HomeMy WebLinkAboutTRAFFIC OPERATIONS FACILITY PDP - 30 91E - DECISION - FINDINGS, CONCLUSIONS & DECISIONCity of Fort Collins
Commu...ry Planning and Environmental ,._rvices
Current Planning
CITY OF FORT COLLINS
ADMINISTRATIVE HEARING OFFICER
TYPE I ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS AND DECISION
ADMINISTRATIVE HEARING DATE
PROJECT NAME:
CASE NUMBER:
APPLICANT:
OWNER:
HEARING OFFICER:
PROJECT DESCRIPTION:
March 19, 2002
Traffic Operations Facility Project
Development Plan
#46-01
City of Fort Collins
Operations Services Department
117 North Mason Street
Fort Collins, CO 80521
City of Fort Collins
Cameron Gloss
Current Planning Director
The Applicant has submitted a development plan for a one-story, 9,441 square foot
office building as Phase One of a multi -phased development. Phase Two would consist
of two buildings, one for a combined office and sign/paint shop and one for a vehicle
storage building. The site is 3.2 acres in size located at the southwest corner of Linden
Street and East Vine Drive.
SUMMARY OF HEARING OFFICER DECISION: Approval
ZONING DISTRICT: I, Industrial
STAFF RECOMMENDATION: Approval
NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established
no controversy or facts to refute that the hearing was
281 North College Avenue • [?O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020
Traffic Operations Facility PDP
Administrative Hearing
Findings, Conclusions, and Decision
February March 19, 2002
Page 2of6
properly posted, legal notices mailed and notice
published.
The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the
hearing at approximately 6:00 p.m. on March 19, 2002 in Conference Room A at 281
North College Avenue, Fort Collins, Colorado.
HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE:
The Hearing Officer accepted during the hearing the following evidence: (1) Planning
Department Staff Report; (2) application, plans, maps and other supporting documents
submitted by the applicant and the applicant's representatives to the City of Fort Collins;
(3) a sign up sheet of persons attending the hearing; and (4) a tape recording of
testimony provided during the hearing. The LUC, the City's Comprehensive Plan (City
Plan), and the formally promulgated policies of the City are all considered part of the
evidence considered by the Hearing Officer.
The following is a list of those who attended the meeting:
From the City:
Ted Shepard, Chief Planner
From the Applicant:
Ron Kechter, City of Fort Collins, Operations Services
John Renhowe, Vaught Frye Architects
Rachel Linder, VF Ripley Associates
From the Public:
None
Written Comments:
None
Traffic Operations Facility PDP
Administrative Hearing
Findings, Conclusions, and Decision
February March 19, 2002
Page 3 of 6
FACTS AND FINDINGS
1. Site Context/Background Information
The surrounding zoning and land uses are as follows:
N: I; Existing Larimer County Vehicle and Equipment Maintenance Facility
S: I; Existing New Belgium Brewery
E: I; Existing Colorado Department of Transportation Maintenance Facility
W: E; Existing Mini -Storage and Catholic Community Services Mission
The site is the easterly portion of the old Great Western Sugar Beet Factory,
established in 1903. This site and its structures are a very important part of our
City's economic and ethnic history.
The parcel is also Lot 5A of the East Vine Streets Facility P.U.D., originally
approved in 1991.
In 1991, the City of Fort Collins purchased the entire 32-acre parcel and an
O.D.P. was approved for a mix of industrial uses. Also in 1991, a Preliminary
and Final P.U.D. were approved on the easterly portion of the site. This project
renovated the existing structures for offices and allowed new construction for
shops, vehicle maintenance, locker room and outside vehicle/equipment storage
for the City of Fort Collins Transportation, Traffic and Streets Departments.
In 1993, the O.D.P. was amended to create the two westerly parcels. In 1999
The Colorado Department of Transportation gained approval for their truck and
heavy equipment maintenance facility which is now constructed on Lot 4A. Also
in 1999, the Streets Department gained approval for a new sand and salt storage
facility which has yet to be constructed on Lot 4B.
2. Compliance with the Overall Development Plan (OPD)
The O.D.P. was initially approved in 1991 and amended in 1993. The subject
parcel is simply designated "future pad site." Therefore, it is difficult to test for
land use compliance with the O.D.P. The parcel size and access, however, do
comply with the O.D.P.
3. Compliance with Article 4 and the I -Industrial Zoning District Standards:
A. Land Use
Traffic Operations Facility PDP
Administrative Hearing
Findings, Conclusions, and Decision
February March 19, 2002
Page 4 of 6
The proposed land uses, office, sign/paint shop and vehicle/equipment storage
are classified as "public facilities" and permitted in the Industrial zone subject to
Administrative Review.
B. Development Standards
(1.) Section 4.23(E)(2)(b) - Orientation
The west -facing elevation of both the office building and signs/paint shop along
Linden Street is attractive and features windows, doorways and projections in the
building line for 100% of its length.
(2.) Section 4.23(E) (2) (c) — Building Character and Color
The building uses both masonry and pre -finished metal panels on the exterior.
Color shades will be light to medium tones. There will be no white, bright or
reflective materials.
(3.) Section 4.23(E)(3)(a)2. — 30-Foot Deep Landscape Yard
There is a minimum of 30 feet of landscaping between the building and Linden
Street.
4. Compliance with Article 3 of the Land Use Code — General Development
Standards
A. Section 3.2.1 — Landscaping and Tree Protection
A. Section 3.2.1(C)(D) — Landscaping and Tree Protection
The P.D.P. provides full tree stocking and foundation shrubs around the north,
west and south sides of both phases of the project. Street trees are provided
along Linden Street.
B. Section 3.2. i(E)(4)(a) — Parking Lot Perimeter Landscaping
The parking lot is internal to the site and screened from Linden by the building.
Along the east perimeter, a continuous row of shrubs and four shade trees are
provided.
C. Section 3.2.1(E)(5) —Parking Lot Interior Landscaping
The parking lot exceeds 6% interior landscaping in the form of islands which
exceeds the required minimum for lots with less than 100 spaces.
Traffic Operations Facility PDH
Administrative Hearing
Findings, Conclusions, and Decision
February March 19, 2002
Page 5 of 6
D. Section 3.2.2(B) — Access Circulation and Parking
Linden Street is an existing collector street. The private access drive on the
south of the parcel is also existing. The parking lot access drive ties directly into
the existing CDOT and City of Fort Collins Streets Facilities. The sidewalk in front
of the proposed building ties directly into the existing sidewalk along Linden.
E. Section 3.2.2(K)(2) — Parking Lots — Maximum Number of Spaces
For the general office component of both Phase One and Two, there is 12,721
square feet. The maximum number of parking spaces allowed for general office
is three spaces per 1,000 square feet resulting in 38 spaces. For the sign shop,
there will be four employees. The maximum number of spaces for industrial
industrial space is .75 spaces per employee resulting in three spaces.
Therefore, the total maximum allowable spaces is 41. The P.D.P. indicates 40
spaces which is less than the maximum allowed for both uses combined.
F. Section 3.5. l (C)(E)(F) — Building Project and Compatibility
The new office building (both phases) will be an attractive new element to the
Streets Facility. The height, scale, roof form, building materials, and building
color achieve a high level of quality that exceeds the level of quality generally
associated with industrial development.
G. Section 3.5.3(B) — Relationship of Buildings to Streets, Walkways and
Parking
The build -to line standard is 15 feet. This standard is superceded, however, by
the more specific standard in Article Four pertaining to the 30-foot landscape
yard between building and street. Since the individual zone district standards in
Article Four are considered more specific than the general standards in Article
Three, the 30-foot landscape yard prevails over the 15-foot build -to line.
H. Section 3.5.3(C)(D) — Variation in Massing and Character and Image
The office building provides architectural variety in the staggered elevation along Linden
and by the use of mezzanine windows. The curvature at the joining of the west and
south elevations is distinctive. The roof is flat but varied, facades are articulated, and
there are windows on three sides. With a variety of masonry materials, windows and
doors there is a recognizable base, middle and top.
Traffic Operations Facility PDP
Administrative Hearing
Findings, Conclusions, and Decision
March 19, 2002
Page 6 of 6
SUMMARY OF CONCLUSIONS
A. The Traffic Operations Facility Project Development Plan is subject to
administrative review and the requirements of the Land Use Code (LUC).
B. The parcel size and access design complies with the Overall Development Plan
(O. D. P).
C. The Traffic Operations Facility Project Development Plan satisfies the
development standards of the I zoning district.
D. The Traffic Operations Facility Project Development Plan complies with all
applicable General Development Standards contained in Article 3 of the Land
Use Code.
DECISION
The Traffic Operations Facility Project Development Plan #46-01, is hereby approved by
the Hearing Officer without condition.
Dated this 26th day of March 2002, per authority granted by Sections
1.4.9(E) and 2.1 of the Land Use Code.
Cameron Gloss
Current Planning irector
RG 9 �
f� ooZ
H 1
G ri U P .J' /YE T
Tot AFFf G OPEk/4 7-7 f1vs F'A c 14::. i T i
Jan l whtTm
arches 1 L inj*r
0 K
l�vl*,ISfiy
C fly b� F
GN
goo