Loading...
HomeMy WebLinkAboutBLEVINS SUBDIVISION LOT 9 PUD PRELIMINARY - 42-91 - SUBMITTAL DOCUMENTS - ROUND 1 - LDGS ACTIVITY FORMAdk DENSITY CHART Maximum Earned Criterion Credit If All Dwelling Units Are Within: Credit - a 20% 2000 feet of an existing or approved neighborhood shopping center. 10% ll 650 feet of an existing transit stop. �� �, ' - AIJo IfOS G1.1�{ /0 /C 1 10% 4000 feetofan existing orapproved regional shopping center, 20% 3500 feet of an existing or reserved neighborhood park community park or community facility, e h(,Q r 1 W 10% y0a 1000 feetofaschoohmee�tirsgCall Me reauiremenhoffhe compulsory education O1he5toteo lor tlo.3000 feet of a motor employment center.55% 1000 feet of a child care center.h 20% 'North -Fort Collins20% I The Central Business District. A project whose boundary is contiguous to existing urban development, Credit may be earned as follows: 30% 0%— For projects whose property boundary nos 10 to0t 10%contiguity10o 0%—Forprojectswhosepropertyboundaryhas10to20%contiguity. 15 to 20%— For projects whose property boundary has 20 to 30%contiguity, ��!!\\ n ��7I�n..wrrV For contiguity: �W 01o� 1 P oundary 2 — . projectswhose pperly as 40 to 50% 5 to 30% For projects whospropedy boundary has40 to 50%contiguity: k If it can be demonstrated that the project will reduce non-renewable energy useage either through the application of alternative energy systems or through committed energy conservation measures beyond that normally required by Ity Code,a 5% bonus may be earned for every 5%reduction in energy use. I Calculate a 1% bonus for every 50 acres included in the project. m Calculate the percentage at the total acres in the project that are devoted to recreational use. enter 112 of that percentage as a bonus. It the applicant commits to preserving permanent ofhite open space that meets the Citys minimum requirements calculate the percentage In oithis open space acreage to the total development acreage, enter this percentage as a bonus. it part of the total development budget Is to be spent on neighborhood public transit facilities which are not otherwise required by City Code. O enter 2%bonus for every$100 per dwelling unit invested. If part of the total development budget is to be spent on neighborhood facilities and services which are not otherwise required by City Code. P enter al%bonus for every$100 per dwelling unitimested. 11 a commitment is being made to develop a specified percentage of the total number of dwelling units for low income families, enter that 4 percentage as a bonus. up to a maximum of 30%. 11 a commitment is being made to develop a specified percentage of the total number of dwelling units for Type'A" and Type'B'handicapped Z housing as defined by the City of Fort Collins calculate the bonus as follows: O Type'A"— Slimes Typt—alum - of A unites oaun _ Type'B"-7.Otimes Type'B'units - - --- - - -- - In no case shall the combined bonus be greater than 30%. It the site or adjacent property contains an historic building or place. a bonus may be earned for the followings 3% — For preventing or mitigating outside influences (e.g.environmental, land use aesthetic, economic and social factors) adverse to its 5 preservation; 3% — For assuring that newstructures will be in keepingwith the character of the building or place, while avoiding total units 3% — For proposing odaplNe use of the building o place thatwill lead to its continuance, preservation and improvement in on approprolemanner. It a portion orall ofthe required parking In the mumplefamily project is provided underground.within the building.o in on elevated parking structure man accessory use to" primary structure.o bonus may be gamed astollows: t 9% — For providing75% or more of the parking in a structure. 6% — Far providing 50-74% of the parking in a structure: 3% — For providing 25-49% of the parking in a structure. u If a commitment is being made to provide approved automatic fire extinguishing systems for the dwelling units enter a bonus of l0%. TOTAL k01b - 30- R. Kint Glover 2101 Lindenmeier Rd. Fort Collins, CO 80524 September 26, 1991 Kirsten Whetstone City Planner City of Fort Collins RE: Lot 9 Blevins Court PUD Preliminary Submittal Kirsten: The following addresses the density chart and schedule for the above referenced project. Density Chart: Criteria B: 650 feet from existing transit stop Review: A transit stop is on the corner of Center Avenue and Lake Street Credit Earned: 100 Criteria C: 4000 feet of an existing or approved regional shopping center Review: The University Mall on South College Avenue Credit Earned: 100 Criteria D: 3500 feet of an existing or reserved neighborhood park, community park or community facility Review: Spring Creek Park/Bikeway, Rolland Moore Park or park by Fort Collins High School Credit Earned: 200 Criteria E: 1000 feet of a school meeting all the requirements of the compul- sory laws of State of Colorado Review: The Fort Collins SDA School, located at 821 W. Lake Street meets the requirements. Contact person: Garry Sudds, Educational Superintendent, 2520 S. Downing, Denver, Colorado 80210, (303) 733-3771 Credit Earned: 100 Criteria F: 3000 feet of a major employment center Review: Colorado State University Credit Earned: 200 Criteria G: 1000 feet of a child care center Review: Colorado State University on West Lake Street and the Sonlight Day Care Center located at 821 West Lake Street Credit Earned: 5a Criteria J : Contiguous boundary Review: 100% contiguity Credit Earned: 30o Total Credits from above: 105% Possible additional credit: Criteria A : 2000 feet of an existing or approved neighborhood center Review: Choice Center Shopping Center (College Ave. and Prospect St.) Credit Earned: Subjective Development Schedule: The triplex on Lot 9 Blevins Court will begin construction barring unfore- seen events, approximately 10-180 days after a six-inch water line is brought up Blevins Court. Mark Taylor (City Water Engineer) has indicated he expects the water line and fire hydrant to be installed in the spring of 1992. (See also attached letter from Mark Taylor dated April 26, 1991.) The triplex will be under construction approximately 120-200 days barring unforeseen conditions.