Loading...
HomeMy WebLinkAboutWATERGLEN SOLAR ARRAY - FDP200013 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTSFort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6689 970.224.6134 - fax rcgov. com/developmentreview August 14, 2020 Ian Skor Sandbox Solar 430 N College Ave. #441 Fort Collins, CO 80524 RE: Waterglen Solar Array, FDP200013, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of Waterglen Solar Array. If you have questions about any comments, you may contact the individual commenter or direct your questions through your Development Review Coordinator, Brandy Bethurem Harras via phone at 970-416-2744 or via email at bbethuremharras@fcgov.com. Comment Summary: Department: Planning Services Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com Topic: General Comment Number: 1 08/10/2020 FOR FINAL: Comment Originated: 08/10/2020 There are several clean-up items for the Landscape Plan & Site Plan, they are: 1. Identifying areas outside the platted are and adding a note describing whose responsibility it will be to maintain, irrigate, replace, etc... Note added to site plan per comment. 2. Note for entryway (see site plan) Note added to site and utility plans per comment. 3. Clean-up on elevation sheet. I believe this might be a misinterpretation of NEC110-26. I've updated labels on the elevation sheet to to properly label and identify on plans- Ian Skor Department: Engineering Development Review Contact: Morgan Stroud, 970-416-4344, mstroud@fcgov.com Page 1 of 5 Topic: General Comment Number: 1 Comment Originated: 08/11/2020 08/11/2020: Development Agreement: Please fill out the information for Development Agreement form and return it to me. Once all contributing departments have their comments resolved, we will be able to draft a Development Agreement. We aim to have the draft completed and into the City Attorney's Office by the time the applicant receives the second round of FDP comments, but this is dependent on resolving comments from contributing departments./ Development Agreement was sent to Morgan on 8/12/20- Ian Skor Department: Environmental Planning Contact: Kelly Smith, , ksmith@fcgov.com Topic: General Comment Number: 1 08/10/2020: FOR APPROVAL Comment Originated: 08/10/2020 Please clearly indicate the all Limits of Development (grading, staging equipment, etc.) on all plans to ensure no disturbance within NHBZs. The limits have been added to the landscape, utility, and site plans. Department: Forestry Contact: Nils Saha, , nsaha@fcgov.com Topic: General Comment Number: 1 08/10/2020: FOR APPROVAL Comment Originated: 08/10/2020 The fence is proposed -3' from tree #6 (6-10" cottonwood). To protect the critical root zone and the canopy, the fence should be placed at least 6' from the trunk. However, given the limitations (i.e. property line and fencing requirements), Forestry asks that following be noted: • Please adjust the placement of the fence posts outside of the interior critical root zone of the tree. • It may be necessary to raise the canopy prior to fence installation to ensure the branches are not damaged in the process. • Forestry will require a site visit prior to fence installation to evaluate tree condition, determine if pruning is required and discuss fence post placement around existing trees. Please add the following note to the utility, landscape, and construction plans: "Please schedule a site visit with Forestry prior to fence installation to determine if pruning is required and to discuss placement of fence posts around existing trees." The note has been added to the landscape plans refer to note 13 on sheet LP101. Page 2 of 5 Department: PFA Contact: Jim Lynxwiler, 970-416-2869, Llynxwiler@poudre-fire.org Topic: General Comment Number: 1 Comment Originated: 08/07/2020 08/07/2020: ADDRESS POSTING In earlier discussions, I believe an address location sign was indicated on the plan but I couldn't find that in this revision. Please add it to plans, unless I overlooked it. Thank you. The address sign location was added to the utility plans. Department: Building Code Review Contact: Russell Hovland, 970-416-2341, rhoviand@fc-gov.com Topic: Building Insp Plan Review Comment Number: 1 Comment Originated: 08/10/2020 08/10/2020: These solar arrays should maintain a 10ft min distance to property line and 20ft between each array to avoid special construction requirements in the IBC. A building permit is required, and the arrays must meet our wind and snow loads. An engineered electrical one -line diagram is required in the construction documents. Solar is 10' from property and confirmed with Russ that the project is F-1 at II-B and will not require 20ft between each array. - US Department: Technical Services Contact: Jeff County, 970-221-6588, icounty@fcgov.com Topic: Construction Drawings Comment Number: 2 08/10/2020: FOR FINAL APPROVAL: Please revise the sub -title as marked. See redlines. Revised per comment. Topic: General Comment Number: 3 08/10/2020: FOR FINAL APPROVAL: Comment Originated: 08/10/2020 Comment Originated: 08/10/2020 Please provide the following information for the Benchmark Statement in the EXACT format shown below. PROJECT DATUM: NAVD88 BENCHMARK # w/ DESCRIPTION Page 3 of 5 ELEVATION: BENCHMARK # w/ DESCRIPTION ELEVATION: PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 DATUM - X.XX'. Revised per comment. Comment Number: 4 08/10/2020: FOR FINAL APPROVAL: There are line over text issues. See redlines. Revised per comment. Topic: Plat Comment Number: 1 08/10/2020: FOR FINAL APPROVAL: Comment Originated: 08/10/2020 Comment Originated: 08/10/2020 Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on reclined sheets and/or in response letter. Revised per comment and redlines. Department: Stormwater Engineering — Erosion and Sediment Control Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 08/03/2020 08/03/2020: Plans and Escrow were found acceptable to meet Criteria. Resolved Comments from PDP. Acknowledged. Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com Topic: General Comment Number: 2 Comment Originated: 08/07/2020 Page 4 of 5 08/07/2020: No comments. Acknowledged. Page 5 of 5