Loading...
HomeMy WebLinkAboutPARAGON POINT PUD PHASE TWO PRELIMINARY - 48 91C - CORRESPONDENCE - OTHER WATER AND OR SANITATION DISTRICTSSOUTH FORT COLLINS Sanitation District M E M O TO: Mr. Ted Shepard, City of Fort Collins Planning FROM: Terry Farrill, Systems Engineer r-r / THRU: Mike DiTullio, District Manager DATE: August 13, 1992 SUBJECT: Paragon Point PUD Phase II Preliminary Utility Plan The Fort Collins -Loveland Water District and the South Fort Collins Sanitation District has reviewed the above mentioned project and submits the following comments: The South Fort Collins Sanitation District may require wider easements for access and maintenance on the steep slopes. The District will evaluate the easement width during the final plan review. The South Fort Collins Sanitation District will require manholes on each side of the Fossil Creek crossing. Due to the location and quantity of sanitary sewer line not located within streets or street right-of-ways, the District may require easements on the Districts standard easement forms. The 12 inch water line in Trilby Road is to be extended east to the property line. The District is currently evaluating the impacts of installing the 12 inch water line with respect to the eventual re -construction of Trilby Road east of Lemay. If you have any questions, please feel free to contact me at 226- 3104. 4700 South College Avenue Fort Collins, Colorado 80525 Telephone 226-3104 -- 669-4321