HomeMy WebLinkAbout1992 SOUTHEAST ELEMENTARY SCHOOL WETLAND MITIGATION PLAN - 17 91A - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSSeptember 24, 1991
HAND DELIVERED
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522-0580
Attn: Ted Shepard, City Planner
Subject: 1992 PR-1 S.E. Elementary School
Wetland Mitigation Plan
Dear Mr. Shepard:
In response to your 9/12/91 letter regarding the above
subject project, we are enclosing the following:
10 copies of the Wetland Mitigation Plan, Revised
9/25/91
Your red -lined drawing returned to us with your 9/12/91
letter.
One copy of drawing SD-3, Revised 8/9/91 (per your
paragraph No. 10)
We believe we have responded to the items in your
letter and offer the following comments:
Paragraph No. 5. - In accordance with City drawings,
the 611 PVC pipe is a sub -drain for your sanitary sewer
and is indicated as such.
100 West 29th Street • Loveland, CO 80538 • (303) 667-8010 a (800) 933-8011
We will appreciate your prompt review of this
submission for approval.
Sincerely,
CDS ENGINEERING CORPORATION
PW4aV
Benjamin M. Hatch
Project Manager
cc: Dulaney Architecture, Attn: Pat Dulaney
(incl. 4 copies of drawing for your records and
distribution to the Contractor. Also a copy of the
9/12/91 letter)
PR-1, Attn: Mike Spearnak
(incl. one copy of drawing and 9/12/91 letter)