS BEEN COMPLETED, THEN: A. REMOVE ALL REMAINING TEMPORARY EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMPS), B. STABILIZE ANY AREAS DISTURBED BY THE REMOVAL OF TEMPORARY BMPS, AND C. ASK THE CM TO CONTACT THE CEC TO COMPLETE THE CEC PRE-NOT SITE INSPECTION AND REPORT (ONLY CM MAY DO THIS). 16. CONTINUE DAILY INSPECTIONS AND REPORTS UNTIL THE CM FINAL DAILY INSPECTION REPORT, MARKED 'READY TO TERMINATE PERMIT', IS SIGNED BY THE CONSTRUCTION MANAGER AND SUBMITTED VIA THE ONLINE SWPPP REPORTING SYSTEM PROVIDED BY THE OWNER. NOTE: THE GENERAL CONTRACTOR MAY COMPLETE CONSTRUCTION-RELATED ACTIVITIES CONCURRENTLY, ONLY IF ALL PRECEDING BMPS AND STABILIZATION ACTIVITIES HAVE BEEN COMPLETELY INSTALLED. BMP-RELATED STEPS IN THE ABOVE SEQUENCE ARE BOLDED FOR CLARITY. THE CEC MUST APPROVE, IN WRITING, ANY CHANGES IN THE ABOVE SWPPP IMPLEMENTATION SEQUENCE, BEFORE THEIR IMPLEMENTATION BEGINS. THE ESTIMATED DATES OF IMPLEMENTATION OF POLLUTION CONTROL MEASURES SHALL BE DOCUMENTED BY THE CONTRACTOR ON THE SOIL EROSION/SEDIMENTATION CONTROL OPERATION TIME SCHEDULE ON SHEET C9.4. SCALE IN FEET 0 50' 75' 100' ACCORDANCE WITH APPENDIX E - TAB 21 OF THE 02370 SPECIFICATION. THE CONTRACTOR IS REQUIRED TO LOCATE OFFICE TRAILERS AND MATERIAL STORAGE AREAS FOR THE PROJECT WITHIN THE LIMITS OF DISTURBANCE. THE CONTRACTOR MAY REQUEST USE OF OFF-SITE LOCATIONS FOR OFFICE TRAILERS OR NON-ERODIBLE MATERIAL STORAGE; HOWEVER, APPROVAL MUST BE OBTAINED FROM THE CONSTRUCTION MANAGER, THE CEC AND THE OWNER PRIOR TO THEIR USE. REQUESTS WILL BE REVIEWED ON A CASE BY CASE BASIS AND IF APPROVED, LIMITATIONS ON USE WILL BE PROVIDED BY THE CEC. C. SPECIAL PROJECT AREAS: THERE ARE NO SPECIAL PROJECTS, LOCATED BEYOND THE OWNER PERMITTED PROJECT AREA, REQUIRING INSPECTION AND MAINTENANCE ASSOCIATED WITH THIS CONSTRUCTION PROJECT. D.1 NON-STORMWATER DISCHARGES: THE GENERAL PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES PROHIBITS MOST NON-STORMWATER DISCHARGES DURING THE CONSTRUCTION PHASE. ALLOWABLE NON-STORMWATER DISCHARGES THAT OCCUR DURING CONSTRUCTION ON THIS PROJECT, ARE INCLUDED IN ACT2 CONDITION NO. T-5 OF THE GENERAL PERMIT. BEST MANAGEMENT PRACTICES (BMPS) MUST BE IMPLEMENTED FOR THE GENERAL PERMIT ALLOWABLE DISCHARGES FOR THE DURATION OF THE PERMIT. THE TECHNIQUES DESCRIBED IN THIS SWPPP FOCUS ON PROVIDING CONTROL OF POLLUTANT DISCHARGES WITH PRACTICAL APPROACHES THAT UTILIZE READILY AVAILABLE EXPERTISE, MATERIAL, AND EQUIPMENT. NON-STORMWATER COMPONENTS OF SITE DISCHARGES MUST BE UNCONTAMINATED NON-TURBID WATER. ALL NON-STORMWATER DISCHARGES MUST BE ROUTED TO A STORMWATER CONTROL PRIOR TO DISCHARGE. WATER USED FOR CONSTRUCTION WHICH DISCHARGES FROM THE SITE MUST ORIGINATE FROM A PUBLIC WATER SUPPLY OR PRIVATE WELL APPROVED BY THE STATE HEALTH DEPARTMENT. WATER USED FOR CONSTRUCTION THAT DOES NOT ORIGINATE FROM AN APPROVED PUBLIC SUPPLY MUST NOT DISCHARGE FROM THE SITE; IT CAN BE RETAINED IN RETENTION PONDS UNTIL IT INFILTRATES OR EVAPORATES. WHEN NON-STORMWATER IS DISCHARGED FROM THE SITE, IT MUST BE DONE IN A MANNER SUCH THAT IT DOES NOT CAUSE EROSION OF THE SOIL DURING DISCHARGE. D.2 POWER WASHING: PROCESS WATER SUCH AS POWER WASHING WATER AND CONCRETE CUTTING EFFLUENT, AMONG OTHERS, MUST BE COLLECTED FOR TREATMENT AND DISPOSAL. IT MUST NOT BE FLUSHED INTO THE SITE STORM DRAIN SYSTEM OR DISCHARGED OFF-SITE. E. DISCHARGE POINTS: ALL DISCHARGE POINTS MUST BE INSPECTED TO DETERMINE WHETHER EROSION AND SEDIMENTATION CONTROL MEASURES ARE EFFECTIVE IN PREVENTING DISCHARGE OF SEDIMENT FROM THE SITE AND/OR IMPACTS TO RECEIVING WATERS. SEDIMENT ACCUMULATION DOWNGRADIENT OF DISCHARGE LOCATIONS SHALL BE REPORTED AS A SEDIMENT DISCHARGE (SEE APPENDIX E - TAB 14, SEDIMENT RELEASES, OF THE 02370 SPECIFICATION) AND THE POTENTIAL UPSTREAM CAUSE SHALL BE INVESTIGATED TO PREVENT FUTURE OCCURRENCE. CONTACT THE CM, CEC AND SWCT TO DETERMINE APPROPRIATE ACTION FOR CLEANUP OF DISCHARGED SEDIMENT THAT MAY BE OUTSIDE OF THE LIMITS OF DISTURBANCE. SEE SAMPLING AND MONITORING OF EFFLUENT PLAN (IF APPLICABLE). EROSION AND SEDIMENT CONTROL NOTES A. CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS REQUIRED BY THIS STORM WATER POLLUTION PREVENTION PLAN. ADDITIONAL BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST OF OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION. B. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY PERMITTING AGENCY OR OWNER. C. SITE MAP MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR REGULATED WETLANDS MUST BE MAINTAINED ON SITE AT ALL TIMES. D. CONTRACTOR TO LIMIT DISTURBANCE OF SITE IN STRICT ACCORDANCE WITH SWPPP IMPLEMENTATION SEQUENCE, OR AS REQUIRED BY THE APPLICABLE GENERAL PERMIT. NO UNNECESSARY OR IMPROPERLY SEQUENCED CLEARING AND/OR GRADING SHALL BE PERMITTED. E. ALL DENUDED/BARE AREAS THAT WILL BE INACTIVE FOR 14 DAYS OR MORE, MUST BE STABILIZED IMMEDIATELY UPON COMPLETION OF MOST RECENT GRADING ACTIVITY, WITH THE USE OF FAST-GERMINATING ANNUAL GRASS/GRAIN VARIETIES, STRAW/HAY MULCH, WOOD CELLULOSE FIBERS, TACKIFIERS, NETTING AND/OR BLANKETS. COMPLETION MUST BE ACHIEVED IMMEDIATELY, BUT NO LATER THAN SEVEN DAYS. F. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY STABILIZED AS SHOWN ON THE PLANS. THESE AREAS SHALL BE SEEDED, SODDED, AND/OR VEGETATED IMMEDIATELY, AND COMPLETED NO LATER THAN SEVEN DAYS AFTER THE LAST CONSTRUCTION ACTIVITY OCCURRING IN THESE AREAS. REFER TO THE GRADING PLAN AND/OR LANDSCAPE PLAN. G. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION. TEMPORARY AND/OR PERMANENT STABILIZATION SHALL BE APPLIED PER REQUIREMENTS IN THESE E&S CONTROL NOTES. H. DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION AND SEDIMENT CONTROL MEASURES (SILT FENCES, ETC.) TO PREVENT EROSION AND POLLUTANT DISCHARGE OFF-SITE. I. ALL MEASURES STATED ON THIS SITE MAP, AND IN THE STORM WATER POLLUTION PREVENTION PLAN, SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION UNTIL NO LONGER REQUIRED FOR A COMPLETED PHASE OF WORK OR FINAL STABILIZATION OF THE SITE. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CHECKED BY A QUALIFIED PERSON IN ACCORDANCE WITH THE CONTRACT DOCUMENTS OR THE APPLICABLE PERMIT, WHICHEVER IS MORE STRINGENT, AND REPAIRED IN ACCORDANCE WITH THE SITE PLANS. J. STORM WATER POLLUTANT CONTROL MEASURES INSTALLED DURING CONSTRUCTION, THAT WILL ALSO PROVIDE STORM WATER MANAGEMENT AFTER CONSTRUCTION, ARE INCLUDED IN THE CONTRACT DOCUMENTS. THE SITE-SPECIFIC POST CONSTRUCTION STORM WATER OPERATION AND MAINTENANCE (O&M) MANUAL IS INCLUDED IN THE CONTRACT DOCUMENTS. K. ALL PERMANENT CONTROLS AND SYSTEMS MUST BE INSTALLED AND FUNCTIONING AS DESIGNED AND FREE OF ACCUMULATED SEDIMENT AND DEBRIS DURING FINAL PROJECT INSPECTION AND APPROVAL. L. NO SOLID MATERIALS, INCLUDING BUILDING MATERIALS, SHALL BE DISCHARGED FROM THE SITE. M. OFF-SITE VEHICLE TRACKING OF SEDIMENT AND THE GENERATION OF DUST SHALL BE MINIMIZED DURING CONSTRUCTION. N. THE PLAN SHALL ENSURE AND DEMONSTRATE COMPLIANCE WITH APPLICABLE STATE OR LOCAL WASTE DISPOSAL AND TEMPORARY AND PERMANENT SANITARY SEWER REGULATIONS. O. NO LIQUID CONCRETE WASTE SHALL BE DISCHARGED FROM THE SITE. P. NO CONTAMINATES FROM FUEL STORAGE ARES, HAZARDOUS WASTE, AND TRUCK WASH AREAS SHALL BE DISCHARGED FROM THE SITE. Q. ADEQUATE HOUSEKEEPING MEASURES SHALL BE IMPLEMENTED SO THAT RANDOM TRASH, MATERIALS, AND TOOLS ARE NOT LEFT LAYING AROUND THE SITE DURING CONSTRUCTION. ANY HAZARDOUS OR POTENTIALLY HAZARDOUS MATERIAL THAT IS BROUGHT ONTO THE CONSTRUCTION SITE SHALL BE HANDLED PROPERLY TO REDUCE THE POTENTIAL FOR STORMWATER POLLUTION. ALL MATERIALS USED ON THIS CONSTRUCTION SITE SHALL BE PROPERLY STORED, HANDLED, DISPENSED AND DISPOSED OF FOLLOWING ALL APPLICABLE LABEL DIRECTIONS. FLAMMABLE AND COMBUSTIBLE LIQUIDS SHALL BE STORED AND HANDLED ACCORDING TO APPLICABLE REGULATIONS, AND, AT A MINIMUM, ACCORDING TO 29 CFR 1926.152. ONLY APPROVED CONTAINERS AND PORTABLE TANKS SHALL BE USED FOR STORAGE AND HANDLING OF FLAMMABLE AND COMBUSTIBLE LIQUIDS. MATERIAL SAFETY DATA SHEETS (MSDS) INFORMATION SHALL BE KEPT ON SITE FOR ANY AND ALL APPLICABLE MATERIALS. HOWEVER, MSDS MAY ALSO BE ACCESSED VIA TELEPHONE OR OTHER ELECTRONIC MEANS OR APPARATUS. IN THE EVENT OF AN ACCIDENTAL SPILL, IMMEDIATE ACTION SHALL BE TAKEN BY THE GC TO CONTAIN AND REMOVE THE SPILLED MATERIAL. THE SPILL SHALL BE REPORTED TO THE APPROPRIATE AGENCIES IN THE REQUIRED TIME FRAMES. AS REQUIRED UNDER THE PROVISIONS OF THE CLEAN WATER ACT, ANY SPILL OR DISCHARGE ENTERING WATERS OF THE UNITED STATES SHALL BE PROPERLY REPORTED. ALL HAZARDOUS MATERIALS, INCLUDING CONTAMINATED SOIL AND LIQUID CONCRETE WASTE, SHALL BE DISPOSED OF BY THE CONTRACTOR IN THE MANNER SPECIFIED BY FEDERAL, STATE AND LOCAL REGULATIONS AND BY THE MANUFACTURER OF SUCH PRODUCTS. THE GC SHALL PREPARE A WRITTEN RECORD OF ANY SPILL AND ASSOCIATED CLEAN-UP ACTIVITIES OF PETROLEUM PRODUCTS OR HAZARDOUS MATERIALS IN EXCESS OF ONE GALLON OR REPORTABLE QUANTITIES, WHICHEVER IS LESS, ON THE DAY OF THE SPILL. THE GC SHALL PROVIDE NOTICE TO OWNER, VIA THE ONLINE CRITICAL INCIDENT REPORT, IMMEDIATELY UPON IDENTIFICATION OF ANY SPILL. SPILL REPORT FORMS ARE AVAILABLE IN THE ONLINE SWPPP REPORTING SYSTEM PROVIDED BY THE OWNER. COPIES OF SPILL CRITICAL INCIDENT REPORTS SHALL BE PRINTED AND MAINTAINED IN THE JOBSITE BINDER. ANY SPILLS OF PETROLEUM PRODUCTS OR HAZARDOUS MATERIALS IN EXCESS OF REPORTABLE QUANTITIES AS DEFINED BY EPA OR THE STATE OR LOCAL AGENCY REGULATIONS, SHALL BE IMMEDIATELY REPORTED TO THE EPA NATIONAL RESPONSE CENTER (1-800-424-8802) AND COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT (1-303-692-3300) IMMEDIATELY. THE STATE REPORTABLE QUANTITY FOR PETROLEUM PRODUCTS IS THAT WHICH EXCEEDS A REPORTABLE QUANTITY ESTABLISHED UNDER 40 CFR 302: ONE BARREL OR 42 GALLONS. THE REPORTABLE QUANTITY FOR HAZARDOUS MATERIALS CAN BE FOUND IN 40 CFR 302 OR THE CODE OF FEDERAL REGULATIONS WEBPAGE HTTP://WWW/ACCESS/GPO.GOV/CGI-BIN/CFRASSEMBLE.CGI?TITLE=200440. TO MINIMIZE THE POTENTIAL FOR A SPILL OF PETROLEUM PRODUCT OR HAZARDOUS MATERIALS TO COME IN CONTACT WITH STORMWATER, THE FOLLOWING STEPS SHALL BE IMPLEMENTED: 1) ALL MATERIALS WITH HAZARDOUS PROPERTIES, SUCH AS PESTICIDES, PETROLEUM PRODUCTS, FERTILIZERS, SOAPS, DETERGENTS, CONSTRUCTION CHEMICALS, ACIDS, BASES, PAINTS, PAINT SOLVENTS, ADDITIVES FOR SOIL STABILIZATION, CONCRETE, CURING COMPOUNDS AND ADDITIVES, ETC., SHALL BE STORED IN A SECURE LOCATION, UNDER COVER AND IN APPROPRIATE, TIGHTLY SEALED CONTAINERS WHEN NOT IN USE. 2) THE MINIMUM PRACTICAL QUANTITY OF ALL SUCH MATERIALS SHALL BE KEPT ON THE JOB SITE AND SCHEDULED FOR DELIVERY AS CLOSE TO TIME OF USE AS PRACTICAL. 3) A SPILL CONTROL AND CONTAINMENT KIT (CONTAINING FOR EXAMPLE, ABSORBENT MATERIAL SUCH AS KITTY LITTER OR SAWDUST, ACID, BASE, NEUTRALIZING AGENT, BROOMS, DUST PANS, MOPS, RAGS, GLOVES, GOGGLES, PLASTIC AND METAL TRASH CONTAINERS, ETC.) SHALL BE PROVIDED AT THE CONSTRUCTION SITE AND ITS LOCATION(S) SHALL BE IDENTIFIED WITH LEGIBLE SIGNAGE AND SHOWN ON SITE MAPS. a. THE SPILL CONTROL AND CONTAINMENT KIT SUPPLIES SHALL BE OF SUFFICIENT QUANTITIES AND APPROPRIATE CONTENT TO CONTAIN A SPILL FROM THE LARGEST ANTICIPATED PIECE OF EQUIPMENT AND FROM THE LARGEST ANTICIPATED QUANTITIES OF PRODUCTS STORED ON THE SITE AT ANY GIVEN TIME. b. CONTENTS SHALL BE INSPECTED DAILY DURING THE DAILY STORMWATER INSPECTION. 4) ALL PRODUCTS SHALL BE STORED IN AND USED FROM THE ORIGINAL CONTAINER WITH THE ORIGINAL PRODUCT LABEL. CONTAINERS MUST BE STORED IN A MANNER TO PROTECT THEM FROM THE ELEMENTS AND INCIDENTAL DAMAGE. 5) ALL PRODUCTS SHALL BE USED IN STRICT COMPLIANCE WITH INSTRUCTIONS ON THE PRODUCT LABEL. 6) THE DISPOSAL OF EXCESS OR USED PRODUCTS SHALL BE IN STRICT COMPLIANCE WITH INSTRUCTIONS ON THE PRODUCT LABEL AND REGULATIONS. THIS PROPERTY IS LOCATED WITHIN FLOOD ZONE "X". FLOOD ZONE "X" IS DEFINED AS AREAS OF 0.2% ANNUAL CHANCE FLOOD; AREAS OF 1% ANNUAL CHANCE FLOOD WITH AVERAGE DEPTHS OF LESS THAN 1 FOOT OR WITH DRAINAGE AREAS LESS THAN 1 SQUARE MILE; AND AREAS PROTECTED BY LEVEES FROM 1% ANNUAL CHANCE FLOOD AS DETERMINED BY THE NATIONAL FLOOD INSURANCE PROGRAM, FLOOD INSURANCE RATE MAP FOR FORT COLLINS, COLORADO. COMMUNITY PANEL NUMBER: 08069C1000F EFFECTIVE DATE: DECEMBER 19, 2006. (NPDES) NOTES 1. IN THE CASE OF EMERGENCY, CALL THE WALMART CONSTRUCTION MANAGER. 2. SEDIMENT FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON SITE USING STRUCTURAL CONTROLS TO THE MAXIMUM EXTENT PRACTICABLE. 3. STOCKPILES OF SOIL SHALL BE PROPERLY CONTAINED TO MINIMIZE SEDIMENT TRANSPORT FROM THE SITE TO STREETS, DRAINAGE FACILITIES OR ADJACENT PROPERTIES VIA RUNOFF, VEHICLE TRACKING, OR WIND. 4. APPROPRIATE BMP'S FOR CONSTRUCTION-RELATED MATERIALS, WASTES, SPILLS SHALL BE IMPLEMENTED TO MINIMIZE TRANSPORT FROM THE SITE TO STREETS, DRAINAGE FACILITIES, OR ADJOINING PROPERTIES BY WIND OR RUNOFF. 5. RUNOFF FROM EQUIPMENT AND VEHICLE WASHING SHALL BE CONTAINED AT CONSTRUCTION SITES UNLESS TREATED TO REDUCE OR REMOVE SEDIMENT AND OTHER POLLUTANTS. 6. ALL CONSTRUCTION CONTRACTOR AND SUBCONTRACTOR PERSONNEL ARE TO BE MADE AWARE OF THE REQUIRED BEST MANAGEMENT PRACTICES AND GOOD HOUSEKEEPING MEASURES FOR THE PROJECT SITE AND ANY ASSOCIATED CONSTRUCTION STAGING AREAS. 7. AT THE END OF EACH DAY OF CONSTRUCTION ACTIVITY ALL CONSTRUCTION DEBRIS AND WASTE MATERIALS SHALL BE COLLECTED AND PROPERLY DISPOSED IN THE TRASH OR RECYCLE BINS. 8. CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN ANTICIPATED STORM DOES NOT CARRY WASTES OR POLLUTANTS OFF THE SITE. DISCHARGES OF MATERIAL OTHER THAN STORM WATER ONLY WHEN NECESSARY FOR PERFORMANCE AND COMPLETION OF CONSTRUCTION PRACTICES AND WHERE THEY DO NOT: CAUSE OR CONTRIBUTE TO A VIOLATION OF ANY WATER QUALITY STANDARD; CAUSE OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR NUISANCE; OR CONTAIN A HAZARDOUS SUBSTANCE IN A QUANTITY REPORTABLE UNDER FEDERAL REGULATIONS 40 CFR PARTS 117 AND 302. 9. POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR LIQUID CHEMICAL SPILLS; WASTES FROM PAINTS, STAINS, SEALANTS, GLUES, LIMES, PESTICIDES, HERBICIDES, WOOD PRESERVATIVES AND SOLVENTS: ASBESTOS FIBERS, PAINT FLAKES OR STUCCO FRAGMENTS; FUELS, OILS, LUBRICANTS, AND HYDRAULIC, RADIATOR OR BATTERY FLUIDS; FERTILIZERS, VEHICLE/EQUIPMENT WASH AND CONCRETE WASH WATER; CONCRETE, DETERGENT OR FLOATABLE WASTES; WASTES FROM ANY ENGINE/EQUIPMENT STREAM CLEANING OR CHEMICAL DEGREASING AND SUPER CHLORINATED POTABLE WATER LINE FLUSHING. DURING CONSTRUCTION, PERMITTEE SHALL DISPOSE OF SUCH MATERIALS IN A SPECIFIED AND CONTROLLED TEMPORARY AREA ON-SITE, PHYSICALLY SEPARATED FROM POTENTIAL STORM WATER RUNOFF, WITH ULTIMATE DISPOSAL IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS. 10. DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGE CONTAMINATED SOILS VIA SURFACE EROSION IS PROHIBITED. DEWATERING OF NON-CONTAMINATED GROUNDWATER REQUIRES A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT FROM THE RESPECTIVE STATE REGIONAL WATER QUALITY CONTROL BOARD. 11. GRADED AREAS ON THE PERMITTED AREA PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPES AT THE CONCLUSION OF EACH WORKING DAY. DRAINAGE IS TO BE DIRECTED TOWARD DESILTING FACILITIES. 12. THE PERMITTEE AND CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATER CREATES A HAZARDOUS CONDITION. 13. THE PERMITTEE AND CONTRACTOR SHALL INSPECT THE EROSION CONTROL WORK AND INSURE THAT THE WORK IS IN ACCORDANCE WITH THE APPROVED PLANS. 14. THE PERMITTEE SHALL NOTIFY ALL GENERAL CONTRACTORS, SUBCONTRACTORS, MATERIAL SUPPLIERS, LESSEES, AND PROPERTY OWNERS: THAT DUMPING OF CHEMICALS INTO THE STORM DRAIN SYSTEM OR THE WATERSHED IS PROHIBITED. 15. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS IMMINENT. 16. ALL REMOVABLE EROSION PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE DAY RAIN PROBABILITY FORECAST EXCEEDS 40%. 17. SEDIMENTS FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON SITE USING AN EFFECTIVE COMBINATION OF EROSION AND SEDIMENT CONTROLS TO THE MAXIMUM EXTENT PRACTICABLE, AND STOCKPILES OF SOIL SHALL BE PROPERLY CONTAINED TO MINIMIZE SEDIMENT TRANSPORT FROM SITE TO STREETS, DRAINAGE FACILITIES OF ADJACENT PROPERTIES VIA RUNOFF, VEHICLE TRACKING, OR WIND. 18. APPROPRIATE BMPS FOR CONSTRUCTION-RELATED MATERIALS, WASTES, SPILLS OR RESIDUES SHALL BE IMPLEMENTED AND RETAINED ON SITE TO MINIMIZE TRANSPORT FROM SITE TO STREETS, DRAINAGE FACILITIES, OR ADJOINING PROPERTY BY WIND RUNOFF. NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEMS EROSION AND SEDIMENT CONTROL PLANS (ESCP) PROVIDE COPIES OF (ESCP) FOR REFERENCE. ESCP ARE USUALLY PART OF BMP'S AND SHALL BE ADDRESSED ON GRADING PLANS AND RELATED BUILDING SITE PLAN. ULTIMATE RECEIVING WATER: SITE DRAINS TO UNNAMED DITCH FLOWING SOUTHEAST, APPROXIMATELY 1/2 MILE EAST OF SITE SW0 SWPPP NOTES SW1 SWPPP IMPLEMENTATION SEQUENCE AND LIMITS OF WORK SW2 PHASE 1 EROSION AND SEDIMENT CONTROL PLAN SW3 PHASE 2 EROSION AND SEDIMENT CONTROL PLAN SW4 SWPPP INFORMATION SUMMARIES SW5 SWPPP DETAIL SHEET 1 SW6 SWPPP DETAIL SHEET 2 SW7 SWPPP DETAIL SHEET 3 IMPORTANT: GC MUST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. HAZARDOUS MATERIAL MANAGEMENT & SPILL REPORTING FLOOD CERTIFICATION: PLAN INDEX: Vicinity Map Not to Scale SUBJECT SITE SITE BENCHMARK CITY OF FORT COLLINS BENCHMARK: 4-08 ON SOUTH SIDE OF HARMONY RD. AT THE NORTHWEST CORNER OF 625 EAST HARMONY RD. (FRONT RANGE BAPTIST CHURCH), ON THE NORTH WALL OF A CONCRETE IRRIGATION DROP STRUCTURE NAVD88=5017.14' GENERAL IRRIGATION NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING A COPY OF THE PROJECT SPECIFICATIONS PRIOR TO BIDDING. THE PROJECT SPECIFICATIONS ARE A PART OF THESE PLANS AND SHALL BE CONSULTED BY THE IRRIGATION CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTING WORK AS SPECIFIED IN THE PROJECT SPECIFICATIONS AND ON THE PLANS. 2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, EQUIPMENT QUANTITIES, AND UTILITY LOCATIONS PRIOR TO BEGINNING WORK. 3. CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT OR LICENSED IRRIGATOR OF ANY DISCREPANCIES IN PLANS OR SPECIFICATIONS PRIOR TO BEGINNING OR CONTINUING WORK. 4. THE CONTRACTOR SHALL MAKE NO SUBSTITUTIONS, DELETIONS, OR ADDITIONS TO THIS PLAN WITHOUT APPROVAL OF THE LANDSCAPE ARCHITECT OR LICENSED IRRIGATOR. 5. ALL CONSTRUCTION SHALL CONFORM TO CITY, COUNTY, STATE, AND FEDERAL REQUIREMENTS. IT SHALL BE THE RESPONSIBILITY OF THE IRRIGATION CONTRACTOR TO ENSURE THAT ALL IRRIGATION EQUIPMENT MEETS GOVERNMENT REGULATIONS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR OBTAINING ANY NECESSARY PERMITS OR APPROVALS. 6. CONTRACTOR IS TO VERIFY ACTUAL AVAILABLE WATER PRESSURE BEFORE BEGINNING INSTALLATION. CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT OR LICENSED IRRIGATOR IF AVAILABLE WATER PRESSURE EXCEEDS 5 PSI HIGHER OR LOWER THAN THE DESIGN WATER PRESSURE OF 65 PSI. 7. IRRIGATION SYSTEMS CONNECTED TO POTABLE WATER SUPPLY, SHALL HAVE A BACKFLOW PREVENTER INSTALLED PER LOCAL REQUIREMENTS. 8. ANY EXISTING TREES TO REMAIN ARE TO BE PROTECTED FROM DAMAGE. DO NOT TRENCH OR EXCAVATE WITHIN THE CRITICAL ROOT ZONE OF ANY TREE. 9. SUPPLY LINE AND METER TO BE PROVIDED BY GENERAL CONTRACTOR. BACKFLOW PREVENTER TO BE PROVIDED BY IRRIGATION CONTRACTOR. IRRIGATION CONTRACTOR'S POINT OF CONNECTION TO BEGIN AFTER THE IRRIGATION WATER METER. 10. IRRIGATION CONTRACTOR SHALL REVIEW WINTERIZATION PROCEDURES FOR IRRIGATION SYSTEM WITH OWNERS REPRESENTATIVE. 11. IRRIGATION CONTRACTOR IS RESPONSIBLE FOR INSTALLING MANUAL DRAIN VALVES AT LOWEST POSSIBLE ELEVATION ON IRRIGATION MAIN SO AS TO PROVIDE POSITIVE DRAINAGE OF IRRIGATION MAIN DURING WINTER MONTHS, OR PROVIDE BLOWOUT ASSEMBLY. 12. ALL LATERAL LINES SHALL BE EQUIPPED WITH AUTOMATIC DRAIN VALVES AT LOW POINTS. 13. IRRIGATION CONTRACTOR SHALL COORDINATE CONTROLLER LOCATION WITH GENERAL CONTRACTOR. GENERAL CONTRACTOR SHALL PROVIDE (2) 1" ELECTRICAL CONDUITS FOR IRRIGATION CONTRACTOR'S POWER/DATA CONNECTION TO CONTROLLER. SEE ARCHITECTURAL ELECTRICAL PLAN FOR ELECTRICAL CONNECTION TO THE IRRIGATION CONTROLLER. IRRIGATION CONTRACTOR SHALL COORDINATE CONSTRUCTION OF IRRIGATION SYSTEM WITH GENERAL CONTRACTOR AND LANDSCAPE CONTRACTOR PRIOR TO COMMENCEMENT OF CONSTRUCTION. 14. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 15. ALL BELOW GRADE LOW VOLTAGE WIRING CONNECTIONS SHALL BE INSTALLED PER WIRE CONNECTION DETAIL. 16. DO NOT INSTALL IRRIGATION AT PYLON / MONUMENT SIGN LOCATION UNTIL SIGN HAS BEEN INSTALLED. 17. LOCATION FOR IRRIGATION SYSTEM AS SHOWN IS FOR DRAWING PURPOSES ONLY. UNSLEEVED PIPES MAY BE SHOWN IN PAVEMENT AREAS FOR CLARITY ONLY. INSTALL THESE PIPES IN ADJACENT LANDSCAPE AREAS WHERE NECESSARY. CONTRACTOR SHALL VERIFY THE EXACT LOCATION IN FIELD PRIOR TO THE COMMENCEMENT OF CONSTRUCTION OF PROPOSED IRRIGATION SYSTEM. ALL PROPOSED IRRIGATION LINES AND EQUIPMENT SHALL BE INSTALLED WITHIN THE BOUNDARIES OF THE PROJECT SITE. CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT OR LICENSED IRRIGATOR IF THE DESIGN AS SHOWN IS NOT ACHIEVABLE. 18. MINIMUM COVER FROM TOP OF PIPING TO FINISHED GRADE SHALL BE AS PER DETAIL 64A. 19. IRRIGATION CONTRACTOR SHALL COORDINATE IRRIGATION INSTALLATION WITH PLANTING PLAN AND SITE CONDITIONS TO PROVIDE COMPLETE COVERAGE WITH MINIMUM OVERSPRAY. THE IRRIGATION CONTRACTOR SHALL MAKE MINOR ADJUSTMENTS TO ENSURE PROPER COVERAGE AT NO ADDITIONAL COST TO THE OWNER. 20. VALVE BOXES SHALL BE INSTALLED FLUSH WITH GRADE, SUPPORTED BY BRICKS IF NEEDED, WITH 3" OF CLEAN PEA GRAVEL LOCATED BELOW THE VALVE. 21. ALL MAIN LINE PIPING, NON-PRESSURE PIPING AND CONTROL WIRE SLEEVING SHALL BE INSTALLED IN SEPARATE SLEEVES. ALL LATERAL LINE PIPING UNDER PAVING SHALL BE PVC SHEDULE 40 AND SHALL BE INSTALLED PRIOR TO ANY HARDSCAPE MATERIAL. IRRIGATION CONTRACTOR TO PROVIDE SLEEVES BETWEEN 12" AND 15" BELOW GRADE AT ALL DRIVE ENTRANCES AND SIDEWALKS. MAINLINE SLEEVE SIZE SHALL BE A MINIMUM OF TWICE (2X) THE DIAMETER OF THE PIPE TO BE SLEEVED. CONTROL WIRE SLEEVES SHALL BE OF SUFFICIENT SIZE FOR THE REQUIRED NUMBER OF WIRES. 22. IT IS THE RESPONSIBILITY OF THE IRRIGATION CONTRACTOR TO FAMILIARIZE HIMSELF WITH ALL GRADE DIFFERENCES, LOCATION OF FENCES, RETAINING WALLS, AND UTILITIES. THE IRRIGATION CONTRACTOR SHALL REPAIR OR REPLACE ALL ITEMS DAMAGED BY HIS WORK. HE SHALL COORDINATE HIS WORK WITH OTHER CONTRACTORS FOR THE LOCATION AND INSTALLATION OF PIPE SLEEVES AND LATERALS THROUGH WALLS, UNDER ROADWAYS AND PAVING AND TIMING, ETC. REFER TO CIVIL ENGINEERING PLANS FOR GRADING, METHODS OF DRAINAGE, IRRIGATION METERS, AND BACKFLOW PREVENTION DEVICE LOCATION. 23. ALL IRRIGATION EQUIPMENT NOT OTHERWISE DETAILED OR SPECIFIED, SHALL BE INSTALLED AS PER MANUFACTURER'S RECOMMENDATIONS, DETAILS AND SPECIFICATIONS. ACCEPTABLE MANUFACTURERS INCLUDE RAINBIRD, HUNTER, TORO, OR NETAFIM 24. ANY DRIP SYSTEM PIPING IN PLANTING BEDS IS DIAGRAMMATIC. CONTRACTOR CAN ROUTE PIPING IN A FREEFORM MANNER (AVOIDING OBJECTS SUCH AS LIGHT POLES, TRANSFORMERS PADS, EQUIPMENT VAULTS, SUBSURFACE ROCK TOO LARGE TO REMOVE, ETC...) AS LONG AS ALL PLANT MATERIAL RECEIVES THE PROPER NUMBER OF EMITTERS PER SCHEDULE AND THE VINYL DISTRIBUTION TUBING DOES NOT EXCEED THE MAXIMUM DESIGN LENGTHS PER MANUFACTURER'S RECOMMENDATIONS. 25. UNLESS OTHERWISE REQUIRED, BACKFLOW PREVENTION DEVICES LESS THAN 2" SHALL BE PLACED IN A WIRE MESH BASKET ENCLOSURE AND PAINTED TO MATCH THE PRIMARY BUILDING COLORS. SEE CIVIL PLANS FOR LOCATION. 26. ALL JOINTS AND BENDS 2" OR LARGER SHALL HAVE CONCRETE THRUST BLOCKING. THRUST BLOCKING SHALL BE A MINIMUM OF 1 CUBIC FOOT OF CONCRETE. PIPE SHALL NOT BE ENCASED IN CONCRETE. SEE DETAIL 31C FOR THRUST BLOCKING. 27. CONTRACTOR WILL PROVIDE OWNER WITH A COMPLETE AND REPRODUCIBLE DRAWING OR IRRIGATION SYSTEM LAYOUT AS IT WAS INSTALLED. DRAWING SHOULD INCLUDE, BUT NOT BE LIMITED TO, LOCATIONS OF ZONES VALVES, MAIN, LATERAL AND DISTRIBUTION LINES, SLEEVES, WATER METER, BACKFLOW PREVENTION DEVICE, SENSORS AND CONTROLLER. 28. ALL LATERAL LINE SIZING SHALL REFER TO PIPE SCHEDULE ON THIS PLAN. SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY RAIN BIRD XCZ-100-PRB-COM WIDE FLOW DRIP CONTROL KIT FOR COMMERCIAL APPLICATIONS. 1" BALL VALVE WITH 1" PESB VALVE AND 1" PRESSURE REGULATING 40PSI QUICK-CHECK BASKET FILTER. 0.3GPM TO 20GPM. 2 TREE DRIP RING 2 DRIP RINGS USING 12" EMITTER SPACING @ .9 GPH. 12" SPACING FROM TRUNK TO FIRST RING. 30" SPACING FROM TRUNK TO SECOND RING. 10 AREA TO RECEIVE DRIPLINE RAIN BIRD XFD-09-18 XFD ON-SURFACE PRESSURE COMPENSATING LANDSCAPE DRIPLINE. 0.9 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. UV RESISTANT. SPECIFY XF INSERT FITTINGS. 974.9 L.F. SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY SHUT OFF VALVE 1 RAIN BIRD PESB 1" 1", 1-1/2", 2" PLASTIC INDUSTRIAL VALVES. LOW FLOW OPERATING CAPABILITY, GLOBE CONFIGURATION. WITH SCRUBBER TECHNOLOGY FOR RELIABLE PERFORMANCE IN DIRTY WATER IRRIGATION APPLICATIONS. 1 RAIN BIRD PESB 1" 1", 1-1/2", 2" PLASTIC INDUSTRIAL VALVES. LOW FLOW OPERATING CAPABILITY, GLOBE CONFIGURATION. WITH SCRUBBER TECHNOLOGY FOR RELIABLE PERFORMANCE IN DIRTY WATER IRRIGATION APPLICATIONS. 1 WATTS 009 1" REDUCED PRESSURE BACKFLOW PREVENTER 1 RAIN BIRD ESP8LXMEF 8 STATION CAPABLE COMMERCIAL CONTROLLER. MOUNTED ON A PLASTIC WALL MOUNT. FLOW SENSING AND WATER MANAGEMENT CAPABILITIES 1 RAIN BIRD SMRT-Y SOIL MOISTURE SENSOR KIT. 24VAC @ 50/60 HZ. OPERATING TEMPERATURE: -4 DEGREES F TO 158 DEGREES F. SURVIVAL TEMPERATURE: -40 DEGREES F TO 185 DEGREES F. UL, CUL, C-TICK CERTIFICATIONS. 1 RAIN BIRD WR2-RFC WIRELESS RAIN AND FREEZE SENSOR COMBO, INCLUDES 1 RECEIVER AND 1 RAIN/FREEZE SENSOR TRANSMITTER. 1 WATER METER 3/4" 1 IRRIGATION LATERAL LINE: PVC CLASS 200 SDR 21 812.2 L.F. IRRIGATION MAINLINE: PVC SCHEDULE 40 327.6 L.F. PIPE SLEEVE: PVC SCHEDULE 40 317.5 L.F. BF C MS RF M #" # Valve Number Valve Size Valve Flow Valve Callout # IRRIGATION SCHEDULE WIRE CONNECTION N.T.S. CRIMP SLEEVE USE RECOMMENDED TOOL BODY FILL WITH SEALANT CAP 61A RUN WIRING BENEATH AND BESIDE MAINLINE. TAPE AND BUNDLE AT 10-FOOT INTERVALS. NOTES: ALL SOLVENT WELD PLASTIC PIPING TO BE SNAKED IN TRENCH AS SHOWN. TIE A 24-INCH LOOP IN ALL WIRING AT CHANGES OF DIRECTION OF 30° OR GREATER. UNTIE AFTER ALL CONNECTIONS HAVE BEEN MADE. MAINLINE, LATERAL, AND WIRING IN THE SAME TRENCH LATERAL PIPE SECTION VIEW MAINLINE PIPE WIRE W/O CONDUIT CONDUIT WIRING IN IRRIGATION PIPE AND WIRE TRENCHING N.T.S. 64A 1. ALL LATERAL LINES SHALL BE SDR-13.5 PVC PIPE. ALL MAIN LINES SHALL BE SDR-21 PVC PIPE. 2. SLEEVES BELOW ALL HARDSCAPE ELEMENTS SHALL BE SCH. 40 PVC AND SHALL BE TWICE THE DIAMETER OF THE PIPE OR WIRE BUNDLE WITHIN. 3. ALL LATERAL LINES SHALL BE BURIED NO LESS THAN 18" DEEP. ALL MAIN LINES AND ELECTRICAL LINES SHALL BE NO LESS THAN 24" DEEP. PVC EXHAUST HEADER PVC SCH 40 TEE OR EL (TYPICAL) BARB X MALE FITTING: RAIN BIRD XFD-MA FITTING (TYPICAL) FLUSH POINT (TYPICAL) SEE RAIN BIRD DETAIL "XFD FLUSH POINT" PERIMETER OF AREA PERIMETER DRIPLINE PIPE TO BE INSTALLED 2"-4" FROM PERIMETER OF AREA ON-SURFACE DRIPLINE: RAIN BIRD XF SERIES DRIPLINE (TYPICAL) POTABLE: XFD DRIPLINE NON-POTABLE: XFDP DRIPLINE PVC SUPPLY HEADER PVC DRIP MANIFOLD FROM RAIN BIRD CONTROL ZONE VALVE KIT (SIZED TO MEET LATERAL FLOW DEMAND) PVC SCH 40 RISER PIPE 9 NOTES: 1. DISTANCE BETWEEN LATERAL ROWS AND EMITTER SPACING TO BE BASED ON SOIL TYPE, PLANT MATERIALS AND CHANGES IN ELEVATION. 2. LENGTH OF LONGEST DRIPLINE LATERAL SHOULD NOT EXCEED THE MAXIMUM SPACING SHOWN IN THE TABLE BELOW. XFD Dripline Maximum Lateral Lengths (Feet) 2-3" MULCH DRIP MANIFOLD BURIAL DEPTH INSET A INSET A ON-SURFACE DRIP IRRIGATION N.T.S. 79D (EMT6-M101) RAIN BUG EMITTER RAINBIRD MULTI-OUTLET EMITTER TUBING CLASS 200 PVC SWING JOINT PVC ELL AND STREET ELL (LENGTH AS REQUIRED) SCHEDULE 80 NIPPLE EMITTER BOX FINISH GRADE 79F MULTI-OUTLET EMITTER N.T.S. ON OPPOSITE EDGES OF THE TREE SAUCER. EDGES OF THE ROOT BALL, AND 2 OUTLETS LOCATED PLAN TREE SAUCER ON PLAN WITH 2 OUTLETS LOCATED ON OPPOSITE ALL EMITTER TUBING SHALL BE PLACED AS SHOWN LATERAL LINE W/ BUG CAP (TYP.) W/ BUG CAP (TYP.) DRIP LINE ROOT BALL IN BOX MULTI-OUTLET EMITTER SHOWN ON PLAN LATERAL LINE EMITTER TUBING 7/16/2020 5/19/2020INITIAL DESIGN Know what'sbelow. Call before you dig. 7/16/2020 ALL SAM'S CLUB GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. 0 20' 30' 40' SCALE IN FEET Not to Scale SITE LANDSCAPE REQUIREMENTS AREA REQUIREMENT REQUIRED PROVIDED STREET TREES STREET TREES SHALL OCCUR IN THE ADJOINING STREET RIGHT-OF-WAY N/A THE SITE DOES NOT ADJOIN ANY STREET RIGHT-OF-WAYS LANDSCAPE AREA TREATMENT LANDSCAPE AREAS SHALL INCLUDE ALL AREAS ON THE SITE THAT ARE NOT COVERED BY BUILDINGS, STRUCTURES, PAVING OR IMPERVIOUS SURFACE PROVIDED PARKING LOT PERIMETER LANDSCAPE TREES SHALL BE PROVIDED AT A RATIO OF 1 TREE PER 25 LF ALONG A PUBLIC STREET AND 1 TREE PER 40 LF ALONG A SIDE LOT LINE PARKING SETBACK AREA N/A THE SITE DOES NOT ADJOIN ANY PUBLIC STREET RIGHT-OF-WAYS. EXISTING TREES PRESERVED ALONG PERIMETER OF PARKING LOT PARKING LOT INTERIOR LANDSCAPING 6% OF THE INTERIOR PARKING LOT SHALL BE LANDSCAPE AREAS 25,324 SF OF PARKING LOT x 6% = 1,519 SF OF LANDSCAPE REQUIRED 1,580 SF PROVIDED 1 TREE SHALL BE PLANTED PER 150 SF OF REQUIRED INTERIOR LANDSCAPE AREA. 1 OR MORE CANOPY TREES SHALL BE LOCATED IN EACH LANDSCAPE ISLAND 1580 SF / 150 = 10 TREES REQUIRED 10 PROPOSED TREES PROVIDED TREES QTY BOTANICAL / COMMON NAME CONT CAL DETAIL NOTES 5 GLEDITSIA TRIACANTHOS INERMIS `SHADEMASTER` / SHADEMASTER LOCUST B & B 3"CAL 50A USE TREE WRAP 5 QUERCUS MACROCARPA / BURR OAK B & B 3"CAL 50A SHRUBS QTY BOTANICAL / COMMON NAME SIZE DETAIL INSTALL HT 24 JUNIPERUS CHINENSIS `ARMSTRONGII` / ARMSTRONG JUNIPER 5 GAL 50B 20 RIBES ALPINUM / ALPINE CURRANT 5 GAL 50B 64 SCHIZACHYRIUM SCOPARIUM `ALDOUS` / ALDOUS LITTLE BLUESTEM 5 GAL 50B PLANT SCHEDULE 1. PLANT QUALITY: ALL PLANT MATERIAL SHALL BE A-GRADE OR NO. 1 GRADE – FREE OF ANY DEFECTS, OF NORMAL HEALTH, HEIGHT, LEAF DENSITY AND SPREAD APPROPRIATE TO THE SPECIES AS DEFINED BY THE AMERICAN ASSOCIATION OF NURSERYMEN (AAN) STANDARDS. ALL TREES SHALL BE BALL AND BURLAP OR EQUIVALENT. 2. IRRIGATION: ALL LANDSCAPE AREAS WITHIN THE SITE INCLUDING TURF, SHRUB BEDS AND TREE AREAS SHALL BE IRRIGATED WITH AN AUTOMATIC IRRIGATION SYSTEM. THE IRRIGATION PLAN MUST BE REVIEWED AND APPROVED BY THE CITY OF FORT COLLINS WATER UTILITIES DEPARTMENT PRIOR TO THE ISSUANCE OF A BUILDING PERMIT. ALL TURF AREAS SHALL BE IRRIGATED WITH AN AUTOMATIC POP-UP IRRIGATION SYSTEM. ALL SHRUB BEDS AND TREES, INCLUDING IN NATIVE SEED AREAS, SHALL BE IRRIGATED WITH AN AUTOMATIC DRIP (TRICKLE) IRRIGATION SYSTEM, OR WITH AN ACCEPTABLE ALTERNATIVE APPROVED BY THE CITY WITH THE IRRIGATION PLANS. THE IRRIGATION SYSTEM SHALL BE ADJUSTED TO MEET THE WATER REQUIREMENTS OF THE INDIVIDUAL PLANT MATERIAL. IRRIGATION SYSTEMS TO BE TURNED OVER TO THE CITY PARKS DEPARTMENT FOR MAINTENANCE MUST BE APPROVED BY THE PARKS MANAGER AND MEET PARKS IRRIGATION STANDARDS. DESIGN REVIEW SHALL OCCUR DURING UTILITIES DEPARTMENT IRRIGATION REVIEW PRIOR TO THE ISSUANCE OF A BUILDING PERMIT AND CONSTRUCTION OBSERVATION AND INSPECTION BY PARKS SHALL BE INCORPORATED INTO THE CONSTRUCTION PROCESS. 3. TOPSOIL: TO THE MAXIMUM EXTENT FEASIBLE, TOPSOIL THAT IS REMOVED DURING CONSTRUCTION ACTIVITY SHALL BE CONSERVED FOR LATER USE ON AREAS REQUIRING REVEGETATION AND LANDSCAPING. 4. SOIL AMENDMENTS: SOIL AMENDMENTS SHALL BE PROVIDED AND DOCUMENTED IN ACCORDANCE WITH CITY CODE SECTION 12-132. THE SOIL IN ALL LANDSCAPE AREAS, INCLUDING PARKWAYS AND MEDIANS, SHALL BE THOUGHLY LOOSENED TO A DEPTH OF NOT LESS THAN EIGHT(8) INCHES AND SOIL AMENDMENT SHALL BE THOROUGHLY INCORPORATED INTO THE SOIL OF ALL LANDSCAPE AREAS TO A DEPTH OF AT LEAST SIX(6) INCHES BY TILLING, DISCING OR OTHER SUITABLE METHOD, AT A RATE OF AT LEAST THREE (3) CUBIC YARDS OF SOIL AMENDMENT PER ONE THOUSAND (1,000) SQUARE FEET OF LANDSCAPE AREA. PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY, A WRITTEN CERTIFICATION MUST BE SUBMITTED TO THE CITY THAT ALL PLANTED AREAS, OR AREAS TO BE PLANTED, HAVE BEEN THOROUGHLY LOOSENED AND THE SOIL AMENDED, CONSISTENT WITH THE REQUIREMENTS SET FORTH IN SECTION 12-132. 5. INSTALLATION AND GUARANTEE: ALL LANDSCAPING SHALL BE INSTALLED ACCORDING TO SOUND HORTICULTURAL PRACTICES IN A MANNER DESIGNED TO ENCOURAGE QUICK ESTABLISHMENT AND HEALTHY GROWTH. ALL LANDSCAPING FOR EACH PHASE MUST BE EITHER INSTALLED OR THE INSTALLATION MUST BE SECURED WITH AN IRREVOCABLE LETTER OF CREDIT, PERFORMANCE BOND, OR ESCROW ACCOUNT FOR 125% OF THE VALUATION OF THE MATERIALS AND LABOR PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY FOR ANY BUILDING IN SUCH PHASE. 6. MAINTENANCE: TREES AND VEGETATION, IRRIGATION SYSTEMS, FENCES, WALLS AND OTHER LANDSCAPE ELEMENTS WITH THESE FINAL PLANS SHALL BE CONSIDERED AS ELEMENTS OF THE PROJECT IN THE SAME MANNER AS PARKING, BUILDING MATERIALS AND OTHER SITE DETAILS. THE APPLICANT, LANDOWNER OR SUCCESSORS IN INTEREST SHALL BE JOINTLY AND SEVERALLY RESPONSIBLE FOR THE REGULAR MAINTENANCE OF ALL LANDSCAPING ELEMENTS IN GOOD CONDITION. ALL LANDSCAPING SHALL BE MAINTAINED FREE FROM DISEASE, PESTS, WEEDS AND LITTER, AND ALL LANDSCAPE STRUCTURES SUCH AS FENCES AND WALLS SHALL BE REPAIRED AND REPLACED PERIODICALLY TO MAINTAIN A STRUCTURALLY SOUND CONDITION. 7. REPLACEMENT: ANY LANDSCAPE ELEMENT THAT DIES, OR IS OTHERWISE REMOVED, SHALL BE PROMPTLY REPLACED IN ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS. 8. THE FOLLOWING SEPARATIONS SHALL BE PROVIDED BETWEEN TREES/SHRUBS AND UTILITIES: 40 FEET BETWEEN CANOPY TREES AND STREET LIGHTS 15 FEET BETWEEN ORNAMENTAL TREES AND STREETLIGHTS 10 FEET BETWEEN TREES AND PUBLIC WATER, SANITARY AND STORM SEWER MAIN LINES 6 FEET BETWEEN TREES AND PUBLIC WATER, SANITARY AND STORM SEWER SERVICE LINES. 4 FEET BETWEEN SHRUBS AND PUBLIC WATER AND SANITARY AND STORM SEWER LINES 4 FEET BETWEEN TREES AND GAS LINES 9. ALL STREET TREES SHALL BE PLACED A MINIMUM EIGHT (8) FEET AWAY FROM THE EDGES OF DRIVEWAYS AND ALLEYS PER LUC 3.2.1(D)(2)(a). 10. PLACEMENT OF ALL LANDSCAPING SHALL BE IN ACCORDANCE WITH THE SIGHT DISTANCE CRITERIA AS SPECIFIED BY THE CITY OF FORT COLLINS. NO STRUCTURES OR LANDSCAPE ELEMENTS GREATER THAN 24" SHALL BE ALLOWED WITHIN THE SIGHT DISTANCE TRIANGLE OR EASEMENTS WITH THE EXCEPTION OF DECIDUOUS TREES PROVIDED THAT THE LOWEST BRANCH IS AT LEAST 6' FROM GRADE. ANY FENCES WITHIN THE SIGHT DISTANCE TRIANGLE OR EASEMENT MUST BE NOT MORE THAN 42" IN HEIGHT AND OF AN OPEN DESIGN. 11. THE FINAL LANDSCAPE PLAN SHALL BE COORDINATED WITH ALL OTHER FINAL PLAN ELEMENTS SO THAT THE PROPOSED GRADING, STORM DRAINAGE, AND OTHER DEVELOPMENT IMPROVEMENTS DO NOT CONFLICT WITH NOR PRECLUDE INSTALLATION AND MAINTENANCE OF LANDSCAPE ELEMENTS ON THIS PLAN. 12. MINOR CHANGES IN SPECIES AND PLANT LOCATIONS MAY BE MADE DURING CONSTRUCTION -- AS REQUIRED BY SITE CONDITIONS OR PLANT AVAILABILITY. OVERALL QUANTITY, QUALITY, AND DESIGN CONCEPT MUST BE CONSISTENT WITH THE APPROVED PLANS. IN THE EVENT OF CONFLICT WITH THE QUANTITIES INCLUDED IN THE PLANT LIST, SPECIES AND QUANTITIES ILLUSTRATED SHALL BE PROVIDED. ALL CHANGES OF PLANT SPECIES AND LOCATION MUST HAVE WRITTEN APPROVAL BY THE CITY PRIOR TO INSTALLATION. 13. ALL PLANTING BEDS SHALL BE MULCHED TO A MINIMUM DEPTH OF THREE INCHES. GENERAL LANDSCAPE NOTES PLAN TREE WRAP BACKFILL MIX WHITE FLAGGING (TYP.) 8" 2-PLY RUBBER HOSE 8' STEEL TEE POST- 3 REQUIRED AT 120° 4 INCHES MULCH UNDISTURBED SUBSOIL 4 INCH DEEP SAUCER NOTE: SEE LANDSCAPE NOTES FOR THE TYPE OF MULCH MATERIAL TO USE. 6" 2'(MIN.) TREE PLANTING N.T.S. 12" 6" 50A REMOVE BURLAP & ROPE FROM TOP 1/3 OF THE BALL DOUBLE STRAND 12 GAUGE WIRE COVERED W/2-PLY RUBBER HOSE PAINTED FLUORESCENT ORANGE 2'(MIN.) 12" UNDISTURBED SUBSOIL BACKFILL MIX 6" 50B SHRUB PLANTING N.T.S. WEED MAT (ONLY IF SHRUB IS WITHIN A PLANTING BED) 4 INCHES MULCH (SEE LANDSCAPE NOTES FOR TYPE OF MULCH) IF SHRUB IS B & B, THEN REMOVE BURLAP & ROPE FROM TOP 1/3 OF BALL 1. ALL EXISTING TREES WITHIN THE LIMITS OF THE DEVELOPMENT AND WITHIN ANY NATURAL AREA BUFFER ZONES SHALL REMAIN AND BE PROTECTED UNLESS NOTED ON THESE PLANS FOR REMOVAL. 2. WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER A FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS EVALUATED AND APPROVED THE DISTURBANCE. 3. ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS FORESTRY STANDARDS. TREE PRUNING AND REMOVAL SHALL BE PERFORMED BY A BUSINESS THAT HOLDS A CURRENT CITY OF FORT COLLINS ARBORIST LICENSE WHERE REQUIRED BY CODE. 4. PRIOR TO AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL PROTECTED EXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE FENCING A MINIMUM OF FOUR (4) FEET IN HEIGHT, SECURED WITH METAL T-POSTS, NO CLOSER THAN SIX (6) FEET FROM THE TRUNK OR ONE-HALF (½) OF THE DRIP LINE, WHICHEVER IS GREATER. THERE SHALL BE NO STORAGE OR MOVEMENT OF EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE FENCED TREE PROTECTION ZONE. 5. DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE CLEANING OF EQUIPMENT OR MATERIAL OR THE STORAGE AND DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF A TREE WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF TREES. 6. NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE. 7. LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION OR LAND CLEARING AREAS, ROAD RIGHTS-OF-WAY AND UTILITY EASEMENTS MAY BE "RIBBONED OFF," RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN SUBSECTION (G)(3) ABOVE. THIS MAY BE ACCOMPLISHED BY PLACING METAL T-POST STAKES A MAXIMUM OF FIFTY (50) FEET APART AND TYING RIBBON OR ROPE FROM STAKE-TO-STAKE ALONG THE OUTSIDE PERIMETERS OF SUCH AREAS BEING CLEARED. 8. THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE ACCOMPLISHED BY BORING UNDER THE ROOT SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF TWENTY-FOUR (24) INCHES. THE AUGER DISTANCE IS ESTABLISHED FROM THE FACE OF THE TREE (OUTER BARK) AND IS SCALED FROM TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE CHART BELOW: 9. ALL TREE REMOVAL SHOWN SHALL BE COMPLETED OUTSIDE OF THE SONGBIRD NESTING SEASON (FEB 1 - JULY 31) OR CONDUCT A SURVEY OF TREES ENSURING NO ACTIVE NESTS IN THE AREA. TREE PROTECTION NOTES Tree Diameter at Breast Height (inches) Auger Distance From Face of Tree (feet) 0-2 1 3-4 2 5-9 5 10-14 10 15-19 12 Over 19 15 MULCH QTY TYPE 1462 SF MULCH TO MATCH MULCH COLOR AND TYPE USED ON EXISTING SAM'S CLUB PROPERTY RIGHT OF WAY LINE STORM DRAIN TYPICAL PLANTING WITH QUANTITY AND KEY (SEE PLANT LIST) PROPOSED LEGEND LANDSCAPE NOTES 77A EXISTING TREE TO REMAIN (REFER TO TREE PROTECTION NOTES) 77B TREE PROTECTION FENCE (REFER TO TREE PROTECTION NOTES) 77C EXISTING LANDSCAPE AREA TO REMAIN, ANY AREA DAMAGED DURING CONSTRUCTION SHALL BE RESTORED/REPLACED BY CONTRACTOR. DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 3:44 PM L1 7/16/20 LANDSCAPE PLAN 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633 31493 31493-LP JOB # 31493 DRAWING: 31493-LP.dwg LAST SAVED BY: MPARKS 5/19/2020INITIAL DESIGN Know what'sbelow. Call before you dig. 7/16/2020 10" 6.88' TOP OF STRUCTURE/RIM ELEVATION 2'-6" 1'-0" 8" 5'-0'' 8" 1'-0" SUBGRADE COMPACTED SUBGRADE COMPACTED 3500 PSI P.C. CONCRETE, TYP 6'' N.T.S. BASE: #4'S @ 6'' E.W. WALLS: HORIZ: #6'S @ 9" VERT: #4'S @ 10" TOP: #4'S @ 8" E.W. DIAGONAL @ COVER ELEVATION SECTION "A"-"A" FILTER FABRIC CONTINUOUS OVER WIRE FENCE FENCE: WOVEN WIRE, 14-1/2 GA. 6" MAX. MESH OPENING WOVEN WIRE FENCE (MIN. 14-1/2 GAUGE, 1. WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. 2. FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES SPACED EVERY 3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH EACH OTHER THEY SHALL BE OVERLAPPED 4. MAINTENANCE SHALL BE PERFORMED AS NOTED IN THE EROSION CONTROL PLAN. COLLECTED MATERIAL FILTER FABRIC: SEE SPECIFICATIONS PREFABRICATED UNIT: SEE SPECIFICATIONS MAX. 6" MESH SPACING) BY SIX INCHES AND FOLDED. SHALL BE REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE. 24" AT TOP AND MID SECTION. EXTEND WIRE FENCE A MIN. 8" INTO GROUND EMBED FILTER FABRIC MIN. OF 2" INTO TRENCH (MIN.) 3'-0" 6" GROUND FINISH GRADE CROSS-SECTION UNDISTURBED MAX. 6" MESH SPACING) WITH FILTER CLOTH COVER WOVEN WIRE FENCE (MIN. 14 1/2 GAUGE, BACKFILL 4" X 4" TRENCH 6" COMPACTED 10' MAX O.C. PLAN VIEW FLOW POSTS: 6' STEEL T-POST 10' MAX O.C. 2' ORANGE FLAGGING 18" MIN WIRE FENCE CONTINUOUS OVER FILTER FABRIC RIBBON (3' O.C.) T-POSTS (TYP.) STEEL EXISTING TREE TO REMAIN BARBED WIRE 3' MIN. TREE PROTECTION FENCE WITH SILT FENCE N.T.S. 1'-6" 1'-6" 2-#4 TOP & BOT 1" CLR FROM TOP 2" CLR FROM BOT DO NOT LET REINFORCEMENT CROSS SAWCUTS NEARBY OR OTHER JOINTS THAT ALLOW FOR MOVEMENT. 1" CLR (TYP) 1/2" SOFT PREFORMED JOINT FILLER FULL DEPTH OF PAVEMENT WITH BACKER ROD AND SEALANT. NOTES: ISOLATION JOINT TO BE USED FOR FIXED STRUCTURES SUCH AS BUILDINGS, RETAINING WALLS/DOCK WALLS, DROP INLETS, MANHOLES, LIGHT POLE BASES AND BOLLARDS. PAVEMENT IS NOT CONSIDERED A FIXED STRUCTURE. ANY FIXED STRUCTURE PAVEMENT USES: MANHOLES, LIGHT POLE BASES AND BOLLARDS USES: BUILDINGS, RETAINING WALLS/DOCK WALLS AND DROP INLETS PAVEMENT N.T.S. CONCRETE JOINT DETAILS 08R CONTRACTION JOINT CONSTRUCTION JOINT PCC JOINT DETAIL BLOW-UP (TYP.) NOTES: 1. ENSURE JOINTS ARE CLEAN AND DRY PRIOR TO THE APPLICATION OF THE JOINT SEALANT. 2. INSTALL CLOSED CELL BACKER ROD AFTER JOINTS HAVE BEEN CLEANED AND DRIED IN ACCORDANCE WITH SEALANT MANUFACTURER'S REQUIREMENTS. 3. INSTALL BACKER TOD AT CONSISTENT AND UNIFORM DEPTH. 4. JOINT SEALANT APPLICATION SHALL BE IN STRICT COMPLIANCE WITH SEALANT MANUFACTURER'S REQUIREMENTS. 1. SEE PLAN FOR JOINT SPACING. NOTE: (FIRST PLACEMENT) (SECOND PLACEMENT) 6" 6" MIN. EXISTING PAVEMENT NEW PAVEMENT DOWEL CLIP BY PNA 1/4" WIDE BY 1" DEEP SAW CUT. FILL WITH PAVEMENT SEALANT. MAKE SAW CUT IMMEDIATELY PRIOR TO INSTALLING PAVEMENT SEALANT. PCC JOINT DETAIL BLOW-UP 3/4" SQUARE DOWEL FOR 6" THICK PAVEMENTS. 1/2" SQUARE DOWEL FOR 4" TO 5" THICK PAVEMENTS. SPACE DOWELS AT 18" O.C. DO NOT GREASE DOWEL. APPLY CURING COMPOUND TO SLAB FACE AT A COVERAGE RATE OF 300 SF MAX PER GALLON TO ACT AS A BOND BREAKER AT LEAST 48 HOURS PRIOR TO PLACING NEW SLAB. ENSURE GROUT IS FLUSH WITH FACE OF EXISTING SLAB. DRILL 1-1/4" DIA. HOLE FOR 3/4" DOWEL AND 1" DIA. HOLE FOR 1/2" DOWEL AND INSTALL DOWEL WITH NON-SHRINK GROUT. SAWCUT FULL DEPTH OF SLAB A DISTANCE BACK FROM EXISTING EDGE TO ENSURE A STRAIGHT EDGE ALONG ENTIRE LENGTH OF PAVEMENT. OBTAIN OWNER'S REPRESENTATIVE APPROVAL PRIOR TO SAWCUTTING. EQ EQ CONSTRUCTION JOINT TO EXISTING PAVEMENT 1/4" WIDE BY 1" DEEP SAW CUT. FILL WITH PAVEMENT SEALANT. MAKE SAW CUT IMMEDIATELY PRIOR TO INSTALLING PAVEMENT SEALANT. PCC JOINT DETAIL BLOW-UP APPLY CURING COMPOUND TO SLAB FACE AT A COVERAGE RATE OF 300 SF MAX PER GALLON TO ACT AS A BOND BREAKER AT LEAST 48 HOURS PRIOR TO PLACING NEW SLAB. PAVEMENT THICKNESS (SEE PLAN) EQ EQ PCC JOINT DETAIL BLOW-UP PAVEMENT THICKNESS (SEE PLAN) TOP OF PAVEMENT 1/8" T/2 BUT NOT LESS THAN 1/4" CLOSED CELL BACKER ROD. TYPICALLY 1/8" TO 1/4" LARGER THAN JOINT WIDTH. PAVEMENT SEALANT 1/8" FIRST SAWCUT 1/4" SECOND SAWCUT (IF REQUIRED) WAIT AS LONG AS FEASIBLE TO SEAL JOINTS TO ALLOW CONCRETE SHRINKAGE TO OCCUR. IF REQUIRED, RE-SAW JOINT IMMEDIATELY PRIOR TO INSTALLING SEALANT TO ACHIEVE A 1/4 " JOINT WIDTH. ENSURE JOINT IS CLEAN, DRY AND SIDES PREPARED PER MANUFACTURER’S RECOMMENDATIONS. T 3/4" DIAMETER DOWEL FOR 6" THICK PAVEMENTS AND 1/2" DIAMETER DOWEL FOR 4" OR 5" THICK PAVEMENTS. DOWELS TO BE 10" LONG CENTERED WITH JOINT SPACED AT 18" ON CENTER. DOWEL TO BE INSTALLED IN FORM WITH AN APPROVED DOWEL BASKET. LIGHTLY OIL FULL LENGTH OF DOWEL. A PIPE SIZE (SEE UTILITY PLAN) CAST IN PLACE BASE & INVERT POURED MONOLITHICALLY. BASE MUST SUPPORT PIPE FROM MANHOLE JOINT TO BE 1'-6" MAX. TO FIRST JOINT CONCRETE FILLET FOR PRECAST CONCRETE SECTIONS PIPE PROTECTION GROUT FRAME TO MANHOLE PIPE AS SPECIFIED ON UTILITY PLAN A 6" WHITE STRIPES 24" O.C. (TYP.) 8" WHITE STRIPE (TYP. EACH SIDE) SEE SITE PLAN VARIES (PREFERRED 6' MIN.) (SEE SITE PLAN) W/ LONGITUDINAL STRIPES N.T.S. CROSSWALK MARKING NOTES: 1. MARKINGS FOR STREET SHALL BE ACCORDING TO LOCAL CODE REQUIREMENTS AND AS OUTLINED IN SECTION 3B.18 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS. 2. MARKINGS WITHIN PRIVATE PARKING LOT SHALL BE PER THIS DETAIL. 3. THESE MARKINGS ARE TO BE PAINTED RETROREFLECTIVE WHITE. 02/15/19 SIGN TO BE PLACED AT ABOUT THE LEADING/ TRANSVERSE LINES OF THE CROSSWALK PER THE SITE PLAN TYPICAL CURB AND GUTTER CROSSWALK MARKINGS ARE TO BE LIMITED TO THE WIDTH OF THE FLUSH SECTION OF THE CURB RAMP. CURB RAMP RAMP TRANSITION 4' MIN. (TYP.) SIGN TO BE PLACED AT ABOUT THE LEADING/ TRANSVERSE LINES OF THE CROSSWALK PER THE SITE PLAN 4' MIN. (TYP.) 6" INLET PIPE FROM ROOF DRAIN 45° ELBOW 3,000 P.S.I. P.C. CONCRETE 45° ELBOW 6" MIN. FINISH GRADE 6" MIN. STORM DRAIN CLEAN-OUT N.T.S. NEENAH R-6013 THRU R-6099 PER THE SIZE OF PIPE AS SPECIFIED ON GRADING PLAN SEE GRADING PLAN FOR SIZE OF COLLECTOR PLAN VIEW SECTION A-A DTWALKPC A NOTE: PROVIDE 1/2" EXPANSION NOTE: (TYP) CONCRETE SIDEWALK 6 x 6 - W1.4 X W1.4 WWF EACH WAY MAX. SPACING, OR WILL BE No. 3 BARS 24" O.C. WHERE REQUIRED REINFORCEMENT 12/17/04 90% STD. PROCTOR (TYP) COURSE COMPACTED TO 4" AGGREGATE BASE N.T.S. (TYP) 5.0' 1/2" RADIUS TOOLED JOINT OR 1" DEEP SAWED JOINT (TYP.) 1/4" THICKNESS PREMOLDED EXPANSION JOINT FILLER SPACED @ 35' O.C. MAX. EXTEND JOINT FILLER FULL DEPTH OF SIDEWALK 5.0' 5.0' 5.0' 5.0' 5.0' 5.0' B 4" 4" 2" (TYP) B A SECTION B-B 6" PC CONCRETE TYP (TYP) 2" SLOPE 1/4" /FT. SEE SITE PLAN MAX. 1/2"R (TYP) AND ALL FIXED OBJECTS JOINT BETWEEN SIDEWALK ADA RAMP IN SIDEWALK SECTION A-A' 03/14/08 N.T.S. PLAN A 2% MAX 8.33% MAX. A' 3. CONSTRUCT PER A.D.A. STANDARDS. NOTES: DETECTABLE WARNINGS DETAIL 1. THE SURFACE OF RAMP SHALL HAVE DETECTABLE WARNINGS AS SHOWN. DETECTABLE WARNINGS SHALL CONSIST OF RAISED TRUNCATED DOMES. SEE DETECTABLE WARNINGS DETAIL. 2. RAMP SIDE SLOPE VARIES UNIFORMLY FROM A MAXIMUM OF UP TO 10% AT CURB TO CONFORM WITH LONGITUDINAL SIDEWALK SLOPE ADJACENT TO TOP OF THE RAMP. 0.2" 0.9" 2.35" O.C. 2.35" O.C. ELEVATION PLAN 2% MAX ADA RAMP IN SIDEWALK 5' MIN. 4" DOMES ARE NOT SHOWN TO SCALE; SEE DETECTABLE WARNINGS DETAIL AND NOTE 1 4. REFER TO PLANS FOR ADJACENT SLOPES. 6' MIN. 5. THE CROSS SLOPE OF THE RAMP SURFACE SHALL BE NO GREATER THAN 1:50. 2% MAX SEE SITE PLAN FOR CROSSWALK STRIPING (IF SHOWN ON PLANS) CONCRETE CURB PAVED AREA SIDEWALK CONCRETE CURB 10% MAX. FLARED SIDE ROUNDED 8.33% MAX. 5' MIN. LANDING AREA 5' MIN. LANDING AREA NOTE: PREFABRICATED PANELS PER A.D.A. ACCESSIBILITY GUIDELINES SECTION 4.29.2 & A4.29.2 SHALL BE USED. 10% MAX. FLARED SIDE 5' MIN. (TYP.) DOMES ARE NOT SHOWN TO SCALE; SEE DETECTABLE WARNINGS DETAIL AND NOTE 1 5' MIN. ARC LENGTH 5' MIN. LANDING AREA 5' MIN. LANDING AREA 4" AGGREGATE BASE COURSE COMPACTED TO 98% OPTIMUM DENSITY PER ASTM D698 OR 95% OPTIMUM DENSITY PER ASTM D1557 3' MIN. OR AS REQUIRED BY THE LOCAL JURISDICTION/ GOVERNING AUTHORITIES SANITARY SEWER 12'' >12" > O.D. OF PIPE + 18" 12/21/04 WATER LINE DTUTLTRN N.T.S. UTILITY AND STORM DRAIN TRENCH AND BEDDING N.T.S. N.T.S. MIN. FILL COMPACTED UNDISTURBED EARTH OR LINE SPRING PIPE 4" 12'' O.D. W <12" O.D. OF PIPE + (12" TO 18") PIPE DIA. (MIN.) INITIAL HAUNCHING 4" BEDDING BACKFILL W FINAL BACKFILL SPRING LINE PIPE 4" UNDISTURBED EARTH OR COMPACTED FILL O.D. W 4" BEDDING HAUNCHING MIN. (MIN.) BACKFILL INITIAL BACKFILL FINAL GENERAL NOTES: 1. BEDDING SHALL BE CLEAN WELL GRADED SAND WITH 100 PERCENT PASSING THE #4 SIEVE, A MAXIMUM OF 15 PERCENT PASSING THE #200 SIEVE, AND A MINIMUM SAND EQUIVALENT OF 20. BEDDING SHALL BE COMPACTED TO A MINIMUM OF 92 PERCENT RELATIVE COMPACTION (ASTM D1557). 2. HAUNCHES SHALL BE CLEAN WELL GRADED SAND WITH 100 PERCENT PASSING THE #4 SIEVE, A MAXIMUM OF 15 PERCENT PASSING THE #200 SIEVE, AND A MINIMUM SAND EQUIVALENT OF 20. 3. HAUNCHES SHALL BE WORKED AROUND THE PIPE BY HAND TO ELIMINATE VOIDS AND COMPACTED TO A MINIMUM OF 92 PERCENT RELATIVE COMPACTION (ASTM D1557). 4. INITIAL FILL SHALL BE CLEAN WELL GRADED SAND WITH 100 PERCENT PASSING THE #4 SIEVE, A MAXIMUM OF 15 PERCENT PASSING THE #200 SIEVE, AND A MINIMUM SAND EQUIVALENT OF 20. 5. INITIAL FILL SHALL EXTEND TO ONE (1) FOOT ABOVE TOP OF PIPE AND COMPACTED TO A MINIMUM OF 92 PERCENT RELATIVE COMPACTION (ASTM D1557). 6. FINAL BACKFILL MAY CONSIST OF ON-SITE SOILS, PLACED IN LOOSE LIFTS OF EIGHT (8) INCHES AND COMPACTED TO 92 PERCENT RELATIVE COMPACTION 7. THE UPPER 12 INCHES BELOW PAVEMENTS SHALL BE COMPACTED TO 95 PERCENT RELATIVE COMPACTION ASTMD 1557 8. ALL MATERIALS ARE CLASSIFIED IN ACCORDANCE WITH ASTM D 2321-89. 9. ALL MATERIALS SHALL BE INSTALLED IN MAXIMUM EIGHT (8) INCH LOOSE LIFTS IN ACCORDANCE WITH ASTM D 1557. CLASS III AND IV-A MATERIALS SHALL BE COMPACTED NEAR OPTIMUM MOISTURE CONTENT. 10. FILL SALVAGED FROM EXCAVATION SHALL BE FREE OF DEBRIS, ORGANICS AND ROCKS LARGER THAN THREE (3) INCHES. 11. ALL TRENCH EXCAVATIONS SHALL BE SLOPED, SHORED, SHEETED, BRACED, OR OTHERWISE SUPPORTED IN COMPLIANCE WITH OSHA REGULATIONS AND LOCAL ORDINANCES. (SEE SPECIFICATIONS) TYPICAL LIGHTING POLE BASE DETAIL 04/19/16 TYPICAL LIGHTING POLE BASE DETAIL N.T.S. NOTE: 2. DRILLING BY HAND IS NOT ACCEPTABLE, PUSHING DOWEL BARS INTO GREEN CONCRETE IS NOT ACCEPTABLE. NOTE: 1. DOWELS SHALL BE SUPPORTED BY AN APPROVED DEVICE. NOTE: T/4 T T/2 1-1/4" MIN. CLEARANCE 2" MIN. TO FIT DOWEL AND BE SECURED DOWEL SLEEVE (CLOSED END) DOWEL TO BE LUBRICATED (FIRST POUR) (SECOND POUR) SEALING COMPOUND POURED JOINT DOWEL TO BE LUBRICATED SEALING COMPOUND POURED JOINT T/4 T T/2 PROPOSED PAVEMENT EXISTING PAVEMENT TOP 1/8" NO SEALING COMPOUND 3/16" MIN. VERTICAL SAW-CUT SEALING COMPOUND TOP 1/8" NO 3/16" MIN. VERTICAL SAW-CUT SAWCUT 3/16" MIN. REDWOOD EXPANSION JOINT FILLER DOWEL DIAMETER = T/8 (IN) 16" LONG SMOOTH DOWEL @ 18" O.C. VERTICAL SAW-CUT T = PAVEMENT 3/16" MIN. THICKNESS TOP 1/8" NO SEALING COMPOUND T = PAVEMENT THICKNESS DOWEL DIAMETER = T/8 (IN) 16" LONG SMOOTH DOWEL @ 18" O.C. DOWEL DIAMETER = T/8 (IN) 16" LONG SMOOTH DOWEL @ 18" O.C. T = PAVEMENT THICKNESS T = PAVEMENT THICKNESS 04/28/14 SOLID ARROW PAVEMENT MARKINGS DTRLTURN N.T.S. NOTES: 1. WORDS AND ARROWS SHALL BE APPLIED IN ACCORDANCE WITH SECTION 3B.20 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS. 2. THESE WORDS ARE TO BE PAINTED "RETROREFLECTIVE WHITE WITH GLASS BEADS", PER SPECIFICATIONS, WHEN AT EXITS FROM PARKING LOT TO PUBLIC STREETS. SOLID ARROW MARKINGS 1'-4" 8'-0" 1'-4" 1'-4" 1'-4" 4" 4" 4" 8'-0" 6'-0" 10'-0" 13'-0" 8'-0" 6'-0" 7'-3" AS INDICATED ON PLANS AS INDICATED ON PLANS "ONLY" PAVEMENT MARKING PAINTED "RETROREFLECTIVE WHITE" R = RADIUS NECESSARY TO ACCOMODATE OF THE SIDEWALK ABUTTING THE PAVED DRIVE OR AS LANE" STRIPING SHALL BE PLACED ON THE TOP EDGE 4" INCH WHITE LETTERS READING "NO PARKING FIRE FIRE LANE STRIPING SHALL BE 6" RED STRIPES WITH FIRE LANE MARKING DTFIRELN 12/17/04 WR = TURNING RADIUS PAVEMENT WIDTH 6" FIRE VEHICLES SPECIFIED BY LOCAL REQUIREMENTS. N.T.S. 25' W R WIDTH (feet) OF FIRE LANE 30' 20' 10' R W = 30' 25' 20' W 30'MIN. 30'MIN. 30'MIN. WR W WR 3'-0" 3" 2'-0" 7'-0" 1'-6" 7-0" (SECONDARY SIGNAGE, IF NEEDED) ALL SIGNS SHOULD COMPLY WITH U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION'S "MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES", LOCAL CODES AND AS SPECIFIED. MOUNT SIGNS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. SIGN BASE N.T.S. MOUNT SIGN HERE "U"-CHANNEL POST (3 lbs./ft.) WHEN SIGN IS IN PAVED AREAS, USE 4" PIPE BOLLARD FILLED W/ CONCRETE AND PAINTED TRAFFIC YELLOW SLOPE TOP OF CONCRETE 3,500 PSI PC CONCRETE 1'-6" 7'-0" (Min.) 3'-0" (MIN) 2'-0" 3" ACCESSIBLE VAN 12" X 9" 12" X 6" PARKING RESERVED R7-8 VARIES ACCESSIBLE / VAN ACCESSIBLE PARKING SIGN N.T.S. THIS SIGN TYPICAL AT ALL ACCESSIBLE PARKING SPACES THIS SIGN TYPICAL AT ALL VAN ACCESSIBLE PARKING SPACES PENALTY SIGN WITH WORDING AS REQUIRED BY STATE OR LOCAL LAW "U"-CHANNEL POST (2-lbs./ft.) 6" PIPE BOLLARD PAINTED TRAFFIC YELLOW, FILLED W/ CONCRETE. SLOPE TOP OF CONCRETE 3500 P.S.I. P.C. CONCRETE GROUND/PAVING SURFACE 06/26/18 N.T.S. STOP PAVEMENT MARKINGS - STREETS AND ROADS STOP LINE (VARIABLE LENGTH) EXTEND FULL WIDTH FROM CURB TO CENTERLINE OF DRIVE OR EDGE OF ENTERING LANE NOTE: 1. WORDS AND LINES SHALL BE APPLIED IN ACCORDANCE WITH SECTIONS 3B.16 AND 3B.20 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS. 2. THESE WORDS AND BAR ARE TO BE PAINTED "WHITE" WHEN IN PARKING LOT AND "RETROREFLECTIVE WHITE WITH GLASS BEADS", PER SPECIFICATIONS, WHEN AT EXITS FROM PARKING LOT TO PUBLIC STREETS. SEE PLAN 4" STROKE WIDTH 4" (TYP.) 4" 4" 8'-0" 1'-4" 1'-4" 1'-4" 1'-4" 1'-4" 12" EDGE OF CROSSWALK OR INTERSECTING TRAVEL WAY 4'-0" STOP SIGN (TYP.) 36"X36" AT HIGHWAY/STREET INTERSECTIONS 30"X30" WITHIN PARKING LOT SEE SITE PLAN 4" WIDE DOUBLE SOLID YELLOW STRIPE (AS SHOWN ON PLANS) 4'-0" MIN. CENTERLINE OF DRIVE OR EDGE OF ENTERING LANE 4'-0" 12" SEE SITE PLAN FOR NUMBER OF "STOP" PAVEMENT MARKINGS P.C. NON-REINF. CONC. 12" STANDARD DUTY CONCRETE PAVING N.T.S. 5" P.C. 28-DAY CONCRETE, MIN COMPRESSIVE STRENGTH OF 4,000 PSI 6" GRADED AGGREGATE BASE @98% CLASS 22A AGGREGATE BASED ON ASTM D698 P.C. CONC. 12" STANDARD DUTY ASPHALT PAVING N.T.S. 3" ASPHALTIC CONCRETE 4" GRADED AGGREGATE BASE @98% COMPACTION BASED ON ASTM D698 12" COMPACTED SUBGRADE REFERENCE SECTION 10.15 FOR PAVEMENT SPECIFICATIONS LISTED IN SALEM GEOTECHNICAL ENGINEERING REPORT NO. 7-219-0819 AND DATED OCTOBER 25, 2019 VAN VAN VAN VAN VAN DSPKSTRP PARKING STRIPING STRIPING 04/12/13 VAN VAN 2 X B 4.33' B 5' 5' 8' 8' 5' 8' 8' 5' 10' 20' 20' 11' 11' 8' STANDARD 90° SPACES (SEE SITE PLAN FOR SIZE) A (TYP.) 5' MIN. 60° NON-ADA STANDARD STRIPING ISLE (TYP.) 2 X B B 5' 10' 20' 22.83' 8' 8' 5' 11' 8' 11' 5' 9.24' 4" TRAFFIC YELLOW STRIPING (TYP.) 45° 45° RAISED ISLAND (SEE END CAP ISLANDS DETAIL) 4" TRAFFIC YELLOW STRIPING (TYP.) STANDARD 60° SPACES (SEE SITE PLAN FOR SIZE) 2 X B B 5' 10' 20' 19.36' 11' 9.24' MIN. 8' 8' 5' 11' 8' 5' 11' 45° 8' A (TYP.) C 60° 90° 4" TRAFFIC YELLOW PERIMETER STRIPING (TYP.) 4" TRAFFIC YELLOW STRIPING 2'-0" O.C. (TYP.) 4" TRAFFIC BLUE INTERIOR STRIPE IN ACCESSIBLE STALL- INTERIOR BLUE STRIPE SHALL DIRECTLY ABUT YELLOW PERIMETER STRIPE (TYP.) 4" TRAFFIC BLUE INTERIOR STRIPE IN ACCESSIBLE STALL- INTERIOR BLUE STRIPE SHALL DIRECTLY ABUT YELLOW PERIMETER STRIPE (TYP.) STANDARD 60° ACCESSIBLE SPACE (TYP.) NOTE: SEE SITE PLAN FOR TYPE. SYMBOL AS SPECIFIED BY LOCAL CODES (TYP.) 6" TRAFFIC WHITE (TYP.) STANDARD 90° ACCESSIBLE SPACE (TYP.) NOTE: SEE SITE PLAN FOR TYPE. SYMBOL AS SPECIFIED BY LOCAL CODES (TYP.) 6" TRAFFIC WHITE (TYP.) 60° STRIPING DETAIL 90° STRIPING DETAIL ACCESS WAY ACCESS WAY ACCESS WAY N.T.S. SEE SITE PLAN FOR TRAFFIC PATTERNS AND AISLE DIMENSIONS 9.24' 9.24' 5.77' 12.7' 4.33' 9.24' 9.24' 5.77' 12.7' 4" TRAFFIC YELLOW PERIMETER STRIPING (TYP.) 4" TRAFFIC YELLOW STRIPING 2'-0" O.C. (TYP.) NON-ADA STANDARD STRIPING ISLE (TYP.) MIN. MIN. ACCESSIBLE SIGN SEE SITE PLAN (TYP.) ACCESSIBLE SIGN SEE SITE PLAN (TYP.) B B B 4" BLUE STRIPE 4" YELLOW STRIPE 4" BLUE STRIPE 4" YELLOW STRIPE 4" BLUE STRIPE 4" YELLOW STRIPE 4" BLUE STRIPE 4" YELLOW STRIPE 4" BLUE STRIPE 4" YELLOW STRIPE 8' TYPICAL ACCESSIBLE STALL STRIPING 4" BLUE STRIPE 4" YELLOW STRIPE 20' LIGHT POLE: PREFERRED LOCATION. REFERENCE LATEST SITE DEVELOPMENT GUIDELINES FOR SPACING AND DISTANCE FROM FRONT OF BUILDING. 2' LIGHT POLE: PREFERRED LOCATION. REFERENCE LATEST SITE DEVELOPMENT GUIDELINES FOR SPACING AND DISTANCE FROM FRONT OF BUILDING. 2' 2' LIGHT POLE: PREFERRED LOCATION. REFERENCE LATEST SITE DEVELOPMENT GUIDELINES FOR SPACING AND DISTANCE FROM FRONT OF BUILDING. R5' STRIPED ISLAND (PREFERRED) STRIPED ISLAND (PREFERRED) RAISED ISLAND (SEE END CAP ISLANDS DETAIL) 9.24' 5.77' 12.7' 12.75' NOTES: 1. SEE SITE PLAN FOR TOTAL LAYOUT. 2. THESE DETAILS ARE FOR REFERENCE AND DIMENSION CONTROL ONLY. 3. ALL DIMENSIONS ARE TO ℄ OF STRIPE UNLESS OTHERWISE INDICATED. 4. ALL COLORS AS SHOWN OR AS SPECIFIED BY LOCAL CODES. CL ACCESSIBLE PARKING SYMBOL LOCATE AT EDGE OF PARKING SPACE UNLESS ACCOMPANIED BY "VAN" LETTERING 6.5' 7.0' 6" 2.5' R (TYP.) B B B B B B 9.5' A 10.97' C 11.0' 8.0' 5.0' SEE SITE PLAN 5.77' 9.24' 12.70' DIMENSION CHART 9.0' 10.39' 5'MIN. 5' MIN. R5' 5' MIN. STRIPED ISLAND (PREFERRED) R5' REFERENCE SECTION 10.15 FOR PAVEMENT SPECIFICATIONS LISTED IN SALEM GEOTECHNICAL ENGINEERING REPORT NO. 7-219-0819 AND DATED OCTOBER 25, 2019 NOTE: GUTTER SLOPE TO MATCH 1" MAX. RADIUS 1/2" MIN. RADIUS CONCRETE CURB AND GUTTER 1" MAX. RADIUS 1/2" MIN. RADIUS N.T.S. 18" MIN. 24" MAX. FACE OF CURB BACK OF CURB 12" 6" 6" 6" 17" MAX. 11" MIN. 1" SEE PAVING DETAILS FOR SUBGRADE AND COMPACTION ASPHALTIC CONCRETE PAVING PAVEMENT SECTIONS, SUBBASE, REQUIREMENTS. CONTRACTOR TO PROVIDE PRIME COAT AND TACK COAT TO FACE OF CURB WHERE CURB CONTACTS ASPHALT. P.C. CONCRETE ADJACENT PAVEMENT, TRAVERSE AND LONGITUDINAL. 12" 12" COMPACTED SUBGRADE sidewalk yield to pedestrian sign w ue ue sanitary sewer manhole rim = 5002.85' 6" PVC inv. in (N) = 4995.29' 6" PVC inv. out (S) = 4995.23' sanitary sewer manhole rim = 5000.72' 6" PVC inv. in (N) = 4993.24' 6" PVC inv. out (S) = 4993.10' stop sign concrete sidewalk stop sign stop sign stop sign stop sign stop sign concrete sidewalk 15" 3" 14 10" 14" 12" 12" 14" 15" 15" 18" 9" 4" 14" 18" 12" 12" 10" 10" 12" 12" 14" 10" 14" 12" 15" 14" 12" 12" 12" 12" 10" 12" 10" 12" 15" 12" 15" 15" 15" 18" 14" 12" 14" 10" 10" 14" 12" 10" 12" 10" 14" 14" 10" 10" 12" APPROX. LOCATION EXISTING 10' ACCESS AND UTILITY EASEMENT TO REMAIN APPROX. LOCATION EXISTING 20' ACCESS AND UTILITY EASEMENT TO REMAIN APPROXIMATE BOUNDARY OF LOT 1 APPROXIMATE BOUNDARY OF LOT 1 LOT 1 HARMONY MARKET P.U.D. APN 9601117001 N89°24'31''E 263.86 S00°00'00''E 714.30 INV 4993.31± (CALCULATED) INV 4994.64 INV 4996.72 INV 4996.58 RIM 4999.91 A B E F 1.5''W 1.5'' IRRIGATION WATER REF IRRIGATION PLAN FOR CONTINATION I J G H K L N P O O O N N N M S 287'± BLANKET ACCESS AND DRAINAGE EASEMENT TO REMAIN 2''C UGT 2''C FOC 2''C UGT 2''C FOC 2''C UGE 2''C UGE 2''C UGE e e e e e e w w w w w w e e e e e e e e e e e e e e e e e e e e ss ss APPROX. LOCATION EXISTING 20' UTILITY EASEMENT TO REMAIN APPROX. LOCATION EXISTING 30' ACCESS AND UTILITY EASEMENT TO REMAIN INV 4995.64 11.25° BEND B 94 LF 6'' PIPE @ 1.00% 7 LF 4'' PIPE @ 2.00% 100 LF 6'' PIPE @ 1.00% 1 LF 6'' PIPE @ 14.07% 100 LF 6'' PIPE @ 1.00% INV 4993.64 B INV 4993.45 B 19 LF 6'' PIPE @ 1.00% ALERT TO CONTRACTOR: ALL SAM'S CLUB GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. 0 20' 30' 40' SCALE IN FEET PROPOSED LEGEND DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 6:41 PM C8 7/29/20 UTILITY PLAN 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633-212 31493 31493-UP JOB # 31493 DRAWING: 31493-UP.dwg LAST SAVED BY: JOEPERKINS Know what'sbelow. Call before you dig. NOTE: SEE ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF PORCHES, RAMPS, VESTIBULE, SLOPED PAVING, TRUCK DOCKS, BUILDING UTILITY ENTRANCE LOCATIONS AND PRECISE BUILDING DIMENSIONS. SITE BENCHMARK: CITY OF FORT COLLINS BENCHMARK: 4-08 ON SOUTH SIDE OF HARMONY RD. AT THE NORTHWEST CORNER OF 625 EAST HARMONY RD. (FRONT RANGE BAPTIST CHURCH), ON THE NORTH WALL OF A CONCRETE IRRIGATION DROP STRUCTURE. NAVD88=5017.14' 5/19/2020INITIAL DESIGN EXISTING LEGEND w ADE SIGN WATER VALVE WATER METER LIGHT POLE UNDERGROUND ELECTRIC LINE UNDERGROUND WATER LINE ACCESS AND DRAINAGE EASEMENT AUE ACCESS AND UTILITY EASEMENT TELECOMMUNICATIONS PEDESTAL TV CABLE TV PEDESTAL SANITARY SEWER MANHOLE SANITARY SEWER CLEAN-OUT UNDERGROUND STORM LINE DECIDUOUS TREE (SIZES SHOWN HEREON) e w PROPERTY LINE EASEMENT LINE ss UNDERGROUND WATER LINE XXXX CONTOUR (ONE FOOT INTERVAL) STORM DRAIN JOINT TRENCH SANITARY SEWER SERVICE SANITARY SEWER FORCE MAIN UNDERGROUND ELECTRIC SERVICE UNDERGROUND TELEPHONE SERVICE WATER SERVICE X"FO FIBER 0PTIC CONDUIT X"W UGT UGE X" FM X"S JT UTILITY NOTES A SANITARY SEWER WYE B SANITARY SEWER CLEAN-OUT, REF DETAIL SHEETS C NOT USED D NOT USED E SANITARY SEWER MANHOLE, REF DETAIL SHEETS F SANITARY SEWER SERVICE BUILDING ENTRY, REF ARCH / MEP PLANS G POINT OF CONNECTION, DOMESTIC WATER SERVICE H POINT OF CONNECTION, IRRIGATION WATER SERVICE I UNDERGROUND VENT PIPING FROM UNDERGROUND STORAGE TANKS, REF ARCH PLANS J UNDERGROUND STORAGE TANK VENT, REF ARCH PLANS K DOMESTIC WATER METER IN H20 TRAFFIC RATED VAULT WITH INTERIOR BACKFLOW PREVENTER L IRRIGATION WATER METER IN H20 TRAFFIC RATED VAULT WITH INTERIOR BACKFLOW PREVENTER M TRANSFORMER, REF ELECTRIC COMPANY PLANS N ALL PULL BOXES LOCATED IN PAVED AREAS SUBJECT TO TRUCK TRAFFIC SHALL BE H-20 LOAD RATED. THE TYPICAL PULL BOX SIZE WILL BE 17 INCHES X 24 INCHES X 24 INCHES ''QUAZITE'' PG1730BA24 BOX WITH PG1730HA0 LID, OR APPROVED EQUAL. DEEPER BOXES MAY BE REQUIRED WHEN THE CONDUIT ALIGNMENT IS AFFECTED BY OTHER UTILITIES. THE PULL BOX SHALL BE INSTALLED PER THE MANUFACTURER'S SPECIFICATION WITH A CONCRETE COLLAR AND A MINIMUM OF 8 INCHES OF GRAVEL COMPACTED PER PROJECT SPECIFICATIONS. IF USING A PULL BOX TO CHANGE DIRECTION, THE MINIMUM BOX SIZE SHALL BE 48 INCHES X 48 INCHES X 24 INCHES PRECAST CONCRETE WITH SEPARATE MANHOLE LID AND COLLAR. O FIBER OPTIC CONDUIT TO FUEL STATION: TWO 2" CONDUITS FOR FIBER OPTIC CABLES AND TELEPHONE LINES REQUIRED FROM BUILDING TO GAS LOT AS NECESSARY, COORDINATE WITH CURRENT UDCP. THE CONDUITS SHALL BE 2" DIAMETER CARLON TYPE "DB" DIRECT BURIAL TELEPHONE DUCT OR 2" SCHEDULE 40 PVC. INSTALL GALVANIZED PULL WIRE OR PURPLE PROPYL-POLYETHYLENE ROPE WITH A MINIMUM PULLING TENSION OF 100 POUNDS IN EACH CONDUIT. THE MINIMUM BURIAL DEPTH SHALL BE 24". INSTALL AN ORANGE DETECTABLE HAZARD TAPE WITH INTEGRAL "BURIED FIBER OPTIC CABLE" WORDING, 12" ABOVE THE CONDUITS. P CONTRACTOR SHALL COORDINATE TRENCH CONSTRUCTION WITH STORE MANAGER TO LIMIT DISRUPTION TO STORE OPERATIONS Q COORDINATE EXACT BUILDING ENTRANCE LOCATION WITH ARCHITECT S MAINTAIN MINIMUM 18 INCHES VERTICAL SEPARATION PORCHES, RAMPS, VESTIBULE, SLOPED PAVING, TRUCK DOCKS, BUILDING UTILITY ENTRANCE LOCATIONS AND PRECISE BUILDING DIMENSIONS. SITE BENCHMARK: CITY OF FORT COLLINS BENCHMARK: 4-08 ON SOUTH SIDE OF HARMONY RD. AT THE NORTHWEST CORNER OF 625 EAST HARMONY RD. (FRONT RANGE BAPTIST CHURCH), ON THE NORTH WALL OF A CONCRETE IRRIGATION DROP STRUCTURE. NAVD88=5017.14' 5/19/2020INITIAL DESIGN SITE FEATURES DRAINAGE BOUNDARY FLOW PATH S OSV VENT APPROX. LOCATION EXISTING 10' ACCESS AND UTILITY EASEMENT TO REMAIN S00°00'00''E 714.30 4999 4999 4999 4999 4998 4998 4997 4999 (P) ''POND A'' HW 4997.66 42 LF 8'' TD @ 0.50% 44 LF 8'' TD @ 2.00% 44 LF 8'' TD @ 2.46% 17 LF 8'' TD @ 0.50% 43 LF 8'' TD @ 0.75% 5 LF 6'' PIPE @ 5.90% 44 LF 6'' PIPE @ 11.29% 30 LF 6'' PIPE @ 1.08% 49 LF 12'' HPP @ 1.08% 2 LF 8'' PIPE @ 2.11% 5 LF 12'' HPP @ 1.08% 33 LF 12'' HPP @ 1.08% 21 LF 12'' HPP @ 1.08% 44 LF 6'' PIPE @ 11.70% 5 LF 6'' PIPE @ 6.31% 35 LF 8'' TD @ 2.00% 41 LF 8'' TD @ 0.50% INV 4998.58 TG 4999.26 A INV 4998.25 TG 4998.93 A INV 4998.17 TG 4999.06 A INV 4999.05 TG 4999.91 A INV 4998.17 TG 4999.03 A INV 4997.97 TG 4999.05 A INV 4998.38 TG 4999.06 A INV 4999.08 TG 4999.75 A INV 4995.89 B C INV 4997.69 B INV 4995.56 B INV 4994.97 F INV 4997.87 B TG 4999.71 INV (E,W) 4992.70 SUMP 4992.20 D INV (N,S) 4994.40± E INV 4995.03 F B INV 4994.62 F (E) ''POND A'' HW 4997.66± INV 4995.08 H APPROXIMATE BOUNDARY OF LOT 1 5000.00 fl ep 5000.43 5000.92 5000.60 fl ng TEMPORARY ONSITE BENCHMARK IRON PIPE IN ASPHALT HOLE ELEV 5000.297' N 1433734.81993' E 3121499.21743' ALERT TO CONTRACTOR: ALL SAM'S CLUB GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. 0 10' 15' 20' SCALE IN FEET DAYLIGHT LINE 2.0% SURFACE FLOW LIMITS OF TWO (2) FOOT OVERBUILD LIMITS OF DISTURBANCE (SHOWN TWO (2) FOOT OFFSET FOR CLARITY) EXISTING LEGEND w ADE SIGN WATER VALVE WATER METER LIGHT POLE UNDERGROUND ELECTRIC LINE UNDERGROUND WATER LINE ACCESS AND DRAINAGE EASEMENT AUE ACCESS AND UTILITY EASEMENT TELECOMMUNICATIONS PEDESTAL TV CABLE TV PEDESTAL SANITARY SEWER MANHOLE SANITARY SEWER CLEAN-OUT UNDERGROUND STORM LINE DECIDUOUS TREE (SIZES SHOWN HEREON) e w PROPERTY LINE EASEMENT LINE (2.0%)± EXISTING SURFACE FLOW DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 2:47 PM C7 8/3/20 DRAINAGE PLAN 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633-212 31493 31493-GP JOB # 31493 DRAWING: 31493-GP.dwg LAST SAVED BY: JOEPERKINS Know what'sbelow. Call before you dig. NOTE: SEE ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF PORCHES, RAMPS, VESTIBULE, SLOPED PAVING, TRUCK DOCKS, BUILDING UTILITY ENTRANCE LOCATIONS AND PRECISE BUILDING DIMENSIONS. 5/19/2020INITIAL DESIGN PROPOSED LEGEND GRADE BREAK CONTOUR ELEVATIONS STORM DRAIN x XX.XX SPOT ELEVATIONS XXX NOTE: WHEN PERFORMING GRADING OPERATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO SITE SPECIFICATIONS. SITE BENCHMARK: CITY OF FORT COLLINS BENCHMARK: 4-08 ON SOUTH SIDE OF HARMONY RD. AT THE NORTHWEST CORNER OF 625 EAST HARMONY RD. (FRONT RANGE BAPTIST CHURCH), ON THE NORTH WALL OF A CONCRETE IRRIGATION DROP STRUCTURE. NAVD88=5017.14' A EIGHT (8) INCH H20 RATED TRENCH DRAIN, REF DETAIL SHEETS B STORM DRAIN CLEAN OUT, REF DETAIL SHEETS C CONNECT TO CANOPY DOWN SPOUT, REF ARCH / MEP PLANS FOR CONTINUATION D FUEL SPILL CONTAINMENT STRUCTURE, REF DETAIL SHEET E CONNECT TO EXISTING DRAINAGE INLET F 12X12X8 INCH TEE G 12 INCH 45° BEND H ONE (1) INCH FUEL SPILL CONTAINMENT VENT PIPE GRADING PLAN LEGEND ABBREVIATIONS: FFE FINISH FLOOR ELEVATION FS FINISH SURFACE G FLOWLINE OF GUTTER INV INVERT ELEVATION TC TOP OF CURB ss UNDERGROUND WATER LINE XXXX CONTOUR (ONE FOOT INTERVAL) tc fl 4997.63 4998.08 tc 4997.91 fl tc 4998.34 4998.25 tc fl 4997.75 fl 4997.54 4998.02 tc 4997.67 fl tc 4998.17 4998.17 tc 4998.14 fl tc 4998.57 fl 4997.47 4997.94 tc fl 4997.30 4997.78 tc 4997.97 tc 4997.56 fl 4997.47 ec 4997.38 fl 4997.74 ec ng 4998.39 fl 4997.73 ng 4999.31 fl 4998.45 fl 4998.11 4998.53 fl 4998.40 fl fl 4998.21 4998.43 ng ng 4998.77 4998.79 fl 4999.90 fl 5000.73 fl 5000.86 fl fl 5001.25 5000.59 fl sw 5000.94 fl 5002.28 tc 5002.33 stop sign stop sign stop sign stop sign stop sign stop sign stop sign stop sign metal chase storm grate rim = 4996.62' 18" RCP inv. (S) = 4994.40' speed bump outback curbside pickup sign concrete sidewalk concrete asphalt asphalt concrete sidewalk concrete sidewalk concrete sidewalk yield to pedestrian sign 20' AUE 10' AUE 5000.90 tc 5000.44 fl 5000.39 ep ep 5000.97 5000.43 ep 5000.92 tc 5000.60 fl 5002.28 tc fl 5001.78 ep 5001.54 5002.34 ec 5002.42 fl w 5002.79 fl 5003.17 tc 5003.07 tc 5002.78 fl 5002.36 ep ue ep 5002.86 fl 5002.96 5003.33 tc 5003.26 tc 5002.81 fl ep 5002.87 5004.27 tc 5003.94 fl 5003.79 ep 5002.13 tc fl 5001.65 5001.52 ep 5001.53 tc fl 5001.35 5001.06 ep 5001.18 ep tc 5001.64 5001.28 ep 5001.66 tc 5001.24 fl 5000.60 ep 5000.68 fl 5001.17 tc 4999.72 tc 4999.23 fl ep 4999.25 4999.29 ep fl 4999.39 4999.85 tc tc 4999.84 4999.44 fl ep 4999.47 ep 4997.26 4997.23 fl 4997.68 tc ep 4997.15 4997.26 fl 4997.62 tc 4997.50 tc 4997.14 fl ep 4997.02 4997.39 ep 4997.32 fl 4997.67 tc 4997.92 tc 4997.50 fl ep 4997.42 tc 4998.56 4998.34 fl 4998.33 ep 4998.09 ep 4998.36 fl 4998.64 tc 4997.73 ep 4997.80 ep fl 4997.92 4998.28 tc 4998.38 tc 4997.73 fl 4997.60 ep fl 4998.47 4998.32 eop eop 4998.05 fl 4998.20 4998.57 tc fl 4998.24 ep 4998.27 ep 4997.69 fl 4997.78 4998.24 tc ep 4998.77 4998.83 fl 4999.07 tc 4998.70 tc 4998.26 fl 4998.12 ep ng 4997.72 4997.95 ng ng 4998.08 4998.19 ng ng 5000.86 4999.87 ng 4999.43 ng ng 4998.96 ng 4998.56 ng 4998.25 ng 4998.06 4997.83 ng ng 4997.58 ng 4997.54 4997.74 ng ng 4997.39 4996.86 ng ng 5000.34 ng 5001.68 4999.70 ng 4998.96 ng 4998.49 ng 4998.25 ng 4998.15 ng ng 4998.14 ng 4998.41 4998.53 ng ng 4998.10 4998.10 ng 4997.54 ng 4998.08 ng ng 5003.26 5002.63 ng ng ng 5004.87 5005.79 tc 5005.37 fl ep 5005.28 5006.17 5005.78 tc ep 5005.18 5005.32 fl ssmh ssmh ssmh co 5003.56 ec fl 5003.56 5004.08 tc eop 5004.08 fl 5004.10 tc 5004.04 mb 5005.79 tc 5005.35 fl 5005.21 ec ec 5003.44 tc 5003.98 5003.16 ec ep 5002.23 tc 5002.81 5002.52 5003.13 fl 5000.93 5002.14 fl 5001.22 5002.70 fl 5002.40 5003.38 fl 5003.52 fl tc 5003.63 5003.86 5004.29 fl 5001.92 5002.42 tc fl 5001.56 5001.59 tc 5001.74 fl ec 5001.77 tc 5002.30 fl 5001.83 5001.95 ec 5002.17 tc 5001.76 fl 5001.77 ec 5001.33 fl 5001.80 tc large snow pile at time of survey concrete sidewalk stop sign stop sign stop sign pillars planters concrete sidewalk 5004 5003 5002 5001 5000 4999 4998 4997 15" 3" 14 10" 14" 6" 14" 12" 12" 14" 15" 15" 18" 9" 4" 14" 18" 12" 12" 10" 10" 12" 12" 10" 14" 12" 15" 14" 12" 12" 12" 12" 12" 12" 10" 12" 15" 15" 15" 18" 14" 12" 14" 10" 10" 14" 12" 10" 12" 10" 14" KIOSK 200± SF FFE 5000.05 covered cart return covered cart return S OSV VENT TEMPORARY ONSITE BENCHMARK IRON PIPE IN ASPHALT HOLE ELEV 5000.297' N 1433734.81993' E 3121499.21743' EXISTING 20' ACCESS AND UTILITY EASEMENT TO REMAIN BLANKET ACCESS AND DRAINAGE EASEMENT TO REMAIN APPROXIMATE BOUNDARY OF LOT 1 APPROXIMATE BOUNDARY OF LOT 1 N89° 24' 31"E 263.86' LOT 1 HARMONY MARKET P.U.D. APN 9601117001 S00°00'00''E 714.30 FS 4999.80 FS 4999.80 FS 4999.92 FS 4999.92 FS 4999.95 FS 4999.95 FS 4999.91 FS 4999.82 FS 4999.75 FS 4999.75 FS 4999.93 FS 4999.95 FS 4999.83 FS 4999.83 FS 4999.63 FS 4999.63 FS 4998.93 FS 4999.25 TC 4999.70 G 4999.20 TC 4999.38 G 4998.88 FS 4999.06 FS 4999.06 FS 4999.06 FS 4999.93 FS 4999.06 TC 4999.17 G 4998.67 TC 4999.08 G 4998.58 TC 4998.70 G 4998.20 TC 4998.62 G 4998.12 TC 4998.50 G 4998.00 TC 4998.50 G 4998.00 TC 4998.78 G 4998.28 TC 4998.18 G 4997.68 TC 4998.56 G 4998.06 TC 4998.30 G 4997.80 TC 4997.68 G 4997.18 TC 4997.86 G 4997.36 TC 4997.60 G 4997.10 TC 4997.75 G 4997.25 TC 4998.12 G 4997.62 FS 4998.23 FS 4997.85 FS 4998.17 FS 4999.28 FS 4999.48 TC 4999.17 G 4998.67 TC 4999.37 G 4998.87 TC 4998.06 G 4997.56 TC 4997.55 G 4997.05 TC 4997.51 G 4997.01 TC 4997.92 G 4997.42 TC 4997.87 G 4997.37 TC 4998.62 G 4998.12 TC 4998.63 G 4998.13 TC 4998.37 G 4997.87 TC 4998.32 G 4997.82 TC 4999.70 G 4999.20 FS 4999.81 TC 4999.54 G 4999.04 FS 4998.92 TC 4999.58 G 4999.08 FS 4998.96 FS 4999.61 TC 4999.52 G 4999.02 TC 4999.06 G 4998.56 TC 4998.96 G 4998.46 FS 4998.63 FS 4998.94 FS 4998.79 TC 5001.10 G 5000.60 FS 5001.15 FS 5000.04 FS 5000.50 TC 5000.39 G 4999.89 1.9% 1.8% 1.9% 2.0% 2.0% 1.6% 1.6% 1.6% 1.6% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 1.4% 0.9% 2.0% 4.0% 0.7% 4.3% 0.5% 2.1% 4.0% 3.2% 5.3% 5.2% TC 4998.98 G 4998.48 1.5% 3.1% 1.8% 1.7% 1.8% 4.9% 1.7% 6.2% 7.3% 1.9% 1.1% 1.0% 1.7% 1.9% 0.9% 1.7% FS 5000.80 5001 5000 5000 4999 4999 4999 4999 4998 4998 4997 4998 4999 TC 4998.16 G 4997.66 TC 4998.15 G 4997.65 0.3% A A A A A A A TC 5000.70 G 5000.20 B 2.9% (1.1%)± (2.0%)± (1.6%)± (1.2%)± 5000 5001 5002 4999 4998 4998 4998 4998 4998 4997 4998 4998 4999 5000 5000 5001 5001 5001 5001 5002 B TG (4996.66±) 4.1% EXISTING 10' ACCESS AND UTILITY EASEMENT TO REMAIN 5.0% TC (4998.33±) G (4997.83±) TC (4998.09±) G (4997.59±) FS 4998.11 FS 4998.00 FS 4997.83 FS 4997.72 F F C D D D D D D ALERT TO CONTRACTOR: ALL SAM'S CLUB GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. 0 20' 30' 40' SCALE IN FEET DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 5:30 PM C6 7/29/20 GRADING PLAN 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633-212 31493 31493-GP JOB # 31493 DRAWING: 31493-GP.dwg LAST SAVED BY: JOEPERKINS Know what'sbelow. Call before you dig. NOTE: SEE ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF PORCHES, RAMPS, VESTIBULE, SLOPED PAVING, TRUCK DOCKS, BUILDING UTILITY ENTRANCE LOCATIONS AND PRECISE BUILDING DIMENSIONS. 5/19/2020INITIAL DESIGN PROPOSED LEGEND GRADE BREAK CONTOUR ELEVATIONS SPOT ELEVATIONS XXX NOTE: WHEN PERFORMING GRADING OPERATIONS DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO SITE SPECIFICATIONS. SITE BENCHMARK: CITY OF FORT COLLINS BENCHMARK: 4-08 ON SOUTH SIDE OF HARMONY RD. AT THE NORTHWEST CORNER OF 625 EAST HARMONY RD. (FRONT RANGE BAPTIST CHURCH), ON THE NORTH WALL OF A CONCRETE IRRIGATION DROP STRUCTURE. NAVD88=5017.14' A LIMITS OF SAWCUT AND PAVEMENT REMOVAL, MATCH EXISTING ELEVATIONS B MATCH EXISTING ELEVATIONS C FUEL SPILL CONTAINMENT STRUCTURE, REF SHEET C7 - DRAINAGE PLAN D EIGHT (8) INCH H20 RATED TRENCH DRAIN, REF SHEET C7 - DRAINAGE PLAN E STORMDRAIN CLEAN-OUT, REF DETAIL SHEETS F PULL BOX, REF SHEET C8 - UTILITY PLAN A EIGHT (8) INCH H20 RATED TRENCH DRAIN, REF DETAIL SHEETS B STORM DRAIN CLEAN OUT, REF DETAIL SHEETS C CONNECT TO CANOPY DOWN SPOUT, REF ARCH / MEP PLANS FOR CONTINUATION D FUEL SPILL CONTAINMENT STRUCTURE, REF DETAIL SHEET E CONNECT TO EXISTING DRAINAGE INLET F 12X12X8 INCH TEE G 12 INCH 45° BEND H ONE (1) INCH FUEL SPILL CONTAINMENT VENT PIPE GRADING PLAN LEGEND ABBREVIATIONS: FFE FINISH FLOOR ELEVATION FS FINISH SURFACE G FLOWLINE OF GUTTER INV INVERT ELEVATION TC TOP OF CURB DAYLIGHT LINE 2.0% SURFACE FLOW LIMITS OF TWO (2) FOOT OVERBUILD LIMITS OF DISTURBANCE (SHOWN TWO (2) FOOT OFFSET FOR CLARITY) EXISTING LEGEND w ADE SIGN WATER VALVE WATER METER LIGHT POLE UNDERGROUND ELECTRIC LINE UNDERGROUND WATER LINE ACCESS AND DRAINAGE EASEMENT AUE ACCESS AND UTILITY EASEMENT TELECOMMUNICATIONS PEDESTAL TV CABLE TV PEDESTAL SANITARY SEWER MANHOLE SANITARY SEWER CLEAN-OUT UNDERGROUND STORM LINE DECIDUOUS TREE (SIZES SHOWN HEREON) e w PROPERTY LINE EASEMENT LINE (2.0%)± EXISTING SURFACE FLOW ss UNDERGROUND WATER LINE XXXX CONTOUR (ONE FOOT INTERVAL) x XXXX.XX x (XXXX.XX±) EXISTING SPOT ELEVATIONS E TYP FF FF FF FF K K L L M N P P P P P P Q Q Q Q R S S S T U V W W Z X Y Z I H I H APPROX. LOCATION EXISTING 10' ACCESS AND UTILITY EASEMENT TO REMAIN APPROX. LOCATION EXISTING 20' ACCESS AND UTILITY EASEMENT TO REMAIN BLANKET ACCESS AND DRAINAGE EASEMENT TO REMAIN APPROXIMATE BOUNDARY OF LOT 1 APPROXIMATE BOUNDARY OF LOT 1 LOT 1 HARMONY MARKET P.U.D. APN 9601117001 BB LIGHT POLE CC LIGHT POLE AA AA AA BB LIGHT POLE CC LIGHT POLE N89°24'31''E 263.86 S00°00'00''E 714.30 6' X X X G BEGIN G END G END G BEGIN G G G G O Q BLDG #100 BLDG #101 DD DD DD EE J A J J A A HORIZONTAL CONTROL POINT LIST POINT # 100 101 NORTHING 1433645.9007 1433670.1507 EASTING 3121420.4473 3121412.1973 DESCRIPTION BUILDING CONTROL BUILDING CONTROL ALERT TO CONTRACTOR: ALL SAM'S CLUB GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. 0 20' 30' 40' SCALE IN FEET SITE LEGEND PROPOSED LEGEND CONCRETE CURB AND GUTTER TYPICAL, SEE DETAIL SHEET PROPERTY LINE/RIGHT-OF-WAY LINE STRIPE LEGEND SWSL/4" SINGLE WHITE SOLID LINE, 4" WIDE SYSL/4" SINGLE YELLOW SOLID LINE, 4" WIDE DYLS/4" DOUBLE YELLOW SOLID LINE, 4" WIDE SYSL/10" SINGLE YELLOW SOLID LINE, 10" WIDE SWDL/4" SINGLE WHITE DASHED LINE, 4" WIDE SYBL/4" SINGLE YELLOW BROKEN LINE, 4" WIDE SWSL/24" SINGLE WHITE SOLID LINE, 24" WIDE LIMITS OF CONCRETE SIDEWALK, REF DETAIL SHEETS LIMITS OF STANDARD DUTY ASPHALT PAVING, REF DETAIL SHEETS LIMITS OF STANDARD DUTY CONCRETE PAVING, REF DETAIL SHEETS A FIRE APPARATUS ACCESS ROAD STENCILING & FIRE LANE SIGN INSTALLATION (STANDARD DETAIL 1 (WITHOUT STENCIL)) PER LARIMER COUNTY URBAN AREA STREET STANDARDS, DRAWING 1419 B AREA STRIPED AT SYSL/4" AT 45° @ 2'-0" O.C. C ''EXIT'' PAVEMENT MARKING, REF "ARROW PAVEMENT MARKING" DETAIL. SEE DETAIL SHEET. D ARROW PAVEMENT MARKINGS TYPICAL, SEE PLAN FOR TYPE. SEE DETAIL SHEET. E ENTER PAVEMENT MARKING WITH ARROW, SEE DETAIL SHEET. F TRANSFORMER WITH BOLLARD PROTECTION, REF. UTILITY PLAN. G CONCRETE CURB AND GUTTER, REF DETAIL SHEET. H 30''x30'' R1-1 ''STOP'' SIGN. I ''STOP'' PAVEMENT MARKING, SEE DETAIL SHEET. J FIRE ACCESS ROAD SIGN (STANDARD FIRE LANE SIGN DETAIL) PER LARIMER COUNTY URBAN AREA STREET STANDARDS, DRAWING 1418 K 30''x30'' R5-1 ''DO NOT ENTER'' SIGN L FUEL CANOPY, REF ARCH PLANS. M UNDERGROUND STORAGE TANKS. REF. ARCH PLANS. N UNDERGROUND VENT PIPING FROM UNDERGROUND STORAGE TANK, REF. ARCH PLANS. O ADA RAMP IN SIDEWALK, REF DETAIL SHEETS P LANDSCAPE AREA. SEE LANDSCAPE PLANS. Q STANDARD DUTY ASPHALT PAVING, SEE DETAIL SHEETS. R STANDARD DUTY CONCRETE PAVING, SEE DETAIL SHEETS. S LIMITS OF ARCHITECTURAL CONCRETE, REF ARCH PLANS. T DOWN SPOUTS - (TYP REF MEP PLANS). U ACCESSIBLE / VAN ACCESSIBLE PARKING SIGN, SEE DETAIL SHEETS. V BIKE RACK, "CLASSIC BIKE U RACK" (IN-GROUND MOUNT) BY CYCLESAFE OR APPROVED EQUAL. W ACCESSIBLE RAMP IN SIDEWALK. SEE DETAIL SHEET. X CONCRETE SIDEWALK (SEE SIZE THIS SHEET). SEE DETAIL SHEET. Y CROSSWALK MARKING. SEE WIDTH INDICATED AT SYMBOL. SEE DETAIL SHEET. Z 2'x5' DETECTABLE WARNING, ARMOR-TILE OR APPROVED EQUAL AA EXISTING TO REMAIN BB EXISTING TO BE RELOCATED CC POINT OF RELOCATION DD PULL BOX, REF SHEET C8 - UTILITY PLAN EE FUEL SPILL CONTAINMENT VENT PIPE, REF SHEET C7 - DRAINAGE PLAN FF NO PARKING ANY TIME SIGN DETAIL PER LARIMER COUNTY URBAN AREA STREET STANDARDS, DRAWING 1402B DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 6:42 PM C5 7/30/20 SITE PLAN 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633-212 31493 31493-SP JOB # 31493 DRAWING: 31493-SP.dwg LAST SAVED BY: JOEPERKINS SITE INFORMATION PROPOSED SITE AREA 21,200± SF (0.45 ACRES) TOTAL PAVEMENT DEMO 19,512± SF TOTAL PAVEMENT REPLACED 19,111± SF LANDSCAPE DEMO 0± SF LANDSCAPE ADDED 358± SF ZONING INFORMATION JURISDICTION: FORT COLLINS, COLORADO ACCESSORS PARCEL NUMBER 9601117001 EXISTING ZONING: H-C (HARMONY CORRIDOR DISTRICT) PROPOSED ZONING: H-C (HARMONY CORRIDOR DISTRICT) MINIMUM PARCEL SIZE N/A EXISTING PARCEL SIZE 520,532± SF (AS SHOWN ON PLAT OF HARMONY MARKET P.U.D.) MINIMUM PARCEL WIDTH 90' EXISTING PARCEL WIDTH 550± FT MIN EXISTING LOT COVERAGE TBD PROPOSED LOT COVERAGE TBD MAX. BUILDING HEIGHT ALLOWED: 6 STORIES PROPOSED BUILDING HEIGHT: SINGLE STORY 10'-10" (KIOSK) - 17'-5" (CANOPY) EXISTING SAM'S CLUB: 130,383± SF KIOSK FLOOR AREA: 200± SF CANOPY FLOOR AREA: 3594± SF SETBACKS: BUILDING: FRONT YARD: N/A SIDE YARD: N/A REAR YARD: N/A LANDSCAPE: FRONT YARD: N/A SIDE YARD: N/A REAR YARD: N/A PROJECT INFORMATION PROJECT NAME: SAM'S CLUB FUEL STATION ADDITION PROJECT ADDRESS: 4700 BOARDWALK DRIVE FORT COLLINS, COLORADO PROJECT DESCRIPTION: GAS STATION ADDITION ON EXISTING SAM'S CLUB SITE SAM'S CLUB PARKING INFORMATION PARKING REQUIRED: 2 SPACE / 1,000 SF (MIN) BUILDING SPACE 4 SPACE / 1,000 SF (MAX) BUILDING SPACE EXISTING PARKING: STANDARD: 545 ACCESSIBLE: 12 TOTAL PARKING: 557 (4.27/1,000) TOTAL PARKING AFTER CONSTRUCTION: STANDARD: 471 ACCESSIBLE: 13 (9 REQUIRED) TOTAL PARKING: 484 (262 MIN - 524 MAX REQUIRED) 3.71 SPACES / 1,000 SF BUILDING SPACE (2/1,000 MIN - 4/1,000 MAX REQ'D) BICYCLE PARKING REQUIRED: 1 SPACE PER 4,000 SF BUILDING SPACE BICYCLE PARKING PROVIDED: 2 Know what'sbelow. Call before you dig. NOTE: SEE ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF PORCHES, RAMPS, VESTIBULE, SLOPED PAVING, TRUCK DOCKS, BUILDING UTILITY ENTRANCE LOCATIONS AND PRECISE BUILDING DIMENSIONS. SITE BENCHMARK: CITY OF FORT COLLINS BENCHMARK: 4-08 ON SOUTH SIDE OF HARMONY RD. AT THE NORTHWEST CORNER OF 625 EAST HARMONY RD. (FRONT RANGE BAPTIST CHURCH), ON THE NORTH WALL OF A CONCRETE IRRIGATION DROP STRUCTURE. NAVD88=5017.14' LIMITS OF ARCHITECTURAL CONCRETE, REF ARCH PLANS OVERALL SHOPPING CENTER PARKING INFORMATION PARKING REQUIRED: 2 SPACE / 1,000 SQ FT (MIN) BUILDING SPACE 4 SPACE / 1,000 SQ FT (MAX) BUILDING SPACE TOTAL BUILDING SQ AREA (POST CONSTRUCTION) 392,427± SQ FT TOTAL PARKING (POST CONSTRUCTION) 1,893 SPACES 4.82 SPACES / 1,000 SQ FT 5/19/2020INITIAL DESIGN EXISTING LEGEND w ADE SIGN WATER VALVE WATER METER LIGHT POLE UNDERGROUND ELECTRIC LINE UNDERGROUND WATER LINE ACCESS AND DRAINAGE EASEMENT AUE ACCESS AND UTILITY EASEMENT TELECOMMUNICATIONS PEDESTAL TV CABLE TV PEDESTAL SANITARY SEWER MANHOLE SANITARY SEWER CLEAN-OUT UNDERGROUND STORM LINE DECIDUOUS TREE (SIZES SHOWN HEREON) e w PROPERTY LINE EASEMENT LINE ss UNDERGROUND WATER LINE XXXX CONTOUR (ONE FOOT INTERVAL) 10' 30' DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 1:36 PM C4.1 8/3/20 FIRE DEPT ACCESS PLAN 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633-212 31493 31493-OSP JOB # 31493 DRAWING: 31493-OSP.dwg LAST SAVED BY: JOEPERKINS LEGEND EXISTING ACCESS AND DRAINAGE EASEMENT, REF PLAN FOR WIDTH Know what'sbelow. Call before you dig. 5/19/2020INITIAL DESIGN 0 80' 120' 160' SCALE IN FEET EXISTING BLANKET ACCESS AND DRAINAGE EASEMENT 30° 60° 90° 120° 150° 180° VEHICLE TRACKING V20.00.2188(20190304) (C) AUTODESK, INC. WWW.AUTODESK.COM NOTES: TITLE: E-ONE HEAVY WALKIN RESCUE 40.57' MIN RADIUS (OUTER WHEEL) 45.78' MIN RADIUS (INNER WHEEL) 25' MIN RADIUS (INNER WHEEL) MAX KICKOUT 0.79' 20.75' 8.33' 4.83' 43.25' OVERALL LENGTH 43.250' OVERALL WIDTH 8.333' OVERALL BODY HEIGHT 11.000' MIN BODY GROUND CLEARANCE 1.393' TRACK WIDTH 8.333' LOCK TO LOCK TIME 6.00 SECONDS MAX WHEEL ANGLE 45.00° TURN(S) BASED UPON FRONT AXLE FOLLOWING A CIRCULAR ARC STARTING TANGENTIALLY. 4 5 1 . 9 4 Δ = 1 9 ° 4 2 ' 1 6 " N85°15'16"W 66.41' N68°30'20"W 150.28' L = 2 0 5 . 8 2 , R = 5 7 6 . 0 0 Δ = 2 0 ° 2 8 ' 2 2 " S00°00'01"E 308.47' N90°00'00"E 117.28' S00°00'00"E 714.30' N89°24'31"E 263.86' L = 9 5 . 3 1 , R = 1 0 0 . 0 0 Δ = 5 4 ° 3 6 ' 2 2 " N34°48'09"E 118.16' L = 7 9 . 7 4 , R = 1 0 0 . 0 0 Δ = 4 5 ° 4 1 ' 1 5 " N80°29'24"E 99.48' N80°29'24"E 20.16' L=77.16, R=565.96 Δ=7°48'40" N08°50'22"W 215.96' L = 1 1 9 . 4 7 , R = 6 4 3 . 9 7 Δ = 1 0 ° 3 7 ' 4 8 " N01°47'25"E 255.44' 6 5 39 20 20 25 30 34 38 36 20 13 17 14 4 71 18 82 46 43 51 37 11 21 15 25 28 23 117 151 210 137 207 141 GREASE MONKEY OIL CHANGE 2,382± SQ FT 1036 OAKRIDGE DRIVE, FORT COLLINS, CO ZONE:HC (HARMONY CORRIDOR DISTRICT) MULTIPLE RETAIL SHOPS USE: COMMERCIAL/RETAIL 115,074± SQ FT 813 E. HARMONY ROAD, FORT COLLINS, CO ZONE:HC (HARMONY CORRIDOR DISTRICT) USE: COMMERCIAL/RETAIL 126'± 52'± 47'± 70' 48'± 70'± 80' HARMONY ROAD SETBACK 40' COLLECTOR BUILDING SETBACK 40' COLLECTOR BUILDING SETBACK EXISTING TRASH COMPACTOR RED ROBINS 8,118± SQ FT 701 E. HARMONY ROAD, FORT COLLINS, CO ZONE:HC (HARMONY CORRIDOR DISTRICT) USE: COMMERCIAL/RETAIL MULTIPLE RETAIL SHOPS 8,992± SQ FT 731 E. HARMONY ROAD, FORT COLLINS, CO ZONE:HC (HARMONY CORRIDOR DISTRICT) USE: COMMERCIAL/RETAIL OUTBACK STEAK HOUSE 6,214± SQ FT 807 E. HARMONY ROAD, FORT COLLINS, CO ZONE:HC (HARMONY CORRIDOR DISTRICT) USE: COMMERCIAL/RETAIL HIBACHI GRILL & SUPREME BUFFET 10,330± SQ FT 901 E. HARMONY ROAD, FORT COLLINS, CO ZONE:HC (HARMONY CORRIDOR DISTRICT) USE: COMMERCIAL/RETAIL MULTIPLE RETAIL SHOPS 20,939± SQ FT 931 E. HARMONY ROAD, FORT COLLINS, CO ZONE:HC (HARMONY CORRIDOR DISTRICT) USE: COMMERCIAL/RETAIL FIRST BANK 6,680± SQ FT 1013 E. HARMONY ROAD, FORT COLLINS, CO ZONE:HC (HARMONY CORRIDOR DISTRICT) USE: COMMERCIAL/RETAIL DIAMOND SHAMROCK GAS STATION 1,885± SQ FT 4701 S. LEMAY AVENUE, FORT COLLINS, CO ZONE:HC (HARMONY CORRIDOR DISTRICT) USE: COMMERCIAL/RETAIL GREASE MONKEY OIL CHANGE 2,382± SQ FT 1036 OAKRIDGE DRIVE, FORT COLLINS, CO ZONE:HC (HARMONY CORRIDOR DISTRICT) USE: COMMERCIAL/RETAIL MULTIPLE RETAIL SHOPS 21,322± SQ FT 925 E. HARMONY ROAD, FORT COLLINS, CO ZONE:HC (HARMONY CORRIDOR DISTRICT) USE: COMMERCIAL/RETAIL MULTIPLE RETAIL SHOPS 54,018± SQ FT 1001 E. HARMONY ROAD, FORT COLLINS, CO ZONE:HC (HARMONY CORRIDOR DISTRICT) USE: COMMERCIAL/RETAIL 40' COLLECTOR BUILDING SETBACK MULTIPLE RETAIL SHOPS 5,890± SQ FT 921 E. HARMONY ROAD, FORT COLLINS, CO ZONE:HC (HARMONY CORRIDOR DISTRICT) USE: COMMERCIAL/RETAIL PROPOSED SAM'S CLUB FUEL STATION SINGLE STORY KIOSK: 200± SQ FT CANOPY: 3,467± SQ FT ZONE: HARMONY CORRIDOR DISTRICT USE: COMMERCIAL/RETAIL EAST HARMONY ROAD (MAJOR ARTERIAL 6 LANES) SOUTH BOARDWALK DRIVE (COLLECTOR 2 LANES) OAKRIDGE DRIVE (COLLECTOR 2 LANES) S. LEMAY AVENUE (ARTERIAL 4 LANES) SAM'S CLUB 130,383± SQ FT 4700 E. BOARDWALK DRIVE, FORT COLLINS, CO ZONE:HC (HARMONY CORRIDOR DISTRICT) USE: COMMERCIAL/RETAIL DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 12:42 PM C4 8/3/20 OVERALL SITE PLAN 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633-212 31493 31493-OSP JOB # 31493 DRAWING: 31493-OSP.dwg LAST SAVED BY: JOEPERKINS PROPOSED LEGEND # PROPOSED SAM'S CLUB PARKING # EXISTING SAM'S CLUB PARKING TO REMAIN PEDESTRIAN PATH OF TRAVEL VEHICULAR CIRCULATION MAJOR POINTS OF INGRESS AND EGRESS # EXISTING OVERALL SHOPPING CENTER PARKING TO REMAIN NOTE: REF SHEET C5 - SITE PLAN FOR PARKING INFORMATION Know what'sbelow. Call before you dig. 5/19/2020INITIAL DESIGN 0 80' 120' 160' SCALE IN FEET 10" 12" 10" 10" 12" 12" 14" 12" 15" 14" 12" 12" 12" 12" 12" 10" 15" 15" 15" 18" 14" 12" 14" 10" 10" 14" 12" 10" 12" 10" 14" C & G A C & G A C & G A A C & G A C & G A C & G A A C A ASPHALT PAVEMENT A ASPHALT PAVEMENT E E E E E CONCRETE A SIDEWALK CONCRETE A SIDEWALK A C & G E A ASPHALT PAVEMENT A ASPHALT PAVEMENT A ASPHALT PAVEMENT TREE C TYP TREE C TYP C TREE TYP LIGHT D POLE LIGHT D POLE STORM INLET B B B C STOP SIGN STOP C SIGN TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TP TEMPORARY SITE BENCHMARK IRON PIPE IN ASPHALT HOLE ELEV 5000.297' N 1433734.81993' E 3121499.21743' APPROX. LOCATION EXISTING 10' ACCESS AND UTILITY EASEMENT TO REMAIN APPROX. LOCATION EXISTING 20' ACCESS AND UTILITY EASEMENT TO REMAIN BLANKET ACCESS AND DRAINAGE EASEMENT TO REMAIN APPROXIMATE BOUNDARY OF LOT 1 APPROXIMATE BOUNDARY OF LOT 1 LOT 1 HARMONY MARKET P.U.D. APN 9601117001 N89°24'31''E 263.86 S00°00'00''E 714.30 LOT 1 HARMONY MARKET P.U.D. APN 9601117001 N89°24'31''E 263.86 S00°00'00''E 714.30 e e e e e e w w w w w w e e e e e e e e e e e e e e e e e ALERT TO CONTRACTOR: ALL SAM'S CLUB GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. 0 20' 30' 40' SCALE IN FEET DATE Engineering Associates, Inc. REVISIONS DPOR PM DES DRW INITIAL DESIGN 5:30 PM C3 7/29/20 DEMO PLAN 4700 BOARDWALK DRIVE FORT COLLINS COLORADO FAX: (559) 447-3129 (559) 447-3119 Fresno, CA 93711 7543 N. Ingram Ave., Suite 107 JDG JPD JAP JAP 5/19/2020 SAM'S CLUB FUEL STATION #6633-212 31493 31493-DM JOB # 31493 DRAWING: 31493-DM.dwg LAST SAVED BY: JOEPERKINS Know what'sbelow. Call before you dig. NOTE: SEE ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF PORCHES, RAMPS, VESTIBULE, SLOPED PAVING, TRUCK DOCKS, BUILDING UTILITY ENTRANCE LOCATIONS AND PRECISE BUILDING DIMENSIONS. SITE BENCHMARK: CITY OF FORT COLLINS BENCHMARK: 4-08 ON SOUTH SIDE OF HARMONY RD. AT THE NORTHWEST CORNER OF 625 EAST HARMONY RD. (FRONT RANGE BAPTIST CHURCH), ON THE NORTH WALL OF A CONCRETE IRRIGATION DROP STRUCTURE. NAVD88=5017.14' 5/19/2020INITIAL DESIGN EXISTING LEGEND w ADE SIGN WATER VALVE WATER METER LIGHT POLE UNDERGROUND ELECTRIC LINE UNDERGROUND WATER LINE ACCESS AND DRAINAGE EASEMENT AUE ACCESS AND UTILITY EASEMENT TELECOMMUNICATIONS PEDESTAL TV CABLE TV PEDESTAL SANITARY SEWER MANHOLE SANITARY SEWER CLEAN-OUT UNDERGROUND STORM LINE DECIDUOUS TREE (SIZES SHOWN HEREON) e w PROPERTY LINE EASEMENT LINE ss UNDERGROUND WATER LINE XXXX CONTOUR (ONE FOOT INTERVAL) 1. THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION, REMOVAL, AND DISPOSAL (IN A LOCATION APPROVED BY ALL GOVERNING AUTHORITIES) ALL STRUCTURES, PADS, WALLS, FLUMES, FOUNDATIONS, PARKING, DRIVES, DRAINAGE, STRUCTURES, UTILITIES, ETC., SUCH THAT THE IMPROVEMENTS SHOWN ON THE REMAINING PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL MATERIAL PER THE SPECIFICATIONS. 2. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROM THE SITE AND DISPOSING THE DEBRIS IN A LAWFUL MANNER. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL. 3. THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVAL AND/OR RELOCATION OF UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY CONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITY COMPANY'S FORCES AND ANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR SERVICES. THE CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES. 4. ALL EXISTING SEWERS, PIPING AND UTILITIES SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT LOCATION, OR AS THE ONLY OBSTACLES THAT MAY OCCUR ON THE SITE. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANY ANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY COMPANIES REGARDING DESTRUCTION AND REMOVAL OF ALL SERVICE LINES AND CAP ALL LINES BEFORE PROCEEDING WITH THE WORK. UTILITIES DETERMINED TO BE ABANDONED AND LEFT IN PLACE SHALL BE GROUTED IF UNDER BUILDING. 5. ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC CABLE AND/OR GAS LINES NEEDING TO BE REMOVED OR RELOCATED SHALL BE COORDINATED WITH THE AFFECTED UTILITY COMPANY. ADEQUATE TIME SHALL BE PROVIDED FOR RELOCATION AND CLOSE COORDINATION WITH THE UTILITY COMPANY IS NECESSARY TO PROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE. CONTRACTOR SHALL PAY CLOSE ATTENTION TO EXISTING UTILITIES WITHIN THE ANY ROAD RIGHT OF WAY DURING CONSTRUCTION. 6. CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES, ENCLOSURES, ETC., (AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES) AS APPROVED BY CONSTRUCTION MANAGER. 7. CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING PROPERTIES AT ALL TIMES DURING DEMOLITION OF THE EXISTING FACILITIES. 8. PRIOR TO DEMOLITION OCCURRING, ALL APPROPRIATE EROSION CONTROL DEVICES ARE TO BE INSTALLED. 9. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 10. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. THE CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT. 11. ENGINEER'S NOTICE TO CONTRACTOR: THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS ARE BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANY AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. GENERAL DEMOLITION NOTES DEMOLITION LEGEND A EXISTING TO BE REMOVED. B EXISTING SITE LIGHTING CONDUIT TO BE REROUTED, REF ARCH PLANS FOR SITE LIGHTING ELECTRICAL PLAN. C EXISTING TO REMAIN D EXISTING TO RELOCATED. E LIMITS OF SAWCUT AND PAVEMENT REMOVAL. F TREE PROTECTION, REF DETAIL SHEETS PROPOSED LIMITS OF DEMOLITION LIMITS OF SAWCUT AND PAVEMENT REMOVAL ABBREVIATIONS C & G - CURB AND GUTTER TP TREE PROTECTION, REF DETAIL SHEEETS WITH THE HIGHWAY DEPARTMENT RESIDENT ENGINEER. H. WETLANDS NOTE: ANY DEVELOPMENT, EXCAVATION, CONSTRUCTION, OR FILLING IN A U.S. CORPS OF ENGINEERS DESIGNATED WETLAND IS SUBJECT TO LOCAL, STATE AND FEDERAL APPROVALS. THE CONTRACTOR SHALL COMPLY WITH ALL PERMIT REQUIREMENTS AND/OR RESTRICTIONS AND ANY VIOLATION WILL BE SUBJECT TO FEDERAL PENALTY. THE CONTRACTOR SHALL HOLD THE OWNER/DEVELOPER, THE ENGINEER AND THE LOCAL GOVERNING AGENCIES HARMLESS AGAINST SUCH VIOLATION. I. RESIDENT ENGINEERING SERVICES: WHEN REQUESTED BY THE OWNER, RESIDENT ENGINEERING SERVICES SHALL BE PROVIDED BY THE ENGINEERS (ON A TIME AND FREQUENCY BASIS) ACCEPTABLE TO THE CITY ENGINEER FOR IMPROVEMENTS TO PUBLIC WATER MAINS, PUBLIC SEWER, AND CITY STREETS. AT THE COMPLETION OF CONSTRUCTION, THE ENGINEER SHALL CERTIFY THE CONSTRUCTION TO BE IN COMPLIANCE WITH THE PLANS AND SPECIFICATIONS. THIS WORK WILL BE AT THE OWNER/DEVELOPER'S DIRECT EXPENSE AND SHALL BE COORDINATED WITH CEI ENGINEERING ASSOCIATES, INC. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE RESIDENT ENGINEER OF ANY PRECONSTRUCTION / CONSTRUCTION CONFERENCES AND ANY PUBLIC CONSTRUCTION 24 HOURS PRIOR TO SAID ACTION. 5/19/2020INITIAL DESIGN A. ALL WORK AND MATERIALS SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL REGULATIONS AND CODES AND O.S.H.A. STANDARDS. B. CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF VESTIBULES, SLOPE PAVING, SIDEWALKS, EXIT PORCHES, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. C. ALL UNPAVED DISTURBED AREAS ARE TO RECEIVE FOUR INCHES OF TOPSOIL, SEED, MULCH AND WATER UNTIL A HEALTHY STAND OF GRASS IS ESTABLISHED. D. ALL CURBED RADII ARE TO BE 2 FEET OR 10 FEET UNLESS OTHERWISE NOTED. STRIPED RADII ARE TO BE 5 FEET UNLESS OTHERWISE NOTED. E. ALL DIMENSIONS AND RADII ARE TO THE FACE OF CURB UNLESS OTHERWISE NOTED. F. EXISTING STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE ABANDONED, REMOVED OR RELOCATED AS NECESSARY. ALL COST SHALL BE INCLUDED IN BASE BID. G. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS (UNLESS OTHERWISE NOTED ON PLANS), INCLUDING BUT NOT LIMITED TO, ALL UTILITIES, STORM DRAINAGE, SIGNS, TRAFFIC POLES, ETC. ALL WORK SHALL BE IN ACCORDANCE WITH GOVERNING AUTHORITIES REQUIREMENTS AND PROJECT SITE WORK SPECIFICATIONS AND SHALL BE APPROVED BY SUCH. ALL COST SHALL BE INCLUDED IN BASE BID. H. SITE BOUNDARY, TOPOGRAPHY, UTILITY AND ROAD INFORMATION TAKEN FROM A SURVEY BY A LAND SURVEYOR. I. TOTAL LAND AREA IS 513,662± SQUARE FEET. J. BASED ON AN ONLINE SEARCH OF U.S. FISH AND WILDLIFE SERVICE NATIONAL WETLANDS INVENTORY LOCATED AT www.fws.gov/wetlands/data/mapper.html, THE PROPOSED PROJECT DOES NOT APPEAR TO BE WITHIN A KNOWN WETLAND AREA. K. THE SITE WORK FOR THIS PROJECT SHALL MEET OR EXCEED "THE SITE SPECIFIC SPECIFICATIONS". L. REFER TO ARCHITECTURAL PLANS FOR SITE LIGHTING ELECTRICAL PLAN. M. ALL SAM'S CLUB GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. N. CONTRACTOR SHALL COORDINATE WITH SAM'S CLUB MANAGER FOR POINT OF RELOCATION FOR EXISTING CART CORRALS. O. ISOLATION JOINTS SHALL BE INSTALLED AT ALL FIXED STRUCTURES (BUILDING, RETAINING WALLS/DOCK WALLS, DROP INLETS, MANHOLES, LIGHT POLE BASES, AND BOLLARDS) SEE DETAIL SHEET. P. ANY EXISTING PARKING LOT STRIPING TO REMAIN THAT IS DAMAGED OR REMOVED DURING CONSTRUCTION OPERATIONS SHALL BE RE-PAINTED; FOUR INCH WIDE, TWO COAT, COLOR SHALL MATCH EXISTING STRIPING. Q. REFER TO FINAL UTILITY PLANS FOR EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR STORM DRAINAGE STRUCTURES, UTILITY MAINS AND SERVICE, PROPOSED TOPOGRAPHY, STREET IMPROVEMENTS. R. REFER TO THE SUBDIVISION PLAT AND UTILITY PLANS FOR EXACT LOCATIONS, AREAS AND DIMENSIONS OF ALL EASEMENTS, LOTS, TRACTS, STREETS, WALKS AND OTHER SURVEY INFORMATION. S. THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FINAL PLANS. AMENDMENTS TO THE PLANS MUST BE REVIEWED AND APPROVED BY THE CITY PRIOR TO THE IMPLEMENTATION OF ANY CHANGES TO THE PLANS. T. ALL ROOFTOP AND GROUND MOUNTED MECHANICAL EQUIPMENT MUST BE SCREENED FROM VIEW FROM ADJACENT PROPERTY AND PUBLIC STREETS. IN CASES WHERE BUILDING PARAPETS DO NOT ACCOMPLISH SUFFICIENT SCREENING, THEN FREE-STANDING SCREEN WALLS MATCHING THE PREDOMINANT COLOR OF THE BUILDING SHALL BE CONSTRUCTED. OTHER MINOR EQUIPMENT SUCH AS CONDUIT, METERS AND PLUMBING VENTS SHALL BE SCREENED OR PAINTED TO MACH SURROUNDING BUILDING SURFACES. U. ALL CONSTRUCTION WITH THIS DEVELOPMENT PLAN MUST BE COMPLETED IN ONE PHASE UNLESS A PHASING PLAN IS SHOWN WITH THESE PLANS. V. ALL EXTERIOR LIGHTING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE REQUIREMENTS IN SECTION 3.2.4 OF THE LAND USE CODE AND SHALL USE A CONCEALED, FULLY SHIELDED LIGHT SOURCE WITH SHARP CUT-OFF CAPABILITY SO AS TO MINIMIZE UP-LIGHT, SPILL LIGHT, GLARE AND UNNECESSARY DIFFUSION. W. SIGNAGE AND ADDRESSING AREA NOT PERMITTED WITH THE PLANNING DOCUMENT AND MUST BE APPROVED BY SEPARATE CITY PERMIT PRIOR TO CONSTRUCTION. SIGNS MUST COMPLY WITH CITY SIGN CODE UNLESS A SPECIFIC VARIANCE IS GRANTED BY THE CITY. X. FIRE HYDRANTS MUST MEET OR EXCEED POUDRE FIRE AUTHORITY STANDARDS. ALL BUILDINGS MUST PROVIDE AN APPROVED FIRE EXTINGUISHING SYSTEM. Y. ALL BIKE RACKS PROVIDED MUST BE PERMANENTLY ANCHORED. Z. ALL SIDEWALKS AND RAMPS MUST CONFORM TO CITY STANDARDS. ACCESSIBLE RAMPS MUST BE PROVIDED AT ALL STREET AND DRIVE INTERSECTIONS AND AT ALL DESIGNATED ACCESSIBLE PARKING SPACES. ACCESSIBLE PARKING SPACES MUST SLOPE NO MORE THAN 1:48 IN ANY DIRECTION. ALL ACCESSIBLE ROUTES MUST SLOPE NO MORE THAN 1:20 IN DIRECTION OF TRAVEL AND WITH NO MORE THAN 1:48 CROSS SLOPE. AA. COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN RIGHT OF WAYS, STREET MEDIANS, AND TRAFFIC CIRCLES ADJACENT TO COMMON OPEN SPACE AREAS ARE REQUIRED TO BE MAINTAINED BY THE PROPERTY OWNER OF THE COMMON AREA. THE PROPERTY OWNER IS RESPONSIBLE FOR SNOW REMOVAL ON ALL ADJACENT STREET SIDEWALKS AND SIDEWALKS IN COMMON OPEN SPACE AREAS. AB. DESIGN AND INSTALLATION OF ALL PARKWAY/TREE LAWN AND MEDIAN AREAS IN THE RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH CITY STANDARDS. UNLESS OTHERWISE AGREED TO BY THE CITY WITH THE FINAL PLANS, ALL ONGOING MAINTENANCE OF SUCH AREAS IS THE RESPONSIBILITY OF THE OWNER/DEVELOPER. AC. THE PROPERTY OWNER FOR EACH RESIDENTIAL LOT IS RESPONSIBLE FOR SNOW REMOVAL ON ALL STREET SIDEWALKS ADJACENT TO EACH RESIDENTIAL LOT. AD. PRIVATE CONDITIONS, COVENANTS, AND RESTRICTIONS (CC&R'S), OR ANY OTHER PRIVATE RESTRICTIVE COVENANT IMPOSED ON LANDOWNERS WITHIN THE DEVELOPMENT, MAY NOT BE CREATED OR ENFORCED HAVING THE EFFECT OF PROHIBITING OR LIMITING THE INSTALLATION OF XERISCAPE LANDSCAPING, SOLAR/PHOTO-VOLTAIC COLLECTORS (IF MOUNTED FLUSH UPON ANY ESTABLISHED ROOF LINE), CLOTHES LINES (IF LOCATED IN BACK YARDS), ODOR-CONTROLLED COMPOST BINS, OR WHICH HAVE THE EFFECT OF REQUIRING THAT A PORTION OF ANY INDIVIDUAL LOT BE PLANTED IN TURF GRASS. AE. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. AF. FIRE LANE MARKING: A FIRE LANE MARKING PLAN MUST BE REVIEWED AND APPROVED BY THE FIRE OFFICIAL PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. WHERE REQUIRED BY THE FIRE CODE OFFICIAL, APPROVED SIGNS OR OTHER APPROVED NOTICES THAT INCLUDE THE WORDS NO PARKING FIRE LANE SHALL BE PROVIDED FOR FIRE APPARATUS ACCESS ROADS TO IDENTIFY SUCH ROADS OR PROHIBIT THE OBSTRUCTION THEREOF. THE MEANS BY WHICH FIRE LANES ARE DESIGNATED SHALL BE MAINTAINED IN A CLEAN AND LEGIBLE CONDITION AT ALL TIMES AD BE REPLACED OR REPAIRED WHEN NECESSARY TO PROVIDE ADEQUATE VISIBILITY. AG. PREMISE IDENTIFICATION: AN ADDRESSING PLAN IS REQUIRED TO BE REVIEWED AND APPROVED BY THE CITY AND POUDRE FIRE AUTHORITY PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. UNLESS THE PRIVATE DRIVE IS NAMED, MONUMENT SIGNAGE MAY BE REQUIRED TO ALLOW WAY_FINDING. ALL BUILDINGS SHALL HAVE ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION THAT IS PLAINLY LEGIBLE, VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY, AND POSTED WITH A MINIMUM OF SIX_INCH NUMERALS ON A CONTRASTING BACKGROUND. WHERE ACCESS IS BY MEANS OF A PRIVATE ROAD AND THE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY, A MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE. GENERAL SITE PLAN NOTES: GENERAL DEMOLITION PLAN NOTES: A. CONTRACTOR IS RESPONSIBLE FOR DEMOLITION OF EXISTING STRUCTURES INCLUDING REMOVAL OF ANY EXISTING UTILITIES SERVING THE STRUCTURE. UTILITIES ARE TO BE REMOVED TO THE RIGHT-OF-WAY. B. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. C. ALL CUT OR FILL SLOPES SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE NOTED. D. EXISTING PIPES TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS. E. EXISTING GRADE CONTOUR SHOWN AT 1 FOOT INTERVALS. F. PROPOSED GRADE CONTOUR SHOWN AT 1 FOOT INTERVALS. G. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. H. ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS WATERTIGHT. I. ALL STORM SEWER MANHOLES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT, AND SHALL HAVE TRAFFIC BEARING RING & COVERS. MANHOLES IN UNPAVED AREAS SHALL BE 6" ABOVE FINISH GRADE. LIDS SHALL BE LABELED "STORM SEWER". J. THE CONTRACTOR SHALL ADHERE TO ALL TERMS & CONDITIONS AS OUTLINED IN THE EPA OR APPLICABLE STATE GENERAL N.P.D.E.S. PERMIT FOR STORM WATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES AND THE WALMART SPECIAL CONDITIONS, SECTION 8, ENVIRONMENTAL COMPLIANCE AND STORM WATER POLLUTION PREVENTION. THIS APPLIES TO WALMART BUILT PROJECTS ONLY. K. CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE. L. CONTRACTOR SHALL ASSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS FOR ALL NATURAL AND PAVED AREAS. M. TOPOGRAPHIC INFORMATION IS TAKEN FROM A TOPOGRAPHIC SURVEY BY LAND SURVEYORS. IF THE CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, THEN THE CONTRACTOR SHALL SUPPLY, AT THEIR EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR TO THE OWNER FOR REVIEW. N. ALL UNSURFACED AREAS DISTURBED BY GRADING OPERATION SHALL RECEIVE 4 INCHES OF TOPSOIL. CONTRACTOR SHALL APPLY STABILIZATION FABRIC TO ALL SLOPES 3H:1V OR STEEPER. CONTRACTOR SHALL STABILIZE DISTURBED AREAS IN ACCORDANCE WITH GOVERNING SPECIFICATIONS UNTIL A HEALTHY STAND OF VEGETATION IS OBTAINED. O. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. P. ALL STORM STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR INVERT FROM INVERT IN TO INVERT OUT. Q. PRIOR TO INSTALLATION OF STORM OR SANITARY SEWER, THE CONTRACTOR SHALL EXCAVATE, VERIFY, AND CALCULATE ALL CROSSINGS AND INFORM THE OWNER AND THE ENGINEER OF ANY CONFLICTS PRIOR TO CONSTRUCTION. THE ENGINEER WILL BE HELD HARMLESS IN THE EVENT THE ENGINEER IS NOT NOTIFIED OF DESIGN CONFLICTS. R. CONTRACTOR HAS THE OPTION TO BID THE FOLLOWING MATERIAL FOR THE STORM SEWER SYSTEM EXCEPT WHERE OTHERWISE NOTED: RCP (ASTM C14), TYPE PSM PVC (ASTM D3034), PE CORRUGATED PIPE, ADS N-12 (ASTM D3212), OR STEEL REINFORCED HDPE AS INDICATED ON THIS PLAN WHERE THE WORD PIPE IS USED. ALL PIPES SHALL HAVE A MAXIMUM ROUGHNESS COEFFICIENT ("N") OF 0.013 AND SHALL MEET OR EXCEED THE PIPE MANUFACTURERS REQUIREMENTS FOR MINIMUM AND MAXIMUM COVER. CONTRACTOR SHALL REFER TO THE SITEWORK SPECIFICATION SECTION FOR STORM SEWER SYSTEMS FOR ACCEPTABLE TYPE AND MATERIAL. S. PRECAST STRUCTURES MAY BE USED AT CONTRACTORS OPTION. T. ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED SMOOTH AND 4" OF TOPSOIL APPLIED. IF ADEQUATE TOPSOIL IS NOT AVAILABLE ON SITE, THE CONTRACTOR SHALL PROVIDE TOPSOIL, APPROVED BY THE OWNER, AS NEEDED. THE AREA SHALL THEN BE SEEDED, FERTILIZED, MULCHED, WATERED AND MAINTAINED UNTIL HARDY GRASS GROWTH IS ESTABLISHED IN ALL AREAS (SEE LANDSCAPE PLAN FOR SEED MIX AND PROPER APPLICATION RATE). ANY AREAS DISTURBED FOR ANY REASON PRIOR TO FINAL ACCEPTANCE OF THE PROJECT SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. U. UNLESS OTHERWISE SHOWN, CALLED OUT OR SPECIFIED HEREON OR WITHIN THE SPECIFICATIONS: ALL STORM DRAIN PIPE BEDDING SHALL BE INSTALLED PER ''UTILITY AND STORM DRAIN TRENCH AND BEDDING'' DETAIL SHOWN ON DETAIL SHEETS. ALL STORM DRAIN PIPES ARE MEASURED FROM CENTER OF STRUCTURES AND ENDS OF FLARED END SECTIONS. GENERAL GRADING PLAN NOTES: A. ALL FILL MATERIAL IS TO BE IN PLACE, AND COMPACTED BEFORE INSTALLATION OF PROPOSED UTILITIES. B. CONTRACTOR SHALL NOTIFY THE UTILITY AUTHORITIES INSPECTORS 72 HOURS BEFORE CONNECTING TO ANY EXISTING LINE. C. UNLESS OTHERWISE SHOWN, CALLED OUT OR SPECIFIED HEREON OR WITHIN THE SPECIFICATIONS: ALL WATER LINES 3/4 INCH TO TWO (2) INCHES SHALL BE TYPE K COPPER CONFORMING TO AWWA C800. 1-1/2 INCH AND TWO (2) INCH SERVICES MAY USE HDPE DR 9 PER ASTM D2737 IN LIEU OF TYPE K COPPER. ALL WATER LINES FOUR (4) INCHES AND LARGER SHALL BE PVC AWWA C900 DR-18 CLASS 150 AND AWWA C909 CLASS 200. ALL SANITARY SEWER LINES FOUR (4) INCHES TO 15 INCHES SHALL BE PVC, ASTM D3034, TYPE PSM, SDR 35. ALL WATER AND SEWER LINES SHALL HAVE A MINIMUM FOUR (4) FEET COVER. D. MINIMUM TRENCH WIDTH SHALL BE TWO (2) FEET. E. ALL WATER JOINTS FOUR (4) INCHES AND LARGER ARE TO BE MECHANICAL JOINTS WITH THRUST BLOCKING AS CALLED OUT IN SPECIFICATIONS. F. ALL UTILITIES SHOULD BE KEPT TEN (10') APART (PARALLEL) OR WHEN CROSSING 18" VERTICAL CLEARANCE (OUTSIDE EDGE OF PIPE TO OUTSIDE EDGE OF PIPE). G. CONTRACTOR SHALL MAINTAIN A MINIMUM COVER ON ALL WATERLINES. H. IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATER LINES, SANITARY LINES, STORM LINES AND GAS LINES (EXISTING AND PROPOSED), THE SANITARY LINE SHALL BE DUCTILE IRON PIPE WITH MECHANICAL JOINTS AT LEAST 10 FEET ON BOTH SIDES OF CROSSING, THE WATER LINE SHALL HAVE MECHANICAL JOINTS WITH APPROPRIATE THRUST BLOCKING AS REQUIRED TO PROVIDE A MINIMUM OF 18" CLEARANCE. MEETING REQUIREMENTS OF ANSI A21.10 OR ANSI 21.11 (AWWA C-151) (CLASS 50). I. LINES UNDERGROUND SHALL BE INSTALLED, INSPECTED AND APPROVED BEFORE BACKFILLING. J. TOPS OF EXISTING MANHOLES SHALL BE RAISED AS NECESSARY TO BE FLUSH WITH PROPOSED PAVEMENT ELEVATIONS, AND TO BE ONE FOOT ABOVE FINISHED GROUND ELEVATIONS WITH WATER TIGHT LIDS. K. ALL CONCRETE FOR ENCASEMENTS SHALL HAVE A MINIMUM 28 DAY COMPRESSION STRENGTH AT 3000 P.S.I. L. EXISTING UTILITIES SHALL BE VERIFIED IN FIELD PRIOR TO INSTALLATION OF ANY NEW LINES. M. REFER TO INTERIOR PLUMBING DRAWINGS FOR TIE-IN OF ALL UTILITIES. N. CONTRACTOR IS RESPONSIBLE FOR COMPLYING TO THE SPECIFICATIONS OF THE LOCAL AUTHORITIES (ANY CITY) WITH REGARDS TO MATERIALS AND INSTALLATION OF THE WATER AND SEWER LINES. O. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. P. CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES. THIS AND THE FINAL CONNECTIONS OF THE SERVICE SHALL BE COMPLETED 30 DAYS PRIOR TO STORE POSSESSION. Q. CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS. R. REFER TO BUILDING PLANS FOR SITE LIGHTING ELECTRICAL PLAN. S. CONTRACTOR SHALL COORDINATE ANY DISRUPTIONS TO EXISTING UTILITY SERVICES WITH ADJACENT PROPERTY OWNERS. T. ALL UTILITY DISCONNECTIONS SHALL BE COORDINATED WITH THE DESIGNATED UTILITY COMPANIES. U. CONSTRUCTION SHALL NOT START ON ANY PUBLIC UTILITY SYSTEM UNTIL WRITTEN APPROVAL HAS BEEN RECEIVED BY THE ENGINEER FROM THE APPROPRIATE GOVERNING AUTHORITY AND CONTRACTOR HAS BEEN NOTIFIED BY THE ENGINEER. V. PRIOR TO THE CONSTRUCTION OF OR CONNECTION TO ANY STORM DRAIN, SANITARY SEWER, WATER MAIN OR ANY OF THE DRY UTILITIES, THE CONTRACTOR SHALL EXCAVATE, VERIFY AND CALCULATE ALL POINTS OF CONNECTION AND ALL UTILITY CROSSINGS AND INFORM CEI ENGINEERING AND THE OWNER/DEVELOPER OF ANY CONFLICT OR REQUIRED DEVIATIONS FROM THE PLAN. NOTIFICATION SHALL BE MADE A MINIMUM OF 48 HOURS PRIOR TO CONSTRUCTION. CEI ENGINEERING AND ITS CLIENTS SHALL BE HELD HARMLESS IN THE EVENT THAT THE CONTRACTOR FAILS TO MAKE SUCH NOTIFICATION. W. UNLESS OTHERWISE SHOWN, CALLED OUT OR SPECIFIED HEREON OR WITHIN SPECIFICATIONS: ALL WATER LINE PIPE AND SANITARY SEWER PIPE SHALL BE INSTALLED PER ''UTILITY AND STORM DRAIN TRENCH AND BEDDING'' DETAIL SHOWN ON DETAIL SHEETS. GENERAL UTILITY PLAN NOTES: A. THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION, REMOVAL, AND DISPOSAL (IN A LOCATION APPROVED BY ALL GOVERNING AUTHORITIES) ALL STRUCTURES, PADS, WALLS, FLUMES, FOUNDATIONS, PARKING, DRIVES, DRAINAGE, STRUCTURES, UTILITIES, ETC., SUCH THAT THE IMPROVEMENTS SHOWN ON THE REMAINING PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL MATERIAL PER THE SPECIFICATIONS. B. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROM THE SITE AND DISPOSING THE DEBRIS IN A LAWFUL MANNER. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL. C. THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVAL AND/OR RELOCATION OF UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY CONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITY COMPANY'S FORCES AND ANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR SERVICES. THE CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES. D. ALL EXISTING SEWERS, PIPING AND UTILITIES SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT LOCATION, OR AS THE ONLY OBSTACLES THAT MAY OCCUR ON THE SITE. VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANY ANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY COMPANIES REGARDING DESTRUCTION AND REMOVAL OF ALL SERVICE LINES AND CAP ALL LINES BEFORE PROCEEDING WITH THE WORK. UTILITIES DETERMINED TO BE ABANDONED AND LEFT IN PLACE SHALL BE GROUTED IF UNDER BUILDING. E. ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC CABLE AND/OR GAS LINES NEEDING TO BE REMOVED OR RELOCATED SHALL BE COORDINATED WITH THE AFFECTED UTILITY COMPANY. ADEQUATE TIME SHALL BE PROVIDED FOR RELOCATION AND CLOSE COORDINATION WITH THE UTILITY COMPANY IS NECESSARY TO PROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE. CONTRACTOR SHALL PAY CLOSE ATTENTION TO EXISTING UTILITIES WITHIN THE ANY ROAD RIGHT OF WAY DURING CONSTRUCTION. F. CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES, ENCLOSURES, ETC., (AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES) AS APPROVED BY CONSTRUCTION MANAGER. G. CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING PROPERTIES AT ALL TIMES DURING DEMOLITION OF THE EXISTING FACILITIES. H. PRIOR TO DEMOLITION OCCURRING, ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED. I. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. J. THE GENERAL CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. THE CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT. K. ENGINEER'S NOTICE TO CONTRACTOR: THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANY AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. A. CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS REQUIRED BY THIS EROSION AND SEDIMENT CONTROL PLAN. ADDITIONAL BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST OF OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION. B. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY PERMITTING AGENCY OR OWNER. C. SITE MAP MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR REGULATED WETLANDS MUST BE MAINTAINED ON SITE AT ALL TIMES. D. CONTRACTOR TO LIMIT DISTURBANCE OF SITE IN STRICT ACCORDANCE WITH EROSION CONTROL SEQUENCING SHOWN ON THIS PLAN, OR AS REQUIRED BY THE APPLICABLE GENERAL PERMIT. NO UNNECESSARY OR IMPROPERLY SEQUENCED CLEARING AND/OR GRADING SHALL BE PERMITTED. E. GENERAL CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FACILITIES. CONTRACTOR SHALL CONSTRUCT TEMPORARY BERM ON DOWNSTREAM SIDES. F. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) SHALL BE DETAINED AND PROPERLY TREATED OR DISPOSED. G. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS. H. DUST ON THE SITE SHALL BE MINIMIZED. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED. I. RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS SHALL BE DEPOSITED INTO SEALED CONTAINERS. MATERIALS SHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE ACTION OF WIND OR STORMWATER DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE. J. ALL DENUDED/BARE AREAS THAT WILL BE INACTIVE FOR 14 DAYS OR MORE, MUST BE STABILIZED IMMEDIATELY UPON COMPLETION OF MOST RECENT GRADING ACTIVITY, WITH THE USE OF FAST-GERMINATING ANNUAL GRASS/GRAIN VARIETIES, STRAW/HAY MULCH, WOOD CELLULOSE FIBERS, TACKIFIERS, NETTING OR BLANKETS. K. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY STABILIZED AS SHOWN ON THE PLANS. THESE AREAS SHALL BE SEEDED, SODDED, AND/OR VEGETATED IMMEDIATELY, AND NO LATER THAN 14 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY OCCURRING IN THESE AREAS. REFER TO THE GRADING PLAN AND/OR LANDSCAPE PLAN. L. IF THE ACTION OF VEHICLES TRAVELING OVER THE GRAVEL CONSTRUCTION ENTRANCES IS NOT SUFFICIENT TO PREVENT TRACKING OF DIRT, DUST OR MUD, THEN THE TIRES MUST BE WASHED BEFORE THE VEHICLES ENTER A PUBLIC ROAD. PROVISIONS MUST BE MADE TO INTERCEPT THE WASH WATER AND TRAP THE SEDIMENT BEFORE IT IS CARRIED OFF THE SITE. ONLY USE INGRESS/EGRESS LOCATIONS AS PROVIDED. M. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. N. CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT IN THE DETENTION POND AND ANY SEDIMENT THAT MAY HAVE COLLECTED IN THE STORM SEWER DRAINAGE SYSTEMS IN CONJUNCTION WITH THE STABILIZATION OF THE SITE. O. ON-SITE AND OFFSITE SOIL STOCKPILE AND BORROW AREAS SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION OF BEST MANAGEMENT PRACTICES. STOCKPILE AND BORROW AREA LOCATIONS SHALL BE NOTED ON THE SITE MAP AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS. P. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION. Q. DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION AND SEDIMENT CONTROL MEASURES (SILT FENCES, ETC.) TO PREVENT EROSION AND POLLUTANT DISCHARGE R. GENERAL CONTRACTOR IS TO DESIGNATE/IDENTIFY AREAS ON THE SITE MAPS, INSIDE OF THE LIMITS OF DISTURBANCE, FOR WASTE DISPOSAL AND DELIVERY AND MATERIAL STORAGE. CONTROL NOTES: GENERAL EROSION & SEDIMENT PROJECT ADDRESS: 4700 BOARDWALK DRIVE, FT. COLLINS, CO 80525 PROJECT DESCRIPTION: CONSTRUCTION OF A FREE STANDING FUEL STATION WITHIN THE EXISTING SAM'S CLUB PARKING LOT EXITING ZONING: HARMONY CORRIDOR DISTRICT (H-C) PROPOSED ZONING: N/A TOTAL PARCEL SIZE (SAM'S CLUB): 11.95± AC / 520,532± SF (AS SHOWN ON PLAT OF HARMONY MARKET P.U.D.) TOTAL PROJECT SIZE (FUEL STATION): TBD MAXIMUM BUILDING HEIGHT: 21'-6'' (CANOPY) 11'-6'' (KIOSK) 30'-0''± (EXISTING SAM'S CLUB) TOTAL FLOOR AREA: 130,383± SF (PRE-CONSTRUCTION) 130,583± SF (POST-CONSTRUCTION) TOTAL FLOOR AREA RATIO: 25.38% (PRE-CONSTRUCTION) 25.42% (POST-CONSTRUCTION) TOTAL PRE-CONSTRUCTION PARKING: 557 (4.27 / 1,000) MINIMUM & MAXIMUM REQUIRED: 261 MIN (2 / 1,000) - 522 MAX (4 / 1,000) STANDARD: 539 SPACES COMPACT: N/A ACCESSIBLE: 12 SPACES (12 REQUIRED - 2% OF TOTAL) MOTORCYCLE: N/A BICYCLE (ENCLOSED): UNKNOWN BICYCLE (FIXED): 8 (33 REQUIRED - 1 / 4,000) TOTAL POST-CONSTRUCTION PARKING: 484 (3.71 / 1,000) MINIMUM & MAXIMUM REQUIRED: 261 MIN (2 /1,000) - 522 MAX (4 / 1,000) STANDARD: 471 COMPACT: N/A ACCESSIBLE: 13 (9 REQUIRED) MOTORCYCLE: N/A BICYCLE (ENCLOSED): UNKNOWN BICYCLE (FIXED): 10 (33 REQUIRED FOR PROJECT - 1 / 4,000) SITE PLAN NOTES: 1. REFER TO FINAL UTILITY PLANS FOR EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR STORM DRAINAGE STRUCTURES, UTILITY MAINS AND SERVICES, PROPOSED TOPOGRAPHY, STREET IMPROVEMENTS. 2. REFER TO THE SUBDIVISION PLAT AND UTILITY PLANS FOR EXACT LOCATIONS, AREAS AND DIMENSIONS OF ALL EASEMENTS, LOTS, TRACTS, STREETS, WALKS AND OTHER SURVEY INFORMATION. 3. THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FINAL PLANS. AMENDMENTS TO THE PLANS MUST BE REVIEWED AND APPROVED BY THE CITY PRIOR TO THE IMPLEMENTATION OF ANY CHANGES TO THE PLANS. 4. ALL ROOFTOP AND GROUND MOUNTED MECHANICAL EQUIPMENT MUST BE SCREENED FROM VIEW FROM ADJACENT PROPERTY AND PUBLIC STREETS. IN CASES WHERE BUILDING PARAPETS DO NOT ACCOMPLISH SUFFICIENT SCREENING, THEN FREE-STANDING SCREEN WALLS MATCHING THE PREDOMINANT COLOR OF THE BUILDING SHALL BE CONSTRUCTED. OTHER MINOR EQUIPMENT SUCH AS CONDUIT, METERS AND PLUMBING VENTS SHALL BE SCREENED OR PAINTED TO MATCH SURROUNDING BUILDING SURFACES. 5. ALL CONSTRUCTION WITH THIS DEVELOPMENT PLAN MUST BE COMPLETED IN ONE PHASE UNLESS A PHASING PLAN IS SHOWN WITH THESE PLANS. 6. [IF APPLICABLE -- INCLUDE LANGUAGE FOR ANY MODIFICATIONS AND CONDITIONS APPROVED WITH PDP/ODP]. 7. [IF APPLICABLE] ALL SINGLE FAMILY DETACHED HOMES SHALL MEET OR EXCEED THE GARAGE DOOR STANDARDS AS OUTLINED IN 3.5.2(E) OF THE LAND USE CODE. 8. [IF APPLICABLE] A MINIMUM OF (NUMBER TBD) HOUSING MODELS FOR THE SINGLE FAMILY HOMES SHALL BE REQUIRED. THESE HOUSING MODELS SHALL MEET OR EXCEED THE STANDARDS AS OUTLINED IN 3.5.2(C) OF THE LAND USE CODE. 9. ALL EXTERIOR LIGHTING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE REQUIREMENTS IN SECTION 3.2.4 OF THE LAND USE CODE AND SHALL USE A CONCEALED, FULLY SHIELDED LIGHT SOURCE WITH SHARP CUT-OFF CAPABILITY SO AS TO MINIMIZE UP-LIGHT, SPILL LIGHT, GLARE AND UNNECESSARY DIFFUSION. 10. SIGNAGE AND ADDRESSING ARE NOT PERMITTED WITH THIS PLANNING DOCUMENT AND MUST BE APPROVED BY SEPARATE CITY PERMIT PRIOR TO CONSTRUCTION. SIGNS MUST COMPLY WITH CITY SIGN CODE UNLESS A SPECIFIC VARIANCE IS GRANTED BY THE CITY. 11. FIRE HYDRANTS MUST MEET OR EXCEED POUDRE FIRE AUTHORITY STANDARDS. ALL BUILDINGS MUST PROVIDE AN APPROVED FIRE EXTINGUISHING SYSTEM. 12. ALL BIKE RACKS PROVIDED MUST BE PERMANENTLY ANCHORED. 13. ALL SIDEWALKS AND RAMPS MUST CONFORM TO CITY STANDARDS. ACCESSIBLE RAMPS MUST BE PROVIDED AT ALL STREET AND DRIVE INTERSECTIONS AND AT ALL DESIGNATED ACCESSIBLE PARKING SPACES. ACCESSIBLE PARKING SPACES MUST SLOPE NO MORE THAN 1:48 IN ANY DIRECTION. ALL ACCESSIBLE ROUTES MUST SLOPE NO MORE THAN 1:20 IN DIRECTION OF TRAVEL AND WITH NO MORE THAN 1:48 CROSS SLOPE. 14. COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN RIGHT OF WAYS, STREET MEDIANS, AND TRAFFIC CIRCLES ADJACENT TO COMMON OPEN SPACE AREAS ARE REQUIRED TO BE MAINTAINED BY THE PROPERTY OWNER OF THE COMMON AREA. THE PROPERTY OWNER IS RESPONSIBLE FOR SNOW REMOVAL ON ALL ADJACENT STREET SIDEWALKS AND SIDEWALKS IN COMMON OPEN SPACE AREAS. 15. DESIGN AND INSTALLATION OF ALL PARKWAY/TREE LAWN AND MEDIAN AREAS IN THE RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH CITY STANDARDS. UNLESS OTHERWISE AGREED TO BY THE CITY WITH THE FINAL PLANS, ALL ONGOING MAINTENANCE OF SUCH AREAS IS THE RESPONSIBILITY OF THE OWNER/DEVELOPER. 16. THE PROPERTY OWNER FOR EACH RESIDENTIAL LOT IS RESPONSIBLE FOR SNOW REMOVAL ON ALL STREET SIDEWALKS ADJACENT TO EACH RESIDENTIAL LOT. 17. PRIVATE CONDITIONS, COVENANTS, AND RESTRICTIONS (CC&R'S), OR ANY OTHER PRIVATE RESTRICTIVE COVENANT IMPOSED ON LANDOWNERS WITHIN THE DEVELOPMENT, MAY NOT BE CREATED OR ENFORCED HAVING THE EFFECT OF PROHIBITING OR LIMITING THE INSTALLATION OF XERISCAPE LANDSCAPING, SOLAR/PHOTO-VOLTAIC COLLECTORS (IF MOUNTED FLUSH UPON ANY ESTABLISHED ROOF LINE), CLOTHES LINES (IF LOCATED IN BACK YARDS), ODOR-CONTROLLED COMPOST BINS, OR WHICH HAVE THE EFFECT OF REQUIRING THAT A PORTION OF ANY INDIVIDUAL LOT BE PLANTED IN TURF GRASS. 18. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 19. FIRE LANE MARKING: A FIRE LANE MARKING PLAN MUST BE REVIEWED AND APPROVED BY THE FIRE OFFICIAL PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. WHERE REQUIRED BY THE FIRE CODE OFFICIAL, APPROVED SIGNS OR OTHER APPROVED NOTICES THAT INCLUDE THE WORDS NO PARKING FIRE LANE SHALL BE PROVIDED FOR FIRE APPARATUS ACCESS ROADS TO IDENTIFY SUCH ROADS OR PROHIBIT THE OBSTRUCTION THEREOF. THE MEANS BY WHICH FIRE LANES ARE DESIGNATED SHALL BE MAINTAINED IN A CLEAN AND LEGIBLE CONDITION AT ALL TIMES AD BE REPLACED OR REPAIRED WHEN NECESSARY TO PROVIDE ADEQUATE VISIBILITY. 20. ALL PUBLIC SIDEWALK, DRIVEWAYS AND RAMPS EXISTING OR PROPOSED ADJACENT OR WITHIN THE SITE NEED TO MEET ADA STANDARDS, IF THEY CURRENTLY DO NOT, THEY WILL NEED TO BE RECONSTRUCTED SO THAT THEY DO MEET CURRENT ADA STANDARDS AS A PART OF THIS PROJECT. PREMISE IDENTIFICATION: AN ADDRESSING PLAN IS REQUIRED TO BE REVIEWED AND APPROVED BY THE CITY AND POUDRE FIRE AUTHORITY PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. UNLESS THE PRIVATE DRIVE IS NAMED, MONUMENT SIGNAGE MAY BE REQUIRED TO ALLOW WAY_FINDING. ALL BUILDINGS SHALL HAVE ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION THAT IS PLAINLY LEGIBLE, VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY, AND POSTED WITH A MINIMUM OF SIX_INCH NUMERALS ON A CONTRASTING BACKGROUND. WHERE ACCESS IS BY MEANS OF A PRIVATE ROAD AND THE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY, A MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE. NOTICE TO BIDDERS: WETLANDS INFORMATION: BASED ON AN ONLINE SEARCH OF U.S. FISH AND WILDLIFE SERVICE NATIONAL WETLANDS INVENTORY LOCATED AT www.fws.gov/wetlands/data/mapper.html, THE PROPOSED PROJECT DOES NOT APPEAR TO BE WITHIN A KNOWN WETLAND AREA. ALL QUESTIONS REGARDING THE PREPARATION OF THE GENERAL CONTRACTOR'S BID SHALL BE DIRECTED TO THE OWNER'S CONSTRUCTION DEPARTMENT VIA ON-LINE BID QUESTION TOOL. SUBCONTRACTORS MUST DIRECT THEIR QUESTIONS THROUGH THE GENERAL CONTRACTOR. THE CONSULTING ARCHITECT AND/OR THE CONSULTING ENGINEER SHALL NOT BE CONTACTED DIRECTLY WITHOUT PRIOR AUTHORIZATION FROM THE OWNER/DEVELOPER. CITY OF FORT COLLINS, CO NOTES: SHEET INDEX SHEET NUMBER SHEET TITLE C1 COVER SHEET C2 GENERAL NOTES C3 DEMO PLAN C4 OVERALL SITE PLAN C4.1 FIRE DEPT ACCESS PLAN C5 SITE PLAN C6 GRADING PLAN C7 DRAINAGE PLAN C7.1 DRAINAGE MAP EXHIBIT C7.2 EXISTING IMPERVIOUS MAP C7.3 PROPOSED IMPERVIOUS MAP C8 UTILITY PLAN C9 DETAIL SHEET C10 DETAIL SHEET C11 DETAIL SHEET C12 DETAIL SHEET L1 LANDSCAPE PLAN L2 LANDSCAPE HYDROZONES L3 IRRIGATION PLAN SW0 SWPPP NOTES SW1 SWPPP IMPLEMENTATION SEQUENCE AND LIMITS OF WORK SW2 PHASE 1 EROSION AND SEDIMENT SW3 PHASE 2 EROSION AND SEDIMENT SW4 SWPPP INFORMATION SUMMARIES SW5 SWPPP DETAIL 1 SW6 SWPPP DETAIL 2 SW7 SWPPP DETAIL 3 APP-C PHOTOMETRIC PLAN APP-D PHOTOMETRIC PLAN 1 OF 2 TOPOGRAPHIC SURVEY PLAT 2 OF 2 TOPOGRAPHIC SURVEY PLAT Vicinity Map VICINITY MAP LEGEND: SCALE: 1 INCH = 1,000 FEET SCHOOLS / COLLEGES S1 COLORADO EARLY COLLEGES HIGH SCHOOL S2 KRUSE ELEMENTARY SCHOOL S3 COLORADO EARLY COLLEGES MIDDLE SCHOOL S4 FRONT RANGE ACADEMY PRIVATE SCHOOL S5 THE LEARNING EXPERIENCE PRESCHOOL S6 ACADEMY OF ARTS AND KNOWLEDGE PRESCHOOL S7 WERNER ELEMENTARY SCHOOL ZONING DISTRICTS GC GENERAL COMMERCIAL DISTRICT HC HARMONY CORRIDOR DISTRICT LDMN LOW DENSITY MIXED-USE NEIGHBORHOOD DISTRICT LDR LOW DENSITY RESIDENTIAL DISTRICT MDMN MEDIUM DENSITY MIXED-USE NEIGHBORHOOD DISTRICT POL PUBLIC OPEN LANDS DISTRICT SC SERVICE COMMERCIAL DISTRICT UE URBAN ESTATES DISTRICT SITE LOCATION BOUNDARY ZONING DISTRICT BOUNDARY STREET CENTERLINE WATER BODY NATURAL AREA PARK THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED FOR ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. INDEMNIFICATION STATEMENT: FLOOD ZONE INFORMATION: FLOOD ZONE CLASSIFICATION: ZONE X (AREA OF MINIMAL FLOOD HAZARD) FLOOD INSURANCE RATE MAP: 08069C1000F, DATED DEC. 19, 2006 (NOT PRINTED) REVISIONS NO. DATE DESCRIPTION 5/19/2020 INITIAL DESIGN LOT 1, HARMONY MARKET P.U.D., FIRST FILING, IN THE CITY OF FORT COLLINS, ACCORDING TO THE RECORDED PLAT THEREOF, COUNTY OF LARIMER, STATE OF COLORADO. ALSO KNOWN AS: A TRACT OF LAND LOCATED IN THE NORTHEAST QUARTER OF SECTION 1, TOWNSHIP 6 NORTH, RANGE 69 WEST OF THE 6TH P.N., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: CONSIDERING THE EAST LINE OF THE NORTHEAST QUARTER OF SAID SECTION 1 AS BEARING, SOUTH 0°10'00” WEST, FROM A FOUND NUMBER FOUR REBAR WITH YELLOW CAP AT THE NORTHEAST CORNER, TO A FOUND REBAR IN A VALVE BOX AT THE EAST QUARTER CORNER OF SAID SECTION 1 AND WITH ALL BEARINGS CONTAINED HEREIN RELATIVE THERETO: COMMENCING AT THE NORTHEAST CORNER OF SAID SECTION 1; THENCE ALONG SAID EAST LINE, SOUTH 0°10'10” WEST, 49.94 FEET; THENCE, NORTH 89°50'00” WEST, 63.00 FEET TO A POINT ON THE SOUTHERLY RIGHT-OF-WAY LINE OF COLORADO STATE HIGHWAY NO. 68; THENCE ALONG SAID RIGHT-OF-WAY, NORTH 46°21'21” WEST, 24.52 FEET; THENCE, SOUTH 89°45'15” WEST, 921.30 FEET; THENCE, SOUTH 89°55'30” WEST, 600.00 FEET; THENCE SOUTH 83°39'00” WEST, 402.76 FEET, THENCE DEPARTING SAID RIGHT-OF-WAY, SOUTH 0°11'05” WEST, 363.38 FEET TO A POINT ON A CURVE CONCAVE TO THE EAST, HAVING A CENTRAL ANGLE OF 1°12'48”, A RADIUS OF 566.00 FEET AND THE CHORD OF WHICH BEARS SOUTH 0°25'19” EAST, 11.99 FEET; THENCE ALONG THE ARC OF SAID CURVE 11.99 FEET TO THE POINT OF BEGINNING; THENCE, NORTH 80°29'24” EAST, 119.64 FEET TO A POINT ON A CURVE CONCAVE TO THE NORTHWEST, HAVING A CENTRAL ANGLE OF 45°41'15”, A RADIUS OF 100.00 FEET AND THE CHORD OF WHICH BEARS, NORTH 57°38'46” EAST 77.64 FEET; THENCE ALONG ARC OF SAID CURVE 79.74 FEET; THENCE, NORTH 34°48'09” EAST, 118.16 FEET TO A POINT ON A CURVE CONCAVE TO THE SOUTHEAST, HAVING A CENTRAL ANGLE OF 54°36'22”, A RADIUS OF 100.00 FEET AND THE CHORD OF WHICH BEARS NORTH 62°06'20” EAST, 91.74 FEET; THENCE ALONG THE ARC OF SAID CURVE 95.31 FEET; THENCE, NORTH 89°24'31” EAST, 263.86 FEET; THENCE, SOUTH 0°00'00” WEST, 714.30 FEET; THENCE, SOUTH 90°00'00” EAST, 117.28 FEET, THENCE SOUTH 0°00'00” EAST, 308.47 FEET TO A POINT ON A CURVE CONCAVE TO THE NORTH, HAVING A CENTRAL ANGLE OF 20°28'22”, A RADIUS OF 576.00 FEET AND THE CHORD OF WHICH BEARS NORTH 78°44'31” WEST, 204.72 FEET; THENCE ALONG THE ARC OF SAID CURVE 205.82 FEET; THENCE, NORTH 68°30'20” WEST, 150.28 FEET TO A POINT ON A CURVE CONCAVE TO THE SOUTH, HAVING A CENTRAL ANGLE OF 19°42'15”, A RADIUS OF 644.00 FEET AND THE CHORD OF WHICH BEARS NORTH 78°21'28” WEST, 220.38 FEET; THENCE ALONG THE ARC OF SAID CURVE 221.47 FEET; THENCE NORTH 88°12'35” WEST, 107.00 FEET TO A POINT ON A CURVE CONCAVE TO THE NORTHEAST, HAVING A CENTRAL ANGLE OF 90°00'00”, A RADIUS OF 11.00 FEET AND THE CHORD OF WHICH BEARS, NORTH 43°12'35” WEST, 15.56 FEET; THENCE ALONG THE ARC OF SAID CURVE 17.28 FEET; THENCE, NORTH 1°47'25” EAST, 255.44 FEET TO A POINT ON A CURVE CONCAVE TO THE WEST, HAVING A CENTRAL ANGLE OF 10°37'46”, A RADIUS OF 644.00 FEET AND THE CHORD OF WHICH BEARS, NORTH 3°31'28” WEST, 119.30 feet; THENCE ALONG THE ARC OF SAID CURVE 119.47 FEET; THENCE, NORTH 8°50'22” WEST, 215.96 FEET TO A POINT ON A CURVE CONCAVE TO THE EAST, HAVING A CENTRAL ANGLE OF 7°48'39”, A RADIUS OF 566.00 FEET AND THE CHORD OF WHICH BEARS, NORTH 4°56'02” WEST, 77.10 FEET; THENCE ALONG THE ARC OF SAID CURVE 77.16 FEET; TO THE POINT OF BEGINNING. LEGAL DESCRIPTION: CITY OF FORT COLLINS, COLORADO APPROVALS APPROVED: CITY ENGINEER DATE CHECKED BY: WATER & WASTEWATER UTILITY DATE CHECKED BY: STORM WATER UTILITY DATE CHECKED BY: PARKS & RECREATION DATE CHECKED BY: TRAFFIC ENGINEER DATE CHECKED BY: DATE