PARAGON POINT P.U.D. - OVERALL DEVELOPMENT PLAN
1. Fort Collins - Loveland Water District.....
a. Petition to Sanitation District.
We are aware of this requirement and are in the process of
submitting this petition for approval by the District Board of
Directors.
b. Extension of 12" water line.
We are in the process of negotiating a postponement of the
construction of this loop until future development phases.
C. Distance between sanitary sewer and storm sewer lines.
This has been corrected on the plans for re -submittal.
d. Specific design regarding sanitary sewer crossing of Fossil Creek.
These will be provided during the Final Design (Final P.U.D.
Submittal process)
2. Access points...
Access points are identified in a legend as requested. The access into
Parcel 'B' has been adjusted to align with the street on the west side of
Lemay Avenue. It is our understanding, after speaking with Mike Herzig,
that the spacings between access points along Trilby Road and Lemay
Avenue are acceptable.G6o—e lo/Aa6
1_,ape Arc"tec"'e
SIID
For AR B0524 117 E. Wurco
(303)484.1921
3. Parcel 'F', neighborhood park site....
The neighborhood park site has been substantially reduced in size from
18.3 acres to 3.3 acres. This area, located along Lemay Avenue, includes
the tennis courts, basketball court, playground and picnic shelter. The
ponds are excluded from the neighborhood park site by request of the
Parks and Recreation Department. The remainder of the original
neighborhood park site will be developed and maintained as a private
recreation area.
4. Platte River Power Authority 75'-100' easement.....
This issue is under discussion/negotiation.
5. Ponds and watercourse between Lemay Avenue and Fossil Creek....
More information regarding the landscape character of the ponds and
watercourse will be available at final review. It is our intention to utilize
xeriscape principles and blend into the naturalistic character of the existing
landscape.
6. Overall Development Plan amendments...
At this point in time we are not certain what land uses will be proposed
on tracts A, B, and C. We believe it is in everyone's best interest for the
ODP to reflect this uncertainty. After discussing the issue with yourself
and my client, we have agreed to illustrate our "best guess" at the
proposed land uses for A, B, and C in bold type within the land use
bubble. Directly under this area on the ODP we will put notes 6 and 7
which identify alternative land uses being proposed for theses tracts and
also states that the ODP does not constitute final approval of these land
uses.
7. Tract 'A' - Commercial.....
We have reviewed the point chart for neighborhood convenience shopping
centers and believe that this site could earn the required number of points
depending on its relationship to adjacent land uses and how its access is
designed. We believe that it is important to plan for a neighborhood
convenience center in this residential area because the nearest existing
shopping is one and a half miles away. A neighborhood convenience
shopping center within walking distance supports city land use and
transportation policies by reducing dependence on the automobile.
8. Fossil Creek Trail...
The Fossil Creek Trail easement will be defined on the final plat. The
bicycle/pedestrian trail has been redesigned to cross Fossil Creek and
provide access to residents on the east side. The exact alignment of the
trail and the location of the Fossil Creek crossing will be shown on the
final plan. At the present time there are no plans to extend a trail system,
other than the Fossil Creek Trail, west of Lemay Avenue or south of
Trilby Road.
9. Undeveloped property northwest......
Huntington Hills P.U.D. is noted on the ODP.
10. Urban density......
The residential density in Paragon P.U.D. is reflective of the inordinate
amount of undevelopable property that is in the floodpWn or is too steep
to develop. If the undevelopable lands are removed from the calculation,
the overall density for residential areas within the ODP is 4.7 dwelling
units per acre. The planning objectives have been revised to emphasize
how this project meets the planning objectives of the Land Use Policies
Plan.
11. Conceptual Drainage Plan vs. Preliminary Drainage Report.....
We questioned the City requirement to submit a Conceptual Drainage
plan, as a part of the Overall Development Plan submittal, at the same
time as the Preliminary Drainage Report, as a part of the Phase 1 -
Preliminary P.U.D. submittal. We were told that though the Preliminary
Drainage Report would be more detailed, and in essence update the
Conceptual Drainage Plan, both items were required for submittal per the
"City of Fort Collins Development Manual".
PARAGON POINT P.U.D.. PRELIMINARY:
12. The 28 foot wide street variance letter....
The variance letter has been signed and stamped by the project engineer.
13. 6' wide rear lot line easement...
These easements will be included on the Final P.U.D. Submittal.
14. Red -lined plans....
These are addressed later in this letter.
15. a. Rear lot line easements...
These will be included on the Final P.U.D. submittal.
b. Lemay Avenue and Trilby Road easements.
These will be included on the Final P.U.D. submittal.
C. U.S. West service provision.
We are currently discussing/negotiating this issue.
16. Public Service...
a. 8' utility easement.
These will be included on the Final P.U.D. submittal.
b. 15' utility easement.
These will be included on the Final P.U.D. submittal.
C. 20'x60' Public Service regulator Station.
This issue is currently under discussion/negotiation.
17. Platte River Power Authority easement along north side of Trilby...
We understand that Platte River Power Authority may request an easement
along the north side of Trilby Road at some point in the future. ,.�
18. City Light and Power... \ 0
a. Lot square footage on Plat
These will be included in the Final P.U.D. submittal.
b. Front lot footage dimensions.
These were shown on original submittal.
C. Lot numbers
These will be included on the Final P.U.D. submittal.
d. Tracts (open space) as blanket easement.
These will be dedicated as such on Final Plat.
19. a. Maximum length of cul-de-sacs....
A second access point has been added to the re -submittal
Preliminary Plat.
b. Southridge Greens Boulevard extension.
This was platted on the original Preliminary Plat. Improvements,
as will be depicted on the Final Construction Drawings, are
anticipated to be "temporary" in nature for emergency access only.
20. Water lines and fire hydrants...
These were shown on the Preliminary Utility Plan as previously
submitted. The Fort Collins -Loveland Water District has assured adequate
pressure and flow to meet fire protection requirements. Fire hydrants
were placed as to not exceed 400' from any residential structure to a fire
hydrant.
21. Southridge Greens Boulevard Connection...
This connection to the existing platted right-of-way has been depicted on
all plans in that the current right-of-way is platted to the northern
boundary of the Fossil Ridge P.U.D. Final construction Plans for this
roadway, however, will include the "off -site" road extension across the
golf course and the tie to existing roadway pavement.
22. Label all utility easements...
All existing and proposed utility easements have been labeled on the
P.U.D.
23. 100-year floodplain...
We are currently under negotiation with the Stormwater Department to
allow adjustment of the floodplain via filling activities within these lots to
raise the elevation of the areas within the current "developed" floodplain.
This will be depicted on the re -submittal documents.
24. Please show all existing vegetation...
Existing vegetation has been shown on the plan.
25. (Paragraph 4) Easement for trail through Tract "D"...
This easement will be dedicated via replat of tract D at the time of future
Replat/Development of this tract. This will be done prior to the
construction of this portion of the trail extension.
26. Impact of Tracts 'A' and '13' on wet area... Yw `
This will be addressed at the time of future development of these tracts.
27. a. Topographic/Grading/Construction concerns of eastern edge of
Tract 'C'...
This will be addressed at the time of future development of this
tract.
b. Depiction of building envelopes...
This, as well as proposed lot grading, slopes, drainages, etc., will
be included on the Final P.U.D. submittal documents.
28. The area east of Lemay.....
The area east of Lemay and north of the neighborhood park has been
labeled Patio Homes as indicated on the ODP.
29. Old Lemay Street Right -of -Way...
This has been revised on the re -submittal.
30. Parkland fees...
We understand that parkland fees will be collected when building permits
are issued and reimbursed when the park is dedicated and accepted by the
city.
31. Trails through Tract 'A'....... Y,, 1&W14
The bicycle/pedestrian trail has been redesigned to cross Fossil Creek and
provide access to the trail system for residents east of the creek and also
for residents of Southridge Greens.
32. Project signage....
Additional information regarding project signage has been provided. �^
33. Street right-of-way widths....
Street right-of-way widths are noted on the site plan.
34. Stormwater comments.
35
a.
Q
c
r,
e
Floodplain preservation, and purchase of said by Stormwater
Department.
This issue is under current negotiation with Stormwater
Department.
Preliminary Drainage Plan vs. Overall Development Plan.
This is under discussion with the Stormwater Department.
Phase 1 delineation and detail via a final report.
Phase 1 has been delineated on the re -submittal of the Preliminary
Plat. A final drainage report, specific to phase one, will be
submitted in conjunction with the Phase 1 - Final P.U.D. submittal
as was previously discusses with the Stormwater Department.
Drainage easements.
Easements required for drainage swales, culverts, storm sewers,
etc. will be depicted on the Final Plat and Final Utility Plans based
on actual requirements of the final design of these improvements.
Red -lined report.
A revised Preliminary Drainage Report has been submitted.
Final P.U.D. submittal....
We agree that a final submittal in December may be premature.
Red -Lined Plans
1. Preliminary Plat as red -lined by Stormwater Department.
a. Elevation of Floodplains.
These have been added on the re -submittal.
b. Flow of storm water per each floodplain elevation.
This information is included in the Preliminary Drainage Report
and is not applicable to a plat document.
C. Platted lots within floodplain.
This has been addressed previously in this letter.
d. Easements for Storm drainage.
These will be depicted on the Final P.U.D. documents as required
by final design of the utilities.
e. Purchase vs. easement of Floodplain.
This issue is currently under negotiation.
2. Preliminary Utility Plan as red -lined by Stormwater Department.
a. Floodplain delineation.
These have been delineated on the re -submittal documents.
b. Drainage easements.
This issue has been discussed previously in this letter.
C. Inlet and pipe size for storm sewers.
These facilities have as of yet not been designed. This information
will be included on the Final Utility Plans as a part of the Final
P.U.D. submittal.
3. Preliminary Utility Plan as red -lined by Engineering Department.
a. Extension of Southridge Boulevard to end of lot. Temporary
turnaround vs. barricade.
These issues have been addressed on the re -submittal documents.
I believe this covers all the review comments pertaining to our documents.
Please feel free to contact me if you should have any questions or concerns.