Loading...
HomeMy WebLinkAboutEAST VINE DRIVE STREETS FACILITY PUD PRELIMINARY - 30 91A - SUBMITTAL DOCUMENTS - ROUND 1 - LDGS ACTIVITY FORM (2)ACTIVITY: Industrial Uses DEFINITION: 0 All industrial and manufacturing uses, and other uses which are of the same general character. CRITERIA ` Each of the following applicable criteria must be answered "yes" and implemented within the development plan. Yes No NA 1. Does the project gain its primary vehicular access ❑ from a street other than South College Avenue? 2. Have all necessary precautions been taken to prevent all lubricants and fuel oil substances, which are stored on the site, from leaking or ❑ 110 draining into the groundwater system, streams, creeks, or other water bodies? 3. Are all repair, painting and body work activities, including the storage of refuse and vehicle parts, ❑ planned to take place within an enclosed structure? X 4. DOES THE PROJECT EARN AT LEAST 50% OF THE MAXIMUM POINTS AS CALCULATED ON "POINT CHART F" FOR THE [K] n FOLLOWING CRITERIA: �l a. Is the project located within "north" Fort Collins? b. Is the project contiguous to or functionally a part of an existing or planned office or industrial park, or in the case of a single user, employ a total of more than 100 full-time employees during a single 8-hour shift? -25- INDUSTRIAL USES POINT CHART F For All Criteria Applicable Criteria Only Criterion the Crtterlon Appkable Yea No 1 11 III IV Circle the Correct score Multlpuer Points Earned Izll Maximum Appilcable Points a. "North" Fort Collins X X 2Q 0 1 Z 2 b. Industrial Center X X�D 0 3 6 c. On Arterial Street X X 0 1 2 Z d. Energy Conservation X X 112131410 2 — 8 e. Historic Preservation X 1 0 2 4 y f. 1 2 0 g. 1 2 0 h. 1 2 0 i. 1 2 0 i 1 2 0 k. 1 2 0 l 1 1 2 0 Totals 14 2 Z v vi Percentage Earned of Maximum Applicable Points V/VI = VII Lo y vu