Loading...
HomeMy WebLinkAboutKECHTER TOWNHOMES - PDP200010 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTDevelopment Review Center – 281 N College Ave – Fort Collins, CO 80522-0580 – 970.221.6689 DRCoord@fcgov.com Page 1 February 1, 2019 Submittal Instructions • A City Development Review Coordinator will be assigned to all projects. Your Development Review Coordinator is available to assist you with the review process. If you do not have a review coordinator assigned to your project, please contact us at 970-221-6689 or DRCoord@fcgov.com for assistance. • Appointments are required for all submittals or resubmittals – A completed paper copy of this checklist, all submittal materials and fee payments are due at the time of project submittal. Please contact your Development Review Coordinator at 970-221-6689 to schedule a submittal appointment. • Only complete submittals are accepted. The submittal may be returned to the applicant if any required PDWHULDOVRUDSSOLFDWLRQIHHVDUHPLVVLQJRULQVXI¿FLHQW6XEPLWWDOVUHFHLYHG0RQGD\PRUQLQJWKURXJK Wednesday noon will be routed for review the same week and submittals received after Wednesday noon will be held and routed the following week. • This checklist shall be used in tandem with the 6XEPLWWDO5HTXLUHPHQWV'RFXPHQW. The applicant must FRPSOHWHWKLVFKHFNOLVWDQGDFNQRZOHGJHPHQWRIWKH6XEPLWWDO5HTXLUHPHQWV'RFXPHQW • The applicant shall be the designated contact person who will receive correspondence from city staff and referral agencies. Additional Resources • Development Review Guide and Flowchart: https://www.fcgov.com/drg/ • 'HYHORSPHQW5HYLHZ$SSOLFDWLRQVDQG6XEPLWWDO5HTXLUHPHQWV0DLQ3DJH https://www.fcgov.com/developmentreview/applications.php • City Land Use Code: https://library.municode.com/co/fort_collins/codes/land_use • City Utilities: Development Forms, Guidelines & Regulations • City Engineering main page: https://www.fcgov.com/engineering/ • The City’s Comprehensive Plans: City Plan and 7UDQVSRUWDWLRQ0DVWHU3ODQ • 2QOLQH&LW\0DS5HVRXUFHV https://www.fcgov.com/gis/maps.php Development Application Complete Submittal Checklist Page 2 Development Application Submittal Checklist February 1, 2019 Project Development Plan (PDP) Complete Submittal Checklist Project Name: Applicant Name: 2I¿FH8VH2QO\ Project Type: Project Number (if assigned): 1HZ6XEPLWWDO Revision -- Review Round 6XEPLWWDO'DWH 6WDII5HYLHZ0HHWLQJ'DWH 6WDII&RRUGLQDWRU In addition to PDP reviews, this checklist may be used for the pre-hearing review of the following review types: 0DMRU$PHQGPHQWV 0-$ Page 3 Development Application Submittal Checklist February 1, 2019 Electronic Copies $OOFRSLHVPXVWEHSURYLGHGSHU&LW\¿OHQDPLQJVWDQGDUGVDQGVXEPLWWHGRQDÀDVKGULYHRU&' See: Submittal Requirements Section M – File Naming Standards 1) General Information: Staff Code Applicant Validation Item Description Submittal Requirement Resources A comment response letter from the project's Conceptual Review or Preliminary Development Review staff meeting; or for resubmittals include a comment response letter from WKHSULRUURXQGRIUHYLHZ7RUHFLHYHD¿QDOFRS\RIWKH staff comment letter, contact your Development Review Coordinator 6HH6XEPLWWDO 5HTXLUHPHQWV6HFWLRQ& for more information on comment respose letters and the project design narrative. Development Review Coordination (DRC) staff 970-221-6689 DRCoord@fcgov.com 3URMHFW,QIRUPDWLRQDQG'HVLJQ1DUUDWLYH VHH6XEPLWWDO 5HTXLUHPHQWV6HFWLRQ& Page 4 Development Application Submittal Checklist February 1, 2019 /DQGVFDSH3ODQ6KHHW V Page 5 Development Application Submittal Checklist February 1, 2019  Page 6 Development Application Submittal Checklist February 1, 2019 d) /DQG8VH&RGH0RGL¿FDWLRQDQG$OWHUQDWLYH Compliance Requests (if required; staff review and recommendation of approval required prior to scheduling hearing) LUC Division 2.8 City Contact: Planning 6HUYLFHV e) 3DUNLQJ$OWHUQDWLYH&RPSOLDQFH6WXGLHV±*XLGHOLQHV for these studies are held by the Director (if required) 3DUNLQJ,PSDFW6WXG\*XLGHOLQHV /8&6HFWLRQ . City Contact: Planning 6HUYLFHV Development Review Engineering: a) 6RLOV5HSRUW±LQFRQIRUPDQFHZLWKWKH/DULPHU &RXQW\8UEDQ$UHD6WUHHW6WDQGDUGV Larimer County Urban Area 6WUHHW6WDQGDUGV b) 6XEVXUIDFH+\GURORJLF6WXG\ c) 6LJQHGOHWWHUVRILQWHQW UHTXLUHGEHIRUHVFKHGXOLQJ hearing) from impacted off-site property owner(s) indicating generating agreement and that all required off-site easement and off-site rights-of-way can be ¿QDOL]HGLQFRQMXQFWLRQZLWKWKH¿QDOGHYHORSPHQW plan submittal City Contact: Engineering Development Review 970- 221-6605 d) Draft legal descriptions for accompanying deeds of dedication by separate document Easement and Right-of-Way Dedication Process e) Draft legal descriptions for accompanying easement vacation request by separate document Vacation of Easements Process f) Engineering or Utility Variance Requests (City review and approval required prior to scheduling hearing) Larimer County Urban Area 6WUHHW6WDQGDUGV 7UDI¿F2SHUDWLRQV 7UDQVSRUWDWLRQ,PSDFW6WXG\ 7,6 Page 7 Development Application Submittal Checklist February 1, 2019 Environmental Planning: a) (FRORJLFDO&KDUDFWHUL]DWLRQ6WXG\ (&6 Page 8 Development Application Submittal Checklist February 1, 2019 Other information and data as required for the full and complete consideration of the development (to be FRPSOHWHGE\&LW\VWDII  +D]DUGRXV0DWHULDOV,PSDFW$QDO\VLV LIUHTXLUHG  Any special wildlife, wetland, natural habitats and features, ecological or environmental study or mapping SXUVXDQWWR6HFWLRQDQGRIWKH/DQG8VH&RGH as requested by the Director; Other items required: City Contact: Development Review Coordination 970- 221-6689 DRCoord@fcgov.com Applicant Acknowledgement: ,KDYHUHYLHZHGWKH'HYHORSPHQW$SSOLFDWLRQ6XEPLWWDO5HTXLUHPHQWV6HFWLRQV$±0$OOGRFXPHQWVVXEPLWWHG DUHFRPSOHWHDQGWKH'HYHORSPHQW$SSOLFDWLRQ6XEPLWWDO5HTXLUHPHQWVKDYHEHHQLQFRUSRUDWHGLQWRWKHSODQV 6HH'HYHORSPHQW$SSOLFDWLRQ6XEPLWWDO5HTXLUHPHQWVIRUGHWDLOHGGHVFULSWLRQRIUHTXLUHPHQWV $OOGRFXPHQWV submitted have been compared and consistent design information is shown on all plan sheets and reports. I XQGHUVWDQGWKDWVXEPLWWDOUHTXLUHPHQWVQRWVXI¿FLHQWO\DGGUHVVHGRUGHIHUUHGPD\UHVXOWLQDGGHGUHYLHZWLPH $SSOLFDQW1DPH    &KHFNER[WRFRQ¿UPDFNQRZOHGJHPHQW (See Development Application Submittal Requirements for detailed description of requirements) Carrie McCool, Principal/Planner ,IDQ(&6 is required, this must be submitted at least ten days prior to the development review application. A copy shall also be submitted at the time of the application with this checklist. 6XEPLWWDO5HTXLUHPHQWV 6HFWLRQ-6HFWLRQ+ /8&6HFWLRQ City Contact: Environmental 3ODQQLQJ6WDIIDW 4311 b) 3KDVH(QYLURQPHQWDO6LWH$VVHVVPHQW 7REHSURYLGHGE\TXDOL¿HG third-party consultant &LW\)RUHVWU\ a) ([LVWLQJ7UHH,QYHQWRU\3ODQ3ULRUWRWKHUHYLHZ submittal, the applicant must schedule an on- site meeting with City Forestry to obtain tree LQYHQWRU\LQIRUPDWLRQIRUDOOH[LVWLQJWUHHVZLWKLQWKH development area. The meeting is also intended WRGLVFXVVDQ\SURSRVHGWUHHUHPRYDO3/($6( 127(7+$7(;,67,1*75((66+28/'127%( 5(029('25'$0$*('35,257268%0,77$/ 5(9,(:$1'$33529$/2)7+(352326(' '(9(/230(17 6HH6XEPLWWDO5HTXLUHPHQWV 6HFWLRQV+DQG/IRUPRUH information regarding GRFXPHQWDWLRQRIH[LVWLQJDQG proposed trees on landscape plans Contact Information: City Forestry forestry@fcgov.com 970.221.6660 City Forestry Resources: www.fcgov.com/forestry /DQG8VH&RGH6HFWLRQ 3.2.1(F) Tree Protection and Replacement b) ([LVWLQJ7UHH5HPRYDO)HDVLELOLW\5HTXHVWSURYLGH DOHWWHUWR&LW\)RUHVWU\RXWOLQLQJWKHMXVWL¿FDWLRQIRU WKHUHPRYDORIDQ\H[LVWLQJWUHHVLISURSRVHG c) ([LVWLQJ7UHH0LWLJDWLRQ3ODQ LIDSSOLFDEOH $W your site meeting, City Forestry will determine the characteristics and mitigation requirements for all H[LVWLQJWUHHVZLWKLQWKHSURMHFW VSURSRVHG/LPLWVRI Disturbance. 3/($6(127(7+,6,7(0,61275(48,5(':,7+ 7+,6&+(&./,67$1',63529,'('+(5()25 ,1)250$7,217+,60((7,1*,65(48,5(')25 &200(5&,$/352-(&7635,2572),1$/3/$1 68%0,77$/  Building Services Presubmittal Meeting: &RQ¿UPDWLRQRIFRPSOHWHG3UH6XEPLWWDO&RGH)HDVLELOLW\ 0HHWLQJZLWK%XLOGLQJ6HUYLFHVLVLQFOXGHGZLWKWKH)LQDO3ODQ (FDP) Checklist, but not with this checklist. New Commercial Projects require a pre-submittal meeting for building code feasibility. This typically takes place when drawings are 50% complete and in the early/mid phases of the Development 5HYLHZ3URFHVVDQGSULRUWR%XLOGLQJ3HUPLW6XEPLWWDO Applicants are encouraged to review building requirements as early as possible in the process. For questions or to schedule this meeting call: 970-416-2748. Please Note: Building Permits will not be reviewed until Development Plan review process is completed Building Codes and 6WDQGDUGV Building Permit Fees W N/A RUZDLYHULQGLFDWHGIURP 7UDI¿F2SHUDWLRQVVWDII(waiver indication to be provided with initial submittal) 7UDI¿F2SHUDWLRQV5HVRXUFH Page &LW\&RQWDFW7UDI¿F Operations 970-221-6630 D D D 3UHOLPLQDU\'UDLQDJHDQG(URVLRQ&RQWURO5HSRUW Staff Code Applicant Validation Item Description Submittal Requirement Resources 3UHOLPLQDU\'UDLQDJHDQG(URVLRQ&RQWURO5HSRUWPD\ include the following: a) Detention Requirements and Calculations b) Offsite Flows (if applicable) c) Floodplain Zone (if applicable) -- Contact Floodplain Administration staff at 970-416-2632 for questions d) +\GUDXOLF&DOFXODWLRQV e) Detention Basin Calculations f) 6WDQGDUG:DWHU4XDOLW\DQG/,'&DOFXODWLRQV g) ,QFOXGH'UDLQDJH3ODQRU([KLELWLQWKHUHSRUW Note: Items shown above are components that may be necessary with a drainage report analysis. Not all components may be necessary. The drainage report analysis must be prepared by a professonal engineer. 6WRUPZDWHU&ULWHULD0DQXDO Resource Page 6WRUPZDWHU&ULWHULD0DQXDO Appendices: A. 5HTXLUHG6XEPLWWDO&RQWHQW B. 6WRUPZDWHU)DFLOLWLHV /DQGVFDSH6WDQGDUGV C. LID Implementation D. Erosion Control Guidance E. Erosion Control &RQVWUXFWLRQ0HDVXUHV )DFW6KHHWV F. Erosion Control &RQVWUXFWLRQ0HDVXUHV 6WDQGDUG1RWHV City Utilities: Development Forms, Guidelines & Regulations )RU6WRUPZDWHURU Floodplain questions, contact: waterutilitieseng@ fcgov.com or 970-221-6689 Erosion Control Information: www.fcgov.com/erosion 6) Reports and Supporting Documents: Staff Code Applicant Validation Item Description Submittal Requirement Resources Planning Services: a) 3HUVSHFWLYHYLHZVRIWKH%XLOGLQJ([WHULRU (incorporated into the building elevation sheets) 6XEPLWWDO5HTXLUHPHQWV 6HFWLRQ* b) %XLOGLQJ0DWHULDO6DPSOH%RDUG 6XEPLWWDO5HTXLUHPHQWV 6HFWLRQ* c) 1HLJKERUKRRG&RQWH[W3ODQ 2YHUDOOVLWHSODQ diagram indicating surrounding neighborhood IHDWXUHVWREHLQFRUSRUDWHGLQWR6LWH3ODQVKHHWVRU cover page) 6XEPLWWDO5HTXLUHPHQWV 6HFWLRQ& VWDQGDUGFLW\ODQGVFDSHQRWHVDQG UHODWHGSODQWLQJGHWDLOVKHHWV 6HH6HFWLRQ,IRUSODQWLQJGHWDLO requirements) 6HFWLRQ+DQG, 6WDQGDUG1RWHV (also available in Word IRUPDWDWWKH6XEPLWWDO Requirements web page) /LJKWLQJ3ODQ3KRWRPHWULF3ODQDQG/LJKWLQJ'HWDLO6KHHWV 6HFWLRQ/ Trash and Recycling Enclosure Details (include these details with the site plan sheets or elevation sheets) 6HFWLRQ, &RQ¿UPDWLRQWKDWDOO6KHHWVSURYLGHGLQFRUSRUDWH&LW\GUDIWLQJ standards 6HFWLRQ' 3) Subdivision Plat: Staff Code Applicant Validation Item Description Submittal Requirement Resources A subdivision plat of the site at an appropriate scale on one RUPRUHVKHHWVZLWKRXWHUGLPHQVLRQVSULQWDEOHDW[ 36" and appurtenant documents prepared according to the requirements described in the submittal requirements. The plat must conform to the subdivision requirements of the City, H[FHSWDVZDLYHGE\WKHDSSURYHGSURMHFWGHYHORSPHQWSODQ for the development. Final Plan review and subdivision plat DSSURYDODQGFRPSOHWHH[HFXWLRQWRJHWKHUZLWKDOOQHFHVVDU\ FHUWL¿FDWLRQVVKDOOEHUHTXLUHGEHIRUH¿OLQJRIWKHVXEGLYLVLRQ plat or issuance of building permits. 6XEPLWWDO5HTXLUHPHQWV 6HFWLRQ- LUC Division 3.3 – (QJLQHHULQJ6WDQGDUGV  &LYLO&RQVWUXFWLRQ3ODQV 8WLOLW\3ODQV  Staff Code Applicant Validation Item Description Submittal Requirement Resources ([LVWLQJ&RQGLWLRQVDQGRU'HPROLWLRQ3ODQ LIDSSOLFDEOH Utility Plans Checklist.pdf City Contact: Engineering Development Review 970- 221-6605 EngDevRev@fcgov.com Overall Grading Plan Overall Utility Plan Drainage Plan 6WUHHW3ODQLQFOXGLQJKRUL]RQWDODOLJQPHQWDQGFHQWHUOLQH SUR¿OHVIRUSXEOLFVWUHHWV  2) Planning Submittal Package: Staff Code Applicant Validation Item Description Submittal Requirement Resources Title Block information on all plan sheets 6HFWLRQ' Cover Page, including: 6HFWLRQ' a) Title Block 6HFWLRQ' b) Land Use Table 6HFWLRQ( F 6KHHW,QGH[ 6HFWLRQ' G 6LJQDWXUH%ORFNV 6HFWLRQ' H 6LWH3ODQ1RWHV 6WDQGDUG1RWHV (also available in Word IRUPDWDWWKH6XEPLWWDO Requirements web page) 6LWH/RFDWLRQ0DS 6HFWLRQ' Legal Description 6HFWLRQ' 6LWH3ODQ6KHHW V  DQGUHODWHGKDUGVFDSHGHVLJQGHWDLO VKHHWV6HH6HFWLRQ,IRU5HTXLUHPHQWV 6HFWLRQ) $UFKLWHFWXUDO(OHYDWLRQ6KHHW V 0DWHULDOVDQGRWKHU'HWDLO 6KHHWV FRORUHOHYDWLRQVUHFRPPHQGHG 6HFWLRQ* WRDSSURYHG3'3¶V$38DQG63$55HIHUWRWKH6XEPLWWDO5HTXLUHPHQWV'RFXPHQW for a description of these review types. $OOFKHFNOLVWLWHPVDUHUHTXLUHGXQOHVVFLW\VWDIILQGLFDWHVDQLWHPLV : DLYHG ' HIHUUHG 1$ 1RW$SSOLFDEOHRUDOUHDG\ 5 HFHLYHG ,IWKHVWDIIFRGHLVEODQN JUH\RUEOXH  WKHQWKHLWHPLVUHTXLUHGThis checklist must be reviewed, completed and accepted by staff prior to project routing. Additional information may be requested from the applicant during the review process if necessary to DGGUHVVVSHFL¿FLVVXHVWKDWDULVH3OHDVHQRWHWKDWDOODSSOLFDWLRQPDWHULDOVRQFHVXEPLWWHGEHFRPHDPDWWHU of public record. Paper Copies* Staff Code Applicant Validation Item Description Submittal Requirement Resources One paper copy of this checklist, checked and acknowledged as complete by the applicant Development Review Coordination staff 970-221- 6689 DRCoord@fcgov.com One signed paper copy of Development Application Form and Fee Application Form.pdf One signed paper copy of Transportation Development Review (TDR) Application and Fee TDR Fees and Application.pdf Check for the above application forms payable to the “City of Fort Collins” (fees may be consolidated into one check) *3DSHUFRSLHVRISODQVDQGUHSRUWVDUHQRWUHTXLUHGGXULQJGHYHORSPHQWUHYLHZ6HH6XEPLWWDO5HTXLUH- PHQWV6HFWLRQ'IRUGUDZLQJIRUPDWJXLGHOLQHV$OOSODQHOHPHQWVVKDOOEHFOHDUO\GUDZQDQGODEHOOHG$VFDOH bar must be provided on all scaled drawings. Paper copies of plan sheets may be requested in order to com- plete a timely review, including instances when the drawing scale is not accurately depicted. Tenae Beane Kechter Land Bank City of Fort Collins