HomeMy WebLinkAboutPARAGON POINT PUD PHASE THREE FINAL - 48 91F - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSMarch 1, 1993
Ted Shepard
City of Fort Collins
281 North College Avenue
Fort Collins, CO 80524
RE: Paragon Point, Phase 3 Final
Dear Ted:
The attached prints of the Phase 3 Final reflect revisions made in
accordance with the comments in your letter of February 22. Our
specific response to each comment is noted below, using numbering
shown on your letter.
1-3. Addressed separately by TST, Inc.
4. A solar symbol has been added to Lot 35.
5. This note has been deleted.
6. The engineering drawings for Pheasant Court have this configu-
ration and the site plan has been revised.
7. Noted. — W H m r
8. A design similar to the one proposed here was approved in
Phase 1 and is scheduled for construction this spring. The plant
species on this phase were chosen to be consistent with Phase 1,
also, which was approved prior to the list of preferred plants.
Sincerely,
JIM SELL DESIGN
Jim Sell
1 �ILQes psl�CS
MoLvoin AveBoO
117 EFort�o16ns.Gobr�°
(303)484"1921