July 22, 2020
City of Fort Collins – Community Development & Neighborhood Services
Attn: Ms. Tenae Beane, Development Review Coordinator
280 North College Avenue
Fort Collins, CO 80524
Re: Kechter Townhomes; Project Development Plan and Subdivision Plat
Applications
3620 Kechter Road, Fort Collins, Colorado 80528
Dear Ms. Beane,
On behalf of the owner, City of Fort Collins, we are pleased to submit the attached Project
Development Plan and Subdivision Plat for the project known as Kechter Townhomes,
generally located at the northwest corner of Kechter Road and Jupiter Drive just east of
Twin Silo Park. The following project information provides additional details to assist City
staff in the review of this Project Development Plan and Subdivision Plat applications.
Project Title: Kechter Townhomes Project Development Plan and Subdivision Plat
Past Meeting Dates:
● Preapplication meeting was held on June 5, 2019
● Neighborhood Meeting is scheduled for July 27, 2020
General Information: This is a request for a Project Development Plan and Subdivision
Plat to develop a ~5 acre City of Fort Collins Land Bank parcel to construct 100%
permanently affordable, for-sale homes consisting of 60 townhomes with a mix of (6) two
and (54) three-bedroom units generally located at the northwest corner of Kechter Road
and Jupiter Drive just east of Twin Silo Park. Primary access is provided off of Kechter
Road with additional neighborhood connectivity provided to Quasar Way and Eclipse Lane.
A total of 119 parking spaces are proposed that include 60 garage spaces, 55 on street and
4 off street spaces. A linear green space provides additional off-street circulation for
pedestrians and north-south connectivity through the development. The property is zoned
Low Density Mixed Use Neighborhood (LMN) and is subject to Administrative (Type 1)
review. The associated subdivision plat includes 60 lots with .57 acres of open space and
~1.599 acres of right-of-way dedication.
Existing and Proposed Owners/Funding Structure: Elevation Community Land Trust
(Elevation CLT or ECLT) secured a grant from the Colorado Department of Housing to
Page 2 of 4
assist with the acquisition of subject property. Indiana-based affordable housing
developer, TWG Development, LLC (TWG), is the developer and has formed a limited
partnership (Kechter Homes LP) with Housing Catalyst, the City of Fort Collins’ Housing
Authority, to allow the project to benefit from tax exemptions and property tax abatement
through the construction period to time of sale to ECLT. TWG’s related entity TWG
Construction, LLC, will serve as the General Contractor.
TWG and ECLT will enter into a purchase and sale agreement through which ECLT will
acquire the subdivided parcels and finished townhomes at an agreed-upon price point.
ECLT will then sell the improvements to qualified households earning less than 80% area
median income (AMI), with prices set around 70% AMI to ensure long term affordability
and to serve a broader range of incomes. The difference between the acquisition sales price
and the homeowner sales price will be subsidized with additional philanthropic capital
from ELCT. ECLT will maintain ownership of underlying land and will ensure affordability
and owner-occupancy using a 99-year renewable land lease. ECLT will also establish a
homeowners association that they will monitor.
Transportation Improvements: A Traffic Impact Study was finalized on July 8, 2020.
Based on the analysis contained in the study, the proposed Kechter townhomes project
demonstrates compliance with the standards in the Larimer County Urban Area Street
Standards for traffic at the time of development. It is recommended that the proposed site
access to Kechter Road be constructed as a full-movement access without an eastbound
left-turn lane. Neighborhood connections are provided to the already planned and stubbed
out roadway connections to Eclipse Lane and Quasar Way.
Neighborhood Meeting Overview: A neighborhood meeting is scheduled for July 27,
2020. We look forward to the opportunity to share our development proposal with the
surrounding neighborhood. A second neighborhood meeting will also be held in August or
September 2020.
Site Design: The site’s design includes an internal street system with sidewalks and tree
lawns on each site. Buildings are set back to provide additional front lawn space. The
center of the neighborhood is anchored with a number of townhomes, a walking path that
provides the neighborhood with a north-south pedestrian connection, and a linear park
that connects the homes in the east-west direction and provides a visual connection to the
adjacent open space to the west.
Transition Techniques: The adjacent land uses include single-family residential (east and
north), school (west), and park (south). The site has been designed to further the City’s
affordable housing goals by integrating and distributing affordable housing as part of
individual neighborhoods and the larger community. More specifically, the site and
building design complement and enhance the positive qualities of existing adjacent
neighborhoods by continuing on-street parking, detached sidewalks, tree lawns, individual
front yards, and front-accessed garages. Lastly, the design aligns with the anticipated
evolution, built form, mix of housing types, and mobility described in Mixed Neighborhood.
Page 3 of 4
The narrative below describes proposed transitioning techniques along all property
boundaries.
Panting Beds are provided along the north, east and west perimeters softening the
buildings. Open space and storm water facilities provide a buffer from Kechter road to the
south.
Architectural Design: Community architecture consists of four different building types
with a number or exterior color options that mimic the architecture of the adjacent
neighborhoods with pitched asphalt roofs, two-story and single-story massing, walk-up
front porches, vinyl windows, residential window proportions, cement board siding and
trim, and earth-toned colors. The combination of two- and three-bedroom townhomes
creates buildings with varied massing and roof lines to provide visual interest and
variation between the building types. Garage doors are recessed from the fronts of the
dwellings and comprise no more than 50% of building frontage.
Utilities:
Water – Water will be provided to the project by the Fort Collins-Loveland Water District
via existing water mains located adjacent to the project site. No upgrades to the existing
system are anticipated.
Sewer – Sewer will be provided by the South Fort Collins Sanitation District via existing
sewer mains adjacent to the project site. No upgrades or off-site improvements to the
existing system are anticipated.
Stormwater – Stormwater will be conveyed via a system of swales and storm drains to
stormwater treatment and detention facilities located at the southern end of the site. All
City of Fort Collins Stormwater requirements will be met by the project, including Low
Impact Development (LID) treatment.
Development Phasing Schedule: At this time, the entire Kechter Townhome project is
anticipated to be developed in a single phase.
Initial Submittal Comment Response Letter: Attached.
Signed Letters of Intent from Impacted off-site property owners(s): The TWG Team in
conjunction with the City of Fort Collins is working with the Observatory Village
Homeowners Association to vacate the existing 30’ access easement that currently
encumbers the western edge of the subject property. This matter will be resolved prior to
scheduling the hearing.
Lighting: With such little lighting proposed, Staff granted a waiver from the Photometric
Plan submittal requirement. All proposed lighting is depicted within the Plan Set (See Sheet
A1.5) and will meet City of Fort Collins requirements.
Page 4 of 4
Ecological Characterization Memo: Since this site is not within the 500 feet of defined
natural habitats and features, the ECS was waived. On July 15, 2020, the City shared a
comment from a community member on a potential Bald Eagle foraging site immediately
adjacent to the Kechter parcel. Given this information, the City required a ECS memo that
focuses on the trees serving as a potential foraging site for American Eagles. The TWG
Team has engaged Cedar Creek Associates, Inc., to prepare the ECS memo. In light of how
the information was received, Kelly Smith granted approval to make this formal submittal
prior to the ECS memo. The ECS memo will be submitted to the City upon completion.
We are thrilled with the opportunity to bring this project to the City of Fort Collins and look
forward to working with you and the City through the development review process. Please
feel free to reach out to me at 303.378.4540 or carrie@mccooldevelopment.com with any
questions or comments.
Sincerely,
McCOOL DEVELOPMENT SOLUTIONS
Carrie McCool,
Principal