Planning Department
September 24, 1991
Jerry Russell
2600 W. Prospect Road
Fort Collins, Co 80525
Dear Mr. Russell:
For your information, attached is a copy of the Staff's comments concerning,
Evergreen Industrial Park Lot 3, that was presented before the Conceptual Review
Team on September 23, 1991.
The comments are offered informally by Staff to assist you in preparing the
detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in
the review process, please feel free to call me at 221-6750.
Sincerely,
Kirsten Whetstone
Project Planner
KW/gjt
Attachment
cc: Tom Peterson, Planning Director
Kerrie Ashbeck, Civil Engineer
Project Planner
File
281 North Colle,e Avenue • P.O. 130N 580 • Fort Collins, CO 80522-0580 • (303) 221-6; 50
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: September 23, 1991
ITEM: Evergreen Industrial Park lot 3
Storage facility for boats, trailers, and rv's
APPLICANT: Jerry Russell
2600 W. Prospect Road
Fort Collins, CO 80525
LAND USE DATA: This is a proposal for a 4800 square foot storage
building...on..a 30,000 square foot lot of the Evergreen Industrial
Park subdivision. The first phase would be for an indoor storage
building. Future phases would include outdoor storage areas and
possibly an additional building for indoor storage. The lot is
proposed to be fenced with a 6' high chain link fence. There would
be not repair facilities, lights, bathrooms, heat, or water on
site.
COMMENTS:
1. The property is currently zoned IL, Limited Industrial, which
allows this use as a use by -right. Any outside storage would
have to be completely enclosed with a fence.
2. The project could either be reviewed as an IL, Site Plan
Review following all of the requirements of the IL Zoning
District, or as a Planned Unit Development (PUD) where the
requirements for landscaping, parking, and site design could
be more flexible. I have attached to this letter, information
on both processes.
3. The parking code would be in effect with the IL Site Plan
__Review. This would require that any areas used for parking of
hi vecles,_ boats,---rv's, etc. be paved -according— to_City_
standards. The landscape requirements for the Site Plan
Review are 1) 5' of landscaping along all adjacent property
lines, 2) 10' of landscaping behind the sidewalk on Red
Cedar Circle, and 3) a minimum of 6% of the interior parking
area shall be landspaped.
4. If you decide to put in lighting or an electric security
system, Light and Power normal development charges would
apply. You can pay for those charges at the time of
construction of phase one, or pay as you get power service.
.Keep in mind that Light and Power charges increase nearly
every year.
5. There are existing water and sewer mains in Red Cedar Circle.
N4
6. A storm water drainage report will be required to be submitted
with your site plan. No on -site detention is required in this
area. The site can be made to drain to the street. If the
drainage will be crossing adjacent properties you will need to
acquire off-site'drainage easements prior to final approval.
Storm drainage fees are $10,000 per acre in this basin. If
you are able to provide on -site detention, the fees may be
reduced. If the parking is gravel, drainage fees could be
reduced by the appropriate run-off .coefficient.
7. The site is not located in the flood plain.
8. The normal building permit submittal will apply. Any building
larger than 5,000 square feet would require special fire
containment construction. A second building would be allowed
as long as the buildings were separated by the required fire
code distance, equipped with fire sprinklers, or meet fire
containment construction requirements and meet the building to
lot ratio as specified in the IL zone (the minimum lot area
shall be the equivalent of 2 times the total floor area of the
building).
9. To meet the fire access code you either need to provide a
minimum drive width of 20' completely circling the building,
or provide a clear emergency vehicle turn around behind the
building (minimum 20' inside radius, 40' outside radius
circle) of approved road base material.
10. Water supply for fire fighting should be adequate in the area,
with the existing fire hydrant locations. If you add a second
building, you may need an additional hydrant closer to the
site. The building needs to be within 400' of a fire hydrant.
The Fire Authority will review your plans to make sure that
you have both adequate access and water supply. Please
indicate existing hydrants on your plans.
11. As this use will create minimal traffic impacts on the
surrounding -neighborhood, no traffic impact study will be _
required. If you submit this project as a PUD, a letter
addressing the expected traffic that this use will generate,
will need to be submitted with your plans. This letter should
indicate the number of trips expected per day or week, as well
as the time of day that these trips will occur.
12. A 4', attached to the curb, sidewalk will be required to be
constructed along this property's street frontage on Red Cedar
Circle. Also, any damaged curb, gutter, and sidewalk along
this property shall be repaired with this request.
13. Street oversizing fees for the proposed storage use are
$5252.00 per acre.
14. The landscaping requirements, especially the interior
landscaping, will be crucial to this project since so much of
the site is paved. Landscaping will require an irrigation
system, most likely necessitating a water tap. Uses which are
existing in the area without landscaping were most likely
approved before there were requirements for landscaping or
were approved in the County. All future development requests
in this area will be required to conform to the same kinds of
landscaping requirements that this project faces. .
15. The Planning Staff will be concerned with the appearance of
the building from the street, as well as the appearance of the
outdoor storage area from the street and adjacent property
lines. Planting a row of drought tolerant trees or high
shrubs behind the fence will effectively screen the outdoor
storage area, as well as the appearance of the chain link
fence.
16. If you anticipate having employees, you will be required to
provide 2 parking spaces for every 3 employees.