Loading...
HomeMy WebLinkAbout609 S COLLEGE AVE MIXED USE - BDR200004 - DOCUMENT MARKUPS - ROUND 2 - STORMWATER-RELATED DOCUMENTSFort Collins Utilities Floodplain Administration (970) 416-2632 Page 1 of 7 City of Fort Collins Floodplain Review Checklist Development Review Submittals Instructions: Complete this checklist by marking all boxes that have been adequately completed. Put an “NA” next to any items that are not applicable to this particular submittal. Any boxes that are left blank and do not have an “NA” marked next to them are considered incomplete. Date of Review: Reviewer’s Name: Plat Map The following required items are on the plat: ☐ 100-year floodplain boundary ☐ City ☐ FEMA ☐ Floodway boundary ☐ City ☐ FEMA ☐ These items match the FIRM. (FEMA Basin) ☐ These items match the Master Plan. (City Basin) Site Plan The following required items are on the site plan: ☐ 100-year floodplain boundary- FEMA and City ☐ 500-year floodplain boundary (if proposed structure is a “critical facility” and a 500-year floodplain is mapped) ☐ Floodway boundary ☐ Erosion buffer zones ☐ Restrictions related to use (ie. critical facility or no residential use of lower floor if floodproofed mixed use structure) Drainage and/or Grading Plan (or a separate Floodplain Sheet if it is too cluttered on Drainage and Grading Plan) The following required items are on the drainage and/or grading plan: ☐ 100-year floodplain boundary- FEMA and City ☐ 500-year floodplain boundary (if proposed structure is a “critical facility” and a 500-year floodplain is mapped) ☐ Floodway boundary Please add note from accela SW Engineering comment #3 Notes added. Responses by: Northern Engineering Benjamin Ruch, PE Fort Collins Utilities Floodplain Administration (970) 416-2632 Page 2 of 7 ☐ Erosion buffer zones ☐ Cross-section locations ☐ BFE lines ☐ Lowest floor elevation of structures (bottom of basement or crawl space is considered the lowest floor) ☐ The floodplain and floodway boundaries are in the correct location and labeled properly. ☐ The cross-section and BFE lines are in the correct location and labeled properly. ☐ Elevations are referenced to the 1988 datum: ☐ Floodway regulations have been met. ☐ No fill in the floodway unless a hydraulic analysis shows “no-rise”. ☐ No manufactured homes, except in an existing park, can be placed in the floodway. ☐ No changing a nonconforming non-residential or mixed use structure to a residential structure. ☐ Landscaping meets requirements for no encroachment in the floodway without a hydraulic analysis to show “no-rise”. ☐ No storage of materials or equipment. ☐ A note is on the plans about the above floodway restrictions. ☐ Critical facilities regulations have been met: ☐ 100-year –no at-risk population, essential service, government service or hazardous material critical facilities ☐ 500-year Poudre –no at-risk population or essential service, critical facilities ☐ Any pedestrian bridges in the floodway that are not able to pass the 100-year flow are designed to be “break-away”. ☐ Fences in the floodway will not block conveyance. Example: split-rail fence cabled together to not float, flap at bottom of privacy fence to allow water through (flap at BFE or above). ☐ Any items in the floodway that can float (Example: picnic tables, bike racks, etc.) are noted as being anchored. ☐ Erosion Buffer Zone requirements have been met: ☐ Design of any allowed development minimizes disturbance to channel bed and banks. Please add to page 4 of utility set Floodplain exhibit added to plan set Fort Collins Utilities Floodplain Administration (970) 416-2632 Page 3 of 7 ☐ No structures allowed. ☐ No additions to existing structures allowed. ☐ Any fencing is split-rail design and break-away, but cabled. Must be oriented parallel to general flow direction. ☐ No detention or water quality ponds. ☐ No bike or pedestrian paths or trails except as required to cross streams or waterways. ☐ Road, bicycle and pedestrian bridges must span erosion buffer zone. ☐ No fill. ☐ No outdoor storage of non-residential materials or equipment. ☐ No driveways or parking areas. ☐ No irrigated vegetation and non-native trees, grasses, or shrubs. ☐ No utilities except as necessary to cross streams or waterways. ☐ No grading or excavation except as required for permitted activities in erosion buffer zone. ☐ No construction traffic except as required for permitted activities in erosion buffer zone. ☐ Any construction in the erosion buffer zone shows that it will not impact the channel stability. ☐ A note is on the plans about the above erosion buffer zone restrictions. ☐ Any necessary floodplain modeling has been submitted and approved. All modeling must follow the City’s floodplain modeling guidelines. Special Poudre River Regulations ☐ Poudre River Floodway Regulations have been met. ☐ No construction of new residential, non-residential or mixed- use structures. ☐ No redevelopment of residential, non-residential or mixed-use structures. ☐ No additions to residential, non-residential or mixed-use structures. ☐ No fill unless hydraulic analysis shows “no-rise”. ☐ Poudre River floodplain regulations have been met ☐ No construction of new residential or mixed-use structures ☐ No additions to residential structures ☐ No additions to mixed-use structures if there is an expansion in the residential-use area of the structure. ☐ No floatable materials on non-residential sites ☐ Emergency Response and Preparedness Plan (ERPP) draft has been prepared. Fort Collins Utilities Floodplain Administration (970) 416-2632 Page 4 of 7 Information Related to Structures in the Floodplain ☐ For structures in the floodplain, a table is shown that lists the following: ☐ City BFE at upstream end of structure ☐ FEMA BFE at upstream end of structure (if different than City BFE) ☐ Regulatory flood protection elevation ☐ Lowest floor elevation (bottom of basement or crawl space is considered lowest floor) ☐ Floodproofing elevation for non-residential structures (if applicable) ☐ Garage slab elevation ☐ HVAC elevation ☐ The BFE at upstream end of structures are correct based on interpolation between the cross-sections. ☐ The regulatory flood protection elevation is correct. ☐ The lowest floor and HVAC are at or above the regulatory flood protection elevation. ☐ Elevations are referenced to the 1988 datum. ☐ A typical drawing detail is included for each foundation type proposed (slab-on- grade, basement, crawl space) showing the elevation of the HVAC and lowest floor elevation (which includes bottom of the basement or crawl space) relative to the BFE. ☐ If garage is not elevated to the regulatory flood protection elevation, then a drawing detail is included showing vent placement, size, and number. ☐ There is 1 square inch of venting for every 1 square foot of enclosed area. ☐ The bottom of the venting is not higher than 1 foot above grade. ☐ The venting is on at least two sides, preferably on upstream and downstream sides. (Does not have to be divided equally). ☐ If a non-residential structure is to be floodproofed, one of these conditions is met: ☐ All requirements on separate sheet titled “Floodproofing Guidelines” have been met. ☐ If floodproofing information is not submitted as part of the plans, then a note is on the plans stating that floodproofing information will be submitted at the time of the building permit application. ☐ For manufactured homes, all submittal requirements on separate sheet titled “Installation of a Mobile Home Located in a Floodplain: Submittal Requirements” have been met. Please add the following to Pg. 4 of Utility plans or on a separate floodplain sheet if it's too cluttered. We are proposing a LOMA for this project, because of this we are not required to meet Chapter 10 for the proposed addition. Elevations have been provided in 88 Datum Fort Collins Utilities Floodplain Administration (970) 416-2632 Page 5 of 7 ☐ If the floodplain use permit is not going to be submitted until the building permit is applied for, then a note is on the plans stating that the floodplain use permit will be submitted at the time of building permit application. ☐ A note is on the plans stating that a FEMA elevation or floodproofing certificate will be completed and approved before the CO is issued. This is required even if property is only in a City floodplain. Drainage Report ☐ The site is described as being in the floodplain. Floodplain name and if the floodplain is a FEMA or City-designated is described. Any floodway or erosion buffer zones on the site are described. ☐ The FEMA FIRM panel # and date and/or the Master Plan information is cited. ☐ A copy of the FIRM panel with the site location marked is included in the report. ☐ If a floodplain modeling report has been submitted, that report is referenced. The reason for the floodplain modeling report is described. ☐ If a FEMA CLOMR or LOMR has been approved for the site, the case number is referenced. The reason for the CLOMR or LOMR is described. ☐ If a FEMA LOMR is required after construction, this is stated in the report. ☐ The location of the structures relative to the floodplain is described. If there is both a FEMA and a City floodplain on the site, the location of the structures relative to both is described. ☐ The use of the structures is described. This is to determine if the structure is residential, non-residential, or mixed-use. Also, structures in all 100-year and Poudre River 500-year floodplains cannot be used as a critical facility. (See Chapter 10 of City Code for definitions.) ☐ If in the Poudre River 100-year floodplain, the requirement to complete an Emergency Response and Preparedness Plan (ERPP) is discussed and the requirement for annual training drills and an annual update in the first quarter of every year is discussed. ☐ The report describes how the development is in compliance with the applicable floodplain regulation (Chapter 10 of City Code). (Examples: elevation of lowest floor above regulatory flood protection elevation, floodproofing, floodway regulation, erosion buffer zone regulation, no-rise, etc.) In addition to the items below, please add the following note: "The applicant acknowledges that the building design does not comply with the current regulatory floodplain. The applicant will apply for a Letter of Map Amendment showing that the addition area is elevated above the Base Flood Elevation, however the City cannot guarantee approval of the LOMA without a submittal. The applicant understands that building permits cannot be issued prior to the approval of the LOMA." Note added to floodplain exhibit Please see LOMA report Please see LOMA report Please see LOMA report Fort Collins Utilities Floodplain Administration (970) 416-2632 Page 6 of 7 ☐ The type of foundation construction for the structures (i.e. slab-on-grade, crawl space, basement, etc.) is discussed in the report. ☐ The type of foundation matches with the lowest floor elevations and grading plan. ☐ If any of the garages are not going to be elevated above the regulatory flood protection elevation, the hydraulic venting requirements are discussed. ☐ For structures in the floodplain, a table is included (same table as on the Drainage/Grading Plan) that lists the following: ☐ City BFE at upstream end of structure ☐ FEMA BFE at upstream end of structure (if different than City BFE) ☐ Regulatory flood protection elevation ☐ Lowest floor elevation (bottom of basement or crawl space is considered lowest floor) ☐ Floodproofing elevation for non-residential structures (if applicable) ☐ Garage slab elevation ☐ HVAC elevation ☐ Elevations are referenced to the NAVD 1988 datum. ☐ If the floodplain use permit is not going to be submitted until the building permit is applied for, then a note must be included in the report that states the permit will be submitted at the time of building permit application. ☐ If floodproofing information is not submitted as part of the plans, then a note must be in the report stating that floodproofing information will be submitted at the time of the building permit application. ☐ A note is in the report stating that a FEMA elevation or floodproofing certificate will be completed and approved before the CO is issued. ☐ In the compliance section, Chapter 10 of City Code is listed. Floodplain Use Permit ☐ Floodplain Use Permit has been submitted for each structure. ☐ Permit fee has been submitted. ☐ All information on permit matches the plans. ☐ All information on permit meets floodplain regulations. Please see LOMA report Fort Collins Utilities Floodplain Administration (970) 416-2632 Page 7 of 7 FEMA CLOMR Approval ☐ FEMA has approved any necessary CLOMRs. ☐ The City has received copies of all updates to the FEMA submittal. Additional Comments: Floodplain terminology is defined in Chapter 10 of City Code. NOTE: Issues specific to individual sites may arise that result in additional requirements. These will be discussed during initial meetings with the applicant. Please refer to Chapter 10 of City Code for specific floodplain regulations. G G G G G G G G G C CONTROL IRR CTV G G G G G G G VAULT ELEC VAULT ELEC / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / G G G G G G G G G G E E E E E E E E E E CTV CTV CTV CTV CTV CTV CTV G G G G G OHU OHU OHU OHU OHU X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 605 COLLEGE LTD 605 S COLLEGE AVE FORT COLLINS, CO 805243003 DALZELL ALLEY EXISTING 12" FLUSH CURB EXISTING LIGHT TO REMAIN EXISTING LIGHT TO REMAIN EXISTING GAS LINE GATON III INC DBA CANINOS ITALIAN RESTAURANT 613 S COLLEGE AVE FORT COLLINS, CO 805243003 RELOCATED IRRIGATION CONTROL ADDITION FFE=97.33 96.99 96.93 97.02 96.83 97.13 97.00 96.85 96.95 97.25 96.89 96.84 97.19 96.48 97.18 96.94 96.84 96.66 95.96 95.98 96.60 96.24 96.19 96.83 96.77 95.93 95.85 96.94 98.04 TOW 98.04 TOW 96.52 96.56 (96.31) (97.18) (97.48) (97.58) (96.92) (96.73) (96.80) (96.76) (97.12) (97.03) (97.00) (96.20) 97.31 97.33 96.94 0.9% 1.0% 1.5% 2.0% 2.0% 1.5% 0.8% 0.6% 2.0% 0.5% PROPOSED 12" FLUSH CURB MATCH EXISTING PROPOSED 12" FLUSH CURB MATCH EXISTING PROPOSED PAVERS MATCH EXISTING PROPOSED PAVERS MATCH EXISTING PROPOSED STRIPING (TYP.) 8' 9' 5' 9' PROPOSED TRASH ENCLOSURE 6' CONCRETE WALK 17' PROPOSED PARKING STOP (TYP.) PROPOSED HC PARKING SIGN PROPOSED 1' SIDEWALK CHASES PROPOSED 2' CONCRETE PAN PROPOSED THICKENED CONCRETE EDGE 1.0% 97.13 RELOCATED CABLE PEDESTAL RAIN GARDEN PLANTERS PROPOSED 18" SEAT WALL KNOCKOUT IN BASE OF WALL CONNECT TO SIDEWALK CHASE PROPOSED GRASSCRETE PAVERS RELOCATED GAS LINE RELOCATED GAS LINE 95.93 96.24 96.83 95.77 95.86 96.86 0.6% CONCRETE PARKING AREA EXISTING 100-YR FLOODPLAIN (CITY OF FORT COLLINS) 96.01 96.07 96.11 98.04 TOW 95.99 96.32 96.27 95.96 96.74 96.36 96.30 96.29 96.11 96.32 96.39 96.27 96.24 95.92 95.91 95.78 96.23 96.19 0.5% G F C.O. G W C S E E E E E E E X X X G G G G G X X X X X X X X X X X GATON III INC DBA CANINOS ITALIAN RESTAURANT 613 S COLLEGE AVE FORT COLLINS, CO 805243003 SOUTH COLLEGE AVENUE EXISTING SANITARY CLEANOUT EXISTING GAS METER EXISTING ±2' SIDEWALK EXISTING WATER METER & CURB STOP EXISTING UTILITY METER EXISTING COAL CHUTE EXISTING 6' SIDEWALK EXISTING ELECTRIC LINE EXISTING BUILDING TO REMAIN FFE = ±4997.3 EXISTING FRONT PORCH EXISTING TIMBER PLANTER 605 COLLEGE LTD 605 S COLLEGE AVE FORT COLLINS, CO 805243003 ADDITION FFE=97.33 96.94 97.42 TOW 96.52 96.56 96.40 (96.09) (97.29) (97.25) (95.47) (95.49) (95.25) (93.96) (93.98) (95.26) (95.39) (95.63) (95.73) (95.82) (95.77) (96.26) (96.49) (95.89) 97.31 96.83 97.33 97.24 97.12 95.69 97.18 95.63 95.62 95.53 96.12 96.13 95.37 95.34 95.71 95.33 95.32 95.30 95.77 95.33 95.36 95.21 95.23 94.85 95.40 95.24 93.96 95.65 95.78 95.72 0.5% 1.4% 0.5% 0.5% 0.6% 4.6% 2.0% 2.0% 2.0% 2.0% PROPOSED 1' CONCRETE CHASE PROPOSED 1' SIDEWALK CHASE 95.45 95.43 95.40 96.13 97.42 TOW EXISTING 4' SIDEWALK PROPOSED 2' SIDEWALK CHASE PROPOSED 2' CONCRETE CHASE PROPOSED 30" VERTICAL CURB & GUTTER MATCH EXISTING CURB & GUTTER MATCH EXISTING CURB & GUTTER TIE TO EXISTING SIDEWALK TIE TO EXISTING SIDEWALK KNOCKOUT IN BASE OF WALL CONNECT TO SIDEWALK CHASE RAIN GARDEN PLANTERS 95.77 96.86 3 - 5" STAIRS 97.33 95.93 3' CONCRETE WALK 95.82 95.71 95.38 2.0% 95.29 EXISTING SIDEWALK 1.2% 0.5% 124.49 LF 4" PVC N89°41'31"W (95.40) (95.25) EXISTING 100-YR FLOODPLAIN (CITY OF FORT COLLINS) PROPOSED 4" PVC FIRE SERVICE PROPOSED THICKENED CONCRETE EDGE 95.66 95.76 95.87 95.86 95.91 96.01 0.5% EXISTING DOWNSPOUT (TYP.) TIE TO EXISTING SIDEWALK ROOF OVERHANG (TYP.) ROOF OVERHANG (TYP.) 100-YR FLOODPLAIN (PENDING LOMA) 100-YR FLOODPLAIN (PENDING LOMA) 95.35 EXISTING DRIVEWAY 94.98 95.11 1.2% 94.71 Sheet 609 SOUTH COLLEGE AVENUE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN FORT COLLINS: 301 North Howes Street, Suite 100, 80521 GREELEY: 820 8th Street, 80631 970.221.4158 northernengineering.com of 8 C200 UTILITY & GRADING PLAN 4 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R NORTH ( IN FEET ) 1 inch = ft. 5 0 5 Feet 5 10 15 NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 3. UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 4. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 5. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 6. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OR FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF CERTIFICATE OF OCCUPANCY. 7. REFER TO PLUMBING PLANS FOR ALL WATER SERVICE AND SANITARY SEWER SERVICE LOCATIONS. IF CONFLICT OCCURS, BOTH THE PLUMBING ENGINEER AND CIVIL ENGINEER SHALL BE CONTACTED PRIOR TO INSTALLATION OR ORDERING OF MATERIALS. 8. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS. 9. CONTRACTOR SHALL COORDINATE ANY NECESSARY TELEPHONE, CABLE, FIBER, GAS, AND ELECTRIC LOWERINGS (OR RE-ROUTING) WITH THE RESPECTIVE UTILITY PROVIDERS. 10. CONTRACTOR TO COORDINATE FINAL LOCATION OF ALL GAS AND ELECTRIC METERS WITH ARCHITECT AND UTILITY PROVIDERS. 11. REFER TO APPROVED SITE ELECTRICAL PLANS FOR ALL CONDUITS AND POWER LINE ROUTING FOR SITE LIGHTING. 12. THE LOCATION OF PROPOSED DRY UTILITIES AS SHOWN ON THIS DRAWING ARE SHOWN FOR HORIZONTAL ALIGNMENTS ONLY AND ARE APPROXIMATE. FINAL DESIGNS OF DRY UTILITIES WILL BE PERFORMED BY THE APPROPRIATE UTILITY COMPANY AND/OR ENGINEER. 13. A FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR EACH SITE CONSTRUCTION ELEMENT IN THE FLOODPLAIN, INCLUDING BUILDING. THE FLOODPLAIN USE PERMIT FOR THE BUILDING WILL BE APPROVED AT THE TIME OF BUILDING PERMIT APPLICATION. 14. A FLOODPLAIN USE PERMIT AND NO RISE CERTIFICATION WILL BE REQUIRED PRIOR TO ANY WORK OCCURRING WITHIN THE FLOODWAY. 15. ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 16. ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM NAVD88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 17. THE CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING AND VERIFYING ELEVATIONS OF ALL CURBS AND GUTTERS AT THE POINTS OF CONNECTION SHOWN ON THE PLANS PRIOR TO INSTALLING ANY OF THE NEW IMPROVEMENTS. IF A CONFLICT EXISTS AND/OR A DESIGN MODIFICATION IS REQUIRED, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN. 18. ADD 4900-FT TO PROPOSED CONTOURS, SPOT ELEVATIONS, AND FFE LABELS, WHERE TRUNCATED. 19. CONTRACTOR SHALL CONFIRM AND COORDINATE WITH STAMPED ARCHITECTURAL AND LANDSCAPE ARCHITECTURE DRAWINGS FOR ALL STEPS, RAMPS, LANDSCAPING WALLS, SEATWALLS, RAILINGS, AND PLANTERS. 20. THE LOWEST FLOOR (INCLUDING ANY BASEMENT OR CRAWL SPACE) AND ALL HVAC EQUIPMENT SHALL BE FLOOD PROTECTED ABOVE THE REGULATORY FLOOD PROTECTION ELEVATION. LEGEND: G T EXISTING CABLE CTV EXISTING TELEPHONE EXISTING GAS PROPOSED CURB & GUTTER EASEMENT LINE PROPERTY BOUNDARY EXISTING LOTLINE PROPOSED ELECTRIC E EXISTING ELECTRIC E PROPOSED CABLE CTV PROPOSED GAS G EXISTING 100-YR FLOODPLAIN (CITY OF FORT COLLINS) SEE THIS SHEET - BELOW LEFT SEE THIS SHEET - ABOVE RIGHT PROPOSED CONTOUR EXISTING CONTOUR PROPOSED SPOT ELEVATION 33.43 PROPOSED SLOPES 2.0% (47.45) EXISTING SPOT ELEVATION PROPOSED FENCE X EXISTING WATER W PROPOSED FIRE SEVICE F SEE FIRE SERVICE DETAIL SHEET C300 100-YR FLOODPLAIN (PENDING LOMA) Please remove this line work and callout Removed