Loading...
HomeMy WebLinkAboutPARAGON POINT PUD PHASE FOUR PRELIMINARY AND FINAL 7.26.93 P AND Z BOARD HEARING - 48 91i - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTS13 ITEM NO. MEETING DATE 7/26/93 STAFF Ted Shepard iii City of Fort Collins PLANNING AND ZONING BOARD STAFF REPORT PROJECT: Paragon Point, Phase Four, Preliminary and Final P.U.D., #48-91I APPLICANT: Trustar, Inc. c/o Jim Sell Design 117 East Mountain Avenue Fort Collins, CO 80524 OWNER: Trustar, Inc. c/o Byron Collins #1 Old Town Square Fort Collins, CO 80524 PROJECT DESCRIPTION: This is a request for Preliminary and Final P.U.D. for 49 single family lots and 16 duplex lots on 12.58 acres located north of Trilby Road and east of Lemay Avenue. The parcel is zoned r-1-p, Low Density Planned Residential. RECOMMENDATION: Approval EXECUTIVE SUMMARY: Paragon Point Phase Four consists of 49 single family lots and 16 duplex lots for an overall density of 5.16 dwelling units per gross acre. The P.U.D. satisfies the All Development Criteria of the L.D.G.S. The density is supported by the performance on the Residential Uses Point Chart. The P.U.D. complies with the Solar Orientation Ordinance. The wetland area has been protected. The project is feasible from a transportation standpoint. A condition of approval is recommended addressing the timely filing of Utility Plans and Development Agreement. COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (303) 221-6750 PLANNING DEPARTMENT ACTIVITY: fees ident is I Uses DEFINITION: All residential uses. Uses would include single family attached dwellings, townhomes, duplexes, mobile homes, and multiple family dwellings; group homes; boarding and rooming houses; fraternity and sorority houses; nursing homes; public and private schools; public and non-profit quasi -public rec- reational uses as a principal use; uses providing meeting places and places for public assembly with incidental office space; and child care centers. CRITERIA <IAEach of the following applicable criteria must be answered "yes" and implemented within the develop- ment plan. Yes No 1. On a gross acreage basis, is the average residential density in the project at least three (3) dwelling units per acre (calculated for ❑ residential portion of the site only)? u 2. DOES THE PROJECT EARN THE MINIMUM PERCENTAGE POINTS AS CALCULATED ON THE FOLLOWING "DENSITY CHART" FOR THE PROPOSED DENSITY OF THE RESI- DENTIAL PROJECT? THE REQUIRED EARNED CREDIT FOR A RESIDENTIAL PROJECT ❑ SHALL BE BASED ON THE FOLLOWING: 30-40 PERCENTAGE POINTS = 3-4 DWELLING UNITS/ACRE; 40-50 PERCENTAGE POINTS = 4-5 DWELLING UNITS/ACRE; .V50-60 PERCENTAGE POINTS = 5-6 DWELLING UNITS/ACRE; 60-70 PERCENTAGE POINTS = 6-7 DWELLING UNITS/ACRE; 70-80 PERCENTAGE POINTS = 7-8 DWELLING UNITS/ACRE; 80-90 PERCENTAGE POINTS = 8-9 DWELLING UNITS/ACRE; 90-100 PERCENTAGE POINTS = 9-10 DWELLING UNITS/ACRE; 100 OR MORE PERCENTAGE POINTS = 10 OR MORE DWELLING UNITS/ACRE. CHART oN r ,.DENSITY ,��, NAB McXIMUM Ecrnea Criterion Credit If All Dwelling UnitlAre Wirhin: Credit a 20% 2000leaf of euong or acorc`ea negnoon000 snooang cent« b 10% 650 reerorcn e.mvg rtcnfnstoo. c 10% UM reel of an e.,mrq o 0111egian0f fn000rq cane« d 2000 3500 feel of an eymnq a refer ea ne191100d aoah. cam OV xrc or Commyt t,,• 2O �a We 10% ow reef of coop meerN on me reawrem«m or me co wu earconon� arms state of Caw000 QIf 20°0 3000 reoroort do emoa ne +cenw W g 5% t000 testa acmaca. center h 200,16 Nam fortcdmf I 200o rho C601,0113 eu011..c+ A aa,,f, ass Oa C<,,,,f aC mq yberuNq voaf Osyeoprffervf Crepe ropydsorted of too 0%—For ofd woof. oroo«N paurfpary rfas 0 to XM a,hgupy .. 1 ° 30% 10to 15%— far aroreaif wnafeaaaart, cW � 10 b 20% connguil, �eO 15 to 20% -for araleay woof. 0,0 a councon, nm 20 to30%Con rgury 201025%—Far profecn wffpfe « adnpoN aofnot 30 to aOI. aontpu+y: VC 25 to 30%—For prote woof O, t oounooN nos 40 ro 50% coneWN k If n can ae aertnr+t+rctw mar me cr e y "reduce ncn-reno'wvofo ecwgy ufeage emw wougn mo aopc\']em of aef,I e e gy f ems Or mrotan conmmw a gyconfenarron memtrmolNrb marnamaNrequrea M C ty Coos .a5% Dona mw off earned toe 5%repuaeonm«vr7y ufe. I • C011a 1%oonw toe 50 cum nck,040nir+e pored M Caa `Cfll me p.rcentogeamelord OCT" nme post tna ore oe orsaro feaearafd ur. enter V2 amar oevI ma Donn n n me 000ecanr commm b aes.rvnq perfnonen+crfvM coon spots rear nseea me GNf mrnxAn rsourertw+n casanae ale p«tentage of me aoen Foxe Dosage ro rn. rota oeveopm.n+areogs. enter evf o«cenNge as a oorxe. O rc Dorf or me rota oe�eroornenr ngppt n b be scant m ne,gnpanppa D.Gc nartsrr tocumm vnrcfs are rid omervffe rewrea by CAN Caas. error 2%bony for syeN st00 Der a..erYr+g tort nneyea FJ itpprt OlaM bld aeyeoa*«+r Yxwageler0 be soenton n«ghparboalartlrlm alp servfcm wNan ore ndotnerwareO..led pyCNCooa. t% bony tar s!00 /� fV� err« a ev«v Der aa,erp urtt nsnea 7irNNIS COVfLTS OOG 'rUU$/JOUSE A a COmrnrrnMn+n ao'+7 mane ro oe.erao o SOeChea peraenipge d e1e id01 I%YMMr d aveiYrg ufllrf ra rPr ncan+e fQnwef. err« mat Q p«tentage Qaoorxa tmbanmWrkYtra30%. Z na aanbnrt 'a OWNmade to as eba a speVIeo percentage of me'0" rVrtfper Of C.V" t far Type 'A' and Type B• hwafOapoea nOUWNg m cefnea :N mo ON of fort Coi" cdaate me Dotty m tdbw2 r pe . ma !voe A — Slow dprT uxt m - ir w e B —10 knef rype oTo6 in no case ends the cmtbrra oats oe gredv mw 30%. e the Wed oafacer+r PMCWN conlawif an hesonc MAdrp a Dote. a conytour beem»o far ms ta,,, ¢ 3% — for prayenrYp a rtyapafrq otlfflae nrewnc7f (eg erMd.+W+IS b+0 rye. aelttMea eaorforrta Ono toad foc>'•orfl aawv ro m 5 prm.rweon: 3% — far assslr+g nqf rw fmrclsr.f wN W n Yseorq wah me afaxrer d me WY]rq a orxe..n+rYe asor6rq ro+a urvn 3% — Fa p000rq oomow te.arr»orwdrga pots mawreaab moonrrw,ce.aewnvrgn aria mprowfwf+n on aooraasae loaner. eo oar+fon a d a me reauea odfang n rffe mAypr. tartly poet+o orosaosp v1o«pouna. w.mrn me uu6r� a n m erev!rsa paarp mfctve of on oCCmfay ua b rrfe pry^ay fmx.�ue. a OOha rttry De emfaa of ra.O.yi t 4% — fp pfofvq)S%a mdeam. oonag namcnrre: 6% — forpfpYfaYq 50-74%ameponvgnasfnrclt , - 3% — for ora f 25-e9%d me oa+se+g n a fnuc*ie. u t o con rrtanen' a berg n acw, to pOy+W acfcn ea Mlornalc nro eOmgiusnsfg fyfrernf for me ct e" turf. err« a pony of 10% TOTAL ss - 30- Paragon Point PUD, 4th Filing - Preliminary and Final, #48-91I July 26, 1993 P & Z Meeting Page 2 COMMENTS 1. Background• The surrounding zoning and land uses are as follows: N: r-1-p; Active Open Space and Single Family (Paragon Point Third Filing) S: r-1-p; Wetlands and Open Space E: r-1-p; Passive Open Space (Paragon Point First Filing) W: r-1-p; Open Space and Single Family (Brittany Knolls P.U.D.) The following parcels have been approved within Paragon Point: 1. Paragon Point O.D.P., December, 1991 2. Paragon Point Phase One, Final P.U.D., March, 1992 3. Paragon Point First Replat, March, 1992 4. Paragon Point Natural Resources Management Plan, March, 1992 5. Paragon Point Phase Two, Final P.U.D., October, 1992 6. Paragon Point Phase Three, Final P.U.D., March, 1993 2. Land Use• A. Overall Development Plan Phase Four is designated as Parcels B and C of the Overall Development Plan. These parcels are listed as "Patio Homes" and "Multi -Family", respectively. The request for Phase Four consists of 49 single family homes (not patio homes), with an average lot size of 6,500 square feet, in addition to the 16 duplex (multi- family) units. Staff has interpreted that 6,500 square foot lots do not qualify as "patio homes". Phase Four P.U.D., therefore, does not presently conform to the approved Overall Development Plan. The applicant has submitted a request to amend the O.D.P. to reflect the change of residential character and density concurrent with the Phase Four Preliminary P.U.D. If the request to amend the O.D.P. is granted, the Phase Four Preliminary P.U.D. would then be in conformance. If the request is denied, the P.U.D. would not conform to the O.D.P. B. Residential Uses Point Chart The request for 49 single family lots and 16 duplex lots on 12.58 acres, at 5.16 dwelling units per acre, was reviewed by the criteria of the Residential Uses Point Chart of the L.D.G.S. This density exceeds the required minimum of three dwelling units per Paragon Point PUD, 4th Filing - Preliminary and Final, #48-91I July 26, 1993 P & Z Meeting Page 3 acre on a gross acreage basis. Paragon Point Phase Four earns 55% on the Residential Uses Point Chart of the L.D.G.S. This score allows the proposed density of 5.16 dwelling units per acre. Points were earned for being in proximity to Fossil Creek Community Park and having contiguity with existing urban development (Filings One and Two). A partial credit was also earned for an estimate of $500 per lot to be applied to the proposed neighborhood facilities located between Filings Three and Four. At this time, these facilities are anticipated to include tennis courts, pool, and clubhouse. Since these amenities are indicated on the O.D.P., it would take an amendment to the O.D.P. to substitute these approved uses for any other uses. 3. Neighborhood Compatibility: Paragon Point Phase Four, as a residential development, is similar in character to the adjacent single family projects to the north (Paragon Point Phase Three) and west (Brittany Knolls Filing Two). Although the density of 5.21 is slightly higher than these adjacent developments, the land use is considered compatible and no neighborhood meeting was held. 4. Design: The primary design objective is to create moderate density single family lots with each lot having contiguity to a commonly held greenbelt. This greenbelt will feature landscape materials and be maintained by a homeowner's association. Other design features are described below. There are three cul-de-sacs which have been enlarged to allow the installation of circular landscaped islands. These islands will help soften the otherwise large expanse of asphalt associated with the standard cul-de-sac. The arterial streetscape along Lemay Avenue will be a continuation of the design established in Filings One and Three. This includes a masonry fence, shrub beds at the entries and various intervals, and street trees. The P.U.D. is intended to have fencing guidelines and restrictions to minimize the impact on the greenbelt. These guidelines and restrictions include open fencing with a maximum height of five feet. As with Phases One and Three, portions of Phase Four of Paragon Point are located adjacent to the future Fossil Creek Trail. Paragon Point PUD, 4th Filing - Preliminary and Final, #48-91I July 26, 1993 P & Z Meeting Page 4 Access to this major recreational amenity is provided and ties into the greenbelt system. 5. Solar Orientation: Of the total of 65 lots, 45, or 69% comply with the siting requirements of the Solar Orientation Ordinance. This percentage of compliance exceeds the required minimum of 65%. 6. Resource Protection: The southern edge of Phase Four is adjacent to a mapped wetland. The Department of Natural Resources has commented on this proposed residential project and the proximity to the wetland feature. It is the finding of the Department of Natural Resources that there is adequate separation from the lots and the wetland and that protective measures will minimize the impact on the wetland during the construction period. The perimeter boundary of a storage area for the 100-year floodplain of Fossil Creek will be slightly modified. In accordance with the Department of Natural Resources and the Stormwater Utility, the storage capacity will not be affected and there will be no impact on downstream property owners. This modification does not violate any local or federal regulations. 7. Transportation: All streets internal to the project will be classified as local streets and built to the standard 36 feet of width, as measured from curb to curb. As mentioned, the cul-de-sacs will be slightly enlarged to add the landscaped islands. Brittany Street will align with the existing street that serves Brittany Knolls P.U.D. on the west side of Lemay. All intersections on Lemay are at sufficiently spaced intervals and meet separation requirements for an arterial street. The project is feasible from a traffic engineering standpoint. RECOMMENDATION: Staff finds that the request for Preliminary and Final P.U.D. for Paragon Point Phase Four satisfies the All Development Criteria of the L.D.G.S. The density is supported by the performance on the Residential Uses Point Chart. The P.U.D. is compatible with surrounding land uses and complies with the Solar Orientation Paragon Point PUD, 4th Filing - Preliminary and Final, 048-91I July 26, 1993 P & Z Meeting Page 5 Ordinance. Staff, therefore, recommends approval of Paragon Point Phase Four, Preliminary and Final P.U.D., #48-91I, subject to the following condition: 1. The Planning and Zoning Board approves this planned unit development final plan upon the condition that the development agreement, final utility plans, and final P.U.D., plans for the planned unit development be negotiated between the developer and City staff and executed by the developer prior to the second monthly meeting (September 27, 1993) of the Planning and Zoning Board following the meeting at which this planned unit development final plan was conditionally approved; or, if not so executed, that the developer, at said subsequent monthly meeting, apply to the Board for an extension of time. The Board shall not grant any such extension of time unless it shall first find that there exists with respect to said planned unit development final plan certain specific unique and extraordinary circumstances which require the granting of the extension in order to prevent exceptional and unique hardship upon the owner or developer of such property and provided that such extension can be granted without substantial detriment to the public good. If the staff and the developer disagree over the provisions to be included in the development agreement, the developer may present such dispute to the Board for resolution if such presentation is made at the next succeeding or second succeeding monthly meeting of the Board. The Board may table any such decision, until both the staff and the developer have had reasonable time to present sufficient information to the Board to enable it to make its decision. (If the Board elects to table the decision, it shall also extend the term of this condition until the date such decision is made). If this condition is not met within the time established herein (or as extended, as applicable), then the final approval of this planned unit development shall become null and void and of no effect. The date of final approval for this planned unit development shall be deemed to be the date that the condition is met, for purposes of determining the vesting of rights. For purposes of calculating the running of time for the filing of an appeal pursuant to Chapter 2, Article II, Division 3, of the City Code, the "final decision" of the Board shall be deemed to have been made at the time of this conditional approval; however, in the event that t dispute is presented to the Board for resolution regarding provisions to be included in the development agreement, the running of time for the filing of an appeal of such "final decision" shall be counted from the date of the Board's decision resolving such dispute. ,11 Rm PORTNER RES n 9 a Marshal coo } n St �o,) a o Prescott S� o S, W i Rd m U d Courtenoy m4 0 :tbcurn C . cn m N T Q C O Urn Clr. RD 34 m` TRILBY RD m ITEM: NUMBER: m Ctus I I u I �u I� I t V LL I i I ' ' I I ' ' I I I ; I , 1 ■ PARAGON POINT PUD /0 4th Filing - Final 48-911 SOLAR ORIENTATION PROJECT NOTES PLANT NOTES r —5 ii 1a"1: 91 63 20 / 4- OVPAE" CERTIFICATION 21 "m.w°.C.�'.".:''".9.we,`:�:..,.w O 4! All, 48 PLANNING 6 ZONING APPROVAL 32 46 58 25 33 34* PROJECT STATISTICS VICINITY MAP ZT M5. A= low WETLANDS A PHASE 4 WETLANDS FWO( L SITE & PLANT LOT L�-�DGQ%PE PUM DECIDUOUS TREES SHRUBS r r EVERGREEN TREES d I SCHOOL PROJECTIONS PROPOSAL: PARAGON POINT PUD, 4th Filing DESCRIPTION: 65 single family homes on 12.58 acres DENSITY: 5.17 du/acre General Population 65 (units) x 3.5 (persons/unit) = 227.5 School Age Population Elementary - 65 (units) x .450 Junior High - 65 (units) x .210 Senior High - 65 (units) x .185 (pupils/unit) = 29.25 (pupils/unit) = 13.65 (pupils/unit) = 12.03 Design Affected Schools Capacity WernerElementary 568 Webber Junior High 900 Rocky Mounain Senior High 1312 Enrollment 630 834 1191 l�aPd�n„1 L 71 kr/ /._ PQ6L/M1AJAd y PIlO. t C/A111L IF LL DEVELOPMENT: NUMBERED CRITERIA CHART ALL CRITERIA APPLICABLE CRITERIA ONLY ITERION FAND Is the criterion applicable? Nil the criterion be schstled? If no, please explain e:........... �d0 Yes No OD COMPATABILITY ompatability orhood Character e Conflicts Traffic Impact OLICIES 5. Comprehensive Plan PUBLIC FACILITIES & SAFETY 6.Street Capacity 7. Utility Capacity B. Design Standards 00, 9. Emergency Access 10, Security Lighting 11. Water Hazards RESOURCE PROTECTION 12. Soils & Slope Hazard / 13. Significant Vegetation 14. Wildlife Habitat ✓ 15. Historical Landmark 16. Mineral Deposit 17. Eco-Sensitive Areas 18. Agricultural Lands pe ENVIRONMENTAL STANDARDS 19, Air Quality 20. Water Quality 21. Noise 22. Glare & Heat p 23. Vibrations 24. Exterior Lighting 25. Sewages & Wastes V/ SITE DESIGN 26. Community Organization 27. Site Organization 28. Natural Features I 29. Energy Conservation �/ I 30.Shadows ✓ 31. Solar Access 32. Privacy 33. Open Space Arrangement r/ 34. Building Height 35. Vehicular Movement 36. Vehicular Design 37. Parking 38. Active Recreational Areas 39. Private Outdoor Areas l 40. Pedestrian Convenience I ✓ 41. Peaestrian Conflicts 42. Landscaping/Open Areas 43. Landscaping/Buildings I 44 Landscaping/Screening 45. Public Access 46. Sians -12-