HomeMy WebLinkAboutPARAGON POINT PUD PHASE TWO PRELIMINARY - 48 91C - CORRESPONDENCE - OTHER WATER AND OR SANITATION DISTRICTSSOUTH FORT COLLINS
Sanitation District
M E M O
TO: Mr. Ted Shepard, City of Fort Collins Planning
FROM: Terry Farrill, Systems Engineer r-r /
THRU: Mike DiTullio, District Manager
DATE: August 13, 1992
SUBJECT: Paragon Point PUD Phase II
Preliminary Utility Plan
The Fort Collins -Loveland Water District and the South Fort Collins
Sanitation District has reviewed the above mentioned project and
submits the following comments:
The South Fort Collins Sanitation District may require
wider easements for access and maintenance on the steep
slopes. The District will evaluate the easement width
during the final plan review.
The South Fort Collins Sanitation District will require
manholes on each side of the Fossil Creek crossing.
Due to the location and quantity of sanitary sewer line
not located within streets or street right-of-ways, the
District may require easements on the Districts standard
easement forms.
The 12 inch water line in Trilby Road is to be extended
east to the property line. The District is currently
evaluating the impacts of installing the 12 inch water
line with respect to the eventual re -construction of
Trilby Road east of Lemay.
If you have any questions, please feel free to contact me at 226-
3104.
4700 South College Avenue
Fort Collins, Colorado 80525
Telephone 226-3104 -- 669-4321