Loading...
HomeMy WebLinkAboutCOUNTRY CLUB RESERVE - FDP180030 - SUBMITTAL DOCUMENTS - ROUND 4 - SITE PLANV.P. W W W W W W W W W W W W W W W W W W W W W W V.P. V.P. A.R.V. GAS GAS V.P. V.P. G G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E E W W W W W W W W W W W W W W W W W W W W W W W W V.P. V.P. V.P. A.R.V. GAS X X X X X X G G G G G G G G G E E E E E E E E E E E E E E E E E E E X X X X X X X X X X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W W W W W W W W W W E E E E E E E E E E X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / F E S M F E S T ELE / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X B B W W W W UD UD UD UD 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W SD SD SD SD SD SD SD SD SD SD SD SD SD SD V.P. / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / F E S M F E S / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X X X X X X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X W S O X X V.P. V AULT CABLE BOX CABLE H2O X W W W W W OHE OHE OHE OHE OHE OHE OHE ST B W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W GAS X X V.P. V.P. X X X X X G G G G G G G G G G G G G G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E E E E E W W W W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E E E E X X X B U D UD UD UD UD UD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD W W W W W W W W W X X X X X X X G G G G G G G G G G E E E E E E E E E X X X X X X X X X X X X X X V .P. X X X X X OHE OHE OHE OHE OHE B / / / / / / / / ST ST ST / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W W W W W W W W W W W W W W / / / / / / / / G G G W W E E E U D 15" SS 15" SS 15" SS 15" SS 15" SS 15" SS 15" SS 15" SS 15" SS 15" SS 15" SS 15" SS SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W V .P. W W W W W W W W W W V.P. V.P. A.R.V. GAS GAS V.P. X G G G G G G G E E E E E E E E E X V .P. X X X X / / / / / / / / M X F E S M M F E S F E S M TELE F.O. TELE F E S MGAS / / / / / / / / F E S M F E S TELE / / / / / / / / F E S M F E S / / / / / / / / X W S O V.P. VAULT CABLE BOX CABLE H2O V.GAS P. GAS OHE OHE B B B B B B B B AW / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W W W E 12" W 12" W 12" W SD SD W W W S S S S S S S S S S S S S W W W W W W W W W S S S S S S S S S W W W W W W W W W S S S S S S S S S W W W W W W W S S S S S S S S S S S S S W W W W W W W W W W W W W S S S S W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S W W W W W W W W W W S S S S S S SSS S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S W S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S W S S 16" W 16" W W A.V. A.V. W W W W IR IR S SD SD A.V. LOD LOD OF: SHEET NUMBER: FORT COLLINS, CO 80524 COUNTRY CLUB RESERVE GROUP landscape architecture|planning|illustration 444 Mountain Ave. Berthoud,CO 80513 T B 970.532.5891 TBGroup.us PREPARED FOR REVISIONS SHEET INFORMATION DATE SEAL 7 PROJECT TITLE SHEET TITLE ISSUE DATE HILLSIDE COMMERCIAL GROUP, LLC CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R JUNE 30, 2020 FINAL DEVELOPMENT PLAN 1st Submittal 12/12/18 2nd Submittal 3/13/19 3rd Submittal 5/29/19 4th Submittal 6/30/20 Site Plan SCALE 1" = 50'-0" S 6.0 0 50' 75' 100' NORTH MATCH LINE - SHEET 3 MATCH LINE - SHEET 5 350' SETBACK OIL/GAS (TYP.) OIL/GAS WELL HEAD #4 LIMIT OF WORK OIL/GAS WELL HEAD #3 LIMIT OF WORK 350' SETBACK OIL/GAS (TYP.) TURNBERRY RD. Site Plan EXISTING CONTOURS EASEMENT LINE PROPERTY LINE Legend Site Plan Notes 1. THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FINAL PLANS. AMENDMENTS TO THE PLANS MUST BE REVIEWED AND APPROVED BY THE CITY PRIOR TO THE IMPLEMENTATION OF ANY CHANGES TO THE PLANS. 2. REFER TO FINAL UTILITY PLANS FOR EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR STORM DRAINAGE STRUCTURES, UTILITY MAINS AND SERVICES, PROPOSED TOPOGRAPHY, STREET IMPROVEMENTS. 3. REFER TO THE SUBDIVISION PLAT AND UTILITY PLANS FOR EXACT LOCATIONS, AREAS AND DIMENSIONS OF ALL EASEMENTS, LOTS, TRACTS, STREETS, WALKS AND OTHER SURVEY INFORMATION. 4. ALL CONSTRUCTION WITH THIS DEVELOPMENT PLAN MUST BE COMPLETED IN ONE PHASE UNLESS A PHASING PLAN IS SHOWN WITH THESE PLANS. 5. ALL EXTERIOR LIGHTING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE REQUIREMENTS IN SECTION 3.2.4 OF THE LAND USE CODE AND SHALL USE A CONCEALED, FULLY SHIELDED LIGHT SOURCE WITH SHARP CUT-OFF CAPABILITY SO AS TO MINIMIZE UP-LIGHT, SPILL LIGHT, GLARE AND UNNECESSARY DIFFUSION. 6. SIGNAGE AND ADDRESSING ARE NOT PERMITTED WITH THIS PLANNING DOCUMENT AND MUST BE APPROVED BY SEPARATE CITY PERMIT PRIOR TO CONSTRUCTION. SIGNS MUST COMPLY WITH CITY SIGN CODE UNLESS A SPECIFIC VARIANCE IS GRANTED BY THE CITY. 7. FIRE HYDRANTS MUST MEET OR EXCEED POUDRE FIRE AUTHORITY STANDARDS. ALL BUILDINGS MUST PROVIDE AN APPROVED FIRE EXTINGUISHING SYSTEM. 8. ALL SIDEWALKS AND RAMPS MUST CONFORM TO CITY STANDARDS. ACCESSIBLE RAMPS MUST BE PROVIDED AT ALL STREET AND DRIVE INTERSECTIONS AND AT ALL DESIGNATED ACCESSABLE PARKING SPACES. ACCESSABLE PARKING SPACES MUST SLOPE NO MORE THAN 1:48 IN ANY DIRECTION. ALL ACCESSIBLE ROUTES MUST SLOPE NO MORE THAN 1:20 IN DIRECTION OF TRAVEL AND WITH NO MORE THAN 1:48 CROSS SLOPE. 9. COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN RIGHT OF WAYS, STREET MEDIANS, AND TRAFFIC CIRCLES ADJACENT TO COMMON OPEN SPACE AREAS ARE REQUIRED TO BE MAINTAINED BY A PROPERTY OWNERS' ASSOCIATION. THE PROPERTY OWNERS' ASSOCIATION IS RESPONSIBLE FOR SNOW REMOVAL ON ALL ADJACENT STREET SIDEWALKS AND SIDEWALKS IN COMMON OPEN SPACE AREAS. 10. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 11. FIRE LANE MARKING: A FIRE LANE MARKING PLAN MUST BE REVIEWED AND APPROVED BY THE FIRE OFFICIAL PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. WHERE REQUIRED BY THE FIRE CODE OFFICIAL, APPROVED SIGNS OR OTHER APPROVED NOTICES THAT INCLUDE THE WORDS NO PARKING FIRE LANE SHALL BE PROVIDED FOR FIRE APPARATUS ACCESS ROADS TO IDENTIFY SUCH ROADS OR PROHIBIT THE OBSTRUCTION THEREOF. THE MEANS BY WHICH FIRE LANES ARE DESIGNATED SHALL BE MAINTAINED IN A CLEAN AND LEGIBLE CONDITION AT ALL TIMES AD BE REPLACED OR REPAIRED WHEN NECESSARY TO PROVIDE ADEQUATE VISIBILITY. 12. PREMISE IDENTIFICATION: AN ADDRESSING PLAN IS REQUIRED TO BE REVIEWED AND APPROVED BY THE CITY AND POUDRE FIRE AUTHORITY PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. UNLESS THE PRIVATE DRIVE IS NAMED, MONUMENT SIGNAGE MAY BE REQUIRED TO ALLOW WAY_FINDING. ALL BUILDINGS SHALL HAVE ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION THAT IS PLAINLY LEGIBLE, VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY, AND POSTED WITH A MINIMUM OF SIX_INCH NUMERALS ON A CONTRASTING BACKGROUND. WHERE ACCESS IS BY MEANS OF A PRIVATE ROAD AND THE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY, A MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE. PROPOSED CONTOURS BUILDING ENVELOPE 2 3 5 6 1 4 Key Map 5' MOWN SOFT SURFACE TRAIL (TYP.) 5' MOWN SOFT SURFACE TRAIL (TYP.) THE NATURAL HAIBTAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. R350' R350' STREET LIGHT (TYP.) W W W S S S S S S S S S S S S S W W W W W W W W W S S S S S S S S S W W W W W W W W W S S S S S S W W W W S S S W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W S W W W SD SD SD SD SD SD SD SD SD SD V .P. W W W W W W W W W W V.P. V.P. A.R.V. GAS GAS V.P. X G G G G G G G E E E E E E E E E X V .P. X X X X / / / / / / / / M X F E S M M F E S F E S M TELE F.O. TELE F E S MGAS / / / / / / / / F E S M F E S TELE / / / / / / / / F E S M F E S / / / / / / / / X W S O V.P. VAULT CABLE BOX CABLE H2O V.GAS P. GAS OHE OHE B B B B B B B B AW / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W W W E 12" W 12" W 12" W SD SD W W W S S S S S S S S S S S S S W W W W W W W W W S S S S S S S S S W W W W W W W W W S S S S S S S S S W W W W W W W S S S S S S S S S S S S S W W W W W W W W W W W W W S S S S W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S W W W W W W W W W W S S S S S S SSS S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S W S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S W S S 16" W 16" W W A.V. A.V. W W W W IR IR S SD SD A.V. LOD LOD OF: SHEET NUMBER: FORT COLLINS, CO 80524 COUNTRY CLUB RESERVE GROUP landscape architecture|planning|illustration 444 Mountain Ave. Berthoud,CO 80513 T B 970.532.5891 TBGroup.us PREPARED FOR REVISIONS SHEET INFORMATION DATE SEAL 7 PROJECT TITLE SHEET TITLE ISSUE DATE HILLSIDE COMMERCIAL GROUP, LLC CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R JUNE 30, 2020 FINAL DEVELOPMENT PLAN 1st Submittal 12/12/18 2nd Submittal 3/13/19 3rd Submittal 5/29/19 4th Submittal 6/30/20 Site Plan SCALE 1" = 50'-0" S 5.0 0 50' 75' 100' NORTH MATCH LINE - SHEET 6 MATCH LINE - SHEET 2 MATCH LINE - SHEET 4 BALTUSROL DR. CARNOUSTIE DR. ROYAL TROON AVE. LIMIT OF WORK 350' SETBACK OIL/GAS (TYP.) 350' SETBACK OIL/GAS (TYP.) 350' SETBACK OIL/GAS (TYP.) Site Plan 5' MOWN SOFT SURFACE TRAIL (TYP.) EXISTING CONTOURS EASEMENT LINE PROPERTY LINE Legend Site Plan Notes 1. THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FINAL PLANS. AMENDMENTS TO THE PLANS MUST BE REVIEWED AND APPROVED BY THE CITY PRIOR TO THE IMPLEMENTATION OF ANY CHANGES TO THE PLANS. 2. REFER TO FINAL UTILITY PLANS FOR EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR STORM DRAINAGE STRUCTURES, UTILITY MAINS AND SERVICES, PROPOSED TOPOGRAPHY, STREET IMPROVEMENTS. 3. REFER TO THE SUBDIVISION PLAT AND UTILITY PLANS FOR EXACT LOCATIONS, AREAS AND DIMENSIONS OF ALL EASEMENTS, LOTS, TRACTS, STREETS, WALKS AND OTHER SURVEY INFORMATION. 4. ALL CONSTRUCTION WITH THIS DEVELOPMENT PLAN MUST BE COMPLETED IN ONE PHASE UNLESS A PHASING PLAN IS SHOWN WITH THESE PLANS. 5. ALL EXTERIOR LIGHTING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE REQUIREMENTS IN SECTION 3.2.4 OF THE LAND USE CODE AND SHALL USE A CONCEALED, FULLY SHIELDED LIGHT SOURCE WITH SHARP CUT-OFF CAPABILITY SO AS TO MINIMIZE UP-LIGHT, SPILL LIGHT, GLARE AND UNNECESSARY DIFFUSION. 6. SIGNAGE AND ADDRESSING ARE NOT PERMITTED WITH THIS PLANNING DOCUMENT AND MUST BE APPROVED BY SEPARATE CITY PERMIT PRIOR TO CONSTRUCTION. SIGNS MUST COMPLY WITH CITY SIGN CODE UNLESS A SPECIFIC VARIANCE IS GRANTED BY THE CITY. 7. FIRE HYDRANTS MUST MEET OR EXCEED POUDRE FIRE AUTHORITY STANDARDS. ALL BUILDINGS MUST PROVIDE AN APPROVED FIRE EXTINGUISHING SYSTEM. 8. ALL SIDEWALKS AND RAMPS MUST CONFORM TO CITY STANDARDS. ACCESSIBLE RAMPS MUST BE PROVIDED AT ALL STREET AND DRIVE INTERSECTIONS AND AT ALL DESIGNATED ACCESSABLE PARKING SPACES. ACCESSABLE PARKING SPACES MUST SLOPE NO MORE THAN 1:48 IN ANY DIRECTION. ALL ACCESSIBLE ROUTES MUST SLOPE NO MORE THAN 1:20 IN DIRECTION OF TRAVEL AND WITH NO MORE THAN 1:48 CROSS SLOPE. 9. COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN RIGHT OF WAYS, STREET MEDIANS, AND TRAFFIC CIRCLES ADJACENT TO COMMON OPEN SPACE AREAS ARE REQUIRED TO BE MAINTAINED BY A PROPERTY OWNERS' ASSOCIATION. THE PROPERTY OWNERS' ASSOCIATION IS RESPONSIBLE FOR SNOW REMOVAL ON ALL ADJACENT STREET SIDEWALKS AND SIDEWALKS IN COMMON OPEN SPACE AREAS. 10. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 11. FIRE LANE MARKING: A FIRE LANE MARKING PLAN MUST BE REVIEWED AND APPROVED BY THE FIRE OFFICIAL PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. WHERE REQUIRED BY THE FIRE CODE OFFICIAL, APPROVED SIGNS OR OTHER APPROVED NOTICES THAT INCLUDE THE WORDS NO PARKING FIRE LANE SHALL BE PROVIDED FOR FIRE APPARATUS ACCESS ROADS TO IDENTIFY SUCH ROADS OR PROHIBIT THE OBSTRUCTION THEREOF. THE MEANS BY WHICH FIRE LANES ARE DESIGNATED SHALL BE MAINTAINED IN A CLEAN AND LEGIBLE CONDITION AT ALL TIMES AD BE REPLACED OR REPAIRED WHEN NECESSARY TO PROVIDE ADEQUATE VISIBILITY. 12. PREMISE IDENTIFICATION: AN ADDRESSING PLAN IS REQUIRED TO BE REVIEWED AND APPROVED BY THE CITY AND POUDRE FIRE AUTHORITY PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. UNLESS THE PRIVATE DRIVE IS NAMED, MONUMENT SIGNAGE MAY BE REQUIRED TO ALLOW WAY_FINDING. ALL BUILDINGS SHALL HAVE ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION THAT IS PLAINLY LEGIBLE, VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY, AND POSTED WITH A MINIMUM OF SIX_INCH NUMERALS ON A CONTRASTING BACKGROUND. WHERE ACCESS IS BY MEANS OF A PRIVATE ROAD AND THE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY, A MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE. PROPOSED CONTOURS BUILDING ENVELOPE 2 3 5 6 1 4 Key Map THE NATURAL HAIBTAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. STREET LIGHT (TYP.) E E E E E E E X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X B B W W W W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / E E E E E E E E E SD SD SD SD SD SD SD SD SD SD S S S W W W S S S S S S S S S S S S S W W W W W W W W W W W W W S S W W S S W A.V. W V.P. W W W W W W W W W W V.P. V.P. A.R.V. GAS GAS V.P. X G G G G G G G E E E E E E E E E X V .P. X X X X / / / / / / / / M X F E S M M F E S F E S M TELE F.O. TELE F E S MGAS / / / / / / / / F E S M F E S TELE / / / / / / / / F E S M F E S / / / / / / / / X W S O V.P. VAULT CABLE BOX CABLE H2O V.GAS P. GAS OHE OHE B B B B B B B B AW / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W W W E 12" W 12" W 12" W SD SD W W W S S S S S S S S S S S S S W W W W W W W W W S S S S S S S S S W W W W W W W W W S S S S S S S S S W W W W W W W S S S S S S S S S S S S S W W W W W W W W W W W W W S S S S W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S W W W W W W W W W W S S S S S S SSS S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S W S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S W S S 16" W 16" W W A.V. A.V. W W W W IR IR S SD SD A.V. LOD LOD OF: SHEET NUMBER: FORT COLLINS, CO 80524 COUNTRY CLUB RESERVE GROUP landscape architecture|planning|illustration 444 Mountain Ave. Berthoud,CO 80513 T B 970.532.5891 TBGroup.us PREPARED FOR REVISIONS SHEET INFORMATION DATE SEAL 7 PROJECT TITLE SHEET TITLE ISSUE DATE HILLSIDE COMMERCIAL GROUP, LLC CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R JUNE 30, 2020 FINAL DEVELOPMENT PLAN 1st Submittal 12/12/18 2nd Submittal 3/13/19 3rd Submittal 5/29/19 4th Submittal 6/30/20 Site Plan SCALE 1" = 50'-0" S 4.0 0 50' 75' 100' NORTH MATCH LINE - SHEET 5 MATCH LINE - SHEET 1 BALTUSROL DR. BALTUSROL CT. 350' SETBACK OIL/GAS (TYP.) OIL/GAS WELL HEAD #2 350' SETBACK OIL/GAS (TYP.) LIMIT OF WORK LIMIT OF WORK Site Plan 5' MOWN SOFT SURFACE TRAIL (TYP.) EXISTING CONTOURS EASEMENT LINE PROPERTY LINE Legend Site Plan Notes 1. THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FINAL PLANS. AMENDMENTS TO THE PLANS MUST BE REVIEWED AND APPROVED BY THE CITY PRIOR TO THE IMPLEMENTATION OF ANY CHANGES TO THE PLANS. 2. REFER TO FINAL UTILITY PLANS FOR EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR STORM DRAINAGE STRUCTURES, UTILITY MAINS AND SERVICES, PROPOSED TOPOGRAPHY, STREET IMPROVEMENTS. 3. REFER TO THE SUBDIVISION PLAT AND UTILITY PLANS FOR EXACT LOCATIONS, AREAS AND DIMENSIONS OF ALL EASEMENTS, LOTS, TRACTS, STREETS, WALKS AND OTHER SURVEY INFORMATION. 4. ALL CONSTRUCTION WITH THIS DEVELOPMENT PLAN MUST BE COMPLETED IN ONE PHASE UNLESS A PHASING PLAN IS SHOWN WITH THESE PLANS. 5. ALL EXTERIOR LIGHTING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE REQUIREMENTS IN SECTION 3.2.4 OF THE LAND USE CODE AND SHALL USE A CONCEALED, FULLY SHIELDED LIGHT SOURCE WITH SHARP CUT-OFF CAPABILITY SO AS TO MINIMIZE UP-LIGHT, SPILL LIGHT, GLARE AND UNNECESSARY DIFFUSION. 6. SIGNAGE AND ADDRESSING ARE NOT PERMITTED WITH THIS PLANNING DOCUMENT AND MUST BE APPROVED BY SEPARATE CITY PERMIT PRIOR TO CONSTRUCTION. SIGNS MUST COMPLY WITH CITY SIGN CODE UNLESS A SPECIFIC VARIANCE IS GRANTED BY THE CITY. 7. FIRE HYDRANTS MUST MEET OR EXCEED POUDRE FIRE AUTHORITY STANDARDS. ALL BUILDINGS MUST PROVIDE AN APPROVED FIRE EXTINGUISHING SYSTEM. 8. ALL SIDEWALKS AND RAMPS MUST CONFORM TO CITY STANDARDS. ACCESSIBLE RAMPS MUST BE PROVIDED AT ALL STREET AND DRIVE INTERSECTIONS AND AT ALL DESIGNATED ACCESSABLE PARKING SPACES. ACCESSABLE PARKING SPACES MUST SLOPE NO MORE THAN 1:48 IN ANY DIRECTION. ALL ACCESSIBLE ROUTES MUST SLOPE NO MORE THAN 1:20 IN DIRECTION OF TRAVEL AND WITH NO MORE THAN 1:48 CROSS SLOPE. 9. COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN RIGHT OF WAYS, STREET MEDIANS, AND TRAFFIC CIRCLES ADJACENT TO COMMON OPEN SPACE AREAS ARE REQUIRED TO BE MAINTAINED BY A PROPERTY OWNERS' ASSOCIATION. THE PROPERTY OWNERS' ASSOCIATION IS RESPONSIBLE FOR SNOW REMOVAL ON ALL ADJACENT STREET SIDEWALKS AND SIDEWALKS IN COMMON OPEN SPACE AREAS. 10. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 11. FIRE LANE MARKING: A FIRE LANE MARKING PLAN MUST BE REVIEWED AND APPROVED BY THE FIRE OFFICIAL PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. WHERE REQUIRED BY THE FIRE CODE OFFICIAL, APPROVED SIGNS OR OTHER APPROVED NOTICES THAT INCLUDE THE WORDS NO PARKING FIRE LANE SHALL BE PROVIDED FOR FIRE APPARATUS ACCESS ROADS TO IDENTIFY SUCH ROADS OR PROHIBIT THE OBSTRUCTION THEREOF. THE MEANS BY WHICH FIRE LANES ARE DESIGNATED SHALL BE MAINTAINED IN A CLEAN AND LEGIBLE CONDITION AT ALL TIMES AD BE REPLACED OR REPAIRED WHEN NECESSARY TO PROVIDE ADEQUATE VISIBILITY. 12. PREMISE IDENTIFICATION: AN ADDRESSING PLAN IS REQUIRED TO BE REVIEWED AND APPROVED BY THE CITY AND POUDRE FIRE AUTHORITY PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. UNLESS THE PRIVATE DRIVE IS NAMED, MONUMENT SIGNAGE MAY BE REQUIRED TO ALLOW WAY_FINDING. ALL BUILDINGS SHALL HAVE ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION THAT IS PLAINLY LEGIBLE, VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY, AND POSTED WITH A MINIMUM OF SIX_INCH NUMERALS ON A CONTRASTING BACKGROUND. WHERE ACCESS IS BY MEANS OF A PRIVATE ROAD AND THE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY, A MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE. PROPOSED CONTOURS BUILDING ENVELOPE 2 3 5 6 1 4 Key Map THE NATURAL HAIBTAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 100' SETBACK ABANDONED WELL R350' 5' MOWN SOFT SURFACE TRAIL (TYP.) 5' MOWN SOFT SURFACE TRAIL (TYP.) STREET LIGHT (TYP.) W W W W W W W W W UD UD UD 15" SS 15" SS 15" SS 15" SS 15" SS 15" SS 15" SS 15" SS 15" SS 15" SS 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W SD SD SD SD S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W A.V. SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD V .P. W W W W W W W W W W V.P. V.P. A.R.V. GAS GAS V.P. X G G G G G G G E E E E E E E E E X V .P. X X X X / / / / / / / / M X F E S M M F E S F E S M TELE F.O. TELE F E S MGAS / / / / / / / / F E S M F E S TELE / / / / / / / / F E S M F E S / / / / / / / / X W S O V.P. VAULT CABLE BOX CABLE H2O V.GAS P. GAS OHE OHE B B B B B B B B AW / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W W W E 12" W 12" W 12" W SD SD W W W S S S S S S S S S S S S S W W W W W W W W W S S S S S S S S S W W W W W W W W W S S S S S S S S S W W W W W W W S S S S S S S S S S S S S W W W W W W W W W W W W W S S S S W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S W W W W W W W W W W S S S S S S SSS S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S W S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S W S S 16" W 16" W W A.V. A.V. W W W W IR IR S SD SD A.V. LOD LOD OF: SHEET NUMBER: FORT COLLINS, CO 80524 COUNTRY CLUB RESERVE GROUP landscape architecture|planning|illustration 444 Mountain Ave. Berthoud,CO 80513 T B 970.532.5891 TBGroup.us PREPARED FOR REVISIONS SHEET INFORMATION DATE SEAL 7 PROJECT TITLE SHEET TITLE ISSUE DATE HILLSIDE COMMERCIAL GROUP, LLC CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R JUNE 30, 2020 FINAL DEVELOPMENT PLAN 1st Submittal 12/12/18 2nd Submittal 3/13/19 3rd Submittal 5/29/19 4th Submittal 6/30/20 Site Plan S 3.0 Site Plan SCALE 1" = 50'-0" 0 50' 75' 100' NORTH MATCH LINE - SHEET 6 MATCH LINE - SHEET 2 WINGED FOOT DR. KIAWAH DR. 350' SETBACK OIL/GAS (TYP.) TURNBERRY RD. E. DOUGLAS RD. LIMIT OF WORK LIMIT OF WORK 5' MOWN SOFT SURFACE TRAIL (TYP.) EXISTING CONTOURS EASEMENT LINE PROPERTY LINE Legend Site Plan Notes 1. THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FINAL PLANS. AMENDMENTS TO THE PLANS MUST BE REVIEWED AND APPROVED BY THE CITY PRIOR TO THE IMPLEMENTATION OF ANY CHANGES TO THE PLANS. 2. REFER TO FINAL UTILITY PLANS FOR EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR STORM DRAINAGE STRUCTURES, UTILITY MAINS AND SERVICES, PROPOSED TOPOGRAPHY, STREET IMPROVEMENTS. 3. REFER TO THE SUBDIVISION PLAT AND UTILITY PLANS FOR EXACT LOCATIONS, AREAS AND DIMENSIONS OF ALL EASEMENTS, LOTS, TRACTS, STREETS, WALKS AND OTHER SURVEY INFORMATION. 4. ALL CONSTRUCTION WITH THIS DEVELOPMENT PLAN MUST BE COMPLETED IN ONE PHASE UNLESS A PHASING PLAN IS SHOWN WITH THESE PLANS. 5. ALL EXTERIOR LIGHTING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE REQUIREMENTS IN SECTION 3.2.4 OF THE LAND USE CODE AND SHALL USE A CONCEALED, FULLY SHIELDED LIGHT SOURCE WITH SHARP CUT-OFF CAPABILITY SO AS TO MINIMIZE UP-LIGHT, SPILL LIGHT, GLARE AND UNNECESSARY DIFFUSION. 6. SIGNAGE AND ADDRESSING ARE NOT PERMITTED WITH THIS PLANNING DOCUMENT AND MUST BE APPROVED BY SEPARATE CITY PERMIT PRIOR TO CONSTRUCTION. SIGNS MUST COMPLY WITH CITY SIGN CODE UNLESS A SPECIFIC VARIANCE IS GRANTED BY THE CITY. 7. FIRE HYDRANTS MUST MEET OR EXCEED POUDRE FIRE AUTHORITY STANDARDS. ALL BUILDINGS MUST PROVIDE AN APPROVED FIRE EXTINGUISHING SYSTEM. 8. ALL SIDEWALKS AND RAMPS MUST CONFORM TO CITY STANDARDS. ACCESSIBLE RAMPS MUST BE PROVIDED AT ALL STREET AND DRIVE INTERSECTIONS AND AT ALL DESIGNATED ACCESSABLE PARKING SPACES. ACCESSABLE PARKING SPACES MUST SLOPE NO MORE THAN 1:48 IN ANY DIRECTION. ALL ACCESSIBLE ROUTES MUST SLOPE NO MORE THAN 1:20 IN DIRECTION OF TRAVEL AND WITH NO MORE THAN 1:48 CROSS SLOPE. 9. COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN RIGHT OF WAYS, STREET MEDIANS, AND TRAFFIC CIRCLES ADJACENT TO COMMON OPEN SPACE AREAS ARE REQUIRED TO BE MAINTAINED BY A PROPERTY OWNERS' ASSOCIATION. THE PROPERTY OWNERS' ASSOCIATION IS RESPONSIBLE FOR SNOW REMOVAL ON ALL ADJACENT STREET SIDEWALKS AND SIDEWALKS IN COMMON OPEN SPACE AREAS. 10. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 11. FIRE LANE MARKING: A FIRE LANE MARKING PLAN MUST BE REVIEWED AND APPROVED BY THE FIRE OFFICIAL PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. WHERE REQUIRED BY THE FIRE CODE OFFICIAL, APPROVED SIGNS OR OTHER APPROVED NOTICES THAT INCLUDE THE WORDS NO PARKING FIRE LANE SHALL BE PROVIDED FOR FIRE APPARATUS ACCESS ROADS TO IDENTIFY SUCH ROADS OR PROHIBIT THE OBSTRUCTION THEREOF. THE MEANS BY WHICH FIRE LANES ARE DESIGNATED SHALL BE MAINTAINED IN A CLEAN AND LEGIBLE CONDITION AT ALL TIMES AD BE REPLACED OR REPAIRED WHEN NECESSARY TO PROVIDE ADEQUATE VISIBILITY. 12. PREMISE IDENTIFICATION: AN ADDRESSING PLAN IS REQUIRED TO BE REVIEWED AND APPROVED BY THE CITY AND POUDRE FIRE AUTHORITY PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. UNLESS THE PRIVATE DRIVE IS NAMED, MONUMENT SIGNAGE MAY BE REQUIRED TO ALLOW WAY_FINDING. ALL BUILDINGS SHALL HAVE ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION THAT IS PLAINLY LEGIBLE, VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY, AND POSTED WITH A MINIMUM OF SIX_INCH NUMERALS ON A CONTRASTING BACKGROUND. WHERE ACCESS IS BY MEANS OF A PRIVATE ROAD AND THE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY, A MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE. PROPOSED CONTOURS BUILDING ENVELOPE 2 3 5 6 1 4 Key Map NATURAL HABITAT BUFFER ZONE BOUNDARY (TYP.) THE NATURAL HAIBTAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. STREET LIGHT (TYP.) SD SD W W W W S S S S W W W W W S S S S S S S SSS S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S W S S IR SD SD SD SD SD SD IR S SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD A.V. LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD V .P. W W W W W W W W W W V.P. V.P. A.R.V. GAS GAS V.P. X G G G G G G G E E E E E E E E E X V .P. X X X X / / / / / / / / M X F E S M M F E S F E S M TELE F.O. TELE F E S MGAS / / / / / / / / F E S M F E S TELE / / / / / / / / F E S M F E S / / / / / / / / X W S O V.P. VAULT CABLE BOX CABLE H2O V.GAS P. GAS OHE OHE B B B B B B B B AW / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W W W E 12" W 12" W 12" W SD SD W W W S S S S S S S S S S S S S W W W W W W W W W S S S S S S S S S W W W W W W W W W S S S S S S S S S W W W W W W W S S S S S S S S S S S S S W W W W W W W W W W W W W S S S S W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S W W W W W W W W W W S S S S S S SSS S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S W S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S W S S 16" W 16" W W A.V. A.V. W W W W IR IR S SD SD A.V. LOD LOD OF: SHEET NUMBER: FORT COLLINS, CO 80524 COUNTRY CLUB RESERVE GROUP landscape architecture|planning|illustration 444 Mountain Ave. Berthoud,CO 80513 T B 970.532.5891 TBGroup.us PREPARED FOR REVISIONS SHEET INFORMATION DATE SEAL 7 PROJECT TITLE SHEET TITLE ISSUE DATE HILLSIDE COMMERCIAL GROUP, LLC CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R JUNE 30, 2020 FINAL DEVELOPMENT PLAN 1st Submittal 12/12/18 2nd Submittal 3/13/19 3rd Submittal 5/29/19 4th Submittal 6/30/20 Site Plan S 2.0 Site Plan SCALE 1" = 50'-0" 0 50' 75' 100' NORTH MATCH LINE - SHEET 3 MATCH LINE - SHEET 5 MATCH LINE - SHEET 1 WINGED FOOT DR. ROYAL TROON AVE. CARNOUSTIE DR. 50' WETLAND BUFFER (145' AVERAGE DEPTH TO REAR LOT LINES) 50' WETLAND BUFFER (145' AVERAGE DEPTH TO REAR LOT LINES) EXISTING WETLAND (PROTECT-IN-PLACE) E. DOUGLAS RD. LIMIT OF WORK EXISTING CONTOURS EASEMENT LINE PROPERTY LINE Legend Site Plan Notes 1. THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FINAL PLANS. AMENDMENTS TO THE PLANS MUST BE REVIEWED AND APPROVED BY THE CITY PRIOR TO THE IMPLEMENTATION OF ANY CHANGES TO THE PLANS. 2. REFER TO FINAL UTILITY PLANS FOR EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR STORM DRAINAGE STRUCTURES, UTILITY MAINS AND SERVICES, PROPOSED TOPOGRAPHY, STREET IMPROVEMENTS. 3. REFER TO THE SUBDIVISION PLAT AND UTILITY PLANS FOR EXACT LOCATIONS, AREAS AND DIMENSIONS OF ALL EASEMENTS, LOTS, TRACTS, STREETS, WALKS AND OTHER SURVEY INFORMATION. 4. ALL CONSTRUCTION WITH THIS DEVELOPMENT PLAN MUST BE COMPLETED IN ONE PHASE UNLESS A PHASING PLAN IS SHOWN WITH THESE PLANS. 5. ALL EXTERIOR LIGHTING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE REQUIREMENTS IN SECTION 3.2.4 OF THE LAND USE CODE AND SHALL USE A CONCEALED, FULLY SHIELDED LIGHT SOURCE WITH SHARP CUT-OFF CAPABILITY SO AS TO MINIMIZE UP-LIGHT, SPILL LIGHT, GLARE AND UNNECESSARY DIFFUSION. 6. SIGNAGE AND ADDRESSING ARE NOT PERMITTED WITH THIS PLANNING DOCUMENT AND MUST BE APPROVED BY SEPARATE CITY PERMIT PRIOR TO CONSTRUCTION. SIGNS MUST COMPLY WITH CITY SIGN CODE UNLESS A SPECIFIC VARIANCE IS GRANTED BY THE CITY. 7. FIRE HYDRANTS MUST MEET OR EXCEED POUDRE FIRE AUTHORITY STANDARDS. ALL BUILDINGS MUST PROVIDE AN APPROVED FIRE EXTINGUISHING SYSTEM. 8. ALL SIDEWALKS AND RAMPS MUST CONFORM TO CITY STANDARDS. ACCESSIBLE RAMPS MUST BE PROVIDED AT ALL STREET AND DRIVE INTERSECTIONS AND AT ALL DESIGNATED ACCESSABLE PARKING SPACES. ACCESSABLE PARKING SPACES MUST SLOPE NO MORE THAN 1:48 IN ANY DIRECTION. ALL ACCESSIBLE ROUTES MUST SLOPE NO MORE THAN 1:20 IN DIRECTION OF TRAVEL AND WITH NO MORE THAN 1:48 CROSS SLOPE. 9. COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN RIGHT OF WAYS, STREET MEDIANS, AND TRAFFIC CIRCLES ADJACENT TO COMMON OPEN SPACE AREAS ARE REQUIRED TO BE MAINTAINED BY A PROPERTY OWNERS' ASSOCIATION. THE PROPERTY OWNERS' ASSOCIATION IS RESPONSIBLE FOR SNOW REMOVAL ON ALL ADJACENT STREET SIDEWALKS AND SIDEWALKS IN COMMON OPEN SPACE AREAS. 10. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 11. FIRE LANE MARKING: A FIRE LANE MARKING PLAN MUST BE REVIEWED AND APPROVED BY THE FIRE OFFICIAL PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. WHERE REQUIRED BY THE FIRE CODE OFFICIAL, APPROVED SIGNS OR OTHER APPROVED NOTICES THAT INCLUDE THE WORDS NO PARKING FIRE LANE SHALL BE PROVIDED FOR FIRE APPARATUS ACCESS ROADS TO IDENTIFY SUCH ROADS OR PROHIBIT THE OBSTRUCTION THEREOF. THE MEANS BY WHICH FIRE LANES ARE DESIGNATED SHALL BE MAINTAINED IN A CLEAN AND LEGIBLE CONDITION AT ALL TIMES AD BE REPLACED OR REPAIRED WHEN NECESSARY TO PROVIDE ADEQUATE VISIBILITY. 12. PREMISE IDENTIFICATION: AN ADDRESSING PLAN IS REQUIRED TO BE REVIEWED AND APPROVED BY THE CITY AND POUDRE FIRE AUTHORITY PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. UNLESS THE PRIVATE DRIVE IS NAMED, MONUMENT SIGNAGE MAY BE REQUIRED TO ALLOW WAY_FINDING. ALL BUILDINGS SHALL HAVE ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION THAT IS PLAINLY LEGIBLE, VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY, AND POSTED WITH A MINIMUM OF SIX_INCH NUMERALS ON A CONTRASTING BACKGROUND. WHERE ACCESS IS BY MEANS OF A PRIVATE ROAD AND THE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY, A MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE. PROPOSED CONTOURS BUILDING ENVELOPE 2 3 5 6 1 4 Key Map NATURAL HABITAT BUFFER ZONE BOUNDARY (TYP.) NATURAL HABITAT BUFFER ZONE BOUNDARY (TYP.) THE NATURAL HAIBTAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 5' MOWN SOFT SURFACE TRAIL (TYP.) STREET LIGHT (TYP.) / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / M X X X X X X X X X X X X F E S M M F E S F E S M M X X X T ELE F.O. TELE F E S B / / / / / / / / / / / / / / / / / / / / / / / / AW / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W SD SD SD SD SD SD SD S S S S S W W W W W W W W W S S S S S W SD SD SD SD V.P. W W W W W W W W W W V.P. V.P. A.R.V. GAS GAS V.P. X G G G G G G G E E E E E E E E E X V .P. X X X X / / / / / / / / M X F E S M M F E S F E S M TELE F.O. TELE F E S MGAS / / / / / / / / F E S M F E S TELE / / / / / / / / F E S M F E S / / / / / / / / X W S O V.P. VAULT CABLE BOX CABLE H2O V.GAS P. GAS OHE OHE B B B B B B B B AW / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W W W E 12" W 12" W 12" W SD SD W W W S S S S S S S S S S S S S W W W W W W W W W S S S S S S S S S W W W W W W W W W S S S S S S S S S W W W W W W W S S S S S S S S S S S S S W W W W W W W W W W W W W S S S S W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S W W W W W W W W W W S S S S S S SSS S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S W S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S W S S 16" W 16" W W A.V. A.V. W W W W IR IR S SD SD A.V. LOD LOD OF: SHEET NUMBER: FORT COLLINS, CO 80524 COUNTRY CLUB RESERVE GROUP landscape architecture|planning|illustration 444 Mountain Ave. Berthoud,CO 80513 T B 970.532.5891 TBGroup.us PREPARED FOR REVISIONS SHEET INFORMATION DATE SEAL 7 PROJECT TITLE SHEET TITLE ISSUE DATE HILLSIDE COMMERCIAL GROUP, LLC CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R JUNE 30, 2020 FINAL DEVELOPMENT PLAN 1st Submittal 12/12/18 2nd Submittal 3/13/19 3rd Submittal 5/29/19 4th Submittal 6/30/20 Site Plan Site Plan SCALE 1" = 50'-0" 0 50' 75' 100' NORTH MATCH LINE - SHEET 2 MATCH LINE - SHEET 4 BETHPAGE DR. WINGED FOOT DR. E. DOUGLAS RD. 350' SETBACK OIL/GAS (TYP.) OIL/GAS WELL HEAD #1 350' SETBACK OIL/GAS (TYP.) LIMIT OF WORK LIMIT OF WORK S1.0 EXISTING CONTOURS EASEMENT LINE PROPERTY LINE Legend Site Plan Notes 1. THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FINAL PLANS. AMENDMENTS TO THE PLANS MUST BE REVIEWED AND APPROVED BY THE CITY PRIOR TO THE IMPLEMENTATION OF ANY CHANGES TO THE PLANS. 2. REFER TO FINAL UTILITY PLANS FOR EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR STORM DRAINAGE STRUCTURES, UTILITY MAINS AND SERVICES, PROPOSED TOPOGRAPHY, STREET IMPROVEMENTS. 3. REFER TO THE SUBDIVISION PLAT AND UTILITY PLANS FOR EXACT LOCATIONS, AREAS AND DIMENSIONS OF ALL EASEMENTS, LOTS, TRACTS, STREETS, WALKS AND OTHER SURVEY INFORMATION. 4. ALL CONSTRUCTION WITH THIS DEVELOPMENT PLAN MUST BE COMPLETED IN ONE PHASE UNLESS A PHASING PLAN IS SHOWN WITH THESE PLANS. 5. ALL EXTERIOR LIGHTING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE REQUIREMENTS IN SECTION 3.2.4 OF THE LAND USE CODE AND SHALL USE A CONCEALED, FULLY SHIELDED LIGHT SOURCE WITH SHARP CUT-OFF CAPABILITY SO AS TO MINIMIZE UP-LIGHT, SPILL LIGHT, GLARE AND UNNECESSARY DIFFUSION. 6. SIGNAGE AND ADDRESSING ARE NOT PERMITTED WITH THIS PLANNING DOCUMENT AND MUST BE APPROVED BY SEPARATE CITY PERMIT PRIOR TO CONSTRUCTION. SIGNS MUST COMPLY WITH CITY SIGN CODE UNLESS A SPECIFIC VARIANCE IS GRANTED BY THE CITY. 7. FIRE HYDRANTS MUST MEET OR EXCEED POUDRE FIRE AUTHORITY STANDARDS. ALL BUILDINGS MUST PROVIDE AN APPROVED FIRE EXTINGUISHING SYSTEM. 8. ALL SIDEWALKS AND RAMPS MUST CONFORM TO CITY STANDARDS. ACCESSIBLE RAMPS MUST BE PROVIDED AT ALL STREET AND DRIVE INTERSECTIONS AND AT ALL DESIGNATED ACCESSABLE PARKING SPACES. ACCESSABLE PARKING SPACES MUST SLOPE NO MORE THAN 1:48 IN ANY DIRECTION. ALL ACCESSIBLE ROUTES MUST SLOPE NO MORE THAN 1:20 IN DIRECTION OF TRAVEL AND WITH NO MORE THAN 1:48 CROSS SLOPE. 9. COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN RIGHT OF WAYS, STREET MEDIANS, AND TRAFFIC CIRCLES ADJACENT TO COMMON OPEN SPACE AREAS ARE REQUIRED TO BE MAINTAINED BY A PROPERTY OWNERS' ASSOCIATION. THE PROPERTY OWNERS' ASSOCIATION IS RESPONSIBLE FOR SNOW REMOVAL ON ALL ADJACENT STREET SIDEWALKS AND SIDEWALKS IN COMMON OPEN SPACE AREAS. 10. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 11. FIRE LANE MARKING: A FIRE LANE MARKING PLAN MUST BE REVIEWED AND APPROVED BY THE FIRE OFFICIAL PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. WHERE REQUIRED BY THE FIRE CODE OFFICIAL, APPROVED SIGNS OR OTHER APPROVED NOTICES THAT INCLUDE THE WORDS NO PARKING FIRE LANE SHALL BE PROVIDED FOR FIRE APPARATUS ACCESS ROADS TO IDENTIFY SUCH ROADS OR PROHIBIT THE OBSTRUCTION THEREOF. THE MEANS BY WHICH FIRE LANES ARE DESIGNATED SHALL BE MAINTAINED IN A CLEAN AND LEGIBLE CONDITION AT ALL TIMES AD BE REPLACED OR REPAIRED WHEN NECESSARY TO PROVIDE ADEQUATE VISIBILITY. 12. PREMISE IDENTIFICATION: AN ADDRESSING PLAN IS REQUIRED TO BE REVIEWED AND APPROVED BY THE CITY AND POUDRE FIRE AUTHORITY PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. UNLESS THE PRIVATE DRIVE IS NAMED, MONUMENT SIGNAGE MAY BE REQUIRED TO ALLOW WAY_FINDING. ALL BUILDINGS SHALL HAVE ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION THAT IS PLAINLY LEGIBLE, VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY, AND POSTED WITH A MINIMUM OF SIX_INCH NUMERALS ON A CONTRASTING BACKGROUND. WHERE ACCESS IS BY MEANS OF A PRIVATE ROAD AND THE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY, A MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE. PROPOSED CONTOURS BUILDING ENVELOPE 2 3 5 6 1 4 Key Map NATURAL HABITAT BUFFER ZONE BOUNDARY (TYP.) THE NATURAL HAIBTAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 150' SETBACK ABANDONED WELL R350' STREET LIGHT (TYP.) E E / / / / / / / / V .P. / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / M F E S M M F E S F E S M M TELE F.O. TELE F E S F E S F E S MM / / / / / / / / / / / / / / / / / / / / / / / / MGAS / / / / / / / / F E S GAS F E S E / / / / / / / / / / / / / / / / / / / / / / / / F E S M F E S TELE / / / / / / / / / / / / / / / / F E S M F E S / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W S O V.P. VAULT CABLE BOX CABLE M M H2O V.GAS P. GAS OHE OHE OHE OHE OHE OHE OHE OHE OHE B B B B B B B B / / / / / / / / / / / / / / / / ST ST AW W / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / W W W W W W W W / / / / / / / / / / / / / / / / E E UD UD 15" SS 15" SS 15" SS 15" SS 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W SD SD SD SD SD SD SD SD SD SD SD SD SD W W W S S S S S S S S S S S S S W W W W W W W W W S S S S S S S S S W W W W W W W W W S S S S S S S S S W W W W W W W S S S S S S S S S S S S S W W W W W W W W W W W W W S S S S W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S W W W W W W W W W W S S S S S S SSS S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S W S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S W S S 16" W 16" W 16" W 16" W 16" W W A.V. A.V. W W W W IR SD SD IR S SD SD SD SD SD SD A.V. LOD LOD LOD LOD SD SD SD SD SD W S W S W S W S SD SD SD SD SD SD SD S 6' HOUSE DRIVEWAY WALKWAY TREE LAWN W ROAD TYPICAL CORNER LOT 20' STOP SIGN 40' TYP. STREET LIGHT 8' S 6' HOUSE 40' STREET LIGHT DRIVEWAY WALKWAY TREE LAWN W TYPICAL NON-CORNER LOT ROAD OF: SHEET NUMBER: FORT COLLINS, CO 80524 COUNTRY CLUB RESERVE GROUP landscape architecture|planning|illustration 444 Mountain Ave. Berthoud,CO 80513 T B 970.532.5891 TBGroup.us PREPARED FOR REVISIONS SHEET INFORMATION DATE SEAL 7 PROJECT TITLE SHEET TITLE ISSUE DATE HILLSIDE COMMERCIAL GROUP, LLC CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R JUNE 30, 2020 FINAL DEVELOPMENT PLAN 1st Submittal 12/12/18 2nd Submittal 3/13/19 3rd Submittal 5/29/19 4th Submittal 6/30/20 Sheet Index S 0.0 - OVERALL SITE PLAN / COVER SHEET & NOTES S 1.0 - SITE PLAN S 2.0 - SITE PLAN S 3.0 - SITE PLAN S 4.0 - SITE PLAN S 5.0 - SITE PLAN S 6.0 - SITE PLAN Overall Site Plan Cover Sheet & Notes S 0.0 Legal Description Owner's Certification of Approval: THE UNDERSIGNED DOES/DO HEREBY CERTIFY THAT I/WE ARE THE LAWFUL OWNERS OF REAL PROPERTY DESCRIBED ON THIS SITE PLAN AND DO HEREBY CERTIFY THAT I/WE ACCEPT THE CONDITIONS AND RESTRICTIONS SET FORTH ON SAID SITE PLAN. IN WITNESS WHEREOF, WE HAVE HEREUNTO SET OUR HANDS AND SEALS THIS THE _______ DAY OF _______________________, 20_____. OWNER , PROSPECTS STATION. A COLORADO LIMITED LIABILITY COMPANY BY:___________________________________ CONSTANCE DOHN , MANAGER NOTARIAL CERTIFICATE STATE OF COLORADO) COUNTY OF ___________________) THE FOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME BY________________________________________________ THIS ______ DAY OF ________________________, 20_____. MY COMMISSION EXPIRES:_____________ __________________ NOTARY PUBLIC (SEAL) A TRACT OF LAND BEING THE NORTH HALF OF THE NORTHEAST QUARTER SECTION 30, TOWNSHIP 8 NORTH, RANGE 68 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO. Vicinity Map: Site SQUARE FEET ACRES % OF RESIDENTIAL LOTS 945,402 21.70 27.1% COMMON OPEN SPACE 2,039,550 46.82 58.3%* INTERNAL ROW 325,828 7.48 9.3% PERIMETER DEDICATED ROW 184,472 4.23 5.3% TOTAL AREA: 3,492,994 80.19 100% *PER LAND USE CODE SECTION 4.2(E)(2)(b), CLUSTER DEVELOPMENT SHALL SET ASIDE AT LEAST 50% OF THE TOTAL LAND AREA OF THE PROPOSED DEVELOPMENT AS PRIVATE OR PUBLIC OPEN SPACE THAT IS PERMANENTLY PRESERVED AS OPEN SPACE THROUGH DEDICATION OF OWNERSHIP. 58% OF THE TOTAL PROJECT AREA HAS BEEN PRESERVED FOR OPEN SPACE TO BE MAINTAINED BY THE HOA *ANY FENCING INSTALLED AROUND OIL WELLS SHALL NOT REDUCE THE TOTAL OPEN SPACE OF THE DEVELOPMENT TO LESS THAN 50%. Area Coverage Planning Approval: BY THE DIRECTOR OF COMMUNITY DEVELOPMENT AND NEIGHBORHOOD SERVICES OF THE CITY OF FORT COLLINS, COLORADO THIS__________DAY OF _________________________ A.D., 20_______. _____________________________________________________________________________________ DIRECTOR OF COMMUNITY DEVELOPMENT AND NEIGHBORHOOD SERVICES Land-Use Statistics EXISTING ZONING: UE - URBAN ESTATE LAND USE: DETACHED SINGLE FAMILY DEVELOPMENT STANDARD: RESIDENTIAL CLUSTER DEVELOPMENT EXISTING BUILDINGS: 0 PROPOSED RESIDENTIAL UNITS 160 UNITS - SINGLE FAMILY TOTAL AREA 3,492,994 - 80.19 ACRES PERIMETER DEDICATED ROW 184,472 SF - 4.23 ACRES NET LAND AREA: 3,308,522 SF - 75.95 ACRES UNITS PER ACRE 2.0 DU / ACRE MINIMUM LOT SIZE N/A SMALLEST LOT 4,950 SF LARGEST LOT 10,620 SF AVERAGE LOT SIZE 5,908 SF Site Plan Notes 1. THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FINAL PLANS. AMENDMENTS TO THE PLANS MUST BE REVIEWED AND APPROVED BY THE CITY PRIOR TO THE IMPLEMENTATION OF ANY CHANGES TO THE PLANS. 2. REFER TO FINAL UTILITY PLANS FOR EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR STORM DRAINAGE STRUCTURES, UTILITY MAINS AND SERVICES, PROPOSED TOPOGRAPHY, STREET IMPROVEMENTS. 3. REFER TO THE SUBDIVISION PLAT AND UTILITY PLANS FOR EXACT LOCATIONS, AREAS AND DIMENSIONS OF ALL EASEMENTS, LOTS, TRACTS, STREETS, WALKS AND OTHER SURVEY INFORMATION. 4. ALL CONSTRUCTION WITH THIS DEVELOPMENT PLAN MUST BE COMPLETED IN ONE PHASE UNLESS A PHASING PLAN IS SHOWN WITH THESE PLANS. 5. ALL EXTERIOR LIGHTING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE REQUIREMENTS IN SECTION 3.2.4 OF THE LAND USE CODE AND SHALL USE A CONCEALED, FULLY SHIELDED LIGHT SOURCE WITH SHARP CUT-OFF CAPABILITY SO AS TO MINIMIZE UP-LIGHT, SPILL LIGHT, GLARE AND UNNECESSARY DIFFUSION. 6. SIGNAGE AND ADDRESSING ARE NOT PERMITTED WITH THIS PLANNING DOCUMENT AND MUST BE APPROVED BY SEPARATE CITY PERMIT PRIOR TO CONSTRUCTION. SIGNS MUST COMPLY WITH CITY SIGN CODE UNLESS A SPECIFIC VARIANCE IS GRANTED BY THE CITY. 7. FIRE HYDRANTS MUST MEET OR EXCEED POUDRE FIRE AUTHORITY STANDARDS. ALL BUILDINGS MUST PROVIDE AN APPROVED FIRE EXTINGUISHING SYSTEM. 8. ALL SIDEWALKS AND RAMPS MUST CONFORM TO CITY STANDARDS. ACCESSIBLE RAMPS MUST BE PROVIDED AT ALL STREET AND DRIVE INTERSECTIONS AND AT ALL DESIGNATED ACCESSABLE PARKING SPACES. ACCESSABLE PARKING SPACES MUST SLOPE NO MORE THAN 1:48 IN ANY DIRECTION. ALL ACCESSIBLE ROUTES MUST SLOPE NO MORE THAN 1:20 IN DIRECTION OF TRAVEL AND WITH NO MORE THAN 1:48 CROSS SLOPE. 9. COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN RIGHT OF WAYS, STREET MEDIANS, AND TRAFFIC CIRCLES ADJACENT TO COMMON OPEN SPACE AREAS ARE REQUIRED TO BE MAINTAINED BY A PROPERTY OWNERS' ASSOCIATION. THE PROPERTY OWNERS' ASSOCIATION IS RESPONSIBLE FOR SNOW REMOVAL ON ALL ADJACENT STREET SIDEWALKS AND SIDEWALKS IN COMMON OPEN SPACE AREAS. 10. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 11. FIRE LANE MARKING: A FIRE LANE MARKING PLAN MUST BE REVIEWED AND APPROVED BY THE FIRE OFFICIAL PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. WHERE REQUIRED BY THE FIRE CODE OFFICIAL, APPROVED SIGNS OR OTHER APPROVED NOTICES THAT INCLUDE THE WORDS NO PARKING FIRE LANE SHALL BE PROVIDED FOR FIRE APPARATUS ACCESS ROADS TO IDENTIFY SUCH ROADS OR PROHIBIT THE OBSTRUCTION THEREOF. THE MEANS BY WHICH FIRE LANES ARE DESIGNATED SHALL BE MAINTAINED IN A CLEAN AND LEGIBLE CONDITION AT ALL TIMES AD BE REPLACED OR REPAIRED WHEN NECESSARY TO PROVIDE ADEQUATE VISIBILITY. 12. PREMISE IDENTIFICATION: AN ADDRESSING PLAN IS REQUIRED TO BE REVIEWED AND APPROVED BY THE CITY AND POUDRE FIRE AUTHORITY PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. UNLESS THE PRIVATE DRIVE IS NAMED, MONUMENT SIGNAGE MAY BE REQUIRED TO ALLOW WAY_FINDING. ALL BUILDINGS SHALL HAVE ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION THAT IS PLAINLY LEGIBLE, VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY, AND POSTED WITH A MINIMUM OF SIX_INCH NUMERALS ON A CONTRASTING BACKGROUND. WHERE ACCESS IS BY MEANS OF A PRIVATE ROAD AND THE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY, A MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE. 13. THE EXISTING PLUGGED AND ABANDONED OIL AND GAS WELL HEAD LOCATION SHALL REMAIN PERMANENTLY PLUGGED AND ABANDONED IN ACCORDANCE WITH THE COLORADO OIL AND GAS CONSERVATION COMMISSION STANDARDS. PRIOR TO CITY AUTHORIZATION OF ANY RESIDENTIAL BUILDING PERMIT IN CONJUNCTION WITH THESE FINAL PLANS, THE OWNER SHALL CONDUCT A SOIL GAS SURVEY OF ALL PLUGGED AND ABANDONED OIL AND GAS WELL HEAD LOCATIONS ON THE PROPERTY AND PROVIDE THE CITY AND THE COGCC WITH THE RESULTS OF THE SURVEY. SHOULD THE RESULTS OF THE SURVEY INDICATE THAT ANY WELL HEAD IS NOT PROPERLY PLUGGED AND ABANDONED IN ACCORDANCE WITH THE COGCC STANDARDS, THE OWNER OR COGCC SHALL RE-PLUG THE WELL HEAD AND PROVIDE FURTHER DOCUMENTATION TO THE CITY AND COGCC THAT THE WELL IS PROPERTY PLUGGED IN ACCORDANCE WITH ALL COGCC REGULATIONS. UPON COMPLETION AND COGCC INITIAL ACCEPTANCE OF ON-SITE WELL PLUGGING AND RECLAMATION, ANY CONTINUED MAINTENANCE, REPAIRS, ALTERATIONS, AND/OR WELL HEAD MONITORING SHALL BE THE RESPONSIBILITY OF THE HOMEOWNERS ASSOCIATION OR OTHER APPROVED CITY ENTITY. Overall Site Plan SCALE 1" = 200' 0 200' 300' 400' NORTH 1 2 3 4 5 6 E. DOUGLAS RD. TURNBERRY RD. WINGED FOOT DR. KIAWAH DR. BALTUSROL CT. BALTUSROL DR. CARNOUSTIE DR. ROYAL TROON AVE. OIL/GAS WELL HEAD #4 OIL/GAS WELL HEAD #3 OIL/GAS WELL HEAD #2 OIL/GAS WELL HEAD #1 350' SETBACK OIL/GAS (TYP.) 350' SETBACK OIL/GAS (TYP.) 350' SETBACK OIL/GAS (TYP.) 350' SETBACK OIL/GAS (TYP.) EXISTING WETLAND (PROTECT-IN-PLACE) 50' WETLAND BUFFER (TYP.) Country Club Reserve Site Plan Fort Collins, Colorado 80524 Urban Estate Residential Cluster Plan Setback Requirements SCALE 1" = 30' 0 30' 45' 60' BUILDING ENVELOPE (TYP.) LOT LINE (TYP.) 8' MIN. REAR YARD SETBACK RIGHT OF WAY (TYP.) TYPICAL LOT WETLAND BOUNDARY (TYP.) 150' SETBACK ABANDONED WELL NATURAL HABITAT BUFFER ZONE BOUNDARY (TYP.) NATURAL HABITAT BUFFER ZONE BOUNDARY (TYP.) Typical Non-Corner Lot Detail Typical Corner Lot Detail BETHPAGE DR. 15' MIN. FRONT YARD SETBACK 5' MIN. SIDE YARD SETBACK