July 01, 2020
Kate Penning
Clark Enerson
Fort Collins, CO
RE: Funshine Early Childhood, FDP200009, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Funshine Early Childhood. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Tenae Beane via phone at 970-224-6119 or via email
at tbeane@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/30/2020
06/30/2020: Please add the list of approved modifications to the site plan set.
The modifications have been added to the site plan set.
Comment Number: 2 Comment Originated: 06/30/2020
06/30/2020: Please delete sheet A1.11, it was good information for the review
but not need for final approval.
This sheet has been removed from the set
Department: Engineering Development Review
Contact: Dave Betley, 970-221-6573, dbetley@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/16/2020
06/16/2020: INFORMATION ONLY: The applicant may want to designate the
hatching of the side walk to be removed more clearly so there is no confusion in
the field.
There is no sidewalk being removed. The sidewalk near the Northwest Play area will be cut to allow for fence post footings.
2
Comment Number: 2 Comment Originated: 06/16/2020
06/16/2020: The applicant will need to pull the proper permits through the
Engineering Inspection Department at the time of construction. Please feel free
to contact Jason Martin, our Chief Construction Inspector at 970-416-2779.
Thank you for the information. This will be passed along to the contractor.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 06/29/2020
06/29/2020: All comments addressed. Ready for mylars
Department: Erosion Control
Contact: Basil Hamdan, 970-222-1801, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 06/25/2020
06/25/2020: INFORMATION ONLY:
Since the disturbed area is less than 10,000 square feet no Erosion and
Sediment Control materials are needed, however, site construction will still
need to maintain good housekeeping practices to prevent dirt and debris from
coming off the site. Enforcement would be driven on a complaint basis.
This note will be passed along to the contractor.
Department: Stormwater Engineering
Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 06/29/2020
06/29/2020: FOR APPROVAL:
On the site plan, for the areas tabulation, please adjust your tabulation to show
the following items: Existing Impervious Area, Final Impervious Area, Added
Imp. Area (onsite), Added Imp. Area (offsite).
The area tabulations have been adjusted.
Department: Water-Wastewater Engineering
Contact: Matt Simpson, (970)416-2754, masimpson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/29/2020
06/29/2020: No comment.
Department: Environmental Planning
Contact: Scott Benton, sbenton@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/26/2020
06/26/2020: No further comments; Environmental Planning is ready for mylars.
3
Department: Forestry
Contact: Molly Roche, 224-616-1992, mroche@fcgov.com
Topic: General
Comment Number: 10 Comment Originated: 06/29/2020
6/29/2020: INFORMATION ONLY
No further comments from City Forestry - thank you!
Department: Building Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 06/29/2020
06/29/2020: Kitchenette and restrooms must be accessible.
The kitchenette is a pass thru accessible kitchenette.
Comment Number: 2 Comment Originated: 06/29/2020
06/29/2020: This is a building code change of occupancy from A-3 to I-4. A
building permit is required to change occupancy.
A building permit will be obtained for the occupancy code change.
Comment Number: 3 Comment Originated: 06/29/2020
06/29/2020: Group I 4 occupancy will require a fire suppression system. If each
classroom is provided with an exterior exit door then a sprinkler system will not
be required
Each classroom is provided with an exit door.
Comment Number: 4 Comment Originated: 06/29/2020
06/29/2020: Plumbing fixture counts (Drinking fountains, toilets, lavatories) will
need to be evaluated for the new occupancy load. Work with a Colorado
licensed architect for proposed
Plumbing counts have been assessed.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/29/2020
06/29/2020: FOR FINAL APPROVAL:
Please revise the legal description as marked. See redlines.
The legal description has been addressed per the redlines.
Department: Outside Agencies
Contact: Nate Ensley, Fort Collins -Loveland Water District,
Topic: General
Comment Number: 1 Comment Originated: 06/26/2020
06/26/2020: We have no concerns with the proposed change of use. They will
just need to notify out billing department of the new contact info for the service.