Loading...
HomeMy WebLinkAboutTRAFFIC OPERATIONS FACILITY PDP - 30 91E - CORRESPONDENCE - STAFF'S PROJECT COMMENTSA A.. STAFF PROJECT REVIEW City of Fort Collins �reo® VF RIPLEY ASSOCIATES Date: 4/5/2002 C/O RACHEL LINDER 401 WEST MOUNTAIN AVENUE, SUITE 201 FORT COLLINS, CO 80521 Staff has reviewed your submittal for EAST VINE DRIVE STREETS FACILITY, TRAFFIC OPERATIONS BUILDING PDP & FINAL COMPLIANCE, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Katie Moore Topic: Detail Sheet C10 88 Please remove unneeded details (no parking/bike lane sign) and see sheet for additional comments Topic: General 102 Please remove the indemnification statement from the cover sheet. 105 For easements on -site: Please provide additional area for the emergency access easement so that it connects with the ROW. Please let me know what the other easements should be labeled as (utility, drainage, etc.). Topic: Utility Sheet C7-Linden plan and profile 103 Please show how the proposed improvements will tie into existing conditions at the north end of the improvements. 104 A straight-line grade value is shown within a vertical curve near the south end of the improvements. Does this value (1.6%) really only apply to the small unlabeled straight grade portion immediately south of the curve? Topic: Utility Sheet Ca -Linden cross -sections 87 Please show the true cross -slopes from the curb to the edge of ROW to the east. 4.3.02: Cross slopes for parkway are all shown as 2%. This does not match the grading plan. Department: Light & Power Issue Contact: Bruce Vogel Topic: General Notes 101 No comments Department: Police Issue Contact: Joseph Gerdom Topic: Site Plan 39 Landscape: The location of the Montmorency Cherry and Autumn Blaze Pear (east of the building) isolates the eastern most parking area. Recommend lower growing shrubs at both locations. Lighting and Building Access: Two doors opening to the west and one opening to north (at north end of building) have no apparent security lighting. Further, the north access point is obscured by the Blue Spruce Page 1 plantings. Recommend some form of security lighting at these doors and moving the Spruce away from the north access point. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage 96 The proposed C-factor for sub -basin 5A-3 is only .27, yet this area is planned for a future parking lot. The C- factor was higher the previous submittal and was reduced. Please use the corresponding C-factor for the ultimate site plan design and revise all hydraulic calculations associated with this new flow. 97 The on -site flow for the 2-foot pan on the east -side of the site and for the private drive storm conveyance does not seem to correspond to any flows in the hydrology calculations. Please revise calculations. 98 The WQ ponds revised calculations say that 10% of the site drains to WQ Pond B, when the schematic shows that 90% of the site drains to WQ Pond B. Please clarify and revise calculations if needed. 100 Please provide a cross-section for the private drive just before Inlet 1 with the HWL for site flows and all off -site flows to show drive has capacity as an ouffall due to smaller storm sewer being constructed, 7 Topic: Erosion/Sdiment Control 99 1. One would assume that site access was at the point of the vehicle tracking pad in the southeast corner of the site, which means the silt fencing shown on the plan at that location cannot extend across the opening. Otherwise, the plan is OK. Thank you. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Easement 92 Construction / Utility easements must be secured prior to plan approval. Please provide a copy of the easement for review. Topic: General 43 46 Previous Comment: Provide utility easements for all water/sewer mains, curb stops and fire hydrants. 48 Previous Comment: Connect all fire hydrants to water mains using a swivel tee. 49 Previous Comment: Provide all appropriate standard details on a detail sheet ( i.e. meter pit, water service, manhole, bedding, etc.). Use current City of Fort Collins Utility details. 50 See site, landscape and utility plans for other comments. Topic: General Notes 91 PVC is not allowed water mains (Revise note on Sht C3). Page 2 w Topic: Landscape Plan 90 Please show water & sewer lines correctly on landscape plan. Maintain minimum of 1 Oft. separation from trees to water / sewer lines. Topic: Utility Details 94 Please provide a detail for the sand and oil interceptor. Please remove unneeded details from detail sheet Topic: Utility Plan 93 Water services may not be located behind or in thrust block. Revise service as redlined on plans. 95 Provide 5 feet (minimum) between water meter pit and reducer located downstream from meter pit. Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, TED SHEPARD City Planner Page 3