Loading...
HomeMy WebLinkAboutWATERGLEN SOLAR ARRAY - FDP200013 - SUBMITTAL DOCUMENTS - ROUND 1 - RESPONSE TO STAFF REVIEW COMMENTSCity of Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6689 970.224.6134 - fax tcgov. com/developmentreview May 29, 2020 Ian Skor Sandbox Solar 430 N College Ave #441 Fort Collins, CO 80524 RE: Waterglen Solar Array, PDP190010, Round Number 4 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of Waterglen Solar Array. If you have questions about any comments, you may contact the individual commenter or direct your questions through your Development Review Coordinator, Brandy Bethurem Harras via phone at 970-416-2744 or via email at bbethuremharras@fcgov.com. Comment Summary: Department: Development Review Coordinator Contact: Brandy Bethurem Harras, 970-416-2744, bbethuremharras@fcgov.com Topic: General Comment Number: 1 04/28/2020: INFORMATION ONLY: Comment Originated: 08/21/2019 I will be your primary point of contact throughout the development review and permitting process. Todd Sullivan will be filling in for me in my absence. He can be contacted at 970.221.6695 or tullivan@fcgov.com . If you have any questions, need additional meetings with the project reviewers, or need assistance throughout the process, please let me know and I can assist your team. Please include me in all email correspondence with other reviewers and keep me informed of any phone conversations. Thank you! Comment Number: 2 04/28/2020: INFORMATION ONLY: Comment Originated: 08/21/2019 Resubmittals are accepted any day of the week, with Wednesday at noon being Page 1 of 7 the cut-off for routing the same week. When you are ready to submit your formal plans, please make an appointment with me at least 24 hours in advance. Everything would be electronic. Comment Number: 3 Comment Originated: 08/21/2019 04/28/2020: INFORMATION ONLY: As part of your resubmittal you will respond to the comments provided in this letter. This letter is provided to you in Microsoft Word format. Please use this document to insert responses to each comment for your submittal, using a different font color. When replying to the comment letter please be detailed in your responses, as all comments should be thoroughly addressed. Provide reference to specific project plans or explanations of why comments have not been addressed, when applicable. Comment Number: 4 Comment Originated: 08/21/2019 08/21/2019: INFORMATION ONLY: The proposed development project is subject to a Type 2 Review. The decision maker for your project will be the Planning & Zoning Board at a public hearing. For the hearing, we will formally notify surrounding property owners within 800 feet (excluding public right-of-way and publicly owned open space). Comment Number: 5 04/28/2020: FOR HEARING: Comment Originated: 08/21/2019 "FOR HEARING" comments will need to be addressed and resolved prior to moving forward with scheduling the hearing. Staff would need to be in agreement the project is ready for hearing approximately 3-5 weeks prior to the hearing. There are key material due dates in order to be scheduled on the Planning and Zoning Board Agenda. Department: Planning Services Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com Topic: General Comment Number: 8 05/27/2020 FOR FINAL: Comment Originated: 04/29/2020 Thank you for providing the construction memo. At FDP additional notes will need to be added to the site plan to articulate the point of conflict and conditions that will apply to the project. Please expect a follow-up comment (post hearing). Response: Acknowledged. We will follow up after public hearing regarding additional comments to be included on the site plan. 04/29/2020 FOR HEARING: Please provide a narrative clearly describing the details of the anticipated construction process for the site. Staff would like to ensure that no impacts occur on any private property not contained within the limits of development of this site. Page 2 of 7 Response: Letter of Construction from Sandbox & Temple attached. - Ian Skor, Sandbox Comment Number: 9 05/27/2020 FOR HEARING: Comment Originated: 05/27/2020 It appears that all proposed landscaping is outside of the platted area of the solar array. Before hearing please provide a signed letter of intent between the applicant and property owner that clarifies that the proposed landscaping is permitted and that any reasonable and/or necessary changes as a result of the public hearing or staff comment is allowed. Response: Letter of Intent from Property Owner Attached - Ian Skor, Sandbox Comment Number: 10 05/27/2020 FOR FINAL: Comment Originated: 05/27/2020 Depending on how the agreement of off -site landscaping is finalized additional notes are needed for the landscaping plan that summarizes the elements of the agreement between the property owner and project owner. Response: The project will be providing two accolade elm trees to be planted at Rabbitbrush Park in lieu of Department: Stormwater Engineering Contact: Basil Hamdan, 970-222-1801, bhamdan@fcqov.com Topic: Erosion Control Comment Number: 9 05/20/2020: FOR FINAL: Comment Originated: 04/27/2020 Please specify the "detention Basin Mix" called out on the Landscape Plan. FINAL PLAN - UPDATED: Please provide final stabilization for the entire site including the area where the solar arrays are to be installed. Response: A note referencing the Upland Mix specified on the landscaping plans was added to the erosion control plan. 08/20/2019: FOR HEARING: Please describe how the site will be stabilized during construction and in the ultimate condition. Response: Final stabilization for the site will be per the landscaping plans. Please specify reseeding that will be done to the disturbed areas. Response: A note referencing the Upland Mix specified on the landscaping plans was added to the erosion control plan. Please use the add the standard Erosion and Sediment Control notes per the City's Criteria. Response: The standard Erosion and Sediment Control notes are included on Sheet EC2. Department: Light And Power Contact: Luke Unruh, 9704162724, lunruh@fcqov.com Page 3 of 7 Topic: General Comment Number: 1 Comment Originated: 08/20/2019 08/20/2019: INFORMATION ONLY: It is my understanding that all electric / solar integration to L&P existing facilities have been worked out and that the solar array will be tying into the existing transformer that is on site. Please contact Luke Unruh if this plan changes. Comment Number: 2 Comment Originated: 08/20/2019 08/20/2019: FOR FINAL PLAN: A commercial service information form (C-1 form) and a one line diagram for all commercial meters will need to be completed and submitted to Light & Power Engineering for review prior to Final Plan. A link to the C-1 form is below: http://zeus.fcgov.com/utils�rocedures/files/EngWiki/WikiPdfs/C/C-1 Form.odf Response: C1 Form & Electrical Diagram are Attached. (Sandbox) Comment Number: 3 08/20/2019: FOR FINAL PLAN: Comment Originated: 08/20/2019 Meter location will need to be coordinated with Light and Power. Please show proposed meter location on the Utility Plan. The current location seems to conflict with the proposed entrance. Response: Meter location was added to the Utility Plan set. Comment Number: 4 Comment Originated: 08/20/2019 08/20/2019: FOR INFORMATION: If any existing electric infrastructure needs to be relocated or underground as part of this project, it will be at the expense of the developer and will need to be relocated within a dedicated easement. Please coordinate relocations with Light and Power Engineering. Response: Noted, Thanks - Ian Skor, Sandbox Solar Comment Number: 5 08/20/2019: FOR FINAL PLAN: Comment Originated: 08/20/2019 Electric capacity fees, development fees, building site charges and any system modification charges necessary to feed the site will apply to this development. Please contact me or visit the following website for an estimate of charges and fees related to this project: http://www.fcgov. com/utilities/b usiness/b u i lders-and-developers/plant-investm en t-development-fees Response: Submitted C1 & Electrical Diagram to Utilities. Received Quote fees and prepared to pay for charges for 200A capacity. - Ian Skor, Sandbox Solar Comment Number: 6 Comment Originated: 08/20/2019 08/20/2019: INFORMATION ONLY: Please contact Luke Unruh with Light & Power Engineering if you have any questions at (970) 416-2724. Please reference our policies, construction practices, development charge processes, electric services standards, and fee estimator at: http://www.fcgov.com/utilities/business/builders-and-developers. Page 4 of 7 Response: Noted, Thanks - Ian Skor, Sandbox Solar Department: Environmental Planning Contact: Kelly Smith, , ksmith@fcgov.com Topic: General Comment Number: 1 Comment Originated: 05/22/2020 05/22/2020: Please edit site and landscape plans to delineate the 150' Cooper Slough (not 100' from wetlands), measured from edge of wetlands. Response: The landscape plan has been updated to include the 150' Cooper Slough measurement. Department: Forestry Contact: Nils Saha, , Topic: General nsaha@fcqov.com Comment Number: 13 5/20/2020: FOR FINAL -UPDATED Comment Originated: 04/28/2020 Was an updated Tree Removal Feasibility Letter submitted for this round? It has not been received by Forestry. Please ensure this letter is updated and submitted at FDP. Response: A final letter has been provided. 04/28/2020: FOR FINAL PLAN: Please provide an updated Tree Removal Feasibility Letter. Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jynxwiler@poudre-fire.org Topic: General Comment Number: 12 05/25/2020: FOR HEARING Comment Originated: 05/25/2020 The project has resolved all comments required for hearing. Remaining comments may be resolved during final plans approval. Comment Number: 13 Comment Originated: 05/25/2020 05/25/2020: FOR FINAL APPROVAL - PLANS LABELING > Site Plan; Pg. S1: Please label the fire lane as an Emergency Access Easement. > Utility Plan; Pg. U1: Please label the fire lane as an Emergency Access Easement. > Please revise other portions of plans that still refer to an Emergency Access Page 5 of 7 Road and change them to EAE. Response: The emergency access easements labels on the site and utility plans were revised per the comment. Comment Number: 14 Comment Originated: 05/25/2020 05/25/2020: FOR FINAL APPROVAL - POSTING > Detail location of "Emergency Access Only - 40 Ton" signage at entry to the array off Elgin Court. > Detail location of solar array address sign. Response: A note specifying the location of the emergency access sign was added to the utility plans. Department: Internal Services Contact: Katy Hand, , khand@fc-gov.com Topic: Building Insp Plan Review Comment Number: 1 Comment Originated: 11/04/2019 11/04/2019: BUILDING PERMIT: A separate building permit will be required for electrical, & structural attachments. Response: Sandbox Solar will submit a building permit and floodplain use permit. - US Department: Technical Services Contact: Jeff County, 970-221-6588, 'county@fcgov.com Topic: General Comment Number: 1 05/26/2020: INFORMATION ONLY: Comment Originated: 08/19/2019 Unless required during PDP, a complete review of all plans will be done at FDP. 04/27/2020: INFORMATION ONLY: Unless required during PDP, a complete review of all plans will be done at FDP. 10/30/2019: INFORMATION ONLY: Unless required during PDP, a complete review of all plans will be done at FDP. 08/19/2019: INFORMATION ONLY: Unless required during PDP, a complete review of all plans will be done at FDP. Topic: Plat Comment Number: 2 Comment Originated: 04/27/2020 05/26/2020: FOR FINAL PLAN -UPDATED: Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response Page 6 of 7 letter. Response: The plat was updated per the received redlines. 04/27/2020: FOR FINAL PLAN: Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter. Department: Outside Agencies Contact: Allan Breden, , Topic: General Comment Number: 3 04/17/2020: INFORMATION ONLY: Comment Originated: 10/23/2019 BNSF takes no exceptions to the design. No impact was noted to BNSF from review. 10/23/2019: INFORMATION ONLY: BNSF takes no exceptions to the design. Page 7 of 7