STAFF PROJECT REVIEW
Date: 10/24/01`�,f�
Staff has reviewed your submittal for K-2 INDUSTRIAL PARK - JB EXCAVATION,
#51-91 C, and we offer the following comments:
ISSUES:
Department: Current Planning
9
Issue Contact: Steve Olt
A copy of a letter from Mayo Sommermeyer of the Larimer & Weld Irrigation
Company is attached to this comment letter.
11
Issue Contact: Steve Olt
Alan Rutz of the Light & Power Department offered the following comments:
a. The applicant will be required to obtain a permit from the affected ditch company
to, cross the Larimer & Weld Canal.
b. The applicant will also be required to obtain easements from the Larimer & Weld
Irrigation Company for electric line extension to the project site.
c. Coordinate transformer location(s) and power requirements with Light & Power.
d. Due to the location of this site and the easement & permit requirements, please
contact. Light & Power as soon as possible. -
Please contact Alan, at 224-6153, if you have questions about these comments.
14
Issue Contact: Steve Olt
Webb Jones of the East Larimer County (ELCO) Water District offered the following
comments:
a. ELCO currently provides water service to Lot 1, K-2 Industrial Park from a 2%"
water line located in the easement shown on the Site Plan. The existing 2'/2" water
line serving the property is not capable of supplying a fire hydrant.
Page 1
a
b. ELCO has a 6" water line in County Road 48 and a 24" water. line on the north
side of the Larimer & Weld Canal, approximately '/< mile north of the site.
Please contact Webb at the water district if you have questions about these
comments.
17
Issue Contact: Steve Olt
Mark Jackson of the Transportation Planning Department offered the following
comments:
a. Provide bike parking near the main entrance to the buildings.
b. Contact the Colorado Department of Transportation (CDOT) Access
Management staff to discuss access issues/requirements off of the frontage road
system.
c. Transportation Planning would recommend that the applicant contact Ken Waido
of the City's Advance Planning Department to get information on the 1-25
Corridor Subarea Plan and how or if it might affect this property in the future.
Please contact Mark, at 41672029, if you have, questions about these comments.
Issue Contact: Steve Olt
It appears that this development request is ready to be scheduled for an
administrative public hearing. Please contact me at 221-6341 to determine the date
and time for the public hearing.
Department: Engineering
64
Issue Contact:- Susan Joy --
Cover Sheet: You can include the Plat in the Index, just don't number it.
Department: Light & Power
59
Issue Contact: Alan Rutz
Applicant is not planning any change to existing load at this time. No comment
unless applicant is adding or changing existing electric load.
Page 2
Department: Natural Resources
62
Issue Contact: Doug Moore
Show buffer around offsite windbreak
• If the offsite windbreak is shown on plans the 25' buffer that is required by the
Land Use Code needs to be shown as well
Department: Police
0
2
Issue Contact: Joseph Gerdom
Plans do not indicate lighting. Some type of down lighting desirable for north and
south entrances. Security lighting for area between buildings.
61 Issue Contact: Joseph Gerdom
Lack of lighting and type of landscaping between office and garage will increase
potential security problems
Department: Stormwater Utility
66 Issue Contact: Basil Hamdan
Floodplain Comments:
Please document the building improvements will -exceed 50% of the value of the
current building. If they do, then the Substantial Improvement policy would be
applicable. The building would then need to be floodproofed.
Prior to obtaining a building permit a floodplain use permit should be submitted to
the Floodplain Administator.
-- —67 -
Issue Contact: Basil Hamdan
Report:
Please provide 3 signed and stamped copies of the drainage report with a drainage,
grading and erosion control plan enclosed for signature.
68 Issue Contact: Basil Hamdan
Erosion Control:
Plan is OK. Thank you
Page 3
Department: Transportation Planning
65 Issue Contact: Mark Jackson
Add curb stops to the new parking spaces that are flush with the sidewalk
Add curb stops to the new parking spaces that are flush with the parking lot. area
This project is considered ready to be scheduled for an administrative public
hearing. Contact Steve Olt, at 221-6341, to determine the date and time for the
hearing. Please submit revisions in response to the attached Revisions Routing
Sheet as soon as possible to ensure that all issures are resolved prior to the public
hearing. Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to -this
project, please feel free to call me at (970) 221-6341.
Yours Truly,
Al
A E OLT
City Planner
Page 4