HomeMy WebLinkAboutMOURNING SUBDIVISION 2ND REPLAT LOTS 1 AND 2 - 13 91A - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWDevelopment Services
Planning Department
November 27, 1991
Frank Vaught
Vaught -Frye Architects
1113 Stoney Hill Drive
Fort Collins, Co 80525
Dear Frank:
For your information, attached is a copy of the Staff's-comments concerning,
Chili's Grill & Bar, that was presented before the Conceptual Review Team on
November 25, 1991.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
S ephen Olt
Project Planner
SO/gjt
Attachment
cc: Tom Peterson, Planning Director
Kerrie Ashbeck, Civil Engineer
Project Planner
File
281 North College AvenLIC • 1'.0. 130x �;80 • Fort Collins, CO 80322-0;,; 1 • 003) '-"' 1-075o
r CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: November 27,. 1991
ITEM: Chili's Grill & Bar
APPLICANT:, Frank Vaught
Vaught -Frye Architects
1113 Stoney Hill Drive
Fort Collins, CO. 80525
A request for a standard restaurant at the northwest corner of
South College'Avenue and Foothills Drive. This site is just east of
Steele's Market and south of Dellenbach Chevrolet.
COMMENTS:
1. This property is in the HB, Highway Business zoning district.
The proposed use may be reviewed as a permitted "Use -By -Right"
or as a P.U.D. The issues surrounding this site (i.e. access
& circulation, parking, landscaping, utilities, potential
impacts to adjacent.properties, etc.) will probably be very
similar regardless of the review process selected.
2. There is existing three-phase electric service- along Foothills
Drive and an electric vault at the corner of Foothills Drive
and the frontage road.
3. Standard electric fees for commercial development will apply
to this request.
4. There is a 12" water main in the frontage road and an 8" main
in Foothills Drive. The water main should remain under asphalt
cover if/when the frontage road is vacated, and a- utility —
easement will be required for the.water main.
5. Sanitary sewer exists in Foothills Drive.
6. A grease trap, outside of the building, will be required:with
this restaurant use.
7. The standard building permit process will be followed with the
City.
8. A fire hydrant must be located within 400' of the building and
accessibility, for emergency vehicles, to all points on the
building must be considered. Sprinkling the building will give
more flexibility to the circulation and access issue.
I
9. a. This property is in the Foothills Drainage Basin and is
subject to those basin fees of $5,024/acre. The fees are based
on the runoff coefficient for commercial use and can be
reduced if on -site detention of stormwater is provided and
approved by the Stormwater Utility.
b. A 48" storm drain line exists along the north property
line, adjacent to Dellenbach Chevrolet. It is essential to
work with and coordinate.the storm drainage solutions with the
Dellenbachs.
c. There is presently a 100 year floodplain designation on
this property that will have to be addressed relative to the
intended development.
d. A drainage report & plans and an erosion control plan will
be required with the submittal.
e. An oil/grease separator is required.
Please contact Glen Schlueter with City Stormwater Utility, at
221-6589, with questions related to drainage issues.
10. The Transportation Department offers the following comments:
a. It will be necessary to relocate access to this site, and
adjacent sites, with a controlled situation when the frontage
road is vacated. The new access(es) will have to be
prioritized and designed such to create a street
appearance/function, not just a driveway through the parking
areas.
b. A potential new curb cut off of South College Avenue,
approved with the South College Avenue Access Plan, would
affect the existing landscaping should it be implemented as
part of this request.
c. It is very important to communicate this development plan
to the adjacent property owners and coordinate a mutually
agreeable effort to vacate the frontage road.
d. A critical element of this proposal is how to maintain
access to Dellenbach Chevrolet for the northbound traffic on
South College Avenue.
e. One example of a solution for vacation of the frontage road
and continued circulation is the Foothills Chrysler/Plymouth
dealership on South College Avenue.
11. City Engineering offers the following comments:
a. The property must be replatted as part of this request to
enable Chili's to own and develop on the site. It cannot be
processed as a Minor Subdivision due to the vacation of a
street right-of-way and other significant issues. This
subdivision request will go before the Planning and Zoning
Board for the final decision.
b. The subdivision plat and all associated documents must be
approved prior to the vacation of the frontage road.
c. This request will require a highway access permit from the
State, potentially adding time to the overall process. Please
contact Mike Herzig or Kerrie Ashbeck at 221-6750 to inquire
about initiating the access permit.
d. A right-in/right-out access associated with a new curb -cut,
again as part of the approved South College Avenue Access
Plan, is possible but may create problems.
e. A minimum of 16' is necessary from the flowline on the west
side of South College Avenue to the first tier of parking
spaces on the Chili's site.
12. It is suggested that Tim Buchanan, City Forester, be contacted
about reviewing the existing trees along the street frontage.
He can be reached at 221-6361.
13. Building foundation plantings, as part of the overall
landscape plan for the site, do provide a significant positive
visual effect.
14. The proposed lighting package for the site should be submitted
to the City for review.
15. To reiterate, it is very important to assure a cooperative
effort with the adjacent property owners in conjunction with
this proposal, even if it is reviewed as a "Use -By -Right". The
Planning Department would appreciate the opportunity to review
the Site & Landscape Plans for this use.