Mr. Ted Shepard
Planning Department
281 North College Avenue
Fort Collins, CO 80524
RE: Paragon Point P.U.D. - Phase 3 Final
Project No. 10-695-014
Dear Ted:
March 3, 1993
This letter is in response to comments received by us from City Staff pertaining to the review
of Final P.U.D. documents for this Phase 3 of the Paragon Point P.U.D. With respect to
the comments, as enumerated in your letter to Mr. Jim Sell dated February 22, 1993, I have
the following responses:
1. We are in the process of negotiating a site with Public Service Company.
2. All Open Space Tracts are defined as also being "utility and drainage easements" on
the plat. See note #1 on sheet 1 of 2 of the plat.
3. A. The distance shown on the original plat was found to be erroneous. This plat
will now show both distances (one as "platted" and one as "measured").
"O.S." will be defined as "Open Space".
C. Offsite easements will be called out as "Dedicated with this Plat".
D. Catalpa Court has been changed to "Cliffrose Court", and Clover Court has
also been changed to "Chickadee Court".
6. The 36-foot wide asphalt section will be extended past lots 1 and 14.
9. Per the original Development Agreement, the Developer is escrowing funds for his
portion of the future Lemay Avenue improvements. There are no improvements
associated with Lemay Avenue tied to this Phase or any other Phase of this project.
To this end, the plans are extremely clear.
TST, INC. 748 Whalers Way • Building D 102 Inverness Terrace East
Consulting Engineers Fort Collins, CO 80525 Englewood, CO 80112
(303) 226-0557 (303)792.0557
Metro Denver (303) 595-9103 FAX (303) 792-9489
FAX (303) 226.0204
TST, INC.
Mr. Ted Shepard
March 3, 1993
Page 2
If however, the Developer would choose to install any of said future improvements
for whatever reason, these would be staked for construction in accordance with the
previously approved SID plans for Lemay Avenue. The Developer would request
reimbursement for these improvements toward his escrow account. In fact, the
Developer has requested to install the detached sidewalk along Lemay Avenue form
the Southridge Golf Course to the crossing of Lemay Avenue by Stone Creek. This
has been requested for an approved by the City (Mr. Matt Baker) in previous
correspondence.
10. This trail and its associated easement are not within the limits of this plat. Any
requirement of the Developer to provide such an easement, needs to be handled
independent of this final plat.
I hope this letter and the associated revisions made to the submittal documents have
sufficiently responded to all the review comments. Please feel free to contact me if you
should have any questions or concerns.
Respectfully,
TST, INC., CONSULTING ENGINEERS
Stephen F. Humann, P.E.