March 20, 2000
Jim Bath
Bath Excavating Company
1801 McLaughlin Lane
Fort Collins, CO. 80525
Dear Jim,
For your information, attached is a copy of the Staff s comments
concerning the request for Bath Excavating Company, which was
presented before the Conceptual Review Team on March 6, 2000.
This is a request for an excavation, company operation on one of two
properties located on the North Frontage Road on the east side of
Interstate 25, north of East Vine Drive, and just south of the Eaton
Ditch:: One property being considered is 1012 North Frontage Road, a 2.2
acre site, and the other is 1118 North Frontage Road, a 5 acre site. The
facility would be used for parts& equipment storage and maintenance of
equipment. There would be 5 office employees daily on -site. The property
is in the I - Industrial Zoning District.
The comments are offered informally by, Staff to assist you in preparing
the detailed components of the project application. Modifications and
additions to these.comments may be made at the time of formal review of
—_-- .
t i§is project-----
If you should have any questions regarding these comments or the next
steps in the review process, please feel free to call me at 221-6341.
Si erOlely�p
Si
S eve t,
Project Planner
cc: Stormwater Utility
Streets
File
9
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580. • (970) 221-6750 • FAX (970) 416-2020
2 #f
CONCEPTUAL REVIEW STAFF COMMENTS
City of Fort Collins
MEETING DATE:
ITEM:
APPLICANT:
LAND USE DATA:
March 6, 2000
Bath Excavating Company
Jim Bath
Bath Excavating Company
1801 McLaughlin Lane
.Fort Collins, CO.,80525
Request. for an excavation company operation on one of two properties
located on the North Frontage Road on the east side of Interstate 25,
north of East Vine Drive, and just south of the Eaton Ditch. One property
being considered is.10.12. North. Frontage -Road, a 2.2 _acre site, and .the
other is 1118 North Frontage Road, a 5 acre site. The, facility would be
.used .for parts & equipment storage and maintenance of equipment.
There ,would be 5 office employees daily.*on-site.. The property is in the I -
Industrial Zoning District. ;
COMMENTS:
1. Gary Lopez of the Zoning.Departmentt offered the following
comments: .
a. This property. is, in the I - Industrial Zoning District and is
subject to the requirements in that district of the City's Land
Use Code (LUC). Offices with exterior storage are permitted
in the I - District, subject to an administrative (Type I) review
and public hearing.
b. If any modifications of standards in the LUC are needed then
the request. becomes a Planning and,Zoning Board (Type II)
review and public hearing
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES
CURRENT PLANNING DEPARTMENT
281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
2.
C. The outdoor storage will be subject to the screening
requirements as set forth in Section 3.2.1(E)(6) of the LUC.
d.._ Section,3.2.2p) of.the LUC states that.any vehicular use
area containing 6 or more parking'spaces or 1,800 or more
square feet shall be set back from the street right-of-way and
the side and rear yard lot line consistent with the provisions
of the section.
e.. Section 3.2.2(1))(3)(d) of the LUC states that all open off-
street parking and vehicular use areas shall be surfaced with
asphalt, concrete or other material in conformance with the
City's specifications.,
f. The normal landscaping requirements as set forth in Section
3.2.1" of the LUC will apply to this development.
Please contact Gary, at 221-6760, if you have questions about
these comments.. j
Marc McCAllum of the Engineering Department offered the -
following comments:
a. A Transportation Impact Study (TIS) would be required with
your Project Development Plan (PDP) submittal. Please
contact Eric Bracke of the Traffic Engineering Department,
at 224-6062, for information about what would be required
in the TIS. Also, contact Kathleen Reavis of the
Transportation Planning Department, at 224-6140, for
information about what would be -required for a multi=modal
level of service study (bicycles, pedestrians, and public
transit) as part of the TIS.
b. The Colorado Department of Transportation (CDOT) will need
to review and (possibly) approve,.this development request. It
is possible that CDOT will require that a State Access Permit
be issued for this project.
C. Street improvement to the North Frontage Road may be
required with this development request. CDOT would be
involved with this.
d. Street oversizing fees will apply to this development. The fee
would be collected at the time of issuance of a building
permit. The fee is based on the proposed land use and
vehicle trips generated by the development. Please contact
Matt Baker, at 224-6108, for detailed information on the
fees.
e. The property must be subdivided into one or more lots and
legally platted, if it is not already, for development to occur.
f. A Development Construction Permit must be issued by the
City before work can start on the site.
g.. :. The standardutility plan submittal requirements, with the
Project Development Plan (PDP), will apply to this
development request.
h. The. submittal requirements will. be determined when the
actual site is selected.
Please contact Mark, at 221-6750, if you have questions about
these comments.
3. Janet McTague of the' Light_& Power Department offered the
following comments:
a. There is. existing City power at County Road 50 (Mountain
Vista) and I-25. It stops north of the Eaton Ditch and is on
the east side of the Frontage Road. Crossing the ditch with
electric service could be difficult iAlso, the City must serve
power to.this site/
b. The normal electric development. charges (based on building
square footage and property front footage) will apply to this
project if the property, at 1118 North. Frontage Road is
selected. Nothing new needs to,be.'done'if the property at
1012 North Frontage Road is selected.
Please contact Janet, at 221-6700, if you°have questions about
these comments:
4. Roger: Buffington of the Water/Wastewater Department stated
that water and sanitary sewer for this development would be
served by the East Larimer. County Water. District and the Boxelder
Sanitation District.:. .::.:. .
5.. Glen Schlueter of the Stormwater Utility offered the following
comments:
1012 North Frontage Road
a. This site is located in the Cooper Slough/Boxelder Drainage
Basins, where there is not presently a new development fee.
HoweYer,;,a master, plan study will begin this year and fees
will be initiated at some point. The site is located in
Inventory Grid# 16F.
b. This site is grandfathered in as long as there are no .
improvements that would cause a rise. in the 100-year water
surface elevation. The site is in the no -rise Boxelder
floodplain,, which is a _FEMA floodplain.
c. Water quality extended detention is, required.to treat the
runoff if any new:pavementas:added to the site. More
impervious area would also trigger the need for a drainage
report to address the increased runoff. The outfall for the
runoff would also bean issue if there rare no drainage
easements or public rights -of -way -to contain it.
d. A floodplain use permit is needed to document the existing
conditions.
e. A grading plan would be needed, for any landscaping or
paving changes required with change, in use.
f. If improvements to the existing structure are in excess of
50% of the existing value, the structure would have to be
floodproofed to 18" above the 100-year floodplain.
g. The site is developed and is located immediately adjacent to
the south of the 5 acre piece.
1118 North. Frontage Road
a. This site is located in the Cooper Slough/Boxelder Drainage
Basins, where there is not presently, a new development fee.
A• drainage master planning -study will• begin this year and
fees willeventually be needed to pay'for improvements
identified in the master plan.
C. The standard drainage and erosion control reports and plans
-are required and they must be prepared by a professional
engineer registered in the State of Colorado.
c. Water quality extended detention'would be required for any
new paved areas. -
d. A new development would have to. show no -rise with HEC-2
.modeling since the site is in the Boxelder floodplain.
Commercial buildings need to be floodproofed to 18" above
the 100-year water surface elevation. �Please contact.Marsha
Hilmes-Robinson, at 224-6036,'for detailed requirements.
Marsha is the City's Floodplain Administrator.
e. A.floodplain.use permit is required: Boxelder-is a FEMA
designated floodplain, so major changes may require FEMA
approval.
f. A drainage outfall point system that is within drainage
easements or public rights -of -way would need to be defined
and sized for this site to drain. This would have to be to the
"natural" drainageway.
g.— The irrigation lateral owner would need to approve the —
construction plans or provide'"a separate agreement.
h. Copies of the Floodplain Use Permit 'application and the
Substantial Improvement Policy are enclosed with this
comment letter.'
Please contact Glen, at 224-6065, if you have questions. about
these comments. .
r
6. Kim Kreimeyer, the City's Natural Resources Planner, offered the
following comments:. .
a. There could be wetlands. on the sites and, if so, they must .be
delineated. by an environmental consultant.
br The Lady Trusses Orchid Study is required for this
development request.
7.
C. An Ecological Characterization Study, dealing partially with
a potential wildlife movement corridor along the Eaton Ditch,
is required for this development request. Please see Section
3.4.1 of the. LUC.
d. A fugitive dust permit is required and will be issued by the
Larimer County Health Department.
e. Native plant materials and grasses should be used and
bluegrass should be minimized, if used at all.
f. Adequate dumpster space should be provided to allow for a
recycling bin.,Please�use.a single trash. hauler:
g. If there are prairie dogs on -site they must be humanely
eradicated prior to beginning construction on .the site.
Please contact Kim, at 221-6641, if you have questions about these
comments.
Tom Cook of Transportation Planning stated that the applicant
-must.submit. a Transportation-ImpactStudy, apply. for a-C-DOT
Access Permit, and provide for adequate bicycle/pedestrian
connections between the site and surrounding properties. Please
contact Tom, at 416-2040, if you have questions about these
comments.
Ken Waido of the Advance Planning Department stated that the
City is working on an I-25 Corridor Stud}
affect these properties.
r
9. This development request will be subject to the Development
Review Fee Schedule that is available in the Current Planning
Department office. The fees are due at the time of submittal of the
required documents for the appropriate development review
process.
10. This development proposal is subject to all applicable requirements
as set forth in the City's LUC, more specifically Articles 2.
Administration (Development Review Procedures), Article 3.
General Development Standards, and Article 4. [Zoning] Districts.