Loading...
HomeMy WebLinkAboutCDOT MAINTENANCE FACILITY AT EAST VINE STREETS FACILITY PDP AND FDP - 30 91C - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSMr. Rex Touslee 17-1d5kIf-1,� CDOT Region 4 1420 2"d Street Greeley, CO 80631 RE: Fort Collins Maintenance Facility PDP/FC Resubmittal Dear Rex, Attached are the revisions to the PDP submittal based upon review comments from the City dated April 16, 1999. Included with the resubmittal are the redlines from the City's review. We have responded to all of the comments in the redlined plans. Per my discussion with Mr. Ted Shepard, City of Fort Collins Planning, we have included the following number of sheets and documents for resubmittal: Utility Plans — 4 Drainage and Erosion Control Report — 2 Subdivision Plat — 2 Site Plan, Landscape Plan, Building Elevations Plan Set (full size) — 10 Site Plan, Landscape Plan, Building Elevations Plan Set (8 ''/z" x 11" size) — 1 A rendered Landscape Plan and rendered Building Elevations will be submitted to Mr. Ted Shepard by May 7, 1999 per prior arrangement with Ted. Following are responses to the comments in Mr. Shepard's letter dated April 16, 1999: 1. A letter is being submitted on behalf of CDOT by Muller Engineering in support of the Modification of a Standard. 2. Barbed wire fence will not be used on this project. 3A. Title has been changed. 3B. Signature block has been changed. 3C. Electrical transformer location has been identified and it is within a landscaped area (non -conflicting). 3D. Ground -mounted HVAC will be screen by an enclosure. 3E. Construction dates have been filled in per your direction. 3F. Address line has been added. 4A. Plant Quantities are included. 4B. Plants are keyed. 4C. Areas of grass are called out. 4D. Plant material has been changed to evergreen. 1' Mr. Rex Touslee May 5, 1999 Page 2 4E. Virginia Creeper shown on plan. Quantity has been increased. 4F. Note has been added. 4G. Plan has been numbered. 5. Note has been added to identify crew quarters. 6. Ground -mounted HVAC will be screen by an enclosure. 7. Plan has been numbered. Please contact me at 303 988-4939 if you have any questions or concerns regarding this response and resubmittal. Sincerely, MULLER ENGINEERING COMPANY, INC. A. Gray Clark Project Manager Attachments Xc: Ted Shepard, Chief Planner, City of Fort Collins