Loading...
HomeMy WebLinkAboutFUNSHINE EARLY CHILDHOOD - FDP200009 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTS1 Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6689 970.224.6134 - fax fcgov.com/developmentreview July 01, 2020 Kate Penning Clark Enerson Fort Collins, CO RE: Funshine Early Childhood, FDP200009, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of Funshine Early Childhood. If you have questions about any comments, you may contact the individual commenter or direct your questions through your Development Review Coordinator, Tenae Beane via phone at 970-224-6119 or via email at tbeane@fcgov.com. Comment Summary: Department: Planning Services Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/30/2020 06/30/2020: Please add the list of approved modifications to the site plan set. The modifications have been added to the site plan set. Comment Number: 2 Comment Originated: 06/30/2020 06/30/2020: Please delete sheet A1.11, it was good information for the review but not need for final approval. This sheet has been removed from the set Department: Engineering Development Review Contact: Dave Betley, 970-221-6573, dbetley@fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/16/2020 06/16/2020: INFORMATION ONLY: The applicant may want to designate the hatching of the side walk to be removed more clearly so there is no confusion in the field. There is no sidewalk being removed. The sidewalk near the Northwest Play area will be cut to allow for fence post footings. 2 Comment Number: 2 Comment Originated: 06/16/2020 06/16/2020: The applicant will need to pull the proper permits through the Engineering Inspection Department at the time of construction. Please feel free to contact Jason Martin, our Chief Construction Inspector at 970-416-2779. Thank you for the information. This will be passed along to the contractor. Department: Traffic Operation Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com Topic: General Comment Number: 2 Comment Originated: 06/29/2020 06/29/2020: All comments addressed. Ready for mylars Department: Erosion Control Contact: Basil Hamdan, 970-222-1801, bhamdan@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 06/25/2020 06/25/2020: INFORMATION ONLY: Since the disturbed area is less than 10,000 square feet no Erosion and Sediment Control materials are needed, however, site construction will still need to maintain good housekeeping practices to prevent dirt and debris from coming off the site. Enforcement would be driven on a complaint basis. This note will be passed along to the contractor. Department: Stormwater Engineering Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com Topic: General Comment Number: 2 Comment Originated: 06/29/2020 06/29/2020: FOR APPROVAL: On the site plan, for the areas tabulation, please adjust your tabulation to show the following items: Existing Impervious Area, Final Impervious Area, Added Imp. Area (onsite), Added Imp. Area (offsite). The area tabulations have been adjusted. Department: Water-Wastewater Engineering Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/29/2020 06/29/2020: No comment. Department: Environmental Planning Contact: Scott Benton, sbenton@fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/26/2020 06/26/2020: No further comments; Environmental Planning is ready for mylars. 3 Department: Forestry Contact: Molly Roche, 224-616-1992, mroche@fcgov.com Topic: General Comment Number: 10 Comment Originated: 06/29/2020 6/29/2020: INFORMATION ONLY No further comments from City Forestry - thank you! Department: Building Services Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com Topic: Building Insp Plan Review Comment Number: 1 Comment Originated: 06/29/2020 06/29/2020: Kitchenette and restrooms must be accessible. The kitchenette is a pass thru accessible kitchenette. Comment Number: 2 Comment Originated: 06/29/2020 06/29/2020: This is a building code change of occupancy from A-3 to I-4. A building permit is required to change occupancy. A building permit will be obtained for the occupancy code change. Comment Number: 3 Comment Originated: 06/29/2020 06/29/2020: Group I 4 occupancy will require a fire suppression system. If each classroom is provided with an exterior exit door then a sprinkler system will not be required Each classroom is provided with an exit door. Comment Number: 4 Comment Originated: 06/29/2020 06/29/2020: Plumbing fixture counts (Drinking fountains, toilets, lavatories) will need to be evaluated for the new occupancy load. Work with a Colorado licensed architect for proposed Plumbing counts have been assessed. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: General Comment Number: 1 Comment Originated: 06/29/2020 06/29/2020: FOR FINAL APPROVAL: Please revise the legal description as marked. See redlines. The legal description has been addressed per the redlines. Department: Outside Agencies Contact: Nate Ensley, Fort Collins -Loveland Water District, Topic: General Comment Number: 1 Comment Originated: 06/26/2020 06/26/2020: We have no concerns with the proposed change of use. They will just need to notify out billing department of the new contact info for the service. The billing department will be notified for the new contact information.