HomeMy WebLinkAboutEAST VINE DRIVE STREETS FACILITY PUD PRELIMINARY - 30 91A - SUBMITTAL DOCUMENTS - ROUND 1 - LDGS ACTIVITY FORM (2)ACTIVITY: Industrial Uses
DEFINITION:
0
All industrial and manufacturing uses, and other uses which are of the
same general character.
CRITERIA ` Each of the following applicable criteria must be
answered "yes" and implemented within the development
plan. Yes No NA
1. Does the project gain its primary vehicular access ❑
from a street other than South College Avenue?
2. Have all necessary precautions been taken to
prevent all lubricants and fuel oil substances,
which are stored on the site, from leaking or ❑ 110
draining into the groundwater system, streams,
creeks, or other water bodies?
3. Are all repair, painting and body work activities,
including the storage of refuse and vehicle parts, ❑
planned to take place within an enclosed structure? X
4. DOES THE PROJECT EARN AT LEAST 50% OF THE MAXIMUM
POINTS AS CALCULATED ON "POINT CHART F" FOR THE [K] n
FOLLOWING CRITERIA: �l
a. Is the project located within "north" Fort Collins?
b. Is the project contiguous to or functionally a part of an
existing or planned office or industrial park, or in the case
of a single user, employ a total of more than 100 full-time
employees during a single 8-hour shift?
-25-
INDUSTRIAL USES
POINT CHART F
For All Criteria
Applicable Criteria Only
Criterion
the
Crtterlon
Appkable
Yea No
1 11 III IV
Circle
the
Correct score
Multlpuer
Points
Earned
Izll
Maximum
Appilcable
Points
a. "North" Fort Collins
X
X
2Q
0
1
Z
2
b. Industrial Center
X
X�D
0
3
6
c. On Arterial Street
X
X
0
1
2
Z
d. Energy Conservation
X
X
112131410
2
—
8
e. Historic Preservation
X
1
0
2
4
y
f.
1
2
0
g.
1
2
0
h.
1
2
0
i.
1
2
0
i
1
2
0
k.
1
2
0
l
1
1 2
0
Totals 14 2 Z
v vi
Percentage Earned of Maximum Applicable Points V/VI = VII Lo y
vu