Loading...
HomeMy WebLinkAboutUNITED STATES POSTAL SERVICE ASPEN STATON - 34 91 - CORRESPONDENCE - SUPPLEMENTAL INFORMATIONDevelopr. A Services Planning Department City of Fort Collins December 26, 1991 Sharad C. Shrestha, P.E. Program Manager Design and Construction United States Postal Service Facilities Service Office Suite 400 8055 East Tufts Avenue Parkway Denver, CO 80237-2881 RE: Rhoads Construction Company - Aspen Station (Fort Collins) Correspondence dated 12/11/91 Dear Sharad, Utility Fees - Reference Previous To date we have received four payments from the contractor for various utility fees. On 11/13/91 our records indicate that the following were paid: Two Inch Water Line $20,300.00 Sewer Plant Investment 15,100.00 Water Rights 14,400.00 Sewer Repay 1,196.58 Although the storm drainage fee is $4,899, we do not appear to have any record of the contractor paying $12,964.37 in storm drainage fees as indicated in Jae B. Pak's note of 12/13/91; nor have we received the street oversizing fee of $16,679. We will certainly, as discussed, give credit for any overpayment. If you or the contracting officer have a record of payment of $12,969.37 or the $16,679, a copy of that would help us to clean-up our books. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 I apologize for any inconvenience this may cause, but we need to make sure our records are correct. Thank you. sincere , Tom Peterson, AICP Planning Director TP/pas cc: Matt Baker Paul Eckman Dottie Nazarenus HPDesk Local Print for Tom PETERSON Start of Item 36. Message. Dated: 12/17/91 at 1540. Subject: New Post Office Fees - Aspen Station . Sender: Dottie NAZARENUS / CFC52/01 Contents: 2. CC: Tom PETERSON / CFC52/01 Part 1. FROM: Dottie NAZARENUS / CFC52/01 TO: Matt BAKER / CFC52/01 CC: Paul ECKMAN / CFC/01 Tom PETERSON / CFC52/01 Ted SHEPARD / CFC52/01 Part 2. A copy of a letter to Rhoads Construction Company from Jae B. Pak dated December 13, indicated that Rhoads had paid $12,969.37 in stormwater fees. We have never received that payment, nor has Accounting or Utility Billing. Just a caution before any credit is given on street oversizing. Maybe Rhoads Construction can produce a cancelled check .or some proof of payment first. Thanks, Dottie End of Item 3.6. UNITED STATES POSTAL SERVICE FACILITIES SERVICE OFFICE n STANFORD PLACE 1 SUITE 400 8055 E TUFTS AVENUE PARKWAY DENVER CO 80237 2881 December 13, 1991 Rhoads Construction Company 1520 E. Mulberry Street, Ste. 250 Fort Collins, CO 80524-3520 Attn: Ed Rhoadarmer Subject: Fort Collins, 00 - Aspen Station Contract No: 079986-91-B-0187 Utility Fees Dear Ed: �d�'C N� z�rwus ��C rC l�/Lt1q,�J Please find enclosed a letter dated December 11, 1991 from the City of Fort Collins regarding the street oversizing fee that was agreed to between the City and the Postal Service. The street oversizing fee has been reduced to $16,679.00 as described in the enclosed letter. In addition, please note that $12,969.37 had been apparently paid by you to the City for the storm drainage fee, which has now been reduced to $4,899.00. The overpayment of $8,070.37 is to be credited to the street oversizing fee. You are hereby authorized to make a payment to the City for the balance amount of $8,608.63 for the street oversizing fee. If you have any questions or comments, please call Sharad. Shrestha at 220-6523. Sincerely, Jae B. Pak Contracting Officer FS0103:JBP:SCS:0300D cc: Tom Peterson, Planning Director, City of Fort Collins Bruce Thompson, Merrick Engineers & Architects 0 V V OFFICIAL OLYMPIC SPONSOR