August 14, 2020
Ian Skor
Sandbox Solar
430 N College Ave. #441
Fort Collins, CO 80524
RE: Waterglen Solar Array, FDP200013, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Waterglen Solar Array. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Brandy Bethurem Harras via phone at 970-416-2744 or
via email at bbethuremharras@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com
Topic: General
Comment Number: 1
08/10/2020 FOR FINAL:
Comment Originated: 08/10/2020
There are several clean-up items for the Landscape Plan & Site Plan, they are:
1. Identifying areas outside the platted are and adding a note describing whose
responsibility it will be to maintain, irrigate, replace, etc...
Note added to site plan per comment.
2. Note for entryway (see site plan)
Note added to site and utility plans per comment.
3. Clean-up on elevation sheet.
I believe this might be a misinterpretation of NEC110-26. I've updated labels on the elevation sheet to
to properly label and identify on plans- Ian Skor
Department: Engineering Development Review
Contact: Morgan Stroud, 970-416-4344, mstroud@fcgov.com
Page 1 of 5
Topic: General
Comment Number: 1 Comment Originated: 08/11/2020
08/11/2020: Development Agreement:
Please fill out the information for Development Agreement form and return it to
me. Once all contributing departments have their comments resolved, we will be
able to draft a Development Agreement. We aim to have the draft completed
and into the City Attorney's Office by the time the applicant receives the second
round of FDP comments, but this is dependent on resolving comments from
contributing departments./
Development Agreement was sent to Morgan on 8/12/20- Ian Skor
Department: Environmental Planning
Contact: Kelly Smith, , ksmith@fcgov.com
Topic: General
Comment Number: 1
08/10/2020: FOR APPROVAL
Comment Originated: 08/10/2020
Please clearly indicate the all Limits of Development (grading, staging
equipment, etc.) on all plans to ensure no disturbance within NHBZs.
The limits have been added to the landscape, utility, and site plans.
Department: Forestry
Contact: Nils Saha, , nsaha@fcgov.com
Topic: General
Comment Number: 1
08/10/2020: FOR APPROVAL
Comment Originated: 08/10/2020
The fence is proposed -3' from tree #6 (6-10" cottonwood). To protect the
critical root zone and the canopy, the fence should be placed at least 6' from the
trunk. However, given the limitations (i.e. property line and fencing
requirements), Forestry asks that following be noted:
• Please adjust the placement of the fence posts outside of the interior critical
root zone of the tree.
• It may be necessary to raise the canopy prior to fence installation to ensure
the branches are not damaged in the process.
• Forestry will require a site visit prior to fence installation to evaluate tree
condition, determine if pruning is required and discuss fence post placement
around existing trees. Please add the following note to the utility, landscape,
and construction plans:
"Please schedule a site visit with Forestry prior to fence installation to
determine if pruning is required and to discuss placement of fence posts around
existing trees."
The note has been added to the landscape plans refer to note 13 on sheet LP101.
Page 2 of 5
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, Llynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 08/07/2020
08/07/2020: ADDRESS POSTING
In earlier discussions, I believe an address location sign was indicated on the
plan but I couldn't find that in this revision. Please add it to plans, unless I
overlooked it. Thank you.
The address sign location was added to the utility plans.
Department: Building Code Review
Contact: Russell Hovland, 970-416-2341, rhoviand@fc-gov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 08/10/2020
08/10/2020: These solar arrays should maintain a 10ft min distance to property
line and 20ft between each array to avoid special construction requirements in
the IBC. A building permit is required, and the arrays must meet our wind and
snow loads. An engineered electrical one -line diagram is required in the
construction documents.
Solar is 10' from property and confirmed with Russ that the project is F-1 at II-B and
will not require 20ft between each array. - US
Department: Technical Services
Contact: Jeff County, 970-221-6588, icounty@fcgov.com
Topic: Construction Drawings
Comment Number: 2
08/10/2020: FOR FINAL APPROVAL:
Please revise the sub -title as marked. See redlines.
Revised per comment.
Topic: General
Comment Number: 3
08/10/2020: FOR FINAL APPROVAL:
Comment Originated: 08/10/2020
Comment Originated: 08/10/2020
Please provide the following information for the Benchmark Statement in the
EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
Page 3 of 5
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF
FORT COLLINS DATUM) = NAVD88 DATUM - X.XX'.
Revised per comment.
Comment Number: 4
08/10/2020: FOR FINAL APPROVAL:
There are line over text issues. See redlines.
Revised per comment.
Topic: Plat
Comment Number: 1
08/10/2020: FOR FINAL APPROVAL:
Comment Originated: 08/10/2020
Comment Originated: 08/10/2020
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on reclined sheets and/or in response
letter.
Revised per comment and redlines.
Department: Stormwater Engineering — Erosion and Sediment Control
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 08/03/2020
08/03/2020: Plans and Escrow were found acceptable to meet Criteria.
Resolved Comments from PDP.
Acknowledged.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 08/07/2020
Page 4 of 5
08/07/2020: No comments.
Acknowledged.
Page 5 of 5