Loading...
HomeMy WebLinkAboutHOMESTEAD AT CLARENDON HILLS - PDP190007 - DOCUMENT MARKUPS - ROUND 3 - DRAINAGE REPORTFebruary 14, 2020 DRAINAGE LETTER AND LID REPORT HOMESTEAD AT CLARENDON HILLS Fort Collins, Colorado Prepared for: Kenneth R. Mitchell Mosaic Real Estate LLC 1021 Nightingale Drive Fort Collins, Colorado. 80525 Prepared by: 301 North Mason Street, Suite 100 Fort Collins, Colorado 80524 Phone: 970.221.4158 www.northernengineering.com Project Number: 1013-008 Page | 4 • The drainage report for Clarendon Hills 4th Filing assumed a runoff coefficient C=0.25 for the church site, and the church site was subsequently part of a land swap for the northwest corner of the Clarendon Hills Subdivision. Detention Assuming a historic runoff coefficient of 0.25, detention from Basin B was accounted for in the original Clarendon Hills drainage report provided the overall flow at Design Point B does not exceed 1.9 cfs. Because of the increased impervious area within Basin B, a detention is required within Basin B2 to reduce the post-developed flow rates at Design Point to equal or less than 1.9 cfs. Since Basins B1, B3, and B4 will be released into the surrounding curb and gutter undetained, the detention pond in Basin B2 is designed to release the 100-year event at 0.24 cfs. A release rate of 0.24 cfs is required to maintain a 100-year flow rate of 1.9 cfs at Design Point B. Inlets By limiting the 100-year flowrate at Design Point B, the flowrate at the existing inlets will match or decrease from the projected flowrates in the previously approved Clarendon Hills drainage reports. This results in matching or decreasing runoff to the existing inlets that were designed and approved with the earlier project, so no additional inlet calculations have been provided as a part of this report. Water Quality/LID Conformance City LID requirements specify that 50% of all single-family areas receive water quality treatment from a LID facility. This project proposes to treat at least 50% of the new impervious areas through two rain gardens on either side of the detention pond. The rain gardens will also provide water quality treatment for the project site. Furthermore, there will be a vegetated buffer between the rear lot lines and the irrigation ditch. Although exact impervious area is unavailable at this preliminary stage, a majority of the lots area will drain towards the rain gardens or across the vegetated buffer. The front 2/3rds of the lot will graded to drain south towards the rain gardens. A LID Treatment Exhibit is provided with this report details treatment area and method. Erosion and Sediment Control During construction, the Contractor will follow the appropriate and applicable City of Fort Collins standards for erosion and sediment control. Since more than 10,000 sf will be disturbed as a part of this project, a comprehensive Stormwater Management Plan will be prepared for this project at final design. Post construction water quality and erosion control will be achieved by a fully established and stabilized site. All areas disturbed during construction will receive permanent hardscape, landscape, or building structure. Floodplains There are no regulatory floodplains associated with the project. Conclusions The proposed grading concept matches the original drainage patterns. The site matches or decreases the designed imperviousness draining to the existing Clarendon Hills curb and gutter. Onsite Project: Calculations By: Date: C2*Cf C10*Cf C100*Cf Length (ft) Elev Up Elev Down Slope (%) Ti 2-Yr (min) Ti 10-Yr (min) Ti 100-Yr (min) Length (ft) Elev Up Elev Down Slope (%) Velocity (ft/s) Tt (min) Length (ft) Elev Up Elev Down Slope (%) Velocity (ft/s) Tt (min) Tc 2-Yr (min) Tc 10-Yr (min) Tc 100-Yr (min) ex a EX A 0.25 0.25 0.31 65 93.83 88.55 8.12% 6.4 6.4 5.9 N/A N/A N/A 665 88.55 85.49 0.46% 0.10 108.93 14.06 14.06 114.83 ex b EX B 0.25 0.25 0.31 30 93.00 91.75 4.17% 5.4 5.4 5.0 340 91.75 84.93 2.01 2.83 2.00 N/A N/A N/A 7.41 7.41 7.01 ex os1 EX OS1 0.25 0.25 0.31 195 93.00 86.13 3.52% 14.6 14.6 13.5 N/A N/A N/A N/A N/A N/A 11.08 11.08 13.51 ex os2 EX OS2 0.25 0.25 0.31 45 92.23 88.81 7.60% 5.4 5.4 5.0 N/A N/A N/A N/A N/A N/A 5.42 5.42 5.02 ex a North 0.25 0.25 0.31 65 93.83 88.55 8.12% 6.4 6.4 5.9 N/A N/A N/A 665 88.55 85.49 0.46% 0.10 108.93 14.06 14.06 114.83 Overland Flow, Time of Concentration: Tc2 Tc10 Tc100 C2 C10 C100 I2 (in/hr) I10 (in/hr) I100 (in/hr) Q2 (cfs) Q10 (cfs) Q100 (cfs) ex a EX A 2.382 14.06 14.06 114.83 0.25 0.25 0.31 1.92 3.29 6.71 1.1 2.0 5.0 ex b EX B 0.684 7.41 7.41 7.01 0.25 0.25 0.31 2.52 4.31 8.80 0.4 0.7 1.9 ex os1 EX OS1 0.147 11.08 11.08 13.51 0.25 0.25 0.31 2.13 3.63 7.42 0.1 0.1 0.3 ex os2 EX OS2 0.064 5.42 5.42 5.02 0.25 0.25 0.31 2.85 4.87 9.95 0.0 0.1 0.2 ex a North 2.594 14.06 14.06 114.83 0.25 0.25 0.31 1.92 3.29 6.71 1.2 2.1 5.4 Combined and Routed Basins HISTORIC DIRECT RUNOFF COMPUTATIONS Intensity Flow Overland Flow, Time of Concentration: Intensity, I from Fig. RA-2 Rational Equation: Q = CiA (Equation 6-1 per MHFD) Design Point Basin Area (acres) Tc (Min) Runoff C Tt = L / 60V (Equation 6-4 per MHFD) Tc = Ti + Tt (Equation 6-2 per MHFD) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ Homestead at Clarendon F. Wegert February 14, 2020 Project: Gutter/Swale Flow, Time of Concentration: Calculations By: Date: (Equation 6-4 per MHFD) (Equation 6-3 per MHFD) } 𝑇𝑖 = 1.87 1.1 − 𝐶 ∗ 𝐶𝑓 𝐿 𝑆 ൗ 1 3 Page 1 of 1 Character of Surface Runoff Coefficient1 Percent Impervious1 0.95 100% 0.95 90% 0.50 40% 0.55 50% 0.20 2% 0.25 2% Basin ID Basin Area (sq.ft.) Basin Area (acres) Asphalt, Concrete (acres) Rooftop (acres) Gravel (acres) Residential: Low Density (acres) Undeveloped: Greenbelts, Agriculture (acres) Lawns, Clayey Soil, Avg Slope 2- 7% (acres) Percent Impervious C2*Cf Cf = 1.00 C5*Cf Cf = 1.00 C10*Cf Cf = 1.00 C100*Cf Cf = 1.25 A 69,082 1.586 0.000 0.000 0.000 0.000 1.194 0.392 2% 0.21 0.21 0.21 0.27 B1 6,956 0.160 0.000 0.000 0.000 0.119 0.041 0.000 38% 0.46 0.46 0.46 0.58 B2 50,820 1.167 0.081 0.000 0.000 0.825 0.000 0.261 43% 0.51 0.51 0.51 0.64 B3 4,484 0.103 0.000 0.000 0.000 0.096 0.007 0.000 47% 0.53 0.53 0.53 0.66 B4 3,524 0.081 2% 0.25 0.25 0.25 0.31 OS1 5,126 0.118 0.000 0.000 0.000 0.000 0.078 0.039 2% 0.22 0.22 0.22 0.27 OS2 2,806 0.064 2% 0.25 0.25 0.25 0.31 North 77,013 1.768 0.000 0.000 0.000 0.000 1.337 0.431 2% 0.21 0.21 0.21 0.27 South 65,784 1.510 0.081 0.000 0.000 1.039 0.129 0.261 40% 0.49 0.49 0.49 0.61 DEVELOPED RUNOFF COEFFICIENT CALCULATIONS Asphalt, Concrete Rooftop Gravel Residential: Low Density Homestead at Clarendon F. Wegert February 14, 2020 Project: Calculations By: Date: Undeveloped: Greenbelts, Agriculture Composite Runoff Coefficient2 1) Runoff coefficients per Tables 3.2-1 & 3.2 of the FCSM. Percent impervious per Tables 4.1-2 & 4.1-3 of the FCSM. Project: Calculations By: Date: C2*Cf C10*Cf C100*Cf Length (ft) Elev Up Elev Down Slope (%) Ti 2-Yr (min) Ti 10-Yr (min) Ti 100-Yr (min) Length (ft) Elev Up Elev Down Slope (%) Velocity (ft/s) Tt (min) Length (ft) Elev Up Elev Down Slope (%) Velocity (ft/s) Tt (min) Tc 2-Yr (min) Tc 10-Yr (min) Tc 100-Yr (min) a A 0.21 0.21 0.27 65 93.83 88.55 8.12% 6.7 6.7 6.3 N/A N/A N/A 665 88.55 85.49 0.46% 0.10 108.93 14.06 14.06 115.18 b B1 0.46 0.46 0.58 65 93.97 92.33 2.52% 7.1 7.1 5.8 326 92.33 84.93 2.27 3.01 1.80 N/A N/A N/A 8.88 8.88 7.61 b B2 0.51 0.51 0.64 71 93.92 92.50 2.00% 7.4 7.4 5.8 350 92.50 84.93 2.16 2.94 1.98 N/A N/A N/A 9.35 9.35 7.76 b B3 0.53 0.53 0.66 70 92.85 91.65 1.71% 7.5 7.5 5.8 305 91.65 84.93 2.20 2.97 1.71 N/A N/A N/A 9.22 9.22 7.50 b B4 0.25 0.25 0.31 20 91.89 90.41 7.40% 3.6 3.6 3.4 167 90.41 84.93 3.28 3.62 0.77 N/A N/A N/A 5.00 5.00 5.00 os1 OS1 0.22 0.22 0.27 172 93.83 86.13 4.48% 13.1 13.1 12.3 N/A N/A N/A N/A N/A N/A 10.96 10.96 12.34 Tc2 Tc10 Tc100 C2 C10 C100 I2 (in/hr) I10 (in/hr) I100 (in/hr) Q2 (cfs) Q10 (cfs) Q100 (cfs) a A 1.586 14.06 14.06 115.18 0.21 0.21 0.27 1.92 3.29 6.71 0.6 1.1 2.8 b B1 0.160 8.88 8.88 7.61 0.46 0.46 0.58 2.35 4.02 8.21 0.2 0.3 0.8 b B2 1.167 9.35 9.35 7.76 0.51 0.51 0.64 2.30 3.93 8.03 1.4 2.3 6.0 b B3 0.103 9.22 9.22 7.50 0.53 0.53 0.66 2.30 3.93 8.03 0.1 0.2 0.5 b B4 0.081 5.00 5.00 5.00 0.25 0.25 0.31 2.85 4.87 9.95 0.1 0.1 0.3 os1 OS1 0.118 10.96 10.96 12.34 0.22 0.22 0.27 2.17 3.71 7.57 0.1 0.1 0.2 os2 OS2 0.064 5.13 5.13 5.00 0.25 0.25 0.31 2.85 4.87 9.95 0.0 0.1 0.2 a North 1.768 14.06 14.06 115.19 0.21 0.21 0.27 1.92 3.29 6.71 0.7 1.2 3.1 b South 1.510 9.62 9.62 8.08 0.49 0.49 0.61 2.26 3.86 7.88 1.7 2.9 7.3 Combined and Routed Basins DEVELOPED DIRECT RUNOFF COMPUTATIONS Intensity Flow Overland Flow, Time of Concentration: Intensity, I from Fig. RA-2 Rational Equation: Q = CiA (Equation 6-1 per MHFD) Design Point Basin Area (acres) Tc (Min) Runoff C Tt = L / 60V (Equation 6-4 per MHFD) Tc = Ti + Tt (Equation 6-2 per MHFD) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ Gutter/Swale Flow, Time of Concentration: Project: Calculations By: Date: Homestead at Clarendon F. Wegert February 14, 2020 (Equation 6-4 per MHFD) (Equation 6-3 per MHFD) } 𝑇𝑖 = 1.87 1.1 − 𝐶 ∗ 𝐶𝑓 𝐿 𝑆 ൗ 1 3 Page 1 of 1 Project: Calc. By: Date: 1.586 acres 0.6 cfs 2.0% per City of Fort Collins SWCM 5.0% per City of Fort Collins SWCM 10.0% per City of Fort Collins SWCM 2.5% 8.3% 14 ft per City of Fort Collins SWCM 14 ft to 48 ft 25 ft 14 ft to 52 ft 42 ft 17,060 ft2 23,160 ft2 1.36 Max. Allowable Cross-Slope for LID Max. Allowable Cross-Slope VEGETATED BUFFER Basin A Design Data & Analysis Vegetated Buffer Area Run-on Ratio Homestead at Clarendon F. Wegert February 14, 2020 Basin Area Design Width (S <= 10.0%) Average Design Width (S <= 10.0%) Min. Design Cross-Slope (Smin) Max. Design Cross-Slope (Smax) Min. Allowable Width Design Width (S <= 5.0%) Average Design Width (S <= 5.0%) Treatment Area Design Discharge Min. Allowable Cross-Slope Note: Existing coverage consists of well established native grasses with over 95% coverage. As much existing vegetation and grading will be preserved as feasibly possible. Disturbed areas within vegetated buffer will occur along rear lot lines, and this work is necessary to daylight lot grades into existing topography. Any disturbed areas will be replaced with a native grass seed mixture and landscaping in accordance with the erosion control and landscaping plans. Average slopes are around 2.5% towards the south and east and gradually get steeper towards the north and west. An existing irrigation ditch along the north edge of the grass buffer impacts the slopes along the north edge of the grass buffer. The steeper slopes, greater than 5.0%, are generally along the irrigation ditch. Some minor grading will be required in the grass buffer to daylight proposed lawn grades into existing grades. However, any disturbed areas within the grass buffer will be revegetated per the erosion control VAULT ELEC E ELEC E VAULT ELEC CONTROL IRR CONTROL IRR CONTROL IRCRONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / CLARENDON HILLS DRIVE LANGDALE DRIVE VEGETATED BUFFER TOTAL TREATMENT AREA: 17,060 SF RAIN GARDEN TOTAL TREATMENT AREA: 53,025 SF RAIN GARDEN TOTAL TREATMENT AREA: 53,025 SF HOMESTEAD AT CLARENDON HILLS SHEET NO: P:\1013-008\DWG\DRNG\1013-008_LID.DWG 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com DRAWING REFERENCE: LID TREATMENT EXHIBIT F. Wegert 1 in = 60 ft February 14, 2020 LID-1 DRAWN BY: SCALE: ISSUED: ( IN FEET ) 0 1 INCH = 60 FEET 60 60 LEGEND RAIN GARDEN TREATMENT AREA VEGETATED BUFFER VEGETATED BUFFER TREATMENT AREA HOMESTEAD AT CLARENDON HILLS ON-SITE LID TREATMENT Project Summary Total Developed Site Area 82,469 sf Target Treatment Percentage 50% Minimum Area to be Treated by LID measures 41,234.50 sf Treatment Area Vegetated Buffer Treatment Area 17,060 sf Rain Garden Treatment Area 53,025 sf Total Treatment Area 70,085 sf Percent Total Project Area Treated 85.0% UNTREATED AREA NOTES: 1. EXCEPT FOR LOTS 1 AND 8, UNTREATED AREA CONSISTS OF LANDSCAPING AND LAWNS. 2. RAIN GARDEN TREATMENT AREA CONSISTS OF APPROXIMATELY SOUTH 2 3 OF LOT, ROOFS, DRIVEWAYS, AND SHARED DRIVEWAY FOR LOTS 2 - 7. 3. APPROXIMATELY NORTH 1 3 OF LOTS WILL DRAIN TOWARDS VEGETATED BUFFER AREA BETWEEN REAR LOT LINES AND IRRIGATION DITCH. os2 OS2 0.25 0.25 0.31 45 92.85 88.81 8.98% 5.1 5.1 4.8 N/A N/A N/A N/A N/A N/A 5.13 5.13 5.00 a North 0.21 0.21 0.27 65 93.83 88.55 8.12% 6.7 6.7 6.3 N/A N/A N/A 665 88.55 85.49 0.46% 0.10 108.93 14.06 14.06 115.19 b South 0.49 0.49 0.61 71 93.92 92.50 2.00% 7.6 7.6 6.1 350 92.50 84.93 2.16 2.94 1.98 N/A N/A N/A 9.62 9.62 8.08 Gutter/Swale Flow, Time of Concentration: Combined and Routed Basins Intensity, i (per Table 3.4-1 of the Fort Collins Stormwater Manual) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ Rational Equation: Q = CiA (Equation 6-1 per MHFD) Overland Flow, Time of Concentration: DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Channelized Flow Swale Flow Design Point Basin(s) Tt = L / 60V (Equation 6-4 per MHFD) Tc = Ti + Tt (Equation 6-2 per MHFD) Overland Flow Time of Concentration Homestead at Clarendon F. Wegert February 14, 2020 (Equation 6-4 per MHFD) (Equation 3.3-2 per Fort Collins Stormwater Manual) } 𝑇𝑖 = 1.87 1.1 − 𝐶 ∗ 𝐶𝑓 𝐿 𝑆 ൗ 1 3 Page 1 of 1 Lawns, Clayey Soil > 7%: C = 0.35, Percent Impervious = 2% Combined and Routed Basins 2) Composite Runoff Coefficient adjusted per Table 3.2-3 of the Fort Collins Stormwater Manual (FCSM). Lawns, Clayey Soil, Avg Slope 2-7% Open Space (undeveloped): C = 0.25, Percent Impervious = 2% USDA SOIL TYPE: B Page 1 of 1 HISTORIC TIME OF CONCENTRATION COMPUTATIONS Channelized Flow Swale Flow Design Point Basin(s) Tt = L / 60V (Equation 6-4 per MHFD) Tc = Ti + Tt (Equation 6-2 per MHFD) Overland Flow Time of Concentration Homestead at Clarendon F. Wegert February 14, 2020 Gutter/Swale Flow, Time of Concentration: Combined and Routed Basins Intensity, i (per Table 3.4-1 of the Fort Collins Stormwater Manual) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ Rational Equation: Q = CiA (Equation 6-1 per MHFD) (Equation 6-4 per MHFD) (Equation 3.3-2 per Fort Collins Stormwater Manual) } 𝑇𝑖 = 1.87 1.1 − 𝐶 ∗ 𝐶𝑓 𝐿 𝑆 ൗ 1 3 Page 1 of 1