Loading...
HomeMy WebLinkAboutPARAGON POINT PUD PHASE FOUR PRELIMINARY - 48 91G - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS1, May 5, 1993 Ted Shepard Planning Department City of Fort Collins 281 North College Avenue Fort Collins, CO 80522 RE: Paragon Point Phase IV, Preliminary P.U.D. Staff Comments Dear Ted: The attached plans address staff comments of April 23. The numbering reflects that used in your comments. Any numbered comment not addressed here will be responded to by TST Engineers. Per Planting Notes, location of trees will be adjusted to provide the required clearance. 2. Final Planting Details will show PVC liner/apron for protection of pavement. Street details will address curb type and cross pan. 6. Provided. 7. Street names have not been determined yet. 8. The cul-de-sac lots at Brittany Court and "C" Court are graded to provide walk -out basements. The side yards will have too much grade change to provide a bike/pedestrian path, but there will be a path between lots 40 and 41. 10. No fencing will be permitted along the Open Space described. 11. We have adjusted the walk location and median in the cul-de- sacs to provide a 20' driveway apron clear of the walk. 12. Description has been re -worded. 13. Per our discussion with Rob Wilkinson of Natural Resources, the developer will install protective construction fencing between the wetland area and the development boundary. This will be in place before any construction begins adjacent to this area. Sill DesiSs Graphic J, r a aPa ewe Planning r'� or117 E�rcan�gg4.1921 14. The first paragraph of the Planning Objectives has been clarified as to dates of approval. 15. Provided. Sincerely, JIM SELL DDEE/SIIGnN� e Kay Farce