May 29, 2020
Brett Barrow
Creative Angle Builders LLC
PO Box 307
Laporte, CO 80535
RE: Nittman Subdivision, FDP200008, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Nittman Subdivision. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Todd Sullivan via phone at 970-221-6695 or via email at
tsullivan@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Todd Sullivan, 970-221-6695, tsullivan@fc-qov.com
Topic: General
Comment Number: 1
Comment Originated: 05/26/2020
I will be your primary point of contact throughout the Development Review and
Permitting process.
Please reach out to me with any questions or concerns you may have, need
additional meetings with project reviewers, or general assistance throughout the
process.
Please include me in all email correspondence with other reviewers, and keep
me informed of any phone conversations. Thank you!
Comment Number: 2
Comment Originated: 05/26/2020
As part of your resubmittal you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a
different font color. When replying to the comment letter please be detailed in
your responses, as all comments should be thoroughly addressed. Provide
reference to specific project plans or explanations of why comments have not
been addressed, when applicable.
Page 1 of 6
Comment Number: 3
Comment Originated: 05/26/2020
Resubmittals are accepted any business day of the week, with Wednesday
noon being the deadline for routing that same week. When you are ready to
submit your formal plans, please make an appointment with me at least 24
hours in advance.
Comment Number: 4 Comment Originated: 05/26/2020
05/26/2020: "FOR HEARING" comments will need to be addressed and
resolved prior to moving forward with scheduling the Administrative Hearing.
Staff will need to be in agreement that the project is ready for hearing
approximately 3-5 weeks prior to the hearing to make the appropriate
arrangements and meet notification requirements.
Department: Planning Services
Contact: Shawna Van Zee, 970-224-6086, svanzee@fcgov.com
Topic: Site Plan
Comment Number: 1 Comment Originated: 05/26/2020
05/26/2020: FOR HEARING:
Existing trees will need to be added to the site plan prior to hearing.
Creative Angle Builders (CAB) Response: Existing trees and tree canopies have been field located and are
depicted on the existing/proposed conditions map.
Comment Number: 2 Comment Originated: 05/26/2020
05/26/2020: FOR HEARING:
See redlines for site plan.
CAB Response: Specific site plan redlines have been addressed and new site plan has been included with
this resubmittal.
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/25/2020
05/25/2020: FOR HEARING:
The plat shows the dedication of an irrigation easement. The Certificate of
Dedication statement has the City as being the beneficiary/grantee of
easements and there appears to be no distinction being made as the irrigation
easement being conveyed to another entity. It should be verified as to who is the
beneficiary of the irrigation easement, and that entity has given the OK with the
project going to hearing with the irrigation easement as depicted on the plat.
CAB Response: The ditch in front of the property that is closest to Scenic Drive is owned by Trilby Lateral
Ditch, however the ones that are behind the house are privately owned by Ms. Nittman. Irrigation easement
entities have been noted on the final plat, along with signature approval blocks.
Comment Number: 2 Comment Originated: 05/25/2020
05/25/2020: FOR HEARING:
The plat shows a "private access" easement being dedicated together with the
emergency access and utility easement. Private access easement would be
incongruent with being dedicated to the City. It would seem that this private
Page 2 of 6
access easement should be indicated separately and not being conveyed to the
City.
CAB Response: A note pertaining to the private access easement (pa) has been added to the final plat in
note form on sheet 1 of 2 and in note form on sheet 2 of 2. This language mimics that used for the plat of
old town north third filing.
Comment Number: 3
Comment Originated: 05/25/2020
05/25/2020: FOR HEARING:
It is believed that Xcel Energy would need to sign the plat for the establishment
of easements crossing their existing easement. Xcel should also be providing
either an OK comment and/or a letter of intent not objecting to the plat going to
hearing.
CAB Response: A signature block for Xcel energy has been added to the
final plat.
Comment Number: 4 Comment Originated: 05/25/2020
05/25/2020: FOR HEARING:
There does not appear to be any information showing existing and/or proposed
utilities. Where/how will water/sewer be provided?
CAB Response: City of FC has provided a Will -Serve letter for water and sewer. As stated during project
meeting on May 26m with City staff, this is not required at this point.
Comment Number: 5
Comment Originated: 05/25/2020
05/25/2020: INFORMATION ONLY:
An information for development agreements sheet should be filled out and
would be used to establish a development agreement pertaining to the status of
Scenic Drive.
CAB Response: Completed "Information for Development Agreements" form has been included with this
resubmittal.
Department: Light And Power
Contact: Cody Snowdon, 970-416-2306, csnowdon@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 05/21/2020
05/21/2020: INFORMATION ONLY:
The lot is currently served by an existing 25 KVA Single -Phase Transformer
located south of the existing house.
Comment Number: 2
Comment Originated: 05/21/2020
05/21/2020: FOR HEARING:
If the property is to be subdivided and a new Single -Family Dwelling is to be
serviced from the existing transformer, the existing electric line, from Scenic
Drive to the transformer, and the transformer will need to be in an easement, as
well as a path to Lot 1 for a future electric service. This will require the
underground electric line to be located and surveyed. Please see the my redlines.
CAB Response: A 10' utility easement encumbering the existing power service has been added over and
across lot 2. This will also serve proposed lot 1. The existing underground power service was field located
and falls within the proposed public utility easement along the common lot line.
Department: Environmental Planning
Page 3 of 6
Contact: Scott Benton, sbenton@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/22/2020
05/22/2020: INFORMATION ONLY: The requirement for an ECS for this project
has been waived as per the communication between the previous
Environmental Planner and the applicant dated April 8, 2019.
1 am available to visit the site should you require any clarification as to the edge
of the wetland.
Department: PFA
Contact: Jim Lynxwiler,
Topic: General
970-416-28699 jynxwiler@poudre-fire.org
Comment Number: 1
Comment Originated: 05/25/2020
05/25/2020: FOR HEARING: DEAD-END FIRE LANES
The proposed Emergency Access Easement (EAE) creates a dead-end fire
lane of approximately 240 feet in length with no turnaround. As currently shown,
this configuration would not be acceptable. Dead-end fire access roads in
excess of 150 feet in length shall be provided with an approved area for turning
around fire apparatus. As access to both properties will be served by this EAE
dedication, the recommended solution is to create a hammerhead style
turnaround that overlaps with the drive connection proposed on Lot 1. Feel free
to contact me to discuss.
CAB Response: Discussion item prior to hearing.
Comment Number: 2
Comment Originated: 05/25/2020
05/25/2020: FOR HEARING: FIRE LANE SPECIFICATIONS
Plan approval requires that additional information be provided so as to ensure
the fire lane is being constructed to minimum specifications (provided
previously). Details to be noted on the site plan.
Comment Number: 3 Comment Originated: 05/25/2020
05/25/2020: FOR HEARING: REQUIRED WATER SUPPLY
Current code requires a fire hydrant, capable of providing 1000 gpm at 20 psi
residual pressure to be located within 400 feet of any residence. For the
purposed of this section, this distance is measured along an approved path of
vehicle travel. The closest available hydrant is located on Scenic Drive to the
east, at a distance of approximately 635 feet from the proposed residence and
approximately 725 feet from the existing residence at 1000 Scenic Drive.
> In order to satisfy current fire code requirements, the installation of a fire
hydrant is required. Location TBD. The alternative to installing a hydrant is to
install a residential fire sprinkler system in the new home as an offset to the
hydrant requirement.
> The existing residence at 1000 Scenic Drive is non -compliant with regard to
water supply requirements, however, this condition will be considered
pre-existing and will not be subject to the hydrant requirement unless further
development is proposed on Lot 1. The installation of a hydrant (as noted
above) would be recommended (but not required) so as to serve both newly
created Lots by this subdivision.
> Either a new fire hydrant shall be noted on the updated plans or the plans
Page 4 of 6
shall note that construction of a residence on Lot 1 will have a fire sprinkler
requirement attached to the building permit.
Comment Number: 4
Comment Originated: 05/25/2020
05/25/2020: FOR HEARING: ADDRESS POSTING
New and existing buildings shall have approved address numbers placed in a
position that is plainly legible, visible from the street fronting the property, and
posted with a minimum of four -inch numerals on a contrasting background. This
requirement shall apply to both properties (existing and proposed). As access
to both lots shall be shared by the same driveway, the addresses shall also be
posted at the driveway connection at Scenic Drive.
Department: Stormwater Engineering —Erosion and Sediment Control
Contact: Basil Hamdan, 970-222-1801, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 05/20/2020
05/20/2020: INFORMATION ONLY:
No Erosion and Sediment Control Materials required at this time.
If site will disturbance exceeds 10,000 square feet when construction, then an
Erosion and Sediment Control Plan will be required prior to the issuance of a
building permit on the subdivided property.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcqov.com
Topic: General
Comment Number: 2
Comment Originated: 05/22/2020
05/22/2020: BUILDING PERMIT:
No comments at this time. A grading plan and drainage report will be required
at time of Building Permit.
Department: Outside Agencies
Contact: Nate Ensley, Fort Collins — Loveland Water District and South Fort Collins Sanitation District
Topic: General
Comment Number: 1
Comment Originated: 05/21/2020
05/21/2020: Fort Collins - Loveland Water District and South Fort Collins
Sanitation District has no comments for the subdivision.
Included as a separate document is a copy of the "Will Serve" letter issued
for this property.
Department: Technical Services
Contact: Jeff County, 970-221-65889 icounty@fcqov.com
Topic: Plat
Comment Number: 1
Comment Originated: 05/21/2020
Page 5 of 6
05/21/2020: FOR HEARING:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter.
CAB Response: Please see responses on redlines, being a part of this resubmittal.
Topic: Site Plan
Comment Number: 2
Comment Originated: 05/21/2020
05/21/2020: FOR HEARING:
The Easements shown need to match the references shown on the Subdivision
Plat. See redlines.
Comment Number: 3 Comment Originated: 05/21/2020
05/21/2020: FOR HEARING:
There are line over text issues. See redlines.
CAB Response: Please see updated documents.
Page 6 of 6