HomeMy WebLinkAboutAMIGOS AT SOUTH COLLEGE PUD 7.22.91 P AND Z BOARD HEARING - 31 91 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEW (2)Develop. at Services
Planning Department
City of Fort Collins
February 8,1991
Mr. William Strickfaden
125 Palmer Drive
Fort Collins, CO 80525
Dear Mr. Strickfaden:
For your information, attached is a copy of the Staff's comments concerning the fast food
restaurant/car wash/tube center which was presented before the Conceptual Review Team on
February 4,1991.
The comments are offered informally by Staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these comments maybe
made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the review
process, please feel free to call me at 221-6750.
Sincerely,
�)4 /'( dt4�
Kirsten Whetstone
Project Planner
KW/kb
xc: Tom Peterson, Planning Director
Kerrie Ashbeck, Civil Engineer I
Project Planner
File
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: February 4, 1991
ITEM: Fast food Restaurant, 6 Bay Car Wash, and 3 Bay Lube Center
located at the southeast corner of College and Kensington (future).
APPLICANT: William Strickfaden
125 Palmer Drive
Ft. Collins, CO 80525
LAND USE DATA:
This is a proposal for a fast food restaurant, a 6 bay carwash, and a 3 bay auto tube center
located at the southeast corner of College and Kensington (future extension) on 1.7 acres owned
by College Limited. There was also a request for information and direction on a conceptual
plan for a 150,000 to 175,000 sq. ft. grocery store/commercial center on the College Limited
property North of Harmony and West of JFK Parkway (future extension).
COMMENTS:
1. You will need to fill out a C-1 form from Light and Power and normal development
charges will apply. Please contact Light and Power at 221-6700 for further information
as you finalize your site design. You would probably want to have a shared transformer
for the three buildings, with access from Kensington.
2. There is an existing water main along Pavilion Lane from College Avenue to the canal.
Sewer is on north side of Pavilion Lane and continues on east past the canal. You will
need to extend lines south to Kensington to serve the fast food restaurant/car wash
property. There will have to be some planning and coordinating of utilities between
this property and the Holter property. Future water lines across the proposed
grocery/commercial property are being planned and designed. Please coordinate and
confirm location of these utilities with the City Water and Wastewater Department. A
master utility plan will be required. You would want to coordinate your development
wiiii tthese plans-Contact-Owen-Randall-at-221�6681-for_information concerning future
lines in the area.
3. The irrigation canal near the two properties in question, has been improved. A storm
drainage report and grading/drainage plans will be required at the time of submittal.
On -site detention will be required for the area east of the canal and may be required
for the area to the west depending on the drainage report. The property is in the
McClelland -Mail Creek Basin and the fees for that basin apply. One master drainage
plan for the entire area would be acceptable.
4. A traffic study will be required at submittal. This study could cover the entire area at
once or in phases as the areas develop. Conceptually, the street system as you have
drawn them, are in conformance with the Transportation Departments plans. In
addition to the PUD process, you will also have to go through the process to amend the
South College and Harmony Road Access Plans. Any proposed access points, signals,
decel lanes, turn lanes, etc. will have to be designed to the Highway Access Codes design
standards. The traffic study will be important in determining future improvements in
the area.
5. A key to designing the access and circulation system for the restaurant/ car wash center
as well as the grocery center, will be close coordination with the neighboring properties.
It is important to incorporate in your design any future plans which the neighboring
property owners might have for their land. Both of these projects have ramifications
on the neighbors and the future of presently vacant surrounding land..
6. A more. specific comment is to design the grocery center to get traffic to circulate to the
south of the parking lot rather than in front of the stores.. This avoids potential
conflicts with pedestrians and automobiles.
7. A 60' half street is required for College Avenue.
8. A detailed intersection design of the College Avenue and Kensington intersection will
be required.
9. Access permits are granted through the Engineering Department.
10. Street Oversizing Fees of $1405.00 per acre are required for the proposed uses.
11. A transportation/access coordination meeting should be arranged to discuss access to
the grocery center concept plan as well as the location of the signal at Harmony. This
signal location should be coordinated with the property owners to the south of Harmony
as well.
12. Zoning on the site is bp, planned business, with a PUD condition. Any development
proposals will be considered under the requirements of the Land Development
Guidance System.
13. The Planning Department urges you to consider architectural consistencyamong the
various buildings in a center. Consider especially, exterior materials, roof lines,
signage, color, and texture for a common thread. If there is a corporate identity
associated with the fast food restaurant or grocery store, tie in a general architectural
theme throughout the center, to blend the franchise in with the other buildings.
14. Landscaping and berming will be requiredTto buffer the -parking -areas -from -the -street•
frontages. Street trees should be located 40' from light poles, ornamental trees should
be located 15' away.
15. One monument sign per lot per frontage will be allowed. Be prepared to include all of
the uses on the monument sign on the College Avenue frontage. Reader boards are
highly discouraged. A menu board is considered a freestanding sign.
16. Utility Plans will need a signature block for the Ditch Company which owns the ditch
crossing the property.
17. Harmony Corridor Plan design guidelines should be adhered to for the grocery center.
Consult Linda Ripley at 221-6376 for specific guidelines.
18. Provide for. pedestrian access between shops and between the parking lot and the
grocery store in the grocery/commercial center.
19. In May of 1981 the Planning and Zoning Board approved the South College Properties
Superblock #1 Master Plan of which the property in question is a part. An amendment
of the Superblock Plan is not required as the uses proposed are within the list of uses
shown on the Superblock plan. We would require you to prepare and submit a Master
Plan of the specific properties in question. This Master Plan should include the Holter
property, the Schrader property, as well as the College Limited properties that you are
considering for development at this time. The Master Plan should indicate proposed
uses, approximate acreage and gross density of each area, access and circulation
patterns, topographic characteristics of the land, information about the surrounding
land ownership and use, proposed phasing plans, and other items listed in the attached
"Submittal Requirements for Master Plans".
20. The Preliminary PUD Plan for the carwash/fast food center may be submitted at the
same time as the Master Plan, to be reviewed simultaneously. I have attached
information on submittal requirements for Preliminary PUD Plans. If you have any
questions, please do not hesitate to call.
21. Courtesy review of the grocery/commercial center does not satisfy the requirement for
a conceptual review of that item prior to submittal. When designs are further along for
that particular site, we would request that you sign up for another conceptual review,
so that we can give you more detailed comments.