Dear Mr. Glover:
For your information, attached is a copy of the Staff's comments concerning Lot
9 Blevins Court, which was presented before the Conceptual Review Team on April
29, 1991.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
Kirsten Whetstone
Project Planner
..Attachment
xc: Tom Peterson, Planning Director
Kerrie Ashbeck, Civil Engineer
Project Planner
File
281 North College Avenue • P.O. Box 380 • Fort Collins, CO 80522-0580 • (303) 221-6750
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: April 29, 1991
ITEM: Lot 9 Blevins Court
APPLICANT: Robert Kent Glover
David E. Knox
901 Canosa Ct.
Fort Collins, CO 80526
LAND USE DATA: This is a proposal to construct a one and a half
story four-plex structure on a vacant lot. The property is
described as lot 9 in Blevins Subdivision, located on Blevins Court
between West Lake and West Prospect, just west of South Whitcomb
Road. The lot is approximately 12,000 sq. ft. in size.
COMMENTS:
1. The property is zoned RL, Low Density Residential, which does
not allow a four plex as a use by right. This proposal would
have to be submitted and reviewed as a PUD, Planned Unit
Development, under the Land Development Guidance System. You
would have to address the "All Development" criteria, paying
particular attention to the social and neighborhood
compatibility criteria. You would also have to address the
Density Chart and provide justification for all points taken.
2. A neighborhood meeting would be required prior to submittal.
I,will attach some information on the neighborhood meeting
process, but generally we need about 2-3 week lead time to
properly notify the neighborhood.
3. Normal Light and Power development charges apply. Consult the .
hand out from Light and Power to determine your charges. Your
__ _._electric service will be placed underground with this
development. Light and Power will do some research to see
what the time frame.looks like for undergrounding service in
the rest of the neighborhood. It may depend on the Streets
Department schedule for road overlays.
7.
4.' Mark -Taylor from the Water and Wastewater Department sent you
a letter describing the problem with water service to this
lot. When the new water main is built you can take your
service off of it. There needs to be a minimum of 15'
separating the sewer main from the building. You will need to
dedicate utility easements for this purpose.
5. All exterior portions of the building need to be within 150'
of a road, for fire access. Please contact the Poudre Fire
Authority at 221- 6570 for more information. A fire hydrant
will be necessary and will be placed at the end of the water
main in Blevins Court.
6. Parkland fees are $625 per unit and are collected at the time
of building permit issuance.
7. This property is in the Spring Creek Basin where Storm
Drainage fees are $1610 per acre. A storm drainage report,
and grading and drainage plan will be required as part of the
submittal. On site detention will be required and can
possibly be incorporated into your parking area. The report
should verify that outfall to the curb and gutter will be
sufficient.
8. A one hour fire construction is required between, all units,
whether vertically or horizontally..
9. A traffic impact, analysis will be required with your study.'
Contact the Transportation Department for specific
information. The issue of adequate on -site parking, as well
as visitor/ over -flow parking into the neighborhood, should be
addressed by the study. A bike barn or shed for bike parking
and security is a great idea.
10. Any damaged sidewalks, curbs, and gutters should be repaired
or replaced at this time. A street cut permit from the
Engineering Department would be required for cutting into
streets for utility taps.
11. Street oversizing fees of $584/unit are applicable and are
collected at the time of building permit issuance.
12. Contact Dave Klockeman at 221-6605 for information on the
timing of street overlays in the area. The water main will be
constructed prior to any overlays.
13. A landscape plan will be required as part of your submittal.
The importance of screening and buffering along the property
lines can not be over emphasized. The general guide would be
to provide a 75% opaque screen from the single family lots.
--This could be a shadow box fence or landscaping which provides
the same opacity.
14. Staff would encourage you to contact the Prospect Shields
Neighborhood Group c/o Emily Smith at 1000 W. Prospect, Fort
Collins, CO 80521, prior to the neighborhood meeting. They
will likely have many comments and ideas for you to
incorporate into your design.