Loading...
HomeMy WebLinkAboutMOUNTAIN VIEW COMMUNITY CHURCH - PDP200008 - SUBMITTAL DOCUMENTS - ROUND 2 - PLANSA,3 2,2 3,2 4,2 5,2 6,2 A B C A,2 B,2 C,2 D,2 E,2 2,3 3,3 4,3 D 2 3 4 5 6 7 1 B,3 C,3 D,3 E,3 F,3 G,3 8 S1 SA S3 SB S5 S6 S7 S8 S9 1111 1111 1111 1111 1111 1111 1111 1111 1111 1111 1111 2222 2222 2222 2222 2222 1111 0 1/2 " 1" 2" 5 4 3 2 1 A B C E PROJECT DATE DRAWN 712 WHALERS WAY SUITE, B-100 FORT COLLINS, CO 80525 (970) 223-1820 UP UP A,3 2,2 3,2 4,2 5,2 6,2 A B C A,2 B,2 C,2 D,2 E,2 2,3 3,3 4,3 2 3 4 4 1 B,3 C,3 D,3 E,3 F,3 G,3 1 A5.2 S1 SA S3 SB 2 A5.2 EXISTING LADDER FROM ROOF OF CENTER BUILDING TO THE ROOF THE EAST BUILDING 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 1/4" / 12" 3/16" / 12" 3/16" / 12" 3/16" / 12" 3/16" / 12" REMOVE EXISTING ROOF TOP MECHANICAL UNITS AND PATCH ANY EXISTING HOLES. REMOVE EXISTING ROOF TOP MECHANICAL UNITS AND PATCH ANY EXISTING HOLES. REMOVE EXISTING ROOF TOP MECHANICAL UNITS AND PATCH ANY EXISTING HOLES. REMOVE EXISTING ROOF TOP MECHANICAL UNITS AND PATCH ANY x x x x x x x x x Wall mounted ventilator, vent pipes, condensing units & screen wall get removed as a part of phase 1. All major rooftop units and tall vent stacks are to be removed as a part of phase 1. Only the smaller vents related to the bathroom grouping at the south end are to remain. Entire southwest metal building structure is demolished in phase 2 All roof mounted equipment on the northwest metal roof will be removed in phase 1. New ductwork coming from the new RTUs "farm" will be kept on the east side of the ridge extending no more than half way up the slope x x x Small screen wall & associated units to be removed. New screen wall the full width of the north one-story flat roof section to be installed as a part of phase 1. Condensing unit to be removed as a part of phase 1. Existing RTUs are not readily visible from adjacent parking areas since they are positioned in the middle of the roof. You have to be more than 150' away from the building before the very x x top edges become visible. x x x x x x x x x x x x x x x x x x x All major rooftop units on the 2-story east wing are to remain in operation. They are centered on the roof and are not readily visible from any nearby parking or drive aisle. You have to get way back from the building to even start seeing the very top edge of the units. Reference the pictures on the right. x x x x x x x x x x x x New RTU "farm" on new structural frame over existing roof in area shown in blue. x x Roof-Mounted Equipment Demolition Plan & Images MVCC I 7/28/20 I alm2s x x x x x EXISTING HOLES. PROVIDE HOLES IN THE ROOF FOR NEW MECHANICAL UNITS - REF. MECH. REMOVE EXISTING ROOF AND PREP FOR NEW SLOPED ROOF - REF. STRUC. FUTURE RTU - REF. MECH 6 A7.1 7 A7.1 A9.6 1 A9.6 2 A9.6 3 A9.6 4 A9.6 6 A9.6 7 5 A9.7 4 A9.7 5 6 S5 S6 S7 S8 S9 A4.3 1 A4.3 2 A8.1 2 A8.1 4 A8.1 3 A8.2 7 5 8 6 17 A8.2 20 19 18 A8.2 9 10 11 12 16 A8.2 15 14 13 22 A8.3 23 A8.2 1 2 3 4 A8.3 13 16 15 14 A8.3 9 8 7 10 A8.3 3 2 1 4 18 A8.3 21 A8.3 A8.3 11 A8.3 5 6 12 19 20 17 A8.4 9 12 11 10 A8.4 15 A8.3 14 24 25 A8.4 17 16 A8.4 A8.4 13 5 A8.5 6 A8.5 A8.5 7 EXISTING CONDITIONS DEPICTED WERE TAKEN FROM OWNER FURNISHED DOCUMENTS. VERIFY ALL EXISTING CONDITIONS AND NOTIFY THE ARCHITECT OF ANY AND ALL DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL CONDITIONS PRIOR TO COMMENCING ANY DEMOLITION WORK. GENERAL CONTRACTOR AND SUB-CONTRACTOR TO MAINTAIN INTEGRITY OF EXISTING CEILING AND WALL ASSEMBLIES AND TO PROVIDE ADDITIONAL SMOKE AND FIRESTOPPING AT ANY AND ALL PENETRATIONS MADE DURING THE COURSE OF DEMOLITION. IT IS THE INTENT OF THIS DEMOLITION PLAN TO COMMUNICATE TO THE CONTRACTOR THE AMOUNT AND EXTENT OF DEMOLITION ACTIVITIES REQUIRED TO CLEAR EXIST. MATERIALS FROM THE PATH OF NEW CONSTRUCTION. INDIVIDUAL ITEMS, ALTHOUGH NOT SPECIFICALLY REFERRED TO, MAY REQUIRE DEMOLITION TO ACCOMPLISH THIS END. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONDUCT A THOROUGH INSPECTION OF AFFECTED AREAS AND PROVIDE A BID ADEQUATE TO ACCOMPLISH THE WORK WITHOUT CHANGES TO THE CONTRACT AMOUNT. SEE CONSTRUCTION PLANS FOR NEW FINISHES. IF NO NEW FINISH IS SPECIFIED FOR AN AREA WHERE DEMOLITION HAS OCCURRED NEW FINISH IS TO MATCH ADJACENT FINISHES. SEE ARCHITECTURAL CONSTRUCTION DRAWINGS TO VERIFY EXTENT OF DEMOLITION AS SHOWN ON DEMOLITION DRAWINGS. NOTIFY ARCHITECT OF ANY DISCREPANCIES. PROVIDE ALL NECESSARY DUST BARRIERS TO ENSURE A SAFE AND CLEAN ENVIRONMENT FOR THE BUILDING WHICH WILL REMAIN OPEN FOR BUSINESS DURING PHASE 2. ALL AREAS OF DEMOLITION SHALL BE PREPPED FOR NEW CONSTRUCTION. ALL MATERIALS THAT ARE TO REMAIN OR TO BE RELOCATED SHALL BE CLEANED & PREPARED FOR INSTALLATION. CONTRACTOR TO VERIFY ALL MECHANICAL REMOVAL W/ MECHANICAL DESIGN BUILD SUB CONTRACTOR. MECHANICAL MAY REQUIRE SELECTIVE DEMOLITION FOR INSTALLATION OF NEW SYSTEMS. EXISTING WALLS AND COLUMNS WHERE DEMOLITION OCCURRED SHALL BE PATCHED AND SANDED AS REQUIRED FOR FINISH TO MATCH ADJACENT FINISH. ALL DEMOLITION SHALL BE SAWCUT OR OTHER MEANS TO PROVIDE A SMOOTH EDGE. EXISTING FIRE SPRINKLER SYSTEM TO REMAIN AND BE ADDED ONTO. RELOCATE ANY HEAD WHICH PENETRATES NEW FINISHED CEILING TO BE FLUSH WITH NEW CEILING. RELOCATE ANY PIPING WHICH PENETRATES NEW FINISHED CEILING TO BE ABOVE NEW CEILING. REPAIR, PATCH ALL EXISTING WALLS TO MATCH EXISTING WHERE AFFECTED BY DEMOLITION AND/OR NEW CONSTRUCTION. NEW FINISHES TO MATCH QUALITY AND CHARACTER OF EXISTING REFER TO ELECTRICAL DRAWINGS FOR DEMOLITION OF ELECTRICAL SYSTEMS, IF ANY AND IF APPLICABLE. ALL EQUIPMENT, FIXTURES, ETC. THAT ARE TO BE REUSED AND/OR RELOCATED ARE TO BE STORED IN AN AREA THAT IS SAFE FROM DAMAGE AND/OR DEBRIS DUE TO DEMOLITION AND/OR CONSTRUCTION ACTIVITY. ITEMS TO BE RELOCATED AND/OR REUSED MUST BE CLEAN AND FREE FROM DEFECTS - CONSULT WITH OWNER. CLEAN ENTIRE AREA AFFECTED BY CONSTRUCTION. DEMO GENERAL NOTES: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. RED LINES ON THE DRAWINGS REPRESENT WALLS, DOORS, WINDOWS, AND SITE ELEMENTS THAT ARE TO BE DEMOLISHED / REMOVED. 0 1/2 " 1" 2" 6 5 4 3 2 A B C D PROJECT DATE DRAWN 712 WHALERS WAY SUITE, B-100 FORT COLLINS, CO 80525 (970) 223-1820 www.alm2s.com PRINTED FILE NAME: 1 E © alm2s 2015 NOT FOR CONSTRUCTION SD REVIEW SET - 2020-04-29 7/16/2020 9:47:37 AM 0000-Project-SD.rvt ROOF DEMO PLAN - PHASE 1 2013 Author 06/05/2020 D1.3 2330 EAST PROSPECT ROAD FORT COLLINS, COLORADO MOUNTAIN VIEW COMMUNITY CHURCH SCALE: N 1/8" = 1'-0" 03 - ROOF DEMO PLAN - PHASE 1 -DEMOLITION NOTES- Key Value Keynote Text NO ISSUE DATE www.alm2s.com PRINTED FILE NAME: © alm2s 2017 NOT FOR CONSTRUCTION 6 D 14-Jul-20 3:28:12 PM HVAC ROOF DEMO PLAN 20-026 TMS 28 APR 2020 H1.1 2330 EAST PROSPECT ROAD FORT COLLINS, COLORADO MOUNTAIN VIEW COMMUNITY CHURCH NO ISSUE DATE 0" 1" 2" HVAC DEMO 1/8" = 1'-0" ROOF PLAN 1111 MCBE MC TO REMOVE HVAC EQUIPMENT AND CURB. ROOF TO BE PATCHED AND REPAIRED BY OTHERS. 2222 RTU HAS RECENTLY BEEN REPLACED. UNIT IS DEDICATED TO THE SECOND FLOOR. NO WORK IS REQUIRED FOR THIS SYSTEM.