HomeMy WebLinkAboutPARAGON POINT PUD PHASE FIVE PRELIMINARY - 48 91K - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS (2)2 February 21, 1995 Mr. Ted Shepard City of Fort Collins Planning Department {' P.O. Box 580 �A 281 North College Avenue Fort Collins, CO 80522-0580 Re: Paragon Point Phase Five, P. U.D. Project No. 10-695-024 Dear Mr. Shepard: We are sending this letter in response to the City Department's comments for the Preliminary Submittal of the Paragon Point Planned Unit Development Phase Five. The site is located in the Southwest corner of the Paragon Point P.U.D. and is bounded by Paragon Point P.U.D. Phase Four to the North, Lemay Avenue to the West, Trilby Road to the South and Paragon Point P.U.D. to the East. The site covers approximately 3.18 acres. The City's Mapping Department requested signature blocks. This will be included when the Final Plat for this Phase is submitted. The Public Service Company was requesting that the utility easement in Finch Court to be 13.0 feet from back of walk to the rear line of the utility easement. The easement depicted on our Preliminary Utility Plan is shown 9.0' back from the street right-of-way. The distance from back of walk to the R.O.W. is 4.0 feet, therefore there is a 13.0 foot utility corridor. Columbine Cable would like to see the open space designated as a utility easement, and have a utility easement on the side lot line of lots 6, 8, 18, and 20. The open space has been designate as a utility easement. Lots 6 and 8, and Lots 18 and 20 share a common wall for the fourplex apartment building and therefore an easement along the lot line/common walls is not feasible. The City's Stormwater Utility Division requested sizes of drainage pans, sizes and types of storm sewer pipe, inlet sizes, and the floodplain be shown. They also requested the submittal of a Drainage Summary, Erosion Control Measures, a 404 Permit, and all supportive material associated with a Final Construction Plan submittal. As mentioned on the referral from the Stormwater Utility, the information mentioned above will be submitted along with all the Final Utility Construction Plans at the time of Final P.U.D. Submittal. TST INC. Whalers Way - BuildingD 102 Inverness Terrace East Fort Collins. CO 80525 Suite 105 Comulting Engineers (303)226-0557 Englewood. CO 80112 Metro Denver (303) 595-9103 (303)792-0557 Fax (303) 226-0204 Fax (303) 792-9489 TST, INC. February 21, 1995 Mr. Ted Shepard Page Two of Two The Engineering Department requested that street and all utility infrastructure plan and profile information be submitted. The Final Construction Plans will provide the requested information and will be submitted with the Final P.U.D. Submittal. We believe that the revised Preliminary Plat, Utility Plan, and Drainage Plan comply with the City's Review. We look forward to your review and comments for this resubmittal and if you have any questions please call our office. Very truly yours, TST, INC. CONSULTING ENGINEERS 0 , Ztv. Humann, P.E. eith G. WSh.ffer� KGS/ing