Loading...
HomeMy WebLinkAboutREPLAT OF PARAGON POINT PUD PHASE FIVE - 48 91M - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSFEE-24-98 TUE 6:29 AM JIM SELL ➢ESIGN INC FAX N0, 970 484 2443 P. 2 I - -VL v� 4v r � (9LA�c ` s u Ct,� zti�w�t 98 TUE 6:36 AM JIM SELL DESIGN INC. FAX NO. 97C 484 2443 PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: January 27, 1998 TO: Streets PROJECT: #48-91IM Paragon Point, 5th Filing - Type I (LUC) PDP/FC All comments must be received by Steve Olt no later than the staff review meeting: Wednesday, February 25,1998 "w nab, ll *AW -�y c ��a��aB p-°� Date: signature: CHECK HERE IF YOU WISH TO RECEIVE OOPIES OF REVISIONS _ PW _ Site _ Ok Ufil _ Reke UE — un6q" City of Fort COW" �'1 C Ly FEE-24-98 TUE 6:37 AM JIM SELL DESIGN INC. FAX NO. 970 484 2443 P. 12 PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: January 27, 1998 TO: Zoning PROJECT: #48-91IM Paragon Point, 5th Filing - Type I (LUC) PDP/FC All comments must be received by Steve Olt no later than the staff review meeting: Wednesday, February 25, 1998 �62 M-6 -lc S.QP, CL, rEut�cd land5ap2 p)0-01 sk pb-yi and btd Date: l " 3 0 signature: l 7len 44 CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Ply _ Site Damage Report _ Oier _ Utility _ Redline Utility _ Landscape city d F+ C�� FEB-2 G:38 AM JIM SELL DESIGN INC. FAX N0, 970 484 2443 PROJECT COMMENT SHEET City of Fort Collins Current Planning PARKS & REC DATE: January 27, 1998 TO: RANDY BALOK PROJECT: #48-91IM Paragon Point, 5th Filing - Type I (LUC) PDP/FC All comments must be received by Steve Olt no later than the staff review meeting: Wednesday, February 25,1998 see ra4 With �-kni-q Date: - ` aia C'Va i aI',&L 1✓ ICJ ay�OL1 CHECK BE IF YOU WISH TO RECEIVE COPIES OF REVLSIONS Pit _ Site _ _ Ober _ Utility _ Regm Utility _ lands* City of Fott Collins PROJECT COMMENT SHEET City of Fort Collins Current Planning NATURAL RESOURCES ROB WILKENSON �■ DATE: January 27, 1998 TO PROJECT: #48-91IM Paragon Point, 5th Filing -Type I (LUC) PDP/FC All comments must be received by Steve Olt no Iater than the staff review meeting: Wednesday, February 25, 1998 1?1__/j `/a7/�8 P'L�-Lj Date: a�% �y Signature: CHECg HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Site _ Drainage Report _ Ok _ Utility — Redline Unity _ Iandsape city of Fort Collins FEB-2 H8 TUE 6:30 AM JIM SELL DESIGN INC. FAX NO. 970 484 2443 P. 3 South Fort Collins Sanitation District February 3, 1998 Mr. Steve Olt, Planner City of Fort Collins P.O. Box 580 Fort Collins, CO 80525 RE: #48-911M Paragon Point, 50' Filing Dear Mr. Olt, The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District have reviewed the above mentioned project and have no objections provided all District requirements are satisfied. Please do not hesitate to contact me at 226-3104, ext. 14, if you have any questions or require additional information. Respectfully, Mr. Ter' r Farrill V' " Systems Engineer xe: Mr. Michael D. DiTullio, District Manager -98 TUE 6:30 AM JIM SELL DESIGN INC. FAX NO. 970 484 2443 P. 4 PROJECT COMMENT SHEET Current Planning DATE: January 27, 1998 TO: TC1 PROJECT: #48-911M Paragon Point, 5th Filing - Type I (LUC) PDPIFC All comments must be received by Steve Olt no later than the staff review meeting: Wednesday, February 25,1998 TCI of Ft. Collins will require continuous rear lot utility easements. On the plat which we received there is no easement from rear of lot 16 to 17, 15 to 14. Is the open space behind these lots part of open space A. - , ap&w,, pc e, tyac4 "A Cffa HERB T YOU WISH TO RECEIVE COPIES OF REV6M 'Ni-ft -r& _ Nop Rep _Oa_ - " j - Rehe " % —' mb* Cltp of Fort Collins EEE-24-98 TUE 5:31 AM JIM SELL DESIGN INC. FAX NO. 970 484 2443 F. 5 PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: January 27, 1998 TO: Post Office PROJECT: #48-91IM Paragon Point, 5th Filing - Type I (LUC) PDP/FC All comments must be received by Steve Olt no later than the staff review meeting: Wednesday, February 25,1998 Date: THERE IF YOU WISH TO RECEIVE MPH OF REVISIONS _ She _ Dr age Repat _ 011a — Utility — Rdim * _ -24-98 TUE 6:32 AM -04' 98 (WEDI 11 32 JIM SELL DESIGN INC. 124 W hL. )L(A FT. CL F.q7A 110. 973 484 2443 TEL:91970224 PROJECT COMMENT SHEET Current Planning DATE: January 27, 1998 TO: U S West PROJECT: 448-911M Paragon Point, 5th Filing - Type I (LUC) PDP/FC All comments must be received by Steve Olt no last r t_l the staff review meeting: Wednesday, February 25,1998 Review of these plans should not t;e construed as a commitment that telephone facilities sufficient to serve this project are presently available. US WEST will provide telephone service in accordance with the rates and tariffs on file wit the Colorado Public Utilities Commission. Telephone facilities generally occupy rear lot utility easements, which must be located on terrain which permits trenching operations. The developer is responsible for provision of ail trench for telephone facilities, including street crossings and ditch crossings, within the single family residential project and the developer contracts with U S WEST for facilibes within the development All relocation of epsbng telephone facilities required by these plans will be paid for by the developer. Susan Myers Peterson Capacity Provisioning Field Engineer 970-224-7473 smpetel @uswestcom Data' cm ME IF «/OppA�:E TO 11Uddr1: us OF 1�G19 ��1�(71\�} to _Rfta* 0 FEE-24-98 TUE 6:33 AM JIM SELL DESIGN INC FAX NO 970 484 2443 F. 7 PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: January 27, 1998 TO: PSCO PROJECT: #48-91IM Paragon Point, 5th Filing - Type I (LUC) PDP/FC All comments must be received by Steve Olt no later than the staff review meeting: Wednesday, February 25,1998 74t, G� fo ¢,X'sfi SSG �+�,/,t� e5 ���cl /- Date: Ma HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Flat _ Site _ RqM _ Oler — U65_ Rune Utility _ Wds* FED-24-98 TUE 6:34 AM JIM SELL DESIGN INC. FAX NO. 970 484 2443 P. 8 PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: January 27, 1998 TO: Building Inspection PROJECT: #48-91IM Paragon Point, 5th Filing - Type I (LUC) PDP/FC All comments must be received by Steve Olt no later than the staff review meeting: Wednesday, February 25, 1998 No comments. Date: Z, iq$ CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Sk _ _ Oda _ Div _ Redline UWq _ fakw City of Fort FEE-24-98 TUE 6:35 AM JIM SELL DESIGN INC. FAX N0, 970 484 2443 P. 9 PROJECT COMMENT SHEET City of Port Collins Current Planning DATE: January 27, 1998 TO: Light & Power PROJECT: #48-91IM Paragon Point, 5th Filing - Type I (LUC) PDP/FC All comments must be received by Steve Olt no later than the staff review meeting: Wednesday, February 25,1998 Q �� haue `� he Adz Date: — GJ— Signature: f I ! 0/ 04t CHECK HERE T YOU WISE TO RECEIVE COPIES Of REVISIONS _ Plat _ Sk _ Drainage Refit _ Otber _ Utr V _ Red u Uhllg` Lmdscq City of Fort Collins FED-24-98 TOE 6 36 AM JIM SELL DESIGN INC FAX NO 970 484 2443 P. 10 PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: January 27, 1998 TO: PFA PROJECT: #48-91IM Paragon Point, 5th Filing - Type I (LUC) PDP/FC All comments must be received by Steve Olt no later than the staff review meeting: Wednesday, February 25, 1998 Date: /vo 1°j 04MC.v7-s FrK- $,; c llt4AI. g!c &ue.Urn Z� X g FGew 3/l+fLc 5 C /Obo gai�on� use.- rki tAAfc / - ;-I- f% A CHECK HERE T YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Site _ Rep — 0O _ Utility _ Refine Uddity — Laads* 4. City of Port Collins