HomeMy WebLinkAboutK 2 INDUSTRIAL PARK LOT 1 JB EXCAVATION PDP - 51 91C - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETREVio-ION ROUTING SHCET
mAZ,16
ITEM: -L rvEU .yial4ra�(V,. .18 cc�� i-- Gil-4t�
DATE RECEIVED:
w
F
C.
z
<
w
w
�
o
�
c.
w
¢�
z W o
z En
WEn
z
o
z w
z
z o
F
Z
O r
z o
WJ
w w
FILE: PROJECT PLANNER
ENGINEERING PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER
TECHNICAL SERVICES
FORESTRY
WATER & WASTEWATER/FCLD
PFA
POLICE - LORI DIGLIANI
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
US WEST
PUBLIC SERVICE 'Kll►•
X
?�
SCHOOLS: POUDRE / THOMPSON
AT & T DIGITAL CABLE
CDOT
DITCH COMPANY
RAILROAD: UP or BNSF
REA/DOE/PRPA
Project: 4-1' T�lDl75l'IiZ�Act..�i�+iZ1L
Date:
Planner:
t 5 Ma/e. 0.7
Traffic Operations:
Engineer:
Items Requested
Redlined Items Being Returned
`�
o
`—°
v
°
0
Other Items Required
L
"'
�
of
0
Other Items being
Returned
Engineering
Stormwater
Water/Wastewater
t
Traffic Operations
Transportation Planning
Tra nsfort
Natural Resources
-Planning
>G
Park
TOTALS
Other:
Note: All redlined items should be returned with the resubmittal/revisions.
Project: �'�' T��-- Date: IS DI
Planner:�� �'T Traffic Operations: Engineer:
J �\
Items Requested
Redlined Items Being Returned
J
a
0
2
Other Items Required
(Q
�
v
r y
.�
o
Other Items being
Returned
En ineerin'
t
1
�, -
Stormwater
Water/Wastewater
Traffic Operations
Transportation Planning_
Transfort
Natural Resources
>G
Park Planning
TOTALS
Other:
Note: All redlined items should be returned with the resubmittal/revisions.