Loading...
HomeMy WebLinkAboutSUN DISK VILLAGE REPLAT PRELIMINARY SUBDIVISION - 15 91 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSDevelop -it Services Planning Department April 18, 1991 John Giuliano Giuliano & Father 1708 East Lincoln Street Fort Collins, CO. 80524 Dear John: City staff has reviewed your submittal for the Replat of Sun disk Village, Preliminary Plat, and offers the following comments: 1. 2. 3. 4. 5. 6. 7. 8. 9. The 60' minimum lot width requirement at the building front face (toward the street) may necessitate excessive front setbacks on some lots. Lot areas, addresses, and street names are not necessary on the Preliminary Plat, but will be required on the Final Plat. Stormwater Utility suggests dedication of the storm drainage swale and detention pond to the City, thereby giving the City responsibility for maintenance of both. A maintenance access will be needed in order for Stormwater to maintain the detention pond. Eventually Stormwater would like to combine this pond with the Five Oaks detention pond, but in the event that this does not happen an easement must be provided to the pond that cannot be fenced. A resubmittal of the Preliminary Drainage Report and Plan is not necessary as long as all concerns are addressed in the final submittal. Please explain the outlet design at the detention pond. Provide turning radius on the street entry into development from Windmill Drive. The Utility Plans have been reviewed and red -lined by Engineering and Water/Wastewater. These red -lined plans have been transmitted to Stewart & Associates with comments. There is an existing Public Service gas main centered in the 8' wide easement along the east side of Windmill Drive that will have to be extended to serve this property. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 4' 10. Notation should be added to the plat relative to the two tracts at the south end of this replat that are to be developed in the future. It should clearly state that -these tracts are subject to the approved Sun Disk Village PUD and anything other than the approved multi -family use with attached densities would require an administrative change or an amendment to the PUD. 11. What is the status of the improvements proposed for the future multi -family tracts? 12. Any changes to the existing driveway that serves the multi- family area must maintain 20' inside and 40' outside turning radius for emergency fire vehicle access. 13. The off-street parking requirements for the undeveloped multi- family units must be maintained independent of this replat to single-family. These requirements are: '1 bedroom or less/dwelling unit ........ 1.5 spaces 2 bedrooms/dwelling unit...............1.75 spaces 3 bedrooms/dwelling unit...............2.0 spaces 4 bedrooms and above/dwelling unit ..... 2.5 spaces There appears to be adequate spaces off-street, with approximately 2 spaces/unit in the garage and driveway, and 7 common spaces in the two parking areas adjacent to each tract. 14. It is important to be very sensitive to the type and locations of fencing along Windmill Drive, the entry to the multi -family area, and the rear lot lines adjacent to the detention pond. Fencing guidelines for this project could be considered, with character sketches that would convey the intent and give the staff a starting point for discussion with you to determine the best possible solution for an attractive development. 15. One street tree per lot, preferably being a mixture of deciduous (both -shade and ornamental). and evergreen,—shou--l--d-be provided on all interior streets. Will there be a Home Owners Association with this single-family development? Some landscape treatment in the detention pond area would benefit the entire area, being aware that it would have to be approved by the Stormwater Department before they would accept maintenance of that facility. 16. Lots 21, 22, and 23 do not comply with Section 29-658(b)of City Code because "Lots with both front and rear frontage on a street shall not'be permitted except where necessary ,to provide separation from arterial streets or from incompatible uses". Please contact me at 221-6750 to discuss the options and possible solutions. J This concludes staff comments at this time. In order to stay on schedule for the May 20, 1991 Planning And Zoning Board hearing, please note the following deadlines: Plan revisions are due May 1, 1991 by 12:00 noon PMT's, colored renderings, revisions are due May 13, 1991 Final documents.are due May 16, 1991 by 12:00 noon I suggest we meet to discuss these comments at your earliest convenience. Please contact me at 221-6750,to set up a meeting in the near future. Since ely, Stephen Olt Project Planner