HomeMy WebLinkAboutVOICE OF TRUTH TABERNACLE - PDP200011 - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTGEOTECHNICAL SUBSURFACE EXPLORATION REPORT
VOICE OF TRUTH TABERNACLE
LOT 1, VOICE OF TRUTH TABERNACLE SUBDIVISION
1108 NORTH TIMBERLINE ROAD
FORT COLLINS, COLORADO
SOILOGIC # 19-1028
January 30, 2020
Soilogic, Inc.
3522 Draft Horse Court • Loveland, CO 80538 • (970) 535-6144
January 30, 2020
Voice of Truth Tabernacle
1132 Sawtooth Oak Court
Fort Collins, Colorado 80525
Attn: Mr. Tito Moreira
Re: Geotechnical Subsurface Exploration Report
Voice of Truth Tabernacle
Lot 1, Voice of Truth Tabernacle Subdivision – 1108 North Timberline Road
Fort Collins, Colorado
Soilogic Project # 19-1028
Mr. Moreira:
Soilogic, Inc. (Soilogic) personnel have completed the geotechnical subsurface
exploration you requested for the proposed Voice of Truth Tabernacle building and
associated site improvements to be constructed on a portion of Lot 1, Voice of Truth
Tabernacle Subdivision in Fort Collins, Colorado. The results of our subsurface
exploration and pertinent geotechnical engineering recommendations are included with
this report.
The subsurface materials encountered in the completed site borings consisted of a thin
mantle of vegetation and topsoil underlain by light brown/brown lean clay with varying
amounts of sand. The lean clay varied from medium stiff to hard in terms of consistency,
generally exhibited no to low swell potential (although one (1) sample of lean clay
obtained from boring B-1 at a depth of approximately 2 feet below ground surface
exhibited moderate swell potential) at current moisture and density conditions and
extended to the bottom all borings at depths ranging from approximately 5 to 15 feet
below present site grade. Groundwater was not encountered in the completed site borings
at the time of drilling.
Based on the subsurface conditions encountered, results of laboratory testing and type of
construction proposed, it is our opinion the proposed church building could be supported
by conventional spread footing foundations bearing on natural, undisturbed lean clay with
low swell potential and/or properly placed and compacted fill and/or overexcavation/
backfill (if/where required). The presence of near-surface moderately expansive lean
clay at the location of boring B-1 completed in the proposed church building area will
Geotechnical Subsurface Exploration Report
Voice of Truth Tabernacle – Lot 1, Voice of Truth Tabernacle Subdivision
1108 North Timberline Road, Fort Collins, Colorado
Soilogic # 19-1028
2
require care in mitigating those soils prior to foundation and flor slab construction. If
identified to any appreciable extent at the time of construction, extending footing
foundations through these soils to bear on low swelling clays at greater depth and/or
overexcavation/backfill procedures will be required. The exact depth and extent of any
required overexcavation/backfill procedures can best be established at the time of
construction through openhole/test pit observation. The site soils would be considered
LVC and could be used as fill and overexcavation/backfill (if required) to develop the
site. The reconditioned near-surface site lean clay and properly placed and compacted fill
and overexcavation/backfill consisting of on-site lean clay or approved low volume
change (LVC) import soils could be used for support of the building floor slabs, exterior
flatwork and site asphalt and/or concrete pavements. Pavement section design options
for the site drive and parking area pavements are included with this report. Other
opinions and recommendations concerning design criteria and construction details for the
proposed site improvements are also provided.
We appreciate the opportunity to be of service to you on this project. If you have any
questions concerning the enclosed information or if we can be of further service to you in
any way, please do not hesitate to contact us.
Very Truly Yours,
Soilogic, Inc. Reviewed by:
Zach Gordon, E.I. Wolf von Carlowitz, P.E.
Project Engineer Principal Engineer
GEOTECHNICAL SUBSURFACE EXPLORATION REPORT
VOICE OF TRUTH TABERNACLE
LOT 1, VOICE OF TRUTH TABERNACLE SUBDIVISION
1108 NORTH TIMBERLINE
FORT COLLINS, COLORADO
SOILOGIC # 19-1028
January 30, 2020
INTRODUCTION
This report contains the results of the completed geotechnical subsurface exploration for
the proposed Voice of Truth Tabernacle church and associated site improvements to be
constructed on a portion of Lot 1, Voice of Truth Tabernacle Subdivision in Fort Collins,
Colorado. The purpose of our exploration was to describe the subsurface conditions
encountered in the completed site borings and develop the test data necessary to provide
recommendations concerning design and construction of the church foundation and
support of floor slabs, exterior flatwork and site pavements. Pavement section design
options are also included. The conclusions and recommendations outlined in this report
are based on the results of the completed field and laboratory testing and our experience
with subsurface conditions in this area.
PROPOSED CONSTRUCTION
Based on the provided site plan and discussion with the client, we understand the church
building will be a partial two-story steel frame structure constructed as slab-on-grade and
with a partial basement area. Foundation loads for the building are expected to be
relatively light, with continuous wall loads less than 3.5 kips per lineal foot and
individual column loads less than 75 kips. As part of the proposed site improvements, we
understand associated exterior flatwork and site drive and parking area pavements will be
constructed. Traffic loading on the site pavements is expected to include areas of both
low volumes of automobiles and light trucks as well as areas of higher light-vehicle
traffic volumes and occasional heavy truck traffic. Small grade changes are expected to
develop finish site grades for the proposed development.
Geotechnical Subsurface Exploration Report
Voice of Truth Tabernacle – Lot 1, Voice of Truth Tabernacle Subdivision
1108 North Timberline Road
Fort Collins, Colorado
Soilogic # 19-1028
2
SITE DESCRIPTION
The project site includes an approximate 2.39-acre parcel of land described as Lot 1,
Voice of Truth Tabernacle Subdivision, located at 1108 North Timberline Road in Fort
Collins, Colorado. The proposed development will be completed to the north of the
existing site residence. At the time of our site exploration, a majority of the site was
undeveloped/vacant and contained a sparse to moderate growth of grass and weed
vegetation. The site was observed to be relatively level across the property, with the
maximum difference in ground surface elevation across the property estimated to be less
than 2 feet. Evidence of prior building construction was not observed in the proposed
construction areas by Soilogic personnel at the time of our site exploration.
SITE EXPLORATION
Field Exploration
To develop subsurface information for the proposed site improvements, a total of five (5)
soils borings were extended to depths ranging from approximately 5 to 15 feet below
present site grade. Two (2) soil borings were completed in the approximate church
building footprint, with one (1) boring completed in the future church building area and
two (2) additional borings completed in proposed drive and parking areas. The boring
locations were established in the field by Soilogic personnel based on a provided site plan
and by using a mechanical surveyor’s wheel and estimating angles from identifiable site
references. A diagram indicating the approximate boring locations is included with this
report. The boring locations outlined on this diagram should be considered accurate only
to the degree implied by the methods used to make the field measurements. Graphic logs
of each of the auger borings are also included.
The test holes were advanced using 4-inch diameter, continuous-flight auger powered by
a truck-mounted CME-45 drill rig. Samples of the subsurface materials were obtained at
regular intervals using California barrel sampling procedures in general accordance with
ASTM specification D-1586. As part of the D-1586 sampling procedure, standard
sampling barrel is driven into the substrata using a 140-pound hammer falling a distance
Geotechnical Subsurface Exploration Report
Voice of Truth Tabernacle – Lot 1, Voice of Truth Tabernacle Subdivision
1108 North Timberline Road
Fort Collins, Colorado
Soilogic # 19-1028
3
of 30 inches. The number of blows required to advance the sampler a distance of 12
inches is recorded and helpful in estimating the consistency, relative density or hardness
of the soils and/or bedrock encountered. In the California barrel sampling procedure,
relatively undisturbed samples are obtained in removable brass liners. Samples of the
subsurface materials obtained in the field were sealed and returned to the laboratory for
further evaluation, classification and testing.
Laboratory Testing
The samples collected were tested in the laboratory to measure natural moisture content
and were visually and/or manually classified in accordance with the Unified Soil
Classification System (USCS). The USCS group symbols are indicated on the attached
boring logs. An outline of the USCS classification system is included with this report.
As part of the laboratory testing, a calibrated hand penetrometer (CHP) was used to
estimate the unconfined compressive strength of essentially-cohesive specimens. The
CHP also provides a more reliable estimate of soil consistency than tactual observation
alone. Dry density, Atterberg limits, -200 wash and swell/consolidation tests were
completed on selected samples to help establish specific soil characteristics. Atterberg
limits tests are used to determine soil plasticity. The percent passing the #200 size sieve (-
200 wash test) is used to determine the percentage of fine-grained materials (clay and silt)
in a sample. Swell/consolidation tests were conducted to evaluate soil volume change
potential under loading and saturation conditions. As part of the laboratory testing, water
soluble sulfate tests were completed on selected soil samples to evaluate corrosive soil
characteristics with respect to buried concrete. The results of the completed laboratory
tests are discussed subsequently in this report and outlined on the attached boring logs
and swell/consolidation test summaries.
SUBSURFACE CONDITIONS
The subsurface materials encountered in the completed site borings consisted of a thin
mantle of vegetation and topsoil underlain by light brown/brown lean clay with varying
amounts of sand. The lean clay varied from medium stiff to hard in terms of consistency,
Geotechnical Subsurface Exploration Report
Voice of Truth Tabernacle – Lot 1, Voice of Truth Tabernacle Subdivision
1108 North Timberline Road
Fort Collins, Colorado
Soilogic # 19-1028
4
generally exhibited no to low swell potential (although one (1) sample of lean clay
obtained from boring B-1 at a depth of approximately 2 feet below ground surface
exhibited moderate swell potential) at current moisture and density conditions and
extended to the bottom all borings at depths ranging from approximately 5 to 15 feet
below present site grade. Groundwater was not encountered in the completed site borings
at the time of drilling.
The stratigraphy indicated on the included boring logs represents the approximate
location of changes in soil and bedrock types. Actual changes may be more gradual than
those indicated.
Groundwater was not encountered in the completed site borings at the time of drilling.
Groundwater levels will vary seasonally and over time based on weather conditions, site
development, irrigation practices and other hydrologic conditions. Perched and/or trapped
groundwater conditions may also be encountered at times throughout the year. Perched
water is commonly encountered in soils overlying less permeable soil layers and/or
bedrock. Trapped water is typically encountered within more permeable zones of layered
soil and bedrock systems. The location and amount of perched/trapped water can also
vary over time.
General
In general, the light brown/brown site lean clay soils encountered across a majority of the
site exhibited no to low swell potential at current moisture and density conditions. Dark
brown, hard lean clay which exhibited moderate swell potential was encountered at a
depth of approximately 2 feet below ground surface at the location of boring B-1
completed at the approximate northeast corner of the proposed church building and may
be present near-surface at other locations within the building footprint. Careful evaluation
of the depth and extent of moderately expansive dry and hard dark brown clay should be
completed at the time of construction through openhole/test pit observation. If more
extensive zones of moderately expansive dark brown lean clay are observed extending
below the proposed foundation and floor slab subgrade elevations, extending footing
foundations through these materials to bear on low swelling clays at greater depth and
Geotechnical Subsurface Exploration Report
Voice of Truth Tabernacle – Lot 1, Voice of Truth Tabernacle Subdivision
1108 North Timberline Road
Fort Collins, Colorado
Soilogic # 19-1028
5
completing overexcavation/backfill procedures beneath building floor slabs will be
required. Low-swelling lean clay soils are anticipated at depths between about 3 to 4 feet
below ground surface in the area of boring B-1. The exact depth and extent of the
moderately expansive site lean clay can best be established at the time of construction
through openhole/test pit observation.
Site Development
All existing vegetation and topsoil should be completely removed from the building,
exterior flatwork, pavement and any proposed fill areas. The moderately expansive dark
brown lean clay encountered in boring B-1 should also be removed to low-swelling lean
clay levels from beneath the church building footprint and to a minimum depth of 2 feet
from below exterior flatwork and site pavements at this time. As previously outlined, the
depth and extent of required expansive soil removal (if any) can best be established at the
time of site development/excavation through test pit and/or openhole observation. After
stripping and completing all cuts and overexcavation procedures and prior to the
placement of any new fill, overexcavation/backfill or overlying improvements, Soilogic
recommends the exposed subgrade soils be scarified to a depth of 9 inches, adjusted in
moisture content and compacted to at least 95% of the materials standard Proctor
maximum dry density. The moisture content of the scarified subgrade soils should be
adjusted to within the range of -1 to +3% or standard Proctor optimum moisture content
at the time of placement and compaction.
Fill and overexcavation/backfill soils required to develop the site should consist of
approved low volume change (LVC) soils free from organic matter, debris and other
objectionable materials. Based on results of the completed laboratory testing, it is our
opinion the site lean clay could be used as fill and overexcavation/backfill to develop the
site. If it is necessary to import additional material to the site for use as fill, those
materials should consist of approved LVC and relatively impervious materials and be
approved prior to use. Typically soils with a liquid limit less than 40 and a plasticity
index less than 18 could be considered LVC. Import soils should contain a minimum of
25% fines (material passing the #200 size sieve) in order to reduce permeability. We
recommend the site lean clay and/or similar materials be placed in loose lifts not to
Geotechnical Subsurface Exploration Report
Voice of Truth Tabernacle – Lot 1, Voice of Truth Tabernacle Subdivision
1108 North Timberline Road
Fort Collins, Colorado
Soilogic # 19-1028
6
exceed 9 inches thick, adjusted in moisture content and compacted as recommended for
the scarified subgrade soils above.
Care should be taken to avoid disturbing the reconditioned subgrade soils and placed fill/
overexcavation/backfill materials prior to placement of any overlying improvements.
Soils which are allowed to dry or out or become wet and softened or disturbed by the
construction activities should be removed and replaced or reworked in place prior to
concrete placement and/or paving.
Foundations
Based on the materials encountered in the completed site borings and results of field and
laboratory testing, it is our opinion the proposed church building could be supported by
continuous spread footing and isolated pad foundations bearing on natural, undisturbed,
stiff to hard lean clay with low swell potential or properly placed and compacted fill or
overexcavation/backfill (if required). Care should be taken at the time of construction to
ensure all footing foundations bear on like materials with suitable strength and low
volume change potential. If more extensive zones of moderately expansive lean clay soils
are encountered at that time, extending footing foundations through moderately
expansive lean clay soils to bear on lean clay with low swell potential at slightly greater
depth than is typical may be required.
For design of foundations bearing on natural, undisturbed, stiff to hard lean clay and/or
suitable fill or overexcavation/backfill compacted to at least 95% of the material’s
standard Proctor maximum dry density, we recommend using a maximum net allowable
soil bearing pressure of 1,500 psf. As a precaution, we recommend footing foundations
be designed to maintain a minimum dead load pressure of 500 psf on the supporting soils.
Exterior footings should bear a minimum of 30 inches below finished adjacent exterior
grade to provide frost protection. We recommend formed strip footings have a minimum
width of 12 inches and isolated pad foundations have a minimum width of 24 inches in
order to facilitate construction and reduce the potential for development of eccentrically
loaded footings. Actual footing widths should be designed by a structural engineer.
Geotechnical Subsurface Exploration Report
Voice of Truth Tabernacle – Lot 1, Voice of Truth Tabernacle Subdivision
1108 North Timberline Road
Fort Collins, Colorado
Soilogic # 19-1028
7
For design of footing foundations and foundation walls to resist lateral movement, a
passive equivalent fluid pressure value of 250 pcf could be used. The top 30 inches of
subgrade could be considered a surcharge load but should not be used in the passive
resistance calculations. A coefficient of friction of 0.35 could be used between foundation
and floor slab concrete and the bearing soils to resist sliding. The recommended passive
equivalent fluid pressure value and coefficient of friction do not include a factor of
safety.
We estimate settlement of footing foundations designed and constructed as outlined
above and resulting from the assumed structural loads would be less than 1 inch.
Differential settlement could approach the amount of total movement estimated above. If
water from any source is allowed to infiltrate the foundation bearing soils, additional
movement of the foundations could occur.
Backfill placed adjacent to foundation walls should consist of LVC potential and
relatively impervious soils free from organic matter, debris and other objectionable
materials. Native site lean clay could be used as backfill in these areas provided the
proper moisture content is developed in those materials at the time of placement and
compaction. We recommend the native site lean clay and/or similar backfill soils be
placed in loose lifts not to exceed 9 inches thick, adjusted in moisture and compacted as
previously outlined in the “Site Development” section of this report.
Excessive lateral stresses can be imposed on unilaterally backfilled foundation walls
when using heavier mechanical compaction equipment. We recommend compaction of
unbalanced foundation wall backfill soils be completed using light mechanical or hand
compaction equipment.
Seismic Design
Based on the results of this investigation and Soilogic’s review of the International
Building Code (IBC - 2015), a soil profile type D could be used for the site strata. Based
on our review of United States Geologic Survey (USGS) mapped information, design
spectral response acceleration values of SDS = 0.192 and SD1
= 0.092 could be used.
Geotechnical Subsurface Exploration Report
Voice of Truth Tabernacle – Lot 1, Voice of Truth Tabernacle Subdivision
1108 North Timberline Road
Fort Collins, Colorado
Soilogic # 19-1028
8
Below Grade Construction
We recommend a perimeter drain system be installed around all below-grade areas to
help reduce the potential for water infiltration into the basement area and/or the
development of hydrostatic pressures behind the below-grade walls. A perimeter drain
system should consist of a 4-inch diameter perforated drain pipe surrounded by a
minimum of six (6) inches of free-draining gravel. A filter fabric should be installed
around the free-draining gravel or perforated pipe to reduce the potential for an influx of
fine-grained soils into the system. The invert of the drain pipe, at its high point, should be
placed at approximate foundation bearing levels, run around the exterior perimeter of the
below-grade area with a minimum slope of ⅛-inch per foot to facilitate efficient water
removal and should discharge to sump pump and pit system. Care should be taken during
perimeter drain installation to avoid disturbing those soils providing support to the
residence footing foundations (extending down at a 1:1 slope from the bottom edges of
the footings).
Floor Slabs and Exterior Flatwork
In the basement area, the floor slab could be supported directly on natural undisturbed
site lean clay with low swell potential. At-grade floor slabs and exterior flatwork could be
supported directly on reconditioned natural site soils and/or properly placed and
compacted fill or overexcavation/backfill (if required) developed as outlined in the “Site
Development” section of this report. A modulus of subgrade reaction (k) value of 150 pci
could be used for design of floor slabs supported on reconditioned natural site lean clay
or similar LVC fill materials. Disturbed subgrades or subgrade soils that have been
allowed to dry out or become wet and softened should be removed and replaced or
reconditioned in place prior to floor slab and exterior flatwork construction.
Floor slabs should be designed and constructed as floating slabs, separated from
foundation walls, columns and plumbing and mechanical penetrations by the use of block
outs or appropriate isolation material. Additionally, we recommend all partition walls
supported above slabs-on-grade be constructed as floating walls to help reduce the
potential for differential slab-to-foundation movement causing distress in upper sections
Geotechnical Subsurface Exploration Report
Voice of Truth Tabernacle – Lot 1, Voice of Truth Tabernacle Subdivision
1108 North Timberline Road
Fort Collins, Colorado
Soilogic # 19-1028
9
of the structures. A minimum one and one-half (1½) inch void space is recommended
beneath all floating walls. Special attention to door and stair framing, drywall installation
and trim carpentry should be taken to isolate those elements from the floor slabs,
allowing for some differential floor slab-to-foundation movement to occur without
transmitting stresses to the overlying structures.
Depending on the type of floor covering and floor covering adhesive used in finished
slab-on-ground areas, a vapor barrier may be required immediately beneath the floor
slabs to maintain flooring product manufacturer warranties. A vapor barrier would help
reduce the transmission of moisture through floor slabs. However, the unilateral moisture
release caused by placing concrete on an impermeable surface can increase slab curl. The
amount of slab curl can be reduced by careful selection of an appropriate concrete mix
and proper placement and curing procedures. Slab curl cannot be eliminated. Soilogic
recommends the owner, architect and flooring contractor consider the performance of the
slab in conjunction with the proposed flooring products to help determine if a vapor
barrier will be required and where best to position the vapor barrier in relation to the floor
slab. Additional guidance and recommendations concerning slab-on-grade design can be
found in American Concrete Institute (ACI) section 302.
Exterior flatwork will experience some movement subsequent to construction as the
subgrade soils increase in moisture content. Based on results of the completed field and
laboratory testing, we expect the amount of movement of exterior flatwork supported on
reconditioned natural site soils and/or properly placed and compacted fill and
overexcavation/backfill (if required) would be limited.
Site Pavements
Pavement subgrades should be developed as outlined in the “ Site Development” section
of this report. Site pavements could be supported directly on the reconditioned subgrade
soils and/or suitable fill and overexcavation/backfill soils placed and compacted as
outlined in that section.
Geotechnical Subsurface Exploration Report
Voice of Truth Tabernacle – Lot 1, Voice of Truth Tabernacle Subdivision
1108 North Timberline Road
Fort Collins, Colorado
Soilogic # 19-1028
10
The pavement subgrades are expected to consist of reconditioned lean clay. The lean clay
soils classify as A-6 soils in accordance with the American Association of State and
Highway Transportation Officials (AASHTO) classification system and would be subject
to low remolded shear strength. A resistance value (R-value) of 5 was estimated for the
lean clay subgrade soils and used in the pavement section design. Traffic loading on the
site pavements is expected to consist of areas of low volumes of automobiles and light
trucks, as well as areas of higher light vehicle traffic volumes and occasional heavier
trash and delivery trucks. Equivalent 18-kip single axle loads (ESAL’s) were estimated
for the quantity of site traffic anticipated. Two (2) general pavement design categories are
outlined below in Table I. Standard duty pavements could be considered in automobile
drive and parking areas. Heavy duty pavements should be considered for access drives
and other areas of the site expected to receive higher traffic volumes or heavy truck
traffic.
Proofrolling of the pavement subgrades should be completed to help identify unstable
areas. Areas which pump or deform excessively should be stabilized prior to asphalt,
PCC or aggregate base course placement. Depending on the in-place moisture content of
the subgrade soils immediately prior to paving, the time of year when construction occurs
and other hydrologic conditions, stabilization of the subgrade soils may become
necessary to develop a suitable paving platform. Isolated areas of instability can be
mended on a case by case basis. If more extensive areas of subgrade instability are
observed at the time of construction, overall chemical stabilization of the pavement
subgrade soils could be completed to develop a suitable paving platform. If required, we
recommend consideration be given to stabilization of the pavement subgrades with Class
C fly ash. With the increase in support strength developed by the chemical stabilization
procedures, it is our opinion some credit for the stabilized zone could be included in the
pavement section design, reducing the required thickness of overlying asphaltic concrete
and aggregate base course. Chemical stabilization can also eliminate some of the
uncertainty associated with attempting to pave during periods of inclement weather.
Pavement section design options incorporating some structural credit for the fly-ash
stabilized subgrade soils are outlined below in Table 1.
Geotechnical Subsurface Exploration Report
Voice of Truth Tabernacle – Lot 1, Voice of Truth Tabernacle Subdivision
1108 North Timberline Road
Fort Collins, Colorado
Soilogic # 19-1028
11
TABLE 1 – PAVEMENT SECTION DESIGN
Standard Duty Heavy Duty
Option A – Composite
Asphaltic Concrete (Grading S or SX)
Aggregate Base (Class 5 or 6)
4”
6”
5”
8”
Option B – Composite on Stabilized Subgrade
Asphaltic Concrete (Grading S or SX)
Aggregate Base (Class 5 or 6)
Fly Ash Stabilized Subgrade
3”
4”
12”
4”
6”
12”
Option C - Portland Cement Concrete Pavement
PCCP
5”
6”
Asphaltic concrete should consist of a bituminous plant mix composed of a mixture of
aggregate, filler, binders and additives (if required) meeting the design requirements of
the City of Fort Collins. Aggregate used in the asphaltic concrete should meet specific
gradation requirements such as Colorado Department of Transportation (CDOT) grading
S (¾-inch minus) or SX (½-inch minus) specifications. Hot mix asphalt designed using
“Superpave” criteria should be compacted to within 92 to 96% of the materials Maximum
Theoretical Density. Aggregate base should be consistent with CDOT requirements for
Class 5 or Class 6 aggregate base, placed in loose lifts not to exceed 9 inches thick and
compacted to at least 95% of the materials standard Proctor maximum dry density.
If chemical stabilization procedures will be completed, we recommend the addition of
12% Class ‘C’ fly ash based on component dry unit weights. A 12-inch thick stabilized
zone should be constructed by thoroughly blending the fly ash with the in-place subgrade
soils. Some “fluffing” of the finish subgrade level should be expected with the
stabilization procedures. The blended materials should be adjusted in moisture content to
within the range of ±2% of standard Proctor optimum moisture content and compacted to
at least 95% of the material’s standard Proctor maximum dry density within two (2) hours
of fly ash addition.
For areas subjected to truck turning movements and/or concentrated and repetitive
loading such as dumpster or truck parking and loading areas, we recommend
consideration be given to the use of Portland cement concrete pavement with a minimum
thickness of 6 inches. The concrete used for site pavements should be air entrained and
Geotechnical Subsurface Exploration Report
Voice of Truth Tabernacle – Lot 1, Voice of Truth Tabernacle Subdivision
1108 North Timberline Road
Fort Collins, Colorado
Soilogic # 19-1028
12
have a minimum 28-day compressive strength of 4,000 psi. Woven wire mesh or fiber
entrained concrete should be considered to help in the control of shrinkage cracking.
Areas of the site expected to receive higher volumes of heavy truck traffic may require
thicker pavement sections. We would be happy to complete a pavement section design
based on the actual type and quantity of heavy truck traffic anticipated.
The proposed pavement section designs do not include an allowance for excessive
loading conditions imposed by heavy construction vehicles or equipment. Heavily loaded
concrete or other building material trucks and construction equipment can cause some
localized distress to site pavements. The recommended pavement sections are minimums
and periodic maintenance efforts should be expected. A preventative maintenance
program can help increase the service life of site pavements.
Corrosive Soil Characteristics
We measured the soluble sulfate concentration of two (2) representative samples of the
subsoils which will likely be in contact with structural concrete. The sulfate
concentrations measured in the samples fell within the range of 0 to 0.1% by weight in
soil. ACI rates the measured concentrations as being defined as a “negligible risk”
category for concrete sulfate attack; therefore, Type I cement should be suitable for
concrete members on and below grade. As an added precaution, Type I/II Portland
cement could be considered for additional sulfate resistance of site concrete. Structural
concrete should be designed in accordance with the provisions of the ACI Design
Manual, Section 318, Chapter 4.
Drainage
Positive drainage is imperative for satisfactory long-term performance of the proposed
church building, associated site improvements. We recommend positive drainage be
developed away from the structure during construction and maintained throughout the
life of the site improvements, with twelve (12) inches of fall in the first 10 feet away from
the building. Shallower slopes could be considered in hardscape areas. In the event that
Geotechnical Subsurface Exploration Report
Voice of Truth Tabernacle – Lot 1, Voice of Truth Tabernacle Subdivision
1108 North Timberline Road
Fort Collins, Colorado
Soilogic # 19-1028
13
some settlement of the building backfill soils occurs over time, the original grade and
associated positive drainage outlined above should be immediately restored.
Care should be taken in the planning of landscaping to avoid features which could result
in the fluctuation of the moisture content of the foundation bearing and flatwork and
pavement subgrade soils. We recommend watering systems be placed a minimum of 5
feet away from the perimeter of the site structures and be designed to discharge away
from all site improvements. Gutter systems should be considered to help reduce the
potential for water ponding adjacent to the structures, with the gutter downspouts, roof
drains or scuppers extended to discharge a minimum of 5 feet away from structural,
flatwork and pavement elements. Water which is allowed to pond adjacent to site
improvements can result in unsatisfactory performance of those improvements over time.
LIMITATIONS
This report was prepared based upon the data obtained from the completed site
exploration, laboratory testing, engineering analysis and any other information discussed.
The completed borings provide an indication of subsurface conditions at the boring
locations only. Variations in subsurface conditions can occur in relatively short distances
away from the borings. This report does not reflect any variations which may occur
across the site or away from the borings. If variations in the subsurface conditions
anticipated become evident, the geotechnical engineer should be notified immediately so
that further evaluation and supplemental recommendations can be provided.
The scope of services for this project does not include either specifically or by
implication any biological or environmental assessment of the site or identification or
prevention of pollutants or hazardous materials or conditions. Other studies should be
completed if concerns over the potential of such contamination or pollution exist.
The geotechnical engineer should be retained to review the plans and specifications so
that comments can be made regarding the interpretation and implementation of our
geotechnical recommendations in the design and specifications. The geotechnical
Geotechnical Subsurface Exploration Report
Voice of Truth Tabernacle – Lot 1, Voice of Truth Tabernacle Subdivision
1108 North Timberline Road
Fort Collins, Colorado
Soilogic # 19-1028
14
engineer should also be retained to provide testing and observation services during
construction to help determine that the design requirements are fulfilled.
This report has been prepared for the exclusive use of our client for specific application
to the project discussed and has been prepared in accordance with the generally accepted
standard of care for the profession. No warranties express or implied, are made. The
conclusions and recommendations contained in this report should not be considered valid
in the event that any changes in the nature, design or location of the project as outlined in
this report are planned, unless those changes are reviewed and the conclusions of this
report modified and verified in writing by the geotechnical engineer.
LOG OF BORING B-1
1/1 CME 45
4" CFA
Automatic
JL / BM
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
3-6" VEGETATION & TOPSOIL -
1
-
2
-
3 CS 37 13.0 100.6 9000+ 4.3% 3200 - - -
-
4
-
5 CS 26 11.1 109.2 9000+ 2.3% 2000 39 22 62.8%
-
6
-
CL SANDY LEAN CLAY 7
light brown, brown -
medium stiff to hard 8
-
9
-
10 CS 11 11.9 111.4 9000+ - - - - -
-
11
-
12
-
13
-
14
-
15 CS 8 14.7 115.2 6500 - - - - -
BOTTOM OF BORING @ 15.0' -
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
VOICE OF TRUTH TABERNACLE
1108 NORTH TIMBERLINE ROAD, FORT COLLINS, COLORADO
LOG OF BORING B-2
1/1 CME 45
4" CFA
Automatic
JL / BM
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
3-6" VEGETATION & TOPSOIL -
1
-
2
-
3 CS 17 7.6 102.5 9000+ 1.2% - - - -
-
4
-
5 CS 20 7.4 111.5 9000+ 1.5% 1600 - - -
-
6
-
CL SANDY LEAN CLAY 7
light brown, brown -
medium stiff to very stiff 8
-
9
-
10 CS 9 13.3 108.4 9000+ - - - - -
-
11
-
12
-
13
-
14
-
15 CS 10 14.4 113.2 9000 - - - - -
BOTTOM OF BORING @ 15.0' -
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
VOICE OF TRUTH TABERNACLE
LOG OF BORING B-3
1/1 CME 45
4" CFA
Automatic
JL / BM
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
3-6" VEGETATION & TOPSOIL -
1
-
2
-
3
-
4
-
5 CS 17 8.6 104.3 9000+ 1.1% - - - -
-
6
-
CL SANDY LEAN CLAY 7
light brown, brown -
medium stiff to stiff 8
-
9
-
10 CS 14 15.2 112.0 9000+ 0.8% 1800 - - -
-
11
-
12
-
13
-
14
-
15 CS 10 15.1 114.0 6000 - - - - -
BOTTOM OF BORING @ 15.0' -
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
VOICE OF TRUTH TABERNACLE
LOG OF BORING B-4
1/1 CME 45
4" CFA
Automatic
JL / BM
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
3-6" VEGETATION & TOPSOIL -
1
-
2
-
3 CS 26 7.2 0.0 9000+ 1.2% - - - -
-
4
-
CL SANDY LEAN CLAY 5 CS 27 8.7 102.4 9000+ 0.7% - 34 17 54.2%
light brown, brown -
very stiff 6
-
7
-
8
-
9
-
10 CS 20 6.9 108.2 9000+ - - - - -
BOTTOM OF BORING @ 10.0' -
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
VOICE OF TRUTH TABERNACLE
LOG OF BORING B-5
1/1 CME 45
4" CFA
Automatic
JL / BM
Estimated Swell % Passing
SOIL DESCRIPTION Depth "N" MC DD qu % Swell @ Pressure # 200 Sieve
(ft) (%) (pcf) (psf) 500 psf (psf) LL PI (%)
3-6" VEGETATION & TOPSOIL -
1
-
2
CL SANDY LEAN CLAY -
light brown, brown 3 CS 23 8.7 108.8 9000+ 2.0% 1700 - - -
stiff to very stiff -
4
-
5 CS 16 9.9 107.7 9000+ - - - - -
BOTTOM OF BORING @ 5.0' -
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
-
17
-
18
-
19
-
20
-
21
-
22
-
23
-
24
-
25
Sheet Drilling Rig: Water Depth Information
VOICE OF TRUTH TABERNACLE
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 100.6
500
Final Moisture 21.7%
% Swell @ 500 psf 4.3%
Swell Pressure (psf) 3,200
Sample ID: B-1 @ 2
Sample Description: Light Brown/Brown Sandy Lean Clay (CL)
Initial Moisture 13.0%
SWELL/CONSOLIDATION TEST SUMMARY
VOICE OF TRUTH TABERNACLE
1108 NORTH TIMBERLINE ROAD, FORT COLLINS, COLORADO
Project # 19-1028
March 2019
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit 39
Plasticity Index 22
% Passing #200 62.8%
Dry Density (pcf) 109.2
500
Final Moisture 20.9%
% Swell @ 500 psf 2.3%
Swell Pressure (psf) 2,000
Initial Moisture 11.1%
Sample ID: B-1 @ 4
Sample Description: Light Brown/Brown Sandy Lean Clay (CL)
SWELL/CONSOLIDATION TEST SUMMARY
VOICE OF TRUTH TABERNACLE
1108 NORTH TIMBERLINE ROAD, FORT COLLINS, COLORADO
Project # 19-1028
March 2019
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 102.5
500
Final Moisture 21.9%
% Swell @ 500 psf 1.2%
Swell Pressure (psf) -
Initial Moisture 7.6%
Sample ID: B-2 @ 2
Sample Description: Light Brown/Brown Sandy Lean Clay (CL)
(Swell Only)
SWELL/CONSOLIDATION TEST SUMMARY
VOICE OF TRUTH TABERNACLE
1108 NORTH TIMBERLINE ROAD, FORT COLLINS, COLORADO
Project # 19-1028
March 2019
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 111.5
500
Final Moisture 20.9%
% Swell @ 500 psf 1.5%
Swell Pressure (psf) 1,600
Initial Moisture 7.4%
Sample ID: B-2 @ 4
Sample Description: Light Brown/Brown Sandy Lean Clay (CL)
SWELL/CONSOLIDATION TEST SUMMARY
VOICE OF TRUTH TABERNACLE
1108 NORTH TIMBERLINE ROAD, FORT COLLINS, COLORADO
Project # 19-1028
March 2019
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 104.3
500
Final Moisture 22.3%
% Swell @ 500 psf 1.1%
Swell Pressure (psf) -
Initial Moisture 8.6%
Sample ID: B-3 @ 4
Sample Description: Light Brown/Brown Sandy Lean Clay (CL)
(Swell Only)
SWELL/CONSOLIDATION TEST SUMMARY
VOICE OF TRUTH TABERNACLE
1108 NORTH TIMBERLINE ROAD, FORT COLLINS, COLORADO
Project # 19-1028
March 2019
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 112.0
500
Final Moisture 17.7%
% Swell @ 500 psf 0.8%
Swell Pressure (psf) 1,800
Initial Moisture 15.2%
Sample ID: B-3 @ 9
Sample Description: Light Brown/Brown Sandy Lean Clay (CL)
SWELL/CONSOLIDATION TEST SUMMARY
VOICE OF TRUTH TABERNACLE
1108 NORTH TIMBERLINE ROAD, FORT COLLINS, COLORADO
Project # 19-1028
March 2019
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 0.0
500
Final Moisture 23.5%
% Swell @ 500 psf 1.2%
Swell Pressure (psf) -
Initial Moisture 7.2%
Sample ID: B-4 @ 2
Sample Description: Light Brown/Brown Sandy Lean Clay (CL)
(Swell Only)
SWELL/CONSOLIDATION TEST SUMMARY
VOICE OF TRUTH TABERNACLE
1108 NORTH TIMBERLINE ROAD, FORT COLLINS, COLORADO
Project # 19-1028
March 2019
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit 34
Plasticity Index 17
% Passing #200 54.2%
Dry Density (pcf) 102.4
500
Final Moisture 23.3%
% Swell @ 500 psf 0.7%
Swell Pressure (psf) -
Initial Moisture 8.7%
Sample ID: B-4 @ 4
Sample Description: Light Brown/Brown Sandy Lean Clay (CL)
(Swell Only)
SWELL/CONSOLIDATION TEST SUMMARY
VOICE OF TRUTH TABERNACLE
1108 NORTH TIMBERLINE ROAD, FORT COLLINS, COLORADO
Project # 19-1028
March 2019
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
Liquid Limit -
Plasticity Index -
% Passing #200 -
Dry Density (pcf) 108.8
500
Final Moisture 20.6%
% Swell @ 500 psf 2.0%
Swell Pressure (psf) 1,700
Initial Moisture 8.7%
Sample ID: B-5 @ 2
Sample Description: Light Brown/Brown Sandy Lean Clay (CL)
SWELL/CONSOLIDATION TEST SUMMARY
VOICE OF TRUTH TABERNACLE
1108 NORTH TIMBERLINE ROAD, FORT COLLINS, COLORADO
Project # 19-1028
March 2019
-12
-10
-8
-6
-4
-2
0
2
4
6
8
10
12
10 100 1000 10000 100000
---------
Applied Load (psf)
UNIFIED SOIL CLASSIFICATION SYSTEM
Criteria for Assigning Group Symbols and Group Names Using Laboratory TestsA Soil Classification
Group
Symbol
Group NameB
Clean Gravels Cu ! 4 and 1 " Cc " 3E GW Well graded gravelF
Less than 5% finesC Cu
< 4 and/or 1 > Cc > 3E GP Poorly graded gravelF
Fines classify as ML or MH GM Silty gravelF,G, H
Coarse Grained Soils
More than 50% retained
on No. 200 sieve
Gravels
More than 50% of coarse
fraction retained on
No. 4 sieve Gravels with Fines More
than 12% finesC Fines classify as CL or CH GC Clayey gravelF,G,H
Clean Sands Cu ! 6 and 1 " Cc " 3E SW Well graded sandI
Less than 5% finesD Cu
< 6 and/or 1 > Cc > 3E SP Poorly graded sandI
Fines classify as ML or MH SM Silty sandG,H,I
Sands
50% or more of coarse
fraction passes
No. 4 sieve Sands with Fines
More than 12% finesD Fines classify as CL or CH SC Clayey sandG,H,I
Silts and Clays PI > 7 and plots on or above “A” lineJ CL Lean clayK,L,M
Liquid limit less than 50
Inorganic
PI < 4 or plots below “A” lineJ ML SiltK,L,M
Liquid limit - oven
dried
Organic clayK,L,M,N
Fine-Grained Soils
50% or more passes the
No. 200 sieve
Organic
Liquid limit - not
dried
< 0.75 OL
Organic siltK,L,M,O
Inorganic PI plots on or above “A” line CH Fat clayK,L,M
Silts and Clays
Liquid limit 50 or more
PI plots below “A” line MH Elastic siltK,L,M
Organic Liquid limit - oven dried Organic clayK,L,M,P
Liquid limit - not dried
< 0.75 OH
Organic siltK,L,M,Q
Highly organic soils Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-in. (75-mm) sieve
B If field sample contained cobbles or boulders, or both, add “with cobbles
or boulders, or both” to group name.
C Gravels with 5 to 12% fines require dual symbols: GW-GM well graded
gravel with silt, GW-GC well graded gravel with clay, GP-GM poorly
graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW-SM well graded
sand with silt, SW-SC well graded sand with clay, SP-SM poorly graded
sand with silt, SP-SC poorly graded sand with clay
E Cu = D60/D10 Cc =
GENERAL NOTES
DRILLING & SAMPLING SYMBOLS:
SS: Split Spoon - 1⅜" I.D., 2" O.D., unless otherwise noted HS: Hollow Stem Auger
ST: Thin-Walled Tube – 2.5" O.D., unless otherwise noted PA: Power Auger
RS: Ring Sampler - 2.42" I.D., 3" O.D., unless otherwise noted HA: Hand Auger
CS: California Barrel - 1.92" I.D., 2.5" O.D., unless otherwise noted RB: Rock Bit
BS: Bulk Sample or Auger Sample WB: Wash Boring or Mud Rotary
The number of blows required to advance a standard 2-inch O.D. split-spoon sampler (SS) the last 12 inches of the total 18-inch
penetration with a 140-pound hammer falling 30 inches is considered the “Standard Penetration” or “N-value”. For 2.5” O.D.
California Barrel samplers (CB) the penetration value is reported as the number of blows required to advance the sampler 12
inches using a 140-pound hammer falling 30 inches, reported as “blows per inch,” and is not considered equivalent to the
“Standard Penetration” or “N-value”.
WATER LEVEL MEASUREMENT SYMBOLS:
WL: Water Level WS: While Sampling
WCI: Wet Cave in WD: While Drilling
DCI: Dry Cave in BCR: Before Casing Removal
AB: After Boring ACR: After Casing Removal
Water levels indicated on the boring logs are the levels measured in the borings at the times indicated. Groundwater levels at other
times and other locations across the site could vary. In pervious soils, the indicated levels may reflect the location of groundwater.
In low permeability soils, the accurate determination of groundwater levels may not be possible with only short-term observations.
DESCRIPTIVE SOIL CLASSIFICATION: Soil classification is based on the Unified Classification System. Coarse Grained Soils
have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand.
Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they
are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents
may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined
on the basis of their in-place relative density and fine-grained soils on the basis of their consistency.
FINE-GRAINED SOILS COARSE-GRAINED SOILS BEDROCK
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Consistency
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Relative
Density
(CB)
Blows/Ft.
(SS)
Blows/Ft.
Consistency
< 3 0-2 Very Soft 0-5 < 3 Very Loose < 24 < 20 Weathered
3-5 3-4 Soft 6-14 4-9 Loose 24-35 20-29 Firm
6-10 5-8 Medium Stiff 15-46 10-29 Medium Dense 36-60 30-49 Medium Hard
11-18 9-15 Stiff 47-79 30-50 Dense 61-96 50-79 Hard
19-36 16-30 Very Stiff > 79 > 50 Very Dense > 96 > 79 Very Hard
> 36 > 30 Hard
RELATIVE PROPORTIONS OF SAND AND
GRAVEL
GRAIN SIZE TERMINOLOGY
Descriptive Terms of
Other Constituents
Percent of
Dry Weight
Major Component
of Sample
Particle Size
Trace < 15 Boulders Over 12 in. (300mm)
With 15 – 29 Cobbles 12 in. to 3 in. (300mm to 75 mm)
Modifier > 30 Gravel 3 in. to #4 sieve (75mm to 4.75 mm)
Sand
Silt or Clay
#4 to #200 sieve (4.75mm to 0.075mm)
Passing #200 Sieve (0.075mm)
RELATIVE PROPORTIONS OF FINES PLASTICITY DESCRIPTION
Descriptive Terms of
Other Constituents
Percent of
Dry Weight
Term Plasticity Index
Trace
With
Modifiers
< 5
5 – 12
> 12
Non-plastic
Low
Medium
High
0
1-10
11-30
30+
F If soil contains ! 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
HIf fines are organic, add “with organic fines” to group name.
I If soil contains ! 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or “with
gravel,” whichever is predominant.
L If soil contains ! 30% plus No. 200 predominantly sand, add
“sandy” to group name.
M If soil contains ! 30% plus No. 200, predominantly gravel, add
“gravelly” to group name.
N PI ! 4 and plots on or above “A” line.
O PI < 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
1108 NORTH TIMBERLINE ROAD, FORT COLLINS, COLORADO
Project # 19-1028
March 2019
USCS
Sampler
Atterberg Limits
Start Date 2/27/2019 Auger Type: During Drilling None
Finish Date 2/27/2019 Hammer Type: After Drilling None
Surface Elev. - Field Personnel: 24 Hours After Drilling -
1108 NORTH TIMBERLINE ROAD, FORT COLLINS, COLORADO
Project # 19-1028
March 2019
USCS
Sampler
Atterberg Limits
Start Date 2/27/2019 Auger Type: During Drilling None
Finish Date 2/27/2019 Hammer Type: After Drilling None
Surface Elev. - Field Personnel: 24 Hours After Drilling -
1108 NORTH TIMBERLINE ROAD, FORT COLLINS, COLORADO
Project # 19-1028
March 2019
USCS
Sampler
Atterberg Limits
Start Date 2/27/2019 Auger Type: During Drilling None
Finish Date 2/27/2019 Hammer Type: After Drilling None
Surface Elev. - Field Personnel: 24 Hours After Drilling -
1108 NORTH TIMBERLINE ROAD, FORT COLLINS, COLORADO
Project # 19-1028
March 2019
USCS
Sampler
Atterberg Limits
Start Date 2/27/2019 Auger Type: During Drilling None
Finish Date 2/27/2019 Hammer Type: After Drilling None
Surface Elev. - Field Personnel: 24 Hours After Drilling -
Project # 19-1028
March 2019
Sheet Drilling Rig: Water Depth Information
Start Date 2/27/2019 Auger Type: During Drilling None
Finish Date 2/27/2019 Hammer Type: After Drilling None
USCS
Sampler
Atterberg Limits
Surface Elev. - Field Personnel: 24 Hours After Drilling -