HomeMy WebLinkAboutPARAGON POINT PUD FINAL - 48 91B - REPORTS - CITIZEN COMMUNICATIONMarch 12, 1992
Fort Collins, Colorado
Mr. Stephen Olt
Project Planner
City of Fort Collins Planning Dept
P.O. Box 580
Fort Collins, CO 80522-0580
Dear Mr. Olt:
I would like clarification of what will happen to the
emergency road across Southridge Golf Course to Greenridge
Circle if and when the Paragon Point PUD Phase 1-Final is
approved and implemented.
This emergency road is adjacent to my property and is very
dangerous and very bothersome. Children ride their bicycles
down the hill from Greenridge going west on the emergency
road right in front of the 18th golf tee.
Numerous times these children just miss being hit by golf
balls being hit off the tee. Also maintenance workers at
the golf course have begun to use the emergency road with
their trucks to gain access to Greenridge Circle. This also
appears to be dangerous since they accelerate to climb the
hill and do not have visibility to pedestrians or bicyle
riders traveling on the west sidewalk of Greenridge Circle.
My hope would be that once Paragon Point PUD Phase 1 is
developed, then this emergency road could be eliminated - or
at least the portion of the road that accesses Greenridge
Circle.
Please let me know what I can do to clarify the status of
the emergency road.
Best Regards
--LCC:-�4
Jim McCabe
5925 Greenridge Circle
Fort Collins, CO 80525
303-223-9314
,7 C//
c eGX
----------
JA—
W 6r Z Consta=eAgin
563OHwnmefLn.
Ft. Cofllms CO 80525
(303) 223-4966