Loading...
HomeMy WebLinkAboutPARAGON POINT PUD PHASE THREE FINAL - 48 91F - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSMarch 1, 1993 Ted Shepard City of Fort Collins 281 North College Avenue Fort Collins, CO 80524 RE: Paragon Point, Phase 3 Final Dear Ted: The attached prints of the Phase 3 Final reflect revisions made in accordance with the comments in your letter of February 22. Our specific response to each comment is noted below, using numbering shown on your letter. 1-3. Addressed separately by TST, Inc. 4. A solar symbol has been added to Lot 35. 5. This note has been deleted. 6. The engineering drawings for Pheasant Court have this configu- ration and the site plan has been revised. 7. Noted. — W H m r 8. A design similar to the one proposed here was approved in Phase 1 and is scheduled for construction this spring. The plant species on this phase were chosen to be consistent with Phase 1, also, which was approved prior to the list of preferred plants. Sincerely, JIM SELL DESIGN Jim Sell 1 �ILQes psl�CS MoLvoin AveBoO 117 EFort�o16ns.Gobr�° (303)484"1921