Loading...
HomeMy WebLinkAboutAMIGOS AT SOUTH COLLEGE PUD 7.22.91 P AND Z BOARD HEARING - 31 91 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWDevelopr it Services Planning Department February 11, 1991 Mr. William Strickfaden 125 Palmer Drive Fort Collins, CO 80525 Dear Bill, I had a few additional comments on your proposal for a fast food restaurant/ car wash center, which you presented at the February 4, 1991 Conceptual Review meeting. These comments are related to Storm Drainage issues for both of your items. 1. The area to the west of the Ditch can drain to the ditch. There is a restriction that you have detention, if necessary, to maintain a release rate of no greater than 0.87 cfs/acre. 2. The area to the east of the Ditch can not drain back to the Ditch. Storm flows on the east side need to drain to the east. On site detention is required. 3. The two. reports which contain these restrictions on storm drainage in this area are: The Landings Master Drainage Plan and the Heart SID Drainage Plan.. 4. Additionally, the Storm Water Utility Department will re -study the whole area in question in the next 6 months. You may want to wait until that study is completed before proceeding with plans for the eastern site. 5. If you have any documentation showing other than these restrictions, or which allow you to drain the eastern flows to the ditch, or anything else, please provide —that documentation—to_us so that we may update our files. If you have any questions please contact. Susan Hayes at 221-6589 or myself at 221-6750. Thank you. Sincceer'elly, li _ Kirsten A. Whetstone Project Planner cc Susan Hayes Tony Hughes Tom Peterson, Planning Director Kerrie Ashbeck, Civil Engineer I Project Planner File 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750.