July 22, 1992
Mr. Glen Schlueter
City of Fort Collins
Stormwater Utility
235 Mathews
Fort Collins, CO 80524
RE: Paragon Point P.U.D., Phase 2
Project No. 10-695-007
Dear Glen:
I am sending this letter as clarification of two issues pertaining to the Paragon Point P.U.D.,
Phase 2 Preliminary P.U.D. submittal. First of all, the Preliminary Drainage Study
previously submitted for the overall P.U.D. is still valid with respect to this Phase 2. We
have therefore, and with full knowledge of the Planning Department, not re -submitted this
report as a part of this submittal. I apologize for any confusion pertaining to the lack of
submittal information. If, during your review of the overall Preliminary Drainage Report
previously submitted you should require any additional information, please do not hesitate
to contact me.
Secondly, I would like to bring you up to date on the Stability Study for Fossil Creek. As
you are aware, we are required to provide this study for the section of Fossil Creek between
Trilby Road and Lemay Avenue prior to the approval of the Final P.U.D. for Phase 2. We
(Lidstone & Anderson) are currently working on this study. We anticipate the approval of
the final P.U.D. to happen around November of this year.
I hope this letter has cleared up these issues. I apologize again for any confusion and look
forward to receiving any review comments you may have.
Respectfully,
TST, INC., CONSULTING ENGINEERS
X /
Stephen F. Humann, P.E.
SFH/lc
TST, INC. 748 Whalers Way - Building D 102 Inverness Terrace East
Consulting Engineers Fort Collins, CO 80525 Englewood, CO 80112
(303) 226-0557 (303) 792-0557
Metro Denver (303) 595-9103 FAX (303) 792-9489
FAX (303) 226-0204