HomeMy WebLinkAboutEVERGREEN PARK LOT4 I-L SITE PLAN REVIEW - 50 91A - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWCommunity Planning and Environmental Services Planning Department City of Fort Collins October 8, 1992 Bob Gomez 4533 Moccasin Circle LaPorte, CO 80535 Dear Bob: For your information, attached is a copy of the Staff's comments concerning Evergreen Park Lot # , IL SIte Plan Review, presented before the Conceptual Review Team on October 5, 1992. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any.questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, L&&—, Kirsten Whetstone City Planner KW/gjt — Attachments cc: Tom Peterson, Planning Director Kerrie Ashbeck, Civil Engineer Transportation Department Project Planner File 281 North Colle,;e Avenue • P.O. floc :;SO • Fort Collins. CO 80522-0580 • (303) 221-o750 CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE: October 5, 1992 ITEM: Evergreen Park Lot 4 , IL Site Plan Review APPLICANT: Bob Gomez 4533 Moccasin Circle LaPorte, CO 80535 LAND USE DATA: This is a proposal to expand an existing IL Site Plan to add additional outdoor storage to an approved warehouse use and to expand the use onto the lot to the south. The property is located north of Conifer Street, south of Bristlecone Drive, east of College Avenue at 1314 Red Cedar Circle. COMMENTS: 1. The Zoning Department has made a determination to allow a temporary certificate of occupancy to be issued, for a 2 year time period, once the I-L Site Plan and Utility Plans have been approved. A permanent certificate would be issued only upon completion of the paving and required interior parking lot landscaping. In the meantime, compacted road base will be allowed for this particular use. 2. Please refer to the parking lot landscaping guidelines and handouts when drawing up your landscape plan. The intent of the landscaping ,is to provide a buffer strip around the perimeter of the lot and to screen the outdoor storage area from adjacent properties and streets. Staff would be looking for a mix of deciduous and evergreen trees and shrubs to provide winter screening as well. "3.- -Light-and--Power development charges are based on the size of the site. Lot 3 charges have been paid. Lot 4 charges have not been paid. A separate bill will be sent for these charges, to be paid as a condition of continued service to Lot 3. There will be additional charges if and when a building is constructed on Lot 4. 4. Continue to work with Glen Schlueter at the Stormwater Utility to address all drainage concerns on this property. There was a condition of approval on Lot 3, that the Grading and Drainage Plans be approved by the Stormwater Utility, prior to the issuance of any building permits or certificates of occupancy. As far as I know, your Utility, Grading, and Drainage Plans are not complete at this time. 5. Poudre Fire Authority does not have a problem with the interim road base. They will be concerned about adequate access around the buildings, if and when, they are constructed. 6. Please redraw the entrance gate to accurately reflect the type of gate that is being proposed. The way the gate on the drawing is shown is not acceptable to the Fire Authority. 7. You will have to provide a Knox box to the Fire Authority to put the gate code in, to enable the Fire Authority to access the property in the case of an emergency. 8. A building permit will be required for any additional buildings on these lots. 9. If either building is greater than 5,000 square feet in uncontained area, you will be required to install an automatic fire sprinkler system or divide the interior into smaller areas. 10. Engineering requires that you design, pave, and complete the public improvements (curb, gutter., walk, and pavement) to Red Cedar Circle to the south property line. There is a possibility of a repay agreement to receive reimbursement as other properties in the area develop. 11. A Development Agreement and Utility Plans (including the street design) must be complete and signed prior to the issuance of a temporary certificate of occupancy for the outdoor storage area. Please complete the enclosed "Development Agreement" form as soon as possible. 12. Planning Staff is concerned about screening and buffering of a fairly unsightly use, which outdoor storage tends to be. Staff suggests the use of evergreen trees and shrubs, in addition to deciduous plantings. Security lighting should be down directional with a short cut-off of light to prevent light spillage off -site. 13. Please contact Ken Kirchoff at the Police Department (221- -- -- 6833) for additional information on crime prevention in this area.