HomeMy WebLinkAboutSKIBO MINOR SUBDIVISION - 36 91 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEW6
Develop nt Services
Planning Department
City of Fort Collins
March 28, 1991
Esther Mae Gibson
1512 S. Shields Street
Fort Collins, CO 80521
Peggy Skibo
1001 N. College Avenue
Fort Collins, CO 80524
Dear Esther Mae and Peggy:.
For your information, attached is a copy of the Staff's comments concerning the Minor Plat for
Tattoo Studio at 1008 N. College Ave. which was presented before the Conceptual Review Team
on.March 25, 1991.
The comments. are offered informally by Staff to assist you in preparing the detailed
components of the project application. 'Modifications and additions to these comments may be
made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the review
process, please feel free to call me at 221-6750.
Since ely,
Kirsten Whetstone
Project Planner
KW/gjt
Attachment
xc: Tom Peterson, Director of Planning
Kerrie Ashbeck, Civil Engineer I
Project Planner
File
281 North College Avenue • P.O'. Box 580 • ,Fort Collins, CO 80522-0580 • (303) 221-6750
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: March 25, 1991
ITEM: Minor Plat for Tattoo Studio at 1008 N. College Ave.
APPLICANTS: Esther Mae Gibson
1512 S. Shields St.
Fort Collins, CO 80521
Peggy Skibo
1001 N. College Ave.
Fort Collins, CO 80524
LAND USE DATA: Request to use an existing building for a Tattoo
Studio. The building is currently used for car sales and used car
parking. The entire property is 3.3 acres but the applicant
intends to use only a portion for the tattoo studio. A back
building will be used for paper storage.
COMMENTS:
1. If the back building requires water or sewer service, you will
need separate water and sewer taps to serve it.
2. If the back building changes use from a paper storage area,
please contact Roger Frasco at the Fire Authority for any fire
requirements you will have to meet.
3. The zoning on the property is H-B, Highway Business, use
permitted in the B-L District are allowed in the H-B. Any use
permitted in the B-L, Limited Business District, not located
in a shopping center, is subject to. the following
a. The yard and parking requirements—of—the—B-L Limited
Business District shall be applicable.
b. The landscape requirements of the B-L, Limited Business
District, shall be applicable.
I will attach.some information specific to these requirements.
4. The width of the newly created lots will have to be a minimum
of 751. The Lot area will have to be at least 2 times the
.floor area of the buildings. Any building.must be at least
20' from any zoning line or alley way.
5. At least 6% of the interior parking, and drive area will be
required to be landscaped.
6. A landscape plan will be required as part of your submittal.
I will attach some information on this requirement. If you
have any questions, please do not hesitate to give me a call
and we could set up a time to meet and discuss the
requirements of a landscape plan.
7. The property is located in the Dry Creek Floodplain. If you
will not be adding any impervious. (paved or built on) surfaces
then no drainage report would be necessary. Please show the
floodplain on the plat with a note, and also note the
elevation of the water surface. If the building is ever
vacant for more than one year, it would have to meet the
requirements of the flood plain regulations.
8. If the north side of the building is less than 10 feet from
the property line, the north wall would have to be a one hour
fire rated wall.
9. The building will have to be handicapped accessible and any
bathroom will have to be handicapped accessible, if it is
feasible to do so. The Building Inspection Department would
be glad to review your plans and will work with you if you
have difficulty meeting these requirements. Please contact
Sheryl Helms at 221-6760 for further assistance.
10. The Engineering Department will meet with you to discuss the
future plans for the Fort Collins Expressway. College Avenue
is. master planned as a major arterial and the City would
foresee eventually needing an additional 20' of right-of-way
from this property.
11. You will be required to obtain a State Highway Access permit
for your proposed access to College Avenue. The Engineering
Department can assist you with the application. It generally
takes about one month to"process the application. Call Mike
Herzig at 221-6750 for further information. .
12. The Transportation and Engineering Departments have looked at
the site and determined that they will not be requiring you
.to install curb, gutter, and sidewalk at this time, but they
a landscaped buffer area, or with planters similar to what is
existing on the site. The planters should be arranged to
define an access point on your site. Additional access from
the north or south will probably still occur, It would be
a good idea to meet with the Engineering and Transportation
Departments, the adjacent property owners, Zoning, and myself
to see if we can work out a solution to the access situation.
Please give me a call if you would like me to schedule this
meeting.