Planning Department
April 9, 1991
Dana Lockwood
320 S. Howes, Suite 107
Fort Collins, CO 80521
Dear Mr. Lockwood:
0
For your information, attached is a copy of the Staff's comments concerning the Colorado
Import Motors Auto Dealership which was presented before the Conceptual Review Team on
April 8, 1991.
The comments are offered informally by Staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these comments may be
made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the review
process, please feel free to call me at 221-6750.
Sincerely,
Kirsten Whetstone
Project Planner
KW/gjt
Attachment
xc: Tom Peterson, Director of Planning
Kerrie Ashbeck, Civil Engineer I
Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
1 CONCEPTUAL REVIEW STAFF COMMENTS
3
MEETING DATE: April 8, 1991
ITEM: . Colorado Import Motors Auto Dealership
APPLICANT: Dana Lockwood
420 S. Howes, Suite 107
Fort Collins, CO 80521
303-493-1023
LAND USE DATA: This is a proposal for a 17,000 sq. ft.' auto
dealership on 3.5 acres. The property is located at the north west
corner of College Avenue and Kensington Drive and is the location
of the previously approved Auto Avenue Mall PUD.
COMMENTS:
1. Three phase power exists along College Avenue. Standard
development charges apply. A C-1, commercial, form will have
to be filled out and Light and Power will have to be provided
with transformer locations.
2. Sewer e:-ists along the north property line. Water is in
Kensington Drive as far as the proposed entrance for the
existing PUD. If you are not able to use stubbed line (611) it
will have to be abandoned at the main. Sand and oil traps
will be required for the service bays.
3. The site will require on site detention with a release rate of
0.5 cfs/acre. There is an outfall to the storm sewer in
College Avenue. A drainage report and grading and drainage
plans will be required as part of the submittal.'- You will
-be.
required to address erosion control during construction as per
the —City Erosion —Control_ Plan. Contact the Storm Water
Utility at 221-6589 if you have questions.
4. Water Quality is a concern in this area. You are encouraged
to provide some type of system to treat storm water runoff,.
either a filter type system or a grassy area to filter the
runoff from the large expanse of parking lot, in light of._-"'`"
these water quality concerns. The downstream neighborhoods
are particularly aware of and sensitive to any increased
runoff into the McClellands-Mail Creek Basin. Drainage fees
for this basin are $3,232.00/acre subject to the percent of
impervious surface on the site.
5. The repair garage will be the determining factor in the
occupancy rating of the building. If the building is equipped
with fire sprinklers it will simplify the rating.
A'
v
6. You will have to determine whether the water line that exists
will provide sufficient fire flows to run the sprinklers. The
immediate perimeter of the building should be designated as a
fire access lane and be restricted with no parking. The site
plan should indicate the location of the nearest existing fire
hydrant. Contact Warren Jones at the Poudre Fire Authority at
221-6570 for further information.
7. Standard building submittal and plan check fees will apply.
If you decide to pursue the fueling center, it is possible to
construct a small tank over ground. Check with.Building
Inspection and the Fire Authority for specifics on over ground
and under ground tanks. Underground tanks are a sensitive
issue in Fort Collins.
8. The property is located in the HB, Highway Business, zoning
district. There is an existing PUD on the site and any
subsequent submittal will also have to be processed as a PUD.
There are specific parking and landscaping requirements which
generally apply, although they may be varied somewhat with the
PUD.
9. At a minimum, we would require a 15' landscaped buffer behind
the sidewalk on College, a 10' landscaped buffer behind the
sidewalk on Kensington, and a 5' landscaped buffer at all
interior lot lines between neighboring properties. The
landscaping along the streets should screen, at the minimum,
20% of the view of the parking lot as seen from the streets.
10. Two street frontages gives this property a signage allowance
of 2 free standing monument signs. We would ask that you
submit details for any signage that you propose.
11.
A traffic impact study will. be required as part of the
submittal. A study was conducted for the Auto Avenue Mall and
can be revised for this project. Please be aware of the South
College•Access Control Plan. Be sure to line up the curb cut
on Kensington w
south.
12. Construction of the medians on College Avenue is scheduled to
begin in June of this year. A north bound left turn from
College�Avenue to Kensington will be constructed at this
time.
13. Any utility easements which need to be vacated or dedicated
can be revised with a replat of the Auto Avenue Mall PUD.
There are existing utility plans which can be revised and
brought up to current City standards. The Engineering
Department requires 16' of Parkway area from the back of the
walk to the flow line of College Avenue. The sidewalk is
required to be a 7 foot detached walk. The street oversizing
fund will pay for 3' of the 7' width.
14. There may be an SID for Kensington Drive as well as a repay
agreement for the decel lane on South College Avenue. Contact
Matt Baker at 221-6605 for more information.
15. The street oversizing fee is $14,005 per acre.
16. Mitigation of the visual impact of the parking area on the
streetscape will be an important element of this project.
Landscaping along College and Kensington, will be very
important. The long line of cars should be broken up with a
landscaped island every 10 or so cars. We would be looking
for street trees along College and Kensington. Large shade
trees should not be planted -closer than 40' to street lights
and ornamental trees should not be planted closer than 151.
If you. would like more detail on these requirements please
give me -a: call.
17:: A sloped or pitched roof line would be a welcome sight for this
part of College Avenue. We would encourage you to consider an
architectural style other than the typical flat roofed,
industrial looking buildings that seems -to be the norm these
days.
18. We would highly discourage angled display racks and would
recommend that any elevated display racks be no higher than
41. We would encourage you to consider landscaped display
a=e:as similar to what exists at the current site on North
College.
19.
20.
21.
The landscape plan should also consider foundation treatment
around the building.
The land use seems to be appropriate and the project appears
to do well on the Auto Related point chart.
Parking lot lighting will
and Zoning Board. Please
lot_wilr-be-lighted_and_i
likely be a concern of the Planning
specify on the plans how the parking
spillage that would be anticipated.