Loading...
HomeMy WebLinkAboutPARAGON POINT PUD PHASE TWO FINAL - 48 91D - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSti tst� Mr. Ted Shepard Planning Department City of Fort Collins 281 N. College Avenue Fort Collins, CO 80522 RE: Paragon Point - Phase 2 Project No. 10-695-010 Dear Ted: September 30, 1992 This letter is in response to your summary of comments pertaining to the City review of the Paragon Point P.U.D. - Phase 2, Final P.U.D. submittal. With respect to the comments, I have the following responses (response numbers relate to comment numbers). 1. We have provided sight distance easements on lots 25, 27, and 30 on the revised plat. 2. A variance request is submitted herewith. 3. The intersection of Southridge Greens Boulevard and Trilby Road now depicts a "final design" for the intersection. The curb returns are not to be constructed at this time due to future improvements for Trilby Road. A preliminary design of the future improvements are included in this re -submittal. 4. These items have been included on the re -submittal. - 5. —This-issue-has-been coordinated -since -the Phase 1; P.U.D. process. 6. An easement on lot 34 has been added. 8. An access restriction note has been added to the plat. 11. The Stability Study for Fossil Creek was submitted on Friday, September 25, 1992, as agreed per Glen Schlueter. The path, as I understand it, will be on the west side of Fossil Creek. This is within an area of "Tract C" of the Phase 1 plat which is not being replatted with this phase. Trail easements will be dedicated through Tract C, as well as other tracts at some future date and should not be tied to this Phase (plat). TST, INC. 748 Whalers Way • Building D 102 Inverness Terrace East ConSUlting Engineers Fort Collins, CO 80525 Englewood, CO 80112 (303) 226-0557 (303)792-0557 Metro Denver (303) 595.9103 FAX (303) 792.9489 FAX (303) 226-0204 1 TST, INC. Mr. Ted Shepard September 30, 1992 Page 2 Please note that as of today, we have not received comment from either the Stormwater Department or the Fort Collins - Loveland Water District/South Fort Collins Sanitation District. These comments were to be provided to us on 9-18-92. We are attempting to contact both agencies to expedite their comment. I believe that we have addressed all the comments. Please advise me as to any further revision required. Respectfully, TST, INC., CONSULTING ENGINEERS -7AwLa,- Stephen F. Human, P.E. SFH/lc cc: Byron Collins Jim Sell